- IMPROVE YOUR DATA CENTER AND SAVE ENERGY -
© eco4cloud 2012
OUR SOLUTIONS
On average only 20-30% of server capacity is exploited. Still an idle server consumes 65-70% of the power consumed when it is fully utilized.
eco4cloud consolidates the Virtual Machines on as few servers as possible. Servers are either fully utilized or hibernated.
INEFFICIENCY OF DATA CENTERS
CONSOLIDATION
PROBLEM
SOLUTION
© eco4cloud 2012
OUR SOLUTIONS
The solutions available today are semi-manual, extremely complex, poorly adaptive, not scalable. The problem requires exponential time if solved with a deterministic approach.
eco4cloud uses a statistical approach to assign Virtual Machines to servers. Thanks to this approach, eco4cloud is automatic, simple, adaptive and over-scalable.
INEFFICIENCY OF CONSOLIDATION ALGORITHMS
STATISTICAL APPROACH
PROBLEM
SOLUTION
© eco4cloud 2012
OUR SOLUTIONS
Available solutions do not prevent overload events,caused by load peaks, wich may deteriorate the QoS perceived by users.
eco4cloud moves Virtual Machines from servers before they get overloaded. This helps to increase the QoS.
LOW QUALITY OF SERVICE
PREVENTION OF OVERLOAD EVENTS
PROBLEM
SOLUTION
© eco4cloud 2012
CONSOLIDATION PROCESS
1. Assignment of VMs to servers is driven by workload-based probabilistic trials
2. VMs are consolidated: servers are either used with high efficiency or unloaded and hibernated
DATA CENTER MANAGER
SERVERS
test with 100 servers, all powered on at the beginning
0.8
0.4
0.6
0.2
0 5 10 15 20 25 30
1
----- Time (hour) -----
----
- C
PU
uti
lizati
on
---
--
0
© eco4cloud 2012
POWER SAVED OVER TIME (48H)
80
40
60
20
0 6 12 18 24 30 36 42 48
100wo. eco4cloudwith eco4cloud
- 60 %
----- Time (hour) -----
----
- P
ow
er
(KW
) --
---
Results from a test in a data center with 400 servers
© eco4cloud 2012
ADVANTAGES
from 20% to 60% depending on the characteristics of the data center
consolidation of VMs releases a large % of servers, which can be assigned to other tasks
the occurence of overload events is highly reduced
eco4cloud works on top of all main Virtualization Platforms (VMWare, Hyper-V...)
each server autonomously decides whether or not to accept a new VM
+ ENERGY SAVING
+ RE-UTILIZATION OF RESOURCES
+ HIGH QUALITY OF SERVICE
+ VERSATILITY
+ SELF-ORGANIZED APPROACH
© eco4cloud 2012
PARTNERSHIP WITH THE CLIENT
we use a monitoring tool to analyze your data center
we estimate the impact of eco4cloud in terms of energy savings and QoS improvements
the product is customized and adapted to the peculiar needs of your data center
eco4cloud is installed on your data center In the first days, we provide full on-site support
we constantly monitor the data center providing continuous and customized product upgrade
REMOTE MONITORING
INSTALLATION AND EARLY MONITORING
CUSTOMIZATION
SIMULATION
ANALISYS 1 WEEK
ON-SITE
3 DAYS
e4c LABS
3 DAYS
ON-SITE
UNLTD e4c LABS
3 DAYS
e4c LABS
© eco4cloud 2012
COST SAVING EXAMPLE
SMALL email Hosting 100 servers Windows Hyper-V
MEDIUM Cloud Hosting 1000 servers Linux KVM
LARGE Cloud Services 10,000 servers VMWare
40,000 €/year
310,000 €/year
3 M €/year
21,000 €/yearsaving: 19,000 €/year
170,000 €/yearsaving: 140,000 €/year
1.8 M €/yearsaving: 1.2 M €/year
Avg. consumption for a single server: 200 WAvg. energy cost 0.14 €/kWh
DATA CENTER SIZE ESTIMATED COST COST WITH e4c
© eco4cloud 2012
PRICING MODEL
First year price = € 56,000 (decreasing in successive years)
No license fee without verified savingseco4cloud revenues: 40% of cost savings
ENERGY SAVING MODEL
First year price = € 30,000 (decreasing in successive years)
ENERGY SAVING MODEL
LICENSE MODEL
1000 servers / 20,000 Virtual Machinesestimated yearly cost savings € 140,000
Lower price w.r.t. the energy saving modelLicense price per VM = € 1.50
LICENSE MODEL
EXAMPLE FOR A MEDIUM DATA CENTER
© eco4cloud 2012
TEAM
Computer Engineer, Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, located in Cosenza, Italy. He published over 50 papers in international journals and conference proceedings. His areas of interest are Cloud Computing, P2P, multi-agent systems, nature-inspired algorithms and cyber security.
--
Computer Engineer & CEO, Assistant Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, Cosenza, Italy. His research interests include grid and cloud computing, P2P networks and bio-inspired computing.
--
Computer Engineer, Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, located in Cosenza, Italy. Previously, he worked at the Computer Department of the Prime Minister Office, in Rome. His areas of interest are Cloud and Grid computing, P2P, nature-inspired algorithms, multi-agent systems.
--
AGOSTINO FORESTIERO
RAFFAELE GIORDANELLI
CARLO MASTROIANNI
© eco4cloud 2012
TEAM
Computer Engineer & CTO, Assistant Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, Cosenza, Italy. His research interests include grid and cloud computing, P2P networks and bio-inspired computing.
--
Graduated in Economics, Business Consultant and Advisor, CEO of Enterprise Business Solutions s.r.l. Skilled in the management and implementation of ERP solutions. She received the ISIPM Certification from the Italian Institute of Project Management.
--
Full professor of Computer Engineering at the University of Calabria, Italy, and the Director of ICAR-CNR in Rende, Italy. He published four books and more than 200 papers in international journals and conference proceedings. His research interests include Cloud computing, distributed knowledge discovery, parallel data mining, parallel programming languages, and peer-to-peer.
--
GIUSEPPE PAPUZZO
IVANA PELLEGRINO
DOMENICO TALIA
© eco4cloud 2012
BRIEF HISTORY
Awarded at Start Cup Calabria
Winner of Telecom Italia PNI Working Capital
Spin-off of University of Calabria
Financed by venture capitalistsdPixel and Principia
Pilot test on a Hyper-V data center
Product certification by Microsoft
Proof of Concept at Cisco Labs
Trial at Telecom Italia Labs
Spin-off of CNR
JUNE 2011 NOV 2011 JAN 2012 APR 2012 MAY 2012 JULY 2012 SEPT 2012
© eco4cloud 2012
THANK YOU
Piazza Vermicelli
Rende (CS) Italy
ph +39 0984 49 42 76
--
www.eco4cloud.com
[email protected]/eco4cloud