““The Changing World The Changing World of Configuration of Configuration ManagementManagement””
Presented by: Debbie DusterwaldPresented by: Debbie DusterwaldComputer Sciences CorporationComputer Sciences CorporationFebruary 2008February 2008
OBJECTIVESOBJECTIVESDefine change and how change affects Define change and how change affects Project ManagementProject ManagementDefine NASA and Goddard Define NASA and Goddard Requirements for Configuration Requirements for Configuration ManagementManagementDefine what are the InDefine what are the In--House and OutHouse and Out--ofof--House Projects at Goddard and how they House Projects at Goddard and how they are organizedare organized
OBJECTIVES OBJECTIVES (Cont(Cont’’d)d)
Define the four principles of Configuration Define the four principles of Configuration ManagementManagement
Emphasize the affects of Change ControlEmphasize the affects of Change Control
Discuss if Configuration Management Discuss if Configuration Management just happens just happens
What is Change?What is Change?
Make or become differentMake or become differentSomething put or taken in place of Something put or taken in place of something elsesomething elseTo substituteTo substitute
How does change affect any How does change affect any type of Project with NASA?type of Project with NASA?
Successful integration, testing and Successful integration, testing and launchlaunchCorrect technical errorsCorrect technical errorsMore effective performance More effective performance More cost effectiveMore cost effectiveAccommodate new requirementsAccommodate new requirementsEnsure the objectives of any type of Ensure the objectives of any type of Project are metProject are met
NASA RequirementsNASA Requirements
NASA Procedural Requirements (NPR) 7120.5CNASA Procedural Requirements (NPR) 7120.5CNASA Program and Project Management Processes NASA Program and Project Management Processes and Requirements (Non Space Flight Project and Requirements (Non Space Flight Project Management)Management)
NPR 7120.5DNPR 7120.5D NASA Program and Project NASA Program and Project Management Processes and Requirements (Space Management Processes and Requirements (Space Flight Project Management)Flight Project Management)
Center RequirementsCenter Requirements
GPR 1410.2 Configuration ManagementGPR 1410.2 Configuration Management
GPR 5330.1 Product Processing GPR 5330.1 Product Processing Inspection and TestInspection and Test
500500--PGPG--8700.2.5 GSFC Engineering 8700.2.5 GSFC Engineering Drawing StandardsDrawing Standards
InIn--House ProjectHouse Project
What is an InWhat is an In--House project?House project?
A spacecraft and/or instrument built onA spacecraft and/or instrument built on--site at Goddard with an understanding site at Goddard with an understanding between subsystems. The responsibility between subsystems. The responsibility of authority is with the designated Project of authority is with the designated Project Office.Office.
OutOut--ofof--House ProjectHouse Project
What is an OutWhat is an Out--ofof--House Project?House Project?
A spacecraft and/or instrument built offA spacecraft and/or instrument built off--site through the contracting office. The site through the contracting office. The responsibility of authority is the Project responsibility of authority is the Project office or System Engineering.office or System Engineering.
GSFC InGSFC In--house Projectshouse ProjectsFormulation/DevelopmentFormulation/Development
Lunar Reconnaissance Orbiter (LRO)nar Reconnaissance Orbiter (LRO)Solar Dynamic Observatory (SDO)Solar Dynamic Observatory (SDO)Space Environmental Testbeds (SET)Space Environmental Testbeds (SET)--11Global Precipitation Measurement (GPM) (part of the Global Precipitation Measurement (GPM) (part of the project)project)Solar Terrestrial Relations Orbiter (STEREO) (part of Solar Terrestrial Relations Orbiter (STEREO) (part of the project)the project)Magnetospheric Multiscale (MMS)(MMS)Instruments: MSL/SAM, MMS/FPI, GLAST/ACD, Instruments: MSL/SAM, MMS/FPI, GLAST/ACD, LRO/LOLA, SACLRO/LOLA, SAC--D/AQUARIUSD/AQUARIUS
GSFC OutGSFC Out--ofof--House ProjectsHouse ProjectsFormulation/ DevelopmentFormulation/ Development
Gamma Ray Large Area Space Gamma Ray Large Area Space Telescope (GLAST)Telescope (GLAST)Geostationary Environmental OperaGeostationary Environmental Opera--tionaltional Satellite SeriesSatellite Series--R (GOES)R (GOES)--RRHubble Space Telescope (HST)Hubble Space Telescope (HST)--DEVDEVNational PolarNational Polar--Orbiting Operational Orbiting Operational Environmental Satellite System Environmental Satellite System (NPOESS) Preparatory Project (NPP)(NPOESS) Preparatory Project (NPP)ConstellationConstellation--X (CON)X (CON)Polar Operational Environmental Polar Operational Environmental Satellites (POES Satellites (POES -- NOAANOAA--N)N)LandsatLandsat Data Continuity Mission Data Continuity Mission (LDCM)(LDCM)Two WideTwo Wide--Angle Imaging NeutralAngle Imaging Neutral--Atom Spectrometers (TWINS)Atom Spectrometers (TWINS)WideWide--field Infrared Survey Explorer field Infrared Survey Explorer (WISE)(WISE)Terrestrial Planet FinderTerrestrial Planet Finder--C (TPF)C (TPF)--CC
IntersellarIntersellar Boundary Explorer Boundary Explorer (IBEX)(IBEX)Global Precipitation Mission (GPM)Global Precipitation Mission (GPM)Solar Terrestrial Relations Solar Terrestrial Relations Observatory (STEREO)Observatory (STEREO)James Webb Space Telescope James Webb Space Telescope (JWST)(JWST)AeronomyAeronomy of Ice in the of Ice in the MetrosphereMetrosphere (AIM)(AIM)GLORYGLORYSTP STP HinodeHinode (used to be SOLAR(used to be SOLAR--B)B)Geostationary Environmental Geostationary Environmental Operational Satellite SeriesOperational Satellite Series--O,P O,P (GOES)(GOES)Laser Interferometer Space Laser Interferometer Space Antenna (LISA)Antenna (LISA)Thermal Emission Imaging System Thermal Emission Imaging System (THEMIS)(THEMIS)
Project OrganizationProject Organization
How is an InHow is an In--House Project organized?House Project organized?
How is an OutHow is an Out--ofof--House Project House Project organized?organized?
LRO Project ManagerC. Tooley
400System Assurance
ManagerR. Kolecki
11/15/2007
Deputy Project ManagerC. Peddie
Deputy Project Manager /ResourcesB. Sluder
Admin. - P. Gregory
Materials P. Joy
ManufacturingN. Virmani
SafetyJ. Rezac
Risk ManagementC. Peddie/K. Safdie
Project ScientistG. ChinDeputyJ. Keller
FinancialManager
D. Adamczyk
Project SupportManager
K. Opperhauser
SchedulingA. Eaker/M. Campbell
General BusinessJ. Reid
Mission Business Mgr.J. Smith
ContractingOfficerJ. Janus
OrbiterI & T Lead
J. Baker
CommunicationsA. Rodriguez-Arroyo
C&DH Q. Nguyen
Flight DynamicsM. Beckman
SoftwareM. Blau
ThermalW. Ousley/C. Baker
ElectricalP. LuersMechanicalG. Rosanova
Mission SystemEngineerD. Everett
GN&C Systems E. Holmes
Avionics Systems P. Luers
Orbiter Systems M. Pryzby
S/C Bus & LV Systems T. Ajluni
SW/HW SystemsC. Wildermann
Contamination Ctrl.C. Lorentson
Payload SystemsManagerA. Bartels
Ground Systems& Operations
R. Saylor
Payload SystemsEngineers
L. HartzM. Reden
200600
300
400
400
500
500500 400400
500
Deputy MSEM. Houghton
Craig Tooley DateLunar Reconnaissance Orbiter (LRO)Project Manager
431-REF-000223
ReliabilityL. Lee
Laser RangingR. Zellar
SpacecraftBus
T. Ajluni 400
EEE PartsR. Williams
CM/DMD. Dusterwald/D. Hall/W. Schultzaberger
MISA. Hess/J. Brill
LROCM. Robinson
Arizona State Univ.
DivinerD. PaigeUCLA
LOLAD. Smith
GSFC
Mini - RFS. Nozette
ACT
LENDI. MitrofanovISR, Moscow
Launch VehicleManagerT. Jones
Lunar
Reconnaissance
Orbiter (LRO)
ProjectCode 451
CRaTERH. Spence
Boston University
LAMPR. Gladstone
SWRI
Resource AnalystsV. Martinez/L. Morales
EVMR. Hesenperger
Original Signed By:
Mech./Thermal Sys.S. Wasserzug
SafingS. Andrews
Systems AnalysisL. Hartz
Science Data Mgmt.S. Scott
ACSJ. Simpson
PowerT. Spitzer
PropulsionC. Zakrzwski
Deputy SAML. Lee
Quality AssuranceA. Lacks
S/W Quality AssuranceC. Taylor
MOT LeadJ. MurphyGS&O System Engr.J. Clapsadle
Public AffairsOfficer
N. Neal-Jones100
EPO LeadS. Stockman600
Project ManagerNick Chrissotimos
Deputy Project ManagerJim Adams
Deputy Project Manager/InstrumentsMike Delmont
Deputy Project Manager/ResourcesRich RyanSecretary
Paula Wood
Project ManagerNick Chrissotimos
Deputy Project ManagerJim Adams
Deputy Project Manager/InstrumentsMike Delmont
Deputy Project Manager/ResourcesRich RyanSecretary
Paula Wood
Project ScientistMichael Kaiser
Project ScientistMichael Kaiser
Deputy Proj. ScientistTerry Kucera
STEREO Science CenterBill Thompson-EITI
Instrument ManagementInstrument Management
IMPACT/ UCBInstrument Mgr. / Lil Reichenthal
SWAVES/ UMNInstrument Mgr. / Paul Buchanan
SECCHI/ NRLInstrument Mgr. / Bernie Klein
PLASTIC/ UNHInstrument Mgr. / Paul Buchanan
Mission Systems EngineeringSystems Engineer / Shane Hynes-Swales
Instrument Systems Engineer / Steve Aloezos, Steve Wasserzug-Swales, Katie Barthelme-OMI
Systems Engineering / Joe Cerullo-ASRCContamination Engineering / Terese Errigo
S/W Systems Engineering / Jerry Hengemihle-MTEL
Mission Systems EngineeringSystems Engineer / Shane Hynes-Swales
Instrument Systems Engineer / Steve Aloezos, Steve Wasserzug-Swales, Katie Barthelme-OMI
Systems Engineering / Joe Cerullo-ASRCContamination Engineering / Terese Errigo
S/W Systems Engineering / Jerry Hengemihle-MTEL
Mission Director / Steve OdendahlMission Operations Engineer / Clay Deyarmin
STP Program Support OfficeConfiguration Management / Debbie Dusterwald-CSC, Linda Hepler-CSC
Planning / Dennis Wicks-CSC, Jim Rogers-CSCProject Support / Mandy Tatum-SGT
STP Program Support OfficeConfiguration Management / Debbie Dusterwald-CSC, Linda Hepler-CSC
Planning / Dennis Wicks-CSC, Jim Rogers-CSCProject Support / Mandy Tatum-SGT
System AssuranceSystems Assurance Mgr. / Laurie Kleppin (acting)
Manuf. & Process. Mgr / Mike Jones/OSCQAE / Larry Gibb-SRSTE
System AssuranceSystems Assurance Mgr. / Laurie Kleppin (acting)
Manuf. & Process. Mgr / Mike Jones/OSCQAE / Larry Gibb-SRSTE
Parts AssuranceAntonio Reyes-OSC
SafetyBrian Smolnick
ReliabilityMatt Samuel-MUNIZ
Observatory ManagementObservatory Manager / Mark Jarosz
Observatory ManagementObservatory Manager / Mark Jarosz
JHU/APLEd Reynolds, Project Mgr.
Contracting Officer / Julie JanusContracting Officer / Julie Janus
Financial ManagerTracy Felton (acting)
Resource AnalystLinnette Morales
General Business SupportB. Power-SGT, J. Arrison-OSC, D. Paugh-SGT, L. Wyatt-CSC
Business SupportBusiness Support
23 March 2006
Project Support ManagerKim Higgins-El -SGT
Software Quality AssuranceVacant
CONFIGURATION CONFIGURATION MANAGEMENT (CM)MANAGEMENT (CM)
A process for the control of A process for the control of baselinedbaselineddocuments and drawings. documents and drawings.
A process for the control of all proposed A process for the control of all proposed changes to changes to baselinedbaselined documents and documents and drawings that may affect form, fit, drawings that may affect form, fit, function, cost and schedule.function, cost and schedule.
CM is a formal process of identification, control, verification and accountability of requirements to meet the overall objectives.
ININ--HOUSE vs. OUTHOUSE vs. OUT--OFOF--HOUSEHOUSE
SOWSOWYesYesWork OrderWork OrderSOWSOWYesYesDrawing ControlDrawing Control
Yes / SOWYes / SOWYes / SOWYes / SOWInstrument/ Instrument/ PayloadsPayloads
SOWSOWYesYesSC/SC/SubsysSubsys CCBCCB
YesYesYesYesMission/Sys Eng Mission/Sys Eng CCBCCB
YesYesYesYesProject CCBProject CCBOutOut--ofof--HouseHouseInIn--HouseHouseRequirementsRequirements
PRINCIPLES OF CMPRINCIPLES OF CM
Configuration IdentificationConfiguration Identification
Configuration ControlConfiguration Control
Configuration Status AccountingConfiguration Status Accounting
Configuration VerificationConfiguration Verification
CONFIGURATION CONFIGURATION IDENTIFICATIONIDENTIFICATION
Process of identifying Configured ItemsProcess of identifying Configured Items
Designating technical documentationDesignating technical documentation
Naming and numbering the Configured Naming and numbering the Configured ItemsItems
DOCUMENT TREEDOCUMENT TREE
Documents that define all aspects of a Documents that define all aspects of a project project
DRAWINGSDRAWINGS
Defines all mechanical and electrical Defines all mechanical and electrical aspects for a spacecraft and subsystemsaspects for a spacecraft and subsystems
Defines all interfacesDefines all interfaces
Systematic coordination, evaluation, approval, Systematic coordination, evaluation, approval, and release of changesand release of changes
Ensure changes are properly and completely Ensure changes are properly and completely defineddefined
Evaluate the cost, schedule, and performance Evaluate the cost, schedule, and performance impacts of a proposed changeimpacts of a proposed change
CONFIGURATION CONFIGURATION CONTROLCONTROL
CHANGE CONTROLCHANGE CONTROL
Configuration Control Boards (Configuration Control Boards (CCBsCCBs))Project (Level 2)Project (Level 2)Systems (Level 3)Systems (Level 3)Subsystems (Level 4)Subsystems (Level 4)
Configuration Status Configuration Status AccountingAccounting
Recording and reporting of all project Recording and reporting of all project documents and drawingsdocuments and drawings-- Approved List of Configured ItemsApproved List of Configured Items-- Status of Proposed ChangesStatus of Proposed Changes
CONFIGURATION CONFIGURATION VERIFICATIONVERIFICATION
Ensure all requirements are in Ensure all requirements are in compliance for Configuration compliance for Configuration ManagementManagement
Ensure all proposed changes Ensure all proposed changes have been implemented have been implemented and/or resolvedand/or resolved
CONFIGURATION CONFIGURATION MANAGEMENT MANAGEMENT WORKING FOR A PROJECTWORKING FOR A PROJECT
Does Configuration Management just Does Configuration Management just happen?happen?Central focus point for any projectCentral focus point for any projectTo be or not to beTo be or not to be……