OUR SOLUTIONS

On average only 20-30% of server capacity is exploited. Still an idle server consumes 65-70% of the power consumed when it is fully utilized.

eco4cloud consolidates the Virtual Machines on as few servers as possible. Servers are either fully utilized or hibernated.

INEFFICIENCY OF DATA CENTERS

CONSOLIDATION

PROBLEM

SOLUTION

Page 3: ECO4CLOUD

© eco4cloud 2012

OUR SOLUTIONS

The solutions available today are semi-manual, extremely complex, poorly adaptive, not scalable. The problem requires exponential time if solved with a deterministic approach.

eco4cloud uses a statistical approach to assign Virtual Machines to servers. Thanks to this approach, eco4cloud is automatic, simple, adaptive and over-scalable.

INEFFICIENCY OF CONSOLIDATION ALGORITHMS

STATISTICAL APPROACH

PROBLEM

SOLUTION

Page 4: ECO4CLOUD

© eco4cloud 2012

OUR SOLUTIONS

Available solutions do not prevent overload events,caused by load peaks, wich may deteriorate the QoS perceived by users.

eco4cloud moves Virtual Machines from servers before they get overloaded. This helps to increase the QoS.

LOW QUALITY OF SERVICE

PREVENTION OF OVERLOAD EVENTS

PROBLEM

SOLUTION

Page 5: ECO4CLOUD

© eco4cloud 2012

CONSOLIDATION PROCESS

1. Assignment of VMs to servers is driven by workload-based probabilistic trials

2. VMs are consolidated: servers are either used with high efficiency or unloaded and hibernated

DATA CENTER MANAGER

SERVERS

test with 100 servers, all powered on at the beginning

0.8

0.4

0.6

0.2

0 5 10 15 20 25 30

1

----- Time (hour) -----

----

- C

PU

uti

lizati

on

---

--

0

Page 6: ECO4CLOUD

© eco4cloud 2012

POWER SAVED OVER TIME (48H)

80

40

60

20

0 6 12 18 24 30 36 42 48

100wo. eco4cloudwith eco4cloud

- 60 %

----- Time (hour) -----

----

- P

ow

er

(KW

) --

---

Results from a test in a data center with 400 servers

igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
igp
Ovale
Page 7: ECO4CLOUD

© eco4cloud 2012

ADVANTAGES

from 20% to 60% depending on the characteristics of the data center

consolidation of VMs releases a large % of servers, which can be assigned to other tasks

the occurence of overload events is highly reduced

eco4cloud works on top of all main Virtualization Platforms (VMWare, Hyper-V...)

each server autonomously decides whether or not to accept a new VM

+ ENERGY SAVING

+ RE-UTILIZATION OF RESOURCES

+ HIGH QUALITY OF SERVICE

+ VERSATILITY

+ SELF-ORGANIZED APPROACH

Page 8: ECO4CLOUD

© eco4cloud 2012

PARTNERSHIP WITH THE CLIENT

we use a monitoring tool to analyze your data center

we estimate the impact of eco4cloud in terms of energy savings and QoS improvements

the product is customized and adapted to the peculiar needs of your data center

eco4cloud is installed on your data center In the first days, we provide full on-site support

we constantly monitor the data center providing continuous and customized product upgrade

REMOTE MONITORING

INSTALLATION AND EARLY MONITORING

CUSTOMIZATION

SIMULATION

ANALISYS 1 WEEK

ON-SITE

3 DAYS

e4c LABS

3 DAYS

ON-SITE

UNLTD e4c LABS

3 DAYS

e4c LABS

Page 9: ECO4CLOUD

© eco4cloud 2012

COST SAVING EXAMPLE

SMALL email Hosting 100 servers Windows Hyper-V

MEDIUM Cloud Hosting 1000 servers Linux KVM

LARGE Cloud Services 10,000 servers VMWare

40,000 €/year

310,000 €/year

3 M €/year

21,000 €/yearsaving: 19,000 €/year

170,000 €/yearsaving: 140,000 €/year

1.8 M €/yearsaving: 1.2 M €/year

Avg. consumption for a single server: 200 WAvg. energy cost 0.14 €/kWh

DATA CENTER SIZE ESTIMATED COST COST WITH e4c

Page 10: ECO4CLOUD

© eco4cloud 2012

PRICING MODEL

First year price = € 56,000 (decreasing in successive years)

No license fee without verified savingseco4cloud revenues: 40% of cost savings

ENERGY SAVING MODEL

First year price = € 30,000 (decreasing in successive years)

ENERGY SAVING MODEL

LICENSE MODEL

1000 servers / 20,000 Virtual Machinesestimated yearly cost savings € 140,000

Lower price w.r.t. the energy saving modelLicense price per VM = € 1.50

LICENSE MODEL

EXAMPLE FOR A MEDIUM DATA CENTER

Page 11: ECO4CLOUD

© eco4cloud 2012

TEAM

Computer Engineer, Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, located in Cosenza, Italy. He published over 50 papers in international journals and conference proceedings. His areas of interest are Cloud Computing, P2P, multi-agent systems, nature-inspired algorithms and cyber security.

--

[email protected]

Computer Engineer & CEO, Assistant Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, Cosenza, Italy. His research interests include grid and cloud computing, P2P networks and bio-inspired computing.

--

[email protected]

Computer Engineer, Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, located in Cosenza, Italy. Previously, he worked at the Computer Department of the Prime Minister Office, in Rome. His areas of interest are Cloud and Grid computing, P2P, nature-inspired algorithms, multi-agent systems.

--

[email protected]

AGOSTINO FORESTIERO

RAFFAELE GIORDANELLI

CARLO MASTROIANNI

Page 12: ECO4CLOUD

© eco4cloud 2012

TEAM

Computer Engineer & CTO, Assistant Researcher at the Institute of High Performance Computing and Networking of the Italian National Research Council, ICAR-CNR, Cosenza, Italy. His research interests include grid and cloud computing, P2P networks and bio-inspired computing.

--

[email protected]

Graduated in Economics, Business Consultant and Advisor, CEO of Enterprise Business Solutions s.r.l. Skilled in the management and implementation of ERP solutions. She received the ISIPM Certification from the Italian Institute of Project Management.

--

[email protected]

Full professor of Computer Engineering at the University of Calabria, Italy, and the Director of ICAR-CNR in Rende, Italy. He published four books and more than 200 papers in international journals and conference proceedings. His research interests include Cloud computing, distributed knowledge discovery, parallel data mining, parallel programming languages, and peer-to-peer.

--

[email protected]

GIUSEPPE PAPUZZO

IVANA PELLEGRINO

DOMENICO TALIA

Page 13: ECO4CLOUD

© eco4cloud 2012

BRIEF HISTORY

Awarded at Start Cup Calabria

Winner of Telecom Italia PNI Working Capital

Spin-off of University of Calabria

Financed by venture capitalistsdPixel and Principia

Pilot test on a Hyper-V data center

Product certification by Microsoft

Proof of Concept at Cisco Labs

Trial at Telecom Italia Labs

Spin-off of CNR

JUNE 2011 NOV 2011 JAN 2012 APR 2012 MAY 2012 JULY 2012 SEPT 2012

Page 14: ECO4CLOUD

© eco4cloud 2012

THANK YOU

Piazza Vermicelli

Rende (CS) Italy

ph +39 0984 49 42 76

--

www.eco4cloud.com

[email protected]/eco4cloud