S&S Technical Packaged Pump & Metering Skids, LACT units, blending and chemical injection, gas compression skids
Citation preview
Loading / Unloading Solutions
Transfer / Metering Solutions
Full Spectrum Industry Solutions Automation Solutions
Custom Fluid and Gas Handling Solutions
DesignEngineerFabricateAutomate
Start Date: March 2006Location: Cumming, GA (40miles North of Atlanta)
Goal: Solution Based CompanyExperience: Scott Ogburn 30+ yearsSpecialty: Custom Packaged Pump Systems
Industries:Oil & Gas, Chemical, Water/Wastewater, All General Industry
Electrical: UL508A, PLC, HMI, SCADAAutomation: System integration with DCSWelders: ASME B31.1, .3, .4/ AWS D1.1Project Mgmt: Team based Testing: Full FAT testing capabilitiesEngineering: Mechanical & ElectricalDesign: Solid Works, AutoCAD, CAD electrical
Design Services
Recent Projects in Oil and Gas
How Can S&S Technical Support Your Business
Application:
Initial: Propane
Reality: Mixture of
propane/butane/heptane
Issue:
Pressures changes from 80 PSI to
150 PSI
Result inaccurate metering
Solution:
Install pressure sustaining valve
with a 20 PSI differential valve
to keep propane in its liquid
phase.
LPG Transloader Project
On-site in Western PA Terminal
Application:
Spec’ed out centrifugal
pump
Concerns about sizing
Issue:
Expected flow rate was to be
300 gallons/m
Actual 125 gallons/m
Solution:
Increased the size of the
pump
Cost concerns
Piping required retrofit
Delay in delivery
Condensate Project
On-site in West Texas Terminal
Application: LACT Unit for crude oil transfer New area of an existing terminal:
Issues with water / oil mixture Cavitation concerns with pumps
Solution: 16” diameter, 20’ log The log allows for air and water separation
Crude Oil LACT Unit
Arrival on-site at N. Dakota Terminal
Application:
Ethanol transfer
Two Skids: dual line
One Skid: single line
Issue:
End- user changed project
managers multiple times
Different vision
Solution:
Listen – offer alternate
solutions based on new vision
Plan- provide defined timelines
Check- review new designs
Ethanol Skid Project
Goal: provide a process
to accurately meter
product and ensure
accuracy down to .002
gallon.
Meter
Customers have their preferences Accuracy and reliability equal Cost differences
Application:
Cooling water for bottle
molding
Issue:
Current system not
sufficient to meet demand
Upgrades necessary in
existing system
Solution:
More GPM at a higher
pressure
Triplex skid design
Industrial Projects
Application:
50% H2O2 injection
Issue:
Inject H2O2 based upon
temperature to ensure a
stable reaction
Solution:
Day tank for the H2O2
Gear metering pump for
the injection
PLC based control system
Chemical Projects
How Can S&S Technical Support Your Business
Solution Oriented
Proven History
Quality Driven
Main Location:
5130 Piney Grove Rd.Cumming, GA 30040Office: 678-867-7024Fax: 678-867-7138
Colorado and West Markets
8117 W. Highway 34Loveland, CO 80537Direct: 970-744-1002Fax: 678-867-7138
E-mail: [email protected] www.skidsolutions.com
The Single Source For All Your Fluid Handling Needs
Choice