Upload
nasapmc
View
12.813
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Citation preview
New Frontiers
Discovery
1February 2010
National Aeronautics and Space Administration
Donna Patterson, Digital Fusion
D&NF Business Manager
Project Management Challenge2011
Discovery and New Frontiers Project Budget Report Process
Used with permission
New Frontiers
Discovery
Programs Overview
2
• Uncoupled program addressing high-priority science objectives in solar system exploration• Frequent opportunities for science community to propose full investigations• Fixed-price cost cap (cradle to grave), excluding the launch vehicle• Full and open competition• Principal Investigator-led project
• Established in 1992• $425M cap per mission (FY09)• Mission opportunities every 18 to 24 mos• Open science competition for all solar
system objects, except for the Earth and the Sun
• Established in 2003• $625M cap per mission (FY10)• Mission opportunities every 42 to 52
mos• Addresses high-priority investigations
identified by the National Academy of SciencesFebruary 2010
New Frontiers
Discovery
October 23, 2007 3
Juno
Mars Pathfinder
CONTOUR
ASPERA-3 on Mars Express
D&NF Science Mission Targets
– The Moon (Lunar Prospector, M3, GRAIL)
– Mars (Mars Pathfinder, ASPERA-3)
– Inner Planets (MESSENGER, Strofio)
– Outer Planets (New Horizons, Juno)
– Comets (CONTOUR, Stardust, Deep Impact, EPOXI, NExT)
– Asteroids (NEAR, Dawn)
– Interplanetary Space (Genesis)
– Extra-Solar System (Kepler)
Dawn
Genesis
Stardust
MESSENGER
NEAR
M3 on Chadrayaan-1
New Horizons
Kepler
GRAIL
Lunar Prospector
Strofio on BepiColombo
New Frontiers
Discovery
4
Project Life Cycle
February 2010
AO Development
Step 1 Step 2
Phase A Phase B(Preliminary Design)
Phase C(Detailed Design)
Phase D(Development)
Phase E(Operations & Data
Analysis)
Formulation Implementation
Draft AO Release
Science/Mission Selection led by SMD Program Implementation led by Discovery Program Office
AO Development AO Implementation
Step 1 Step 2
Phase A(ConceptStudies)
Phase C(Detailed Design)
Phase D(Development)
Phase E(Operations & Data
Analysis)
Formulation Implementation
CR
Competitive Selection
Science/Mission Selection led by SMD
KDP A
KDP B KDP C KDP D KDP E KDP F
CSR Evaluation
CSR
Final AO Release
Phase B(Preliminary Design)
Program Implementation led by D&NF Program Office
Initial Cost Proposal
Final Cost Proposal
Project Confirmed Cost
AnnualPPBE Submit
AnnualPPBE Submit
AnnualPPBE Submit
AnnualPPBE Submit
AnnualPPBE Submit
AnnualPPBE Submit
AnnualPPBE Submit
New Frontiers
Discovery
Program Organization
Phase B, C, D, E
Confirmation Review at end of Phase B
Decision Authority makes confirmation decision
PM becomes heavily engaged following selection
D&NFProgram Director
Mission Program Scientist
D&NFProgram Manager
Principal Investigators
Programmatic Reporting& Accountability
Scientific Reporting& Accountability
NASA Headquarters
MissionProgram Executive
Lead Program
Scientist
Project Manager(Implementing Organization)
NASA Ctr. CMC or Appointed Board
Program Office
Projects
LeadProgram Executive
Mission Manager
Associate Administrator for the
Science Mission Directorate (SMD)Governing PMC
New Frontiers
Discovery
6
Budget Process: Interfaces and Interactions
February 2010
Responsibilities
• Provide Monthly Reports• Identify liens and threats• Identify reserves• Identify workforce• Submit PPBE input• Track project cost agreements• Report cost agreement changes• Monitor project performance against total cost• Prepare 533s or enter IEMP data, if applicable
Responsibilities• Track all project funding and cost• Provide monthly budget performance presentations to HQ, PO, MSFC CFO • Request fund transfer within Program implementation budget• Develop detailed Program, Planning, Budgeting and Evaluation (PPBE) Plans and Operating Plans for the Program, integrate for projects• Monitor MSFC contracts, including 533M input• Integrate 533/IEMP data and monthly reports• Maintain PBRs
Responsibilities
• Advocate/justify program and budget• Execute funds consistent
with Operating Plan, appropriation actions, and law• Transfer approved budgeted funds• Administer HQ held futures and other program-level budgets• Review/revise recommended budget
Project Offices
Program Office
Headquarters
533s or IEMP data
Implementation budget request,Project requests
(PPBE)PPBE input info
Monthly reportsMonthly report roll-up
Budget drill actions
Budget drill responses
Budget and Operating Plan
guidelinesNotify of funding
authorization
Funding transfer notice
Coordinate funding transfers (PRs)
Operating Plan
Implementing Organizations(Project Related)
Responsibilities• Input IEMP data
Fun
ding
PP
BE
Inp
ut
Fun
ding
Aut
horiz
atio
n N
otic
e
Implementing Organizations(Non-project Related)
Responsibilities• Input IEMP data
Cos
t Pha
sing
Pla
ns Fun
ding
PP
BE
Inpu
t
Maintain PBRs Maintain PBRs
New Frontiers
Discovery
7
Project Budget Report Process Motivation
February 2010
• Due to the timing of official budgetary documents, budget changes inevitably occur up to the printing of the Program Resource Guidance (PRG)
• Preparing the Program Planning Budget Execution (PPBE) and other budget submits in this environment can be a complex, time-consuming, and a frustrating activity
– Reconciling the project budget history at the program and project levels– Identifying and correcting errors– Ensuring 100% confidence in each project budget
• Additionally, the lack of clear, complete trace of project budget changes hinders program office ability to study project cost increases
– Understanding the drivers behind cost increases– Tracing the effects of NASA process changes on life cycle cost
Solution: Project Budget Report (PBR) and Quarterly Budget Status (QBS) processes
New Frontiers
Discovery
8
Project Budget Report (1 of 3)
February 2010
• Used to document and communicate each project’s funding profile and adjustments over the life of the project− Created and maintained by the Program Office (PO)− Distributed by the PO to Headquarters (HQ) and projects− A budget tracking tool, not a funding authorization by NASA
• PBR serves as an acknowledgement of the approved project new obligation authority (NOA) profile and any adjustments made to the profile− Issued at the beginning of each fiscal year and revised throughout the year to
capture all funding changes− Supporting documentation referenced− Explanatory comments included to provide understanding and traceability− Has played a major role in helping to prevent budget and funding misunderstandings
and errors− Signed by the Principal Investigator (when applicable), Project Manager, Program
Manager, and Program Director at the beginning of each FY and after a project re-plan or major funding adjustment
• Documents a project’s life cycle cost by fiscal year, phase, and implementing organizations
New Frontiers
Discovery
9
Project A Project AFY 2010 FY 2010
CTR: PROJECT #: PLRA: ANALYST: UPN: REV: 1
PHONE: DATE: 5/4/2010CURRENT APPROVED PROJECT LIFE CYCLE COST PROFILE FY2010
TOTAL BASELINE$K FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC LCC COST CAP
TOTAL PROJECT 260,059.000 485,848.000 237,173.000 152,768.000 21,424.000 14,381.000 17,800.000 18,080.000 17,839.000 84,687.000 1,050,000.000 1,050,000.000
JPL 204,987.886 397,434.743 168,728.331 68,048.000 21,424.000 8,053.000 11,820.000 12,102.000 11,286.000 40,236.000 739,132.074GSFC 2,251.764 5,174.764 4,287.236 715.000 138.000 478.000 486.000 590.000 2,665.000 14,534.000KSC 46,000.000 51,600.000 59,400.000 79,400.000 190,400.000
MSFC/SwRI 6,725.000 31,500.943 4,668.000 4,605.000 6,190.000 5,502.000 5,492.000 5,963.000 41,786.000 105,706.943JSC 43.200 43.200
MSFC 94.350 94.350 89.433 183.783FUNDING PROFILE DESCRIPTION / EXPLANATION:
1st QTR FUNDING PROFILE ADJUSTMENT #1TOTAL
Center FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC ADJUSTMENTTOTAL ADJ
JPL (5.000) (5.000) 4200316052APL 5.000 5.000 4200317845
Adjustment #1 Explanation:Transfer $5K to APL to set up Government Bill of Lading (GBL) account.
2nd QTR FUNDING PROFILE ADJUSTMENT #1TOTAL
Center FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC ADJUSTMENTTOTAL ADJ
JPL 4,186.000 (1,000.000) 3,186.000 GSFC 214.000 214.000 KSC (4,400.000) 1,000.000 (3,400.000)
Adjustment #1 Explanation:
ADJUSTED PROJECT LIFE CYCLE COST (NOA) PROFILE FY2010
TOTAL BASELINE$K FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC LCC COST CAP
TOTAL PROJECT 260,059.000 485,848.000 237,173.000 152,768.000 21,424.000 14,381.000 17,800.000 18,080.000 17,839.000 84,687.000 1,050,000.000 1,050,000.000
JPL 204,987.886 397,434.743 172,909.331 67,048.000 21,424.000 8,053.000 11,820.000 12,102.000 11,286.000 40,236.000 742,313.074GSFC 2,251.764 5,174.764 4,501.236 715.000 138.000 478.000 486.000 590.000 2,665.000 14,748.000KSC 46,000.000 51,600.000 55,000.000 80,400.000 187,000.000
MSFC/SwRI 6,725.000 31,500.943 4,668.000 4,605.000 6,190.000 5,502.000 5,492.000 5,963.000 41,786.000 105,706.943JSC 43.200 43.200
MSFC 94.350 94.350 89.433 183.783APL 5.000 5.000
FUNDING PROFILE DESCRIPTION / EXPLANATION:As per KDP-C decision and memorandum, the project management (internal to NASA) approved LCC is $1050M, while the Agency/MD externally reported LCC is $1107M.
The Agency/MD externally reported $1107M includes $57M for the IPAO 70% Cost Confidence Level, which is reported under the Unallocated Future Expenses (UFE) budget line, andto be managed by HQ/SMD. The $57M for UFE is neither managed by nor made available to the project without prior approval from either the DPMC or the APMC.
Phase E
NEW FRONTIERS PROGRAM
ADJUSTED PROJECT BUDGET REPORTJPL
Jane Doe
PR#
PR#
Phase E
Phase E
Phase EPhase C/D Phase C/D
Phase C/D
112233132-46. 678-90
Phase C/D
Phase C/D Phase C/D
(256) 961-0000
FY10 KSC funding decrease in the amount of $4.4M due to $3.4M LV price reduction, plus a $1.0M loan to be paid back from JPL in FY11. Out of the $4.4M total transfer, $214K will go to GSFC for the addition of an instrument manager and the balance of $4.186M will go to JPL to help replenish the reserve profile.
Phase C/D Phase C/D
Project Budget Report (2 of 3)
February 2010
EXAMPLE
New Frontiers
Discovery
10
Project Budget Report (3 of 3)
February 2010
FY2010 MILESTONE SCHEDULE
ADDITIONAL COMMENTS
APPROVAL SIGNATURES:
PRINCIPAL INVESTIGATOR DATE PROGRAM MANAGER DATE
PROJECT MANAGER DATE PROGRAM DIRECTOR DATE
1) Juno project profile as reflected above as the Approved LCC profile does not include $107K of funding re-routed to Juno from DSN for CFDP software compliance. Juno received this funding in FY2007.
2005 2006 2007 2008 2009 2010 2011 2012
FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12
JUNO Top Level Schedule
Phase B (33 mths) Phase C (20 mths) Phase D (16 mths) Phase E (thru 10/2018)
11/28ATP
10/24CRR
5/21PMSR
5/12PDR/NAR
7/15
CR
8/5KDP-C IBR
2/33/4
SIR4/1KDP-D
8/31ERR 3/2
PSR8/4LRR
10/4PLAR
4/20
CDR 9/28Deep Space Maneuver7/7FRR
SYSTEM ENG Requirements 1/19BL-L2 PSRD
5/1P-L2 PSRD
8/30F-L2 PSRD
V&V Plan (F)FS/LV ICD (F) EPDT Plan (F) JOISRLSR p2 PP Pre-Launch Rpt (F)
7/1 Flight Instr Req'd for Inst'l
PAYLOAD Requirements & Preliminary Design Refer to Payload Schedule for Details
FLIGHT SYSTEM
Requirements/Trades/Analysis & Risk Reduction Preliminary Design Detail Design
2/19 2/26 PDDU ATU
PIU Flight Box
POWERPDDU
Design/Procurements Fabrication Assy & Test 3
FT Wing#2
#1Solar Cell Testing/LL Proc 2/11 1/26 9/4
C&DH EDU#1
7/19C&DH BC&DH
CCA IRAD Dev/EGSE Cap Dev EDU Dev Assembly & Test ATU #1 #2 C&DH A8/17
2/4 1/21 7/6 Vault Pnl to JPLTELECOM
SDST Proc Preliminary Design/LL Proc Detailed Design Fabricate & Test4/9
2/25 2/10 LEGEND:MECHANICAL &STRUCTURES
Configuration Trades Design Dev / Fab & Assy Test Vault4/5
= PDR
Struc to Prop = CDR4/28
Prop/Struc = Payload Del'y
3/5 2/17PROPULSION = Funded Margin
Preliminary Design/LL Proc Design Procure Tanks, Main Engine & REMs= Critical Path
Prop/Struc Integ = Milestone
SRU RFP SRU Study Contract SRU PDRs 5/13 3/5 = Complete MilestoneGN&C
SRU LL Procurement Fab Material SRU Assy & Test8/31
IMU/SUN Procure 4/22
FLIGHT SOFTWARE#1 AAC
3/17GIF CMIC #0
3/2#3 #4 #4.1#5 #6
IRAD Board & Box SW FSW Development FSW Builds
TESTBEDS S/C Emulators (Plyd Dels)1st SCE Del Final SCE Del
3/4
STL#1
STL Cert#2 #2 #1
4/1 7/1Instruments to ATLO
8/5LAUNCHASSY, TEST &
LAUNCH OPS 3/11 SS I&T Pld Env Test Sys
Launch Ops Launch Period (8/5-8/26)
3/24MDNav
7/14MOS
2/19MDNav
9/15MOS
6/7 ORR 10/13
MS PR3/22
Ops Cncpt4/27L3 K&D
Training
MISSION SYSTEM Trade Studies Requirements10/5
P-L3 3/24F-L3 MD/NAV
7/14F-L3/P-L4 MOS
7/27F-L4
#3 #3.17/28
3.2 #4 ATLO Del #5 #6 Launch Del
Ground Data System Engineering GDS SW Development #7 Contingency
2005 2006 2007 2008 2009 2010 2011 2012
FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12
JUNO Top Level Schedule
Phase B (33 mths) Phase C (20 mths) Phase D (16 mths) Phase E (thru 10/2018)
11/28ATP
10/24CRR
5/21PMSR
5/12PDR/NAR
7/15
CR
8/5KDP-C IBR
2/33/4
SIR4/1KDP-D
8/31ERR 3/2
PSR8/4LRR
10/4PLAR
4/20
CDR 9/28Deep Space Maneuver7/7FRR
SYSTEM ENG Requirements 1/19BL-L2 PSRD
5/1P-L2 PSRD
8/30F-L2 PSRD
V&V Plan (F)FS/LV ICD (F) EPDT Plan (F) JOISRLSR p2 PP Pre-Launch Rpt (F)
7/1 Flight Instr Req'd for Inst'l
PAYLOAD Requirements & Preliminary Design Refer to Payload Schedule for Details
FLIGHT SYSTEM
Requirements/Trades/Analysis & Risk Reduction Preliminary Design Detail Design
2/19 2/26 PDDU ATU
PIU Flight Box
POWERPDDU
Design/Procurements Fabrication Assy & Test 3
FT Wing#2
#1Solar Cell Testing/LL Proc 2/11 1/26 9/4
C&DH EDU#1
7/19C&DH BC&DH
CCA IRAD Dev/EGSE Cap Dev EDU Dev Assembly & Test ATU #1 #2 C&DH A8/17
2/4 1/21 7/6 Vault Pnl to JPLTELECOM
SDST Proc Preliminary Design/LL Proc Detailed Design Fabricate & Test4/9
2/25 2/10 LEGEND:MECHANICAL &STRUCTURES
Configuration Trades Design Dev / Fab & Assy Test Vault4/5
= PDR
Struc to Prop = CDR4/28
Prop/Struc = Payload Del'y
3/5 2/17PROPULSION = Funded Margin
Preliminary Design/LL Proc Design Procure Tanks, Main Engine & REMs= Critical Path
Prop/Struc Integ = Milestone
SRU RFP SRU Study Contract SRU PDRs 5/13 3/5 = Complete MilestoneGN&C
SRU LL Procurement Fab Material SRU Assy & Test8/31
IMU/SUN Procure 4/22
FLIGHT SOFTWARE#1 AAC
3/17GIF CMIC #0
3/2#3 #4 #4.1#5 #6
IRAD Board & Box SW FSW Development FSW Builds
TESTBEDS S/C Emulators (Plyd Dels)1st SCE Del Final SCE Del
3/4
STL#1
STL Cert#2 #2 #1
4/1 7/1Instruments to ATLO
8/5LAUNCHASSY, TEST &
LAUNCH OPS 3/11 SS I&T Pld Env Test Sys
Launch Ops Launch Period (8/5-8/26)
3/24MDNav
7/14MOS
2/19MDNav
9/15MOS
6/7 ORR 10/13
MS PR3/22
Ops Cncpt4/27L3 K&D
Training
MISSION SYSTEM Trade Studies Requirements10/5
P-L3 3/24F-L3 MD/NAV
7/14F-L3/P-L4 MOS
7/27F-L4
#3 #3.17/28
3.2#4 ATLO Del #5 #6 Launch Del
Ground Data System Engineering GDS SW Development #7 Contingency
EXAMPLE
New Frontiers
Discovery
Project Phase C/D: Fiscal Year 2010
Example:
1st Qtr Jan JulApr2nd Qtr 4th Qtr3rd QtrOct
2010 Center Funding Re-allocations October - September
2010 Operating Plan October
PPBE2012 Budget Cycle, PRG received from HQ March
PPBE2012 Project over-guide submit April
PBR
Updated
PPBE2012 Final Budget Approval May
Final PBR released for signatures and becomes starting point for FY11
September
PBR
Updated
Budget Profile Changes
Signed
PBR
Major Project Re-plan July
Signed
PBR
New Frontiers
Discovery
12
Quarterly Budget Status (1 of 3)
February 2010
• Reflects the current fiscal year budget transactions, including any adjustments to the approved NOA and distributions − Reports the current fiscal year only− Reflects NOA, any adjustments, and funding distributions by Center− Reports are distributed to HQ, PO, and Project Manager/Principal Investigator
• Comments are added to fully document the reasoning or purpose of any adjustment to the approved NOA to maintain our understanding of the profile and any changes to the profile over the life of the project
• QBS is not signed; distributed quarterly by the PO
• QBS has improved the tracking and analysis of the current fiscal year funding levels− Reports detail funding transactions for all project partners− QBS (and PBR) creates a funding trace for each project− Provides details of all funding transactions during current FY− Like the PBR, has played a major role in helping to prevent budget and funding
misunderstandings and errors
New Frontiers
Discovery
13
Project A QUARTERLY BUDGET STATUS (QBS) Project AFY 2010 2nd QUARTER FY 2010
($K) DATE: PROJECT LCC ($K)
237,173.000 PROJECT #: $1,050,000.000237,173.000 ANALYST:
226,379.135 PHONE:10,793.865
-
($K)168,728.331
4,181.000 FY 2010 Month PR Number PY Fund
1st Qtr ADJ # 1 (5.000) Oct FY10 4200316052 2010 SCEX22010D
2nd Qtr ADJ # 1 4,186.000 Jan FY10 2010 SCEX22010D
172,909.331
162,329.466 FY 2010 Month PR Number PY Fund
1st Qtr DIST # 3 26,751.764 Oct FY10 4200316052 2010 SCEX22010D
1st Qtr DIST # 4 30,000.000 Nov FY10 4200318506 2010 SCEX22010D1st Qtr DIST # 10 7,419.000 Dec FY10 4200321816 2010 SCEX22010D1st Qtr DIST # 11 976.000 Dec FY10 4200323008 2010 SCEX22010D2nd Qtr DIST # 13 7,600.000 Jan FY10 4200324160 2010 SCEX22010D
2nd Qtr DIST # 15 89,004.879 Jan FY10 4200326295 2010 SCEX22010D2nd Qtr DIST # 20 577.823 Feb FY10 Not Assigned 2010 SCEX22010D
10,579.865
($K)4,287.236
214.000 FY 2010 Month PR Number PY Fund
2nd Qtr ADJ # 1 214.000 Jan FY10 2010 SCEX22010D
4,501.236
4,287.236 FY 2010 Month PR Number PY Fund
1st Qtr DIST # 1 2,248.236 Oct FY10 2010 SCEX22010D
1st Qtr DIST # 2 340.000 Nov FY10 2010 SCEX22010D
1st Qtr DIST # 9 450.000 Dec FY10 2010 SCEX22010D
2nd Qtr DIST # 14 1,249.000 Jan FY10 2010 SCEX22010D214.000
Budget Distribution
Budget Distribution
WBS Comments
Budget Distribution
$3.4M LV Price reduction. Transfer $4.186M to JPL (reserves) and
$214K to GSFC for addition of Instrument Manager. JPL to repay $1M in FY11.
WBS Comments
804068.01.01 Budget Distribution
804068.01.01 Transfer $5K to APL to set up Government Bill of Lading (GBL) account.FY10 KSC funding decrease in the amount of $4.4M due to $3.4M LV price reduction, plus a $1.0M loan to be paid back from JPL in FY11.
CommentsWBS
804068.01.01 Budget Distribution
Comments
TOTAL ADJUSTMENTS
QBS FY10 ADJUSTED NOA
TOTAL DISTRIBUTIONS
TOTAL UNDISTRIBUTEDTOTAL FORWARD FUNDING
TOTAL FORWARD FUNDING
PBR FY10 ADJUSTED NOA
TOTAL PROJECT
PBR FY10 ADJUSTED NOA QBS FY10 ADJUSTED NOA
TOTAL DISTRIBUTED TOTAL UNDISTRIBUTED
JPL
WBS
QBS FY10 ADJUSTED NOA
TOTAL DISTRIBUTIONS
5/4/2010
112233Jane Doe
(256) 961-0000
804068.01.01 Budget Distribution
GSFCPBR FY10 ADJUSTED NOA
TOTAL ADJUSTMENTS
Budget DistributionTOTAL UNDISTRIBUTED
TOTAL FORWARD FUNDING
804068.01.01804068.01.01 Budget Distribution
Budget Distribution
804068.01.01
804068.01.01
Budget Distribution
Budget Distribution
Quarterly Budget Status (2 of 3)
February 2010
EXAMPLE
New Frontiers
Discovery
14
Quarterly Budget Status (3 of 3)
February 2010
($K)59,400.000(4,400.000) FY 2010 Month PR Number PY Fund
2nd Qtr ADJ # 1 (4,400.000) Jan FY10 2010 SCEX22010D
55,000.00055,000.000 FY 2010 Month PR Number PY Fund
1st Qtr DIST # 7 14,100.000 Oct FY10 2010 SCEX22010D1st Qtr DIST # 8 4,000.000 Nov FY10 2010 SCEX22010D1st Qtr DIST # 12 4,000.000 Dec FY10 2010 SCEX22010D2nd Qtr DIST # 17 32,900.000 Jan FY10 2010 SCEX22010D
-
($K)4,668.0004,668.0004,668.000 FY 2010 Month PR Number PY Fund
2nd Qtr DIST # 16 997.000 Jan FY10 4200324473 2010 SCEX22010D2nd Qtr DIST # 18 2,964.433 Feb FY10 4200329000 2010 SCEX22010D2nd Qtr DIST # 19 706.567 Feb FY10 4200318902 2010 SCEX22010D
-
($K)89.43389.43389.433 FY 2010 Month PR Number PY Fund
1st Qtr DIST # 6 89.433 Oct FY10 2010 SCEX22010D-
($K)
5.000 FY 2010 Month PR Number PY Fund1st Qtr ADJ # 1 5.000 Oct FY10 4200317845 2010 SCEX22010D
5.0005.000 FY 2010 Month PR Number PY Fund
1st Qtr DIST # 5 5.000 Nov FY10 4200317845 2010 SCEX22010D-
804068.01.04 Budget DistributionWBS Comments
WBS CommentsBudget Distribution
TOTAL UNDISTRIBUTEDTOTAL FORWARD FUNDING
804068.04.01 Budget Distribution
WBS Comments
Budget Distribution
WBS CommentsBudget DistributionBudget Distribution
WBS Comments
TOTAL DISTRIBUTIONS
PBR FY10 ADJUSTED NOATOTAL ADJUSTMENTS
QBS FY10 ADJUSTED NOA
TOTAL DISTRIBUTIONS
MSFC
APL
PBR FY10 ADJUSTED NOA
TOTAL UNDISTRIBUTEDTOTAL FORWARD FUNDING
TOTAL FORWARD FUNDING
PBR FY10 ADJUSTED NOA
TOTAL UNDISTRIBUTEDTOTAL FORWARD FUNDING
QBS FY10 ADJUSTED NOA
MSFC/SwRI
TOTAL DISTRIBUTIONS
TOTAL ADJUSTMENTS
QBS FY10 ADJUSTED NOATOTAL DISTRIBUTIONS
TOTAL UNDISTRIBUTED
QBS FY10 ADJUSTED NOAPBR FY10 ADJUSTED NOA
KSC
Budget Distribution
WBS Comments804068.01.04 Transfer $5K to APL to set up Government Bill of Lading (GBL) account.
$3.4M LV Price reduction. Transfer $4.186M to JPL (reserves) and $214K to GSFC for addition of Instrument Manager. JPL to repay $1M in FY11.
804068.04.01 Budget Distribution804068.04.01 Budget Distribution
EXAMPLE
New Frontiers
Discovery
15
Project Budget Report Benefits
February 2010
•PBR Documents a project’s life cycle cost by fiscal year, phase, and implementing organizations
•QBS has improved the tracking and analysis of the current fiscal year funding levels
• Together, the PBR and QBS have – Cut the time required to develop the program PPBE budget by more than 50% – Reduced the time required to verify and distribute funds to the project organizations
by 50%– Ensured 100% agreement and confidence in each project budget and the distribution
of funds by both program and project management– Proven to be a valuable record of the project or programmatic budget, facilitating
data mining
The PBR has proven so successful, it is being implemented for other SMD programs
New Frontiers
Discovery
16February 2010
Supplemental Data and Backup
New Frontiers
Discovery
17
Acronyms
February 2010
AO Announcement of OpportunityASPERA Analyzer of Space Plasma and Energetic
AtomsCFO Chief Financial Officer CMC Center Management
CouncilCONTOUR Comet Nucleus TOURCR Confirmation ReviewCSR Concept Study ReportD&NF Discovery and New
FrontiersFY Fiscal YearGRAIL Gravity Recovery and
Interior LaboratoryHQ HeadquartersIEMP Integrated Enterprise
Management ProgramKDP Key Decision PointM3 Moon Mineralogy MapperMESSENGER MErcury Surface, Space ENvironment,
Geochemistry, and RangingMSFC Marshall Space Flight
CenterNEAR Near Earth Asteroid
RendezvousNOA New Obligation AuthorityPBR Project Budget ReportPDS Planetary Data SystemPMC Program Management
CouncilPO Program OfficePPBE Program Planning Budget Execution PRG Program Resource GuidancePSD Planetary Science DivisionQBS Quarterly Budget StatusSMD Science Mission Directorate