WHAT’S NEW?
Page 1 of 38
PLEASE FEEL FREE TO PRINT THESE PAGES OUT AS A REFERENCE TO THE CHANGES IN
THE MANAGEMENT SYSTEM NOTE: THIS “WHAT’S NEW” EDITION WILL REMAIN POSTED ON THE INTRANET FOR A MINIMUM OF 90 DAYS IN ORDER FOR ALL PERSONNEL TO HAVE THE OPPORTUNITY TO SEE THE CHANGES TO THE MANAGEMENT SYSTEM (MS) AND THE COMPANY’S INTRANET. NOTE THAT ONLY THE LATEST CHANGES TO POLICIES ARE HIGHLIGHTED WITH BOLD, ITALICS TEXT AND (REV) IN THE LEFT-SIDE MARGIN. FOR EXAMPLE, REVISIONS TO SAF 300.00 MADE IN DECEMBER 2009 ARE NOW INCORPORATED AS REGULAR TEXT AND FONT, WHILE THE FEBRUARY CHANGES ARE HIGHLIGHTED. REFER TO ISM 1103.00 FOR MORE DETAILS. PLEASE REMOVE AND DESTROY ALL OBSOLETE (SUPERSEDED) DOCUMENTS AND BEGIN IMPLEMENTING THE REVISED CHANGES IMMEDIATELY.
NOTE: WHAT’S NEW ARCHIVE CAN BE ACCESSED ONLINE ONTO MANAGEMENT SYSTEM USING THE FOLLOWING LINK –
MANAGEMENT SYSTEM/ WHAT’S NEW ARCHIVE
JANUARY 2016
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
SABU VARGHESE MOTORMAN – ABAN VI
RAJA ALAGU – JACK MECHANIC – ABAN VI
N. S. REGI – DERRICKMAN – ABAN III
MURALI DURAISWAMY – ELECTRICIAN – ABAN IV
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
MANJAN CRNJAK – TOOLPUSHER – ABAN IV
K. P. RAJA KUMAR – FLOORMAN – ABAN IV
DIPANKER – ASST BARGE ENGINEER – ABAN IV
D. K. TANEJA – OIM – ABAN IV
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
A. C. D’SOUZA – OIM – ABAN IV
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
WHAT’S NEW?
Page 2 of 38
MOHANAN G NAIR & D. S. RAMAMOORTHY – WELDERS – ABAN VIII
THEOTONIO D. COSTA & D. KANNANPIRAN – CRANE OP & WELDER – ABAN VI
C. K. MOHANDAS & MANI T. ARJUNAN – CRANE OP & WELDER – ABAN VI
FRANCISCO CAMELO & DHAMENDRA SINGH – ROUSTABOUT – ABAN VI
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
JANUARY 2016
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
JANUARY 2016
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JANUARY 2016
UPLOADED RIG MANAGER’S QHSET SUMMARY OF JANUARY 2016
DECEMBER 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
STEPHENS JOHN RODRIGUES& S. DINESH KUMAR – CRANE OPERATOR & WELDER – DD4
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
WHAT’S NEW?
Page 3 of 38
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
DECEMBER 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
DECEMBER 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF DECEMBER 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF DECEMBER 2015
NOVEMBER 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
BHUVESH SHARMA & JOHN D’SOUZA – CHIEF MECHANIC & CHIEF ELECTRICIAN – DD4
K. VADHIRAJ – ABAN VIII
P. SREEJITH – ASST CRANE OPERATOR – ABAN III
KARISIDDA SWAMY – TRAINEE BARGE ENGINEER – ABAN VIII
P. SREEJITH – ASST CRANE OPERATOR – ABAN III
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
NOVEMBER 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
NOVEMBER 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF NOVEMBER 2015
WHAT’S NEW?
Page 4 of 38
UPLOADED RIG MANAGER’S QHSET SUMMARY OF NOVEMBER 2015
OCTOBER 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
N. K PANDEY & R. S PANDEY – SAFETYMAN & ROUSTABOUT – ABAN II
N. K PANDEY & VEERAN – SAFETYMAN & WELDER – ABAN II
SANKAR ANNAMALAI & SARAVANAN – WELDERS – DD4
BASTIAN P – ELECTRICIAN – DD4
BASTIAN P – ELECTRICIAN – DD4
J. RAVICHANDRAN & ANISH RAMACHANDRAN – BARGE MASTER & WELDER – ABAN V
DIPANKAR TUNG – ASST BARGE ENGINEER – ABAN IV
A. C. D’SOUZA – OIM – ABAN IV
D. K. HIRAWALA – BARGE ENGINEER – ABAN IV
P. O. MOHANAN – MECHANIC/SCO – ABAN III
SANKAR ANNAMALAI, SARAVANAN & DINESH – WELDERS – DD4
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
OCTOBER 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
OCTOBER 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF OCTOBER 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF OCTOBER 2015
WHAT’S NEW?
Page 5 of 38
SEPTEMBER 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
AMIT SHUKLA – ELECTRICIAN – ABAN V
GEORGE KUTTY & NAND LAL – WELDER & ASST DRILLER – ABAN V
PRADEEP JADHAV – ELECTRONIC TECHNICIAN – ABAN III
C. K. GANAMURALI – FLOORMAN - ABAN V
J. RAVICHANDRAN & ANISH RAMACHANDRAN – BARGE MASTER & WELDER – ABAN V
N. K PANDEY – SAFETYMAN – ABAN II
MURALI – CRANE OPERATOR – ABAN II
S. EASWER – CHIEF MECHANIC – ABAN ICE
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
SEPTEMBER 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
SEPTEMBER 2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF SEPTEMBER 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF SEPTEMBER 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF SEPTEMBER 2015
AUGUST 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
WHAT’S NEW?
Page 6 of 38
ANAND YADAV & DEVARAJAN – CHIEF ELECTRICIAN & ELECTRICIAN – ABAN V
A. V. JOHN – CHIEF MECHANIC – ABAN N
K. V. V. RAJU – DERRICKMAN – ABAN II
VEERAN – WELDER – ABAN II
RAVICHANDRAN, GOPI & ANAND – CHIEF MECHANIC, CHIEF ELECTRICIAN & BARGE
MASTER – ABAN V
GHANSHYAMI VERMA – FLOORMAN – ABAN III
S. KARTHICK – FLOORMAN – ABAN III
ARUN MURALI – TOOLPUSHER – ABAN III
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
AUGUST 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
AUGUST 2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF AUGUST 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF AUGUST 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF AUGUST 2015
MARINE OPERATIONS –
MAR405.00 – (REV) CLAUSE 5.4 - IF THE BOLLARD PULL CERTIFICATE FOR A BOAT IS MORE THAN 2 YEARS OLD, OR IF THE BOAT DOES NOT HAVE ANY CERTIFICATE, THE EFFECTIVE BOLLARD PULL RATING FOR THE BOAT WILL BE DETERMINED BY FORMULATION TAKING INTO ACCOUNT THE TOWBOAT’S AGE AND DATE OF THE LAST TEST.
JULY 2015
MANAGEMENT SYSTEM HOMEPAGE
WHAT’S NEW?
Page 7 of 38
I MADE A DIFFERENCE –
S. S PANT – ABAN ICE – DECK FOREMAN
SANJAY LONUSHTE – ABAN ICE – NAVIGATING RATING
JEGAVEERAPANDIAN & MATTHEW VIRKKEY – ABAN ICE – ELECTRICIAN & RSTC
ARDARSH T. S – ABAN ICE – DECK CADET
J. RAVICHANDRAN – ABAN V – BARGE MASTER
BARGE TEAM – ABAN VI
CYRUS O’KELLY – ABAN III – ROUSTABOUT
AMIT KUMAR YADAV – ABAN III – CRANE OPERATOR
S. EASWER – ABAN ICE – CHIEF ENGINEER
K. S. RAJENDRAN – ABAN ICE – DRILLER
SANTOSH K. SINGH – ABAN ICE – CHIEF ENGINEER
AMRITEY VAISHNAV – ABAN ICE – DECK CADET
GEORGE KUTTY – ABAN V – WELDER
VEERAN – ABAN II – WELDER
VEERAN & SABU – ABAN II – WELDER & SAFETYMAN
VEERAN – ABAN II – WELDER
VEERAN – ABAN II – WELDER
VEERAN – ABAN II – WELDER
VEERAN – ABAN II – WELDER
VEERAN – ABAN II – WELDER
KHAN, VEERAN & PANDEY – ABAN II – MECHANIC, WELDER & SAFETYMAN
THOMAS & BIJU – ABAN II – WELDER & ELECTRICIAN
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JULY
2015
WHAT’S NEW?
Page 8 of 38
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JULY
2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JULY 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JULY 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF JULY 2015
JUNE 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
STEVE OLIVEAUX – ABAN II – OIM
K. AGAMANA RAJU – ABAN II – FLOORMAN
K. AGAMANA RAJU – ABAN II - FLOORMAN
VEERAN – ABAN II – WELDER
RAJA ALAGU PILLAPPA – ABAN VI – JUNIOR MECHANIC
ABAN V TEAM
ANISH RAMACHANDRAN – ABAN V – WELDER
SATISH SWARNA – ABAN V – WELDER
ANISH RAMACHANDRAN & M. SANTOSH – ABAN V – WELDER & FIRE WATCHMAN
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JUNE
2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JUNE
2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JUNE 2015
WHAT’S NEW?
Page 9 of 38
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JUNE 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF JUNE 2015
MAY 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
ANAND C. YADAV – ABAN V – CHIEF ELECTRICIAN
ALI KUTTY & GEORGE KUTTY – ABAN V – BARGE MASTER & WELDER
G. S. CHHABRA – ABAN V – OIM
A. V. JOHN & GOPI KIRAN – ABAN V – CHIEF MECHANICS
B. G. KRISHNAN – ABAN V – OIM
DEVARAJAN – ABAN V – ELECTRICIAN
DEVARAJAN – ABAN V – ELECTRICIAN
JAMES RAVICHANDRAN – ABAN V – BARGE MASTER
ABAN V TEAM
ABE JOHN KAKKARA – ABAN ICE – NWKO
VIDYA SAGAR THADI – ABAN ICE – CHIEF ENGINEER
C. ARIVALAGAN – ABAN ICE – WELDER
SANTOSH K. SINGH – ABAN ICE DECK RATING
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF MAY
2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF MAY
2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF MAY 2015
WHAT’S NEW?
Page 10 of 38
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF MAY 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF MAY 2015
APRIL 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
RAM KUMAR BHAL – ABAN V – RIG MANAGER
BHURESH, JOHN, JOHNSON, BASTIAN – DD4
TEAM DD4 – DD4
S. BHOUNESHWARAN – DD6 – CH ELECTRICIAN
JAMES RAVICHANDRAN – ABAN V – BARGE MASTER
ELECTRICAL TEAM –DD2
SANTOSH SINGH – ABAN ICE – DECK FOREMAN
SANTOSH & NILAMADHAB – ABAN ICE – DECK FOREMAN & CH OFFICER
NAVARATHIRAM – ABAN ICE – SEAMAN
JOSE PRAKASH – ABAN ICE – 2ND ENGINEER
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF APRIL
2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF APRIL
2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF APRIL 2015
QHSE STATISTICS
WHAT’S NEW?
Page 11 of 38
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF APRIL 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF APRIL 2015
QHSE MANUAL –
SAF220.00 – TO ELIMINATE STARCAP AS THE SOLE COMPANY INCIDENT INVESTIGATION PROCESS
MARCH 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
JOSE PRAKASH – ABAN ICE – 2ND ENGINEER
K. NEELAKANDAN – ABAN ICE – MOTORMAN
P. T. VARKEY, KASHYAPNATH & BIJU – ABAN II
RAM KUMAR – ABAN V – RIG MANAGER
QHSET ALERTS & ADVISORIES:
ABAN BULLETINS –
#03-15 – INCIDENT INVESTIGATION REMINDER
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
MARCH 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF MARCH
2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF MARCH 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF MARCH 2015
WHAT’S NEW?
Page 12 of 38
UPLOADED RIG MANAGER’S QHSET SUMMARY OF MARCH 2015
FEBRUARY 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
RAVINDER SING – ABAN ICE – SEAMAN
MUGESH P – ABAN ICE – ROUSTABOUT
ABE JOHN KAKKARA – ABAN ICE – CHIEF OFFICER
ABE JOHN KAKKARA – ABAN ICE – CHIEF OFFICER
RAJESH KUMAR YADAV – DD6 – CRANE OPERATOR
YOGENDRA SINGH – ABAN III – FLOORMAN
QHSET ALERTS & ADVISORIES:
ABAN BULLETINS –
#02-15 – PORTABLE HAND AND POWERTOOLS
QHSE MANUAL –
SAF230.00 – THIS POLICY HAS BEEN SUSPENDED WITH IMMEDIATE EFFECT, UNTIL FURTHER NOTICE
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
FEBRUARY 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
FEBRUARY 2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF FEBRUARY 2015
QHSE STATISTICS
WHAT’S NEW?
Page 13 of 38
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF FEBRUARY 2015
UPLOADED RIG MANAGER’S QHSET SUMMARY OF FEBRUARY 2015
JANUARY 2015
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
TRILOK KUMAR SHARMA – DD4 – CHIEF ENGINEER
UDAYA KUMAR – ABAN V – SAFETY OFFICER
DR. SUFIYAN – ABAN V – TR. RSTC
K. S. TOMER – ABAN II – SOLID CONTROL ENGINEER
MARINE TEAM – ABAN II – MARINE TEAM
PANNEER SELVAM – ABAN II – TOUR PUSHER
MANIKANDAN – ABAN II – DRILLER
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
ABAN BULLETINS –
#01-15 – TRAILING HAND TECHNIQUE
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
JANUARY 2015
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
JANUARY 2015
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JANUARY 2015
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JANUARY 2015
WHAT’S NEW?
Page 14 of 38
UPLOADED RIG MANAGER’S QHSET SUMMARY OF JANUARY 2015
DECEMBER 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
JOY KURIAPPEN – ABAN ICE – CHIEF ENGINEER
C. ARIVALAGAN – ABAN ICE – WELDER
DHINESH KUMAR – DD4 – WELDER
YOUTHRAJAN – DD6 – MECHANIC
YOUTHRAJAN – DD6 – MECHANIC
A. V. JOHN – ABAN V – CHIEF MECHANIC
SHAJI THOMAS – ABAN II – BARGE ENGINEER
BINUMON PALLATH – ABAN II – SOLID CONTROL ENGINEER
MARINE TEAM – ABAN II
VEERAN – ABAN II – WELDER
DIRESH – ABAN II – FLOORMAN
QHSE MANUAL –
SAF200 – INCIDENT REPORTING FLOWCHART – ATTACHMENT A
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
DECEMBER 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
DECEMBER 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF DECEMBER 2014
WHAT’S NEW?
Page 15 of 38
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF DECEMBER 2014
UPLOADED RIG MANAGER’S QHSET SUMMARY OF DECEMBER 2014
NOVEMBER 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
MATHEW VIRKKEY - RSTC – ABAN ICE
JOSE PRAKASH – 2ND ENGINEER – ABAN ICE
ABID ALI – CRANE OPERATOR – ABAN ICE
JOSE PRAKASH – 2ND ENGINEER – ABAN ICE
SIBIN MOHANAN – ROUSTABOUT – ABAN ICE
GANAMURALI – FLOORMAN – ABAN III
ANISH RAMACHANDRAN – WELDER – ABAN V
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
NOVEMBER 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
NOVEMBER 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF NOVEMBER 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF NOVEMBER 2014
UPLOADED RIG MANAGER’S QHSET SUMMARY OF NOVEMBER 2014
ISM / ISPS HOMEPAGE
WHAT’S NEW?
Page 16 of 38
OCTOBER 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
LIJO JOHN – ROUSTABOUT – ABAN III
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF
OCTOBER 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF
OCTOBER 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF OCTOBER 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF OCTOBER2014
UPLOADED RIG MANAGER’S QHSET SUMMARY OF OCTOBER 2014
ISM / ISPS HOMEPAGE
SEPTEMBER 2014 MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
ANIL K. SHIGAM – CRANE OPERATOR – ABAN IV
PURVOKO – WELDER – DD8
SHAJI THOMAS – BARGE ENGINEER – ABAN II
THOMAS – GET – ABAN II
RAMASAMY – CHIEF MECHANIC – ABAN II
MAHFOOZ A KHAN – MECHANIC – ABAN II
WHAT’S NEW?
Page 17 of 38
PURUSHOTHAMAN – CHIEF MECHANIC – ABAN II
P MURALIKRISHNA – CHIEF MECHANIC – ABAN III
D. K. HIWARALE – BARGE ENGINEER – ABAN IV
DR. AQUEEL ARIF SAYYED – DD2
AJI MATHEW – TOUR PUSHER – ABAN II
LIJO GEORGE – ROUSTABOUT – ABAN III
ANTO ARAKKAL RAPPAI – WELDER – DD6
G. SELVAKUMAR – MECHANIC – DD6
MATHIV GIGI – ROUSTABOUT – DD6
MARINE TEAM – ABAN II
MAINTENANCE TEAM – ABAN II
MAINTENANCE TEAM – ABAN VIII
QHSE MANUAL – SAF006 – ARRIVAL LOG SAF007 – DEPARTURE LOG
RIGGING, SLINGING AND HANDLING –
RSH 225.00 – 3.5A ALL “RUNNING LINES” (BOOM, AUXILIARY, AND MAIN HOIST
LINES) ARE TO BE REPLACED ANNUALLY, THE EXCEPTION BEING THOSE DEFINED IN POLICY
SAF358.00, 5.8C.
QHSET HOMEPAGE
UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
IADC ALERTS –
ALERT 14 –19 DROPPED OBJECT RESULTS IN NEAR MISS
ALERT 14 – 20 HAND TOOL LEFT ON CCU RESULTS IN POTENTIAL
DROPPED OBJECT
WHAT’S NEW?
Page 18 of 38
ALERT 14 – 21 LACK OF COMMUNICATION / FAILURE TO STOP JOB
RESULTS IN FATALITY
ABAN ALERTS –
#7 CROSBY MASTER LINKS ALERT
#8 WASTE MANAGEMENT PLANS
#9 REPORTING MANHOURS
#10 SAFETY AWARD RECOGNITION PROGRAMME
#11 ARRIVAL DEPARTURE LOGS
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JUNE,
JULY, AUGUST AND SEPTEMBER 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JUNE,
JULY, AUGUST AND SEPTEMBER 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JUNE, JULY, AUGUST AND
SEPTEMBER 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JUNE, JULY, AUGUST
AND SEPTEMBER 2014
UPLOADED RIG MANAGER’S QHSET SUMMARY OF JUNE, JULY, AUGUST AND SEPTEMBER
2014
QHSET ORGANIZATION CHART
SINGAPORE OFFICE ORGANIZATION CHART
SOPEP
WHAT’S NEW?
Page 19 of 38
ABAN V
ABAN VI
ABAN VIII
DD2
DD4
DD6
ISM / ISPS HOMEPAGE
JUNE 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
MUKESH P – ROUSTABOUT – ABAN ICE RAVI – ROUSTABOUT – ABAN ICE SAJI DANIEL – WELDER – ABAN ICE PS SURAJ – STORE KEEPER - ABAN ICE RIJO – MECHANIC – ABAN 2
MARINE OPERATIONS –
MAR 800.00 – WEATHER FORECAST SERVICES
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
IADC ALERTS – ALERT 14 –16 IMPROPER HAND PLACEMENT RESULTS IN AMPUTATION ALERT 14 – 17 LINE-OF-FIRE INCIDENT RESULTS IN FACIAL INJURIES ALERT 14 – 18 IMPROPER CONFINED SPACE ENTRY RESULTS IN
MULTIPLE FATALITIES
ABAN ALERTS – #06 – SMOKING POLICY
WHAT’S NEW?
Page 20 of 38
TRAINING –
#01 – OJT WORKBOOK
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF MAY, 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF MAY, 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF MAY, 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF MAY, 2014
UPLOADED RIG MANAGER’S QHSET SUMMARY OF MAY 2014
ISM / ISPS HOMEPAGE
MAY 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
MANOJ ABRAHAM – STORE KEEPER – ABAN II SURESH KUMAR – OIM – ABAN II
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
IADC ALERTS – ALERT 14 –13 PRESSURE RELEASE AFTER ICE PLUG REMOVAL RESULTS
IN INJURY ALERT 14 – 14 IMPROPER PRE-TRIP INSPECTION LEADS TO RUNAWAY
TRAILER
WHAT’S NEW?
Page 21 of 38
ALERT 14 – 15 FAILURE TO RECOGNIZE HAZARDS RESULTS IN TWO DOWNED POWER LINES IN THE SAME DAY
ABS – FATALITY RESULTING FROM DRAINAGE FROM AIR RESERVOIR
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF APRIL, 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF APRIL, 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF APRIL, 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF APRIL, 2014
ISM / ISPS HOMEPAGE
APRIL 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE –
SACHIN PATEL – ELECTRICIAN – ABAN IV
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
IADC ALERTS – ALERT 14 – 07 ARM CAUGHT IN PINCH POINT ON HYDRAULIC CATWALK
RESULTS IN DEEP CONTUSION ALERT 14 – 08 MAINTENANCE ON ACCOMMODATION’S ELEVATOR
RESULTS IN A FATALITY ALERT 14 – 09 HIGH POTENTIAL INCIDENT– STRUCK BY DROPPED
OBJECT ALERT 14 – 10 DROPPED LANDING STRING RESULTS IN NEAR MISS
WHAT’S NEW?
Page 22 of 38
ALERT 14 – 11 LACK OF COMMUNICATION RESULTS IN FATALITY ALERT 14 – 12 EQUIPMENT SHIFT DURING RIG UP RESULTS IN NEAR
MISS
CHEVRON –
OE MOMENT: PULSATION DAMPENER INCIDENT
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF MARCH, 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF MARCH, 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF MARCH, 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF MARCH, 2014
ISM / ISPS HOMEPAGE
MARCH 2014
MANAGEMENT SYSTEM HOMEPAGE
I MADE A DIFFERENCE – KA CHANDRAN – CRANE OPERATOR – ABAN III SUJITH V (GLOBAL REMOTE) – PAINTER – ABAN ICE NISHNATH OMANAKUTTAN – ELECTRICIAN – ABAN III SREENATHAN – QHSET COORDINATOR – ABAN VIII
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
ABAN ALERTS – #04- RIG MANAGER’S QHSET MONTHLY SUMMARY_SAF024 #05- HAND AND FINGER INJURIES
SHELL –
WHAT’S NEW?
Page 23 of 38
D-RING FAILURES DURING LIFTING OPERATIONS
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF FEBRUARY, 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF FEBRUARY, 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF FEBRUARY, 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF FEBRUARY, 2014
ISM / ISPS HOMEPAGE
UPLOADED ABAN OFFSHORE – DOCUMENT OF ANNUAL ENDORSEMENT
UPLOADED ABAN ICE – SAFETY MANAGEMENT CERTIFICATE
FEBRUARY 2014
MANAGEMENT SYSTEM HOMEPAGE
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 14 – 04 BLOCKS FALL TO RIG FLOOR AFTER DRILL LINE CAME OFF OF THE DRAW WORKS
ALERT 14 – 05 AIR WINCH LINE CAUGHT IN DERRICK FINGERS RESULTS IN AN EMPLOYEE BEING PULLED OFF OF THE RIG FLOOR
ALERT 14 – 06 TANK CABLE STRIKE RESULTS IN INJURY TO EMPLOYEE
PETRONAS – FATAL ACCIDENT – IP STRUCK BY OBJECT DURING RIG DOWN ACTIVITIES
TRAINING
WHAT’S NEW?
Page 24 of 38
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JANUARY, 2014
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JANUARY, 2014
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JANUARY, 2014
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JANUARY, 2014
ISM / ISPS HOMEPAGE
JANUARY 2014
MANAGEMENT SYSTEM HOMEPAGE
QHSE MANUAL SAF 024 – QHSE MANAGER’S MONTHLY SUMMARY
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
ABAN BULLETINS –
#01-14 – DAYS AWAY FROM WORK
#02-14 – SAF – INCIDENT INVESTIGATION REPORT
#03-14 – QHSET MONTHLY SUMMARY REPORT_SAF024
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 14 – 01 INTERNAL EXPLOSION RUPTURES CROWN MOUNTED COMPENSATOR PIPING
ALERT 14 – 02 DROP OBJECT RESULTS IN LOST TIME INCIDENT ALERT 14 – 03 “STRUCK BY” INCIDENT RESULTS IN LEG INJURY
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF DECEMBER, 2013
WHAT’S NEW?
Page 25 of 38
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF DECEMBER, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF DECEMBER, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF DECEMBER, 2013
ISM / ISPS HOMEPAGE
DECEMBER 2013
MANAGEMENT SYSTEM HOMEPAGE MANAGEMENT SYSTEM
ISM 900 & ISM 005 MANAGEMENT OF CHANGE
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
ABAN BULLETINS –
QHSET – 7 - RUBBER GOODS
QHSET – 8 - MOC PERSONNEL
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 28 SUDDEN ICE PLUG RELEASE RESULTS IN STRUCK-BY INJURY
ALERT 13 – 29 COMPLACENCY WITH A COMMON JOB TASK RESULTS IN INJURY TO THE DERRICKMAN
ALERT 13 – 30 FAILURE TO TORQUE LIFT SUB RESULTS IN DROPPED MONEL DRILL COLLAR
EQUIPMENT BULLETINS -
NATIONAL OIL WELL VARCO –
BX-149-PIB-001 REV 01 - INCORRECT RETAINER BOLT INSTALLED IN BX5 (REF. TRACKER TICKET NOV-404608)
TRAINING
WHAT’S NEW?
Page 26 of 38
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF NOVEMBER, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF NOVEMBER, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF NOVEMBER, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF NOVEMBER, 2013
UPDATED ABAN ORGANISATION CHARTS
UPDATED AND UPLOADED EMERGENCY RESPONSE PLAN OF ABAN ICE
ISM / ISPS HOMEPAGE
NOVEMBER 2013
MANAGEMENT SYSTEM HOMEPAGE
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 23 FAILURE TO TORQUE DRILL PIPE RESULTS IN SERIOUS NEAR MISS EVENT
ALERT 13 – 24 UNRECOGNISED HAZARD RESULTS IN LACERATION TO LEG
ALERT 13 – 25 STRUCK-BY INCIDENT WHILE RUNNING CASING RESULTS IN FATALITY
ALERT 13 – 26 FAILURE OF LIFTING EYEBOLT RESULTS IN DROPPED OBJECT
ALERT 13 – 27 PIPE DROPPED FROM SIDE DOOR ELEVATOR
SAUDI ARAMCO – FATALITY WHILE RUNNING CASING
WHAT’S NEW?
Page 27 of 38
FATALITY - ELECTROCUTION
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF OCTOBER, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF OCTOBER, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF OCTOBER, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF OCTOBER, 2013
ISM / ISPS HOMEPAGE
OCTOBER 2013
MANAGEMENT SYSTEM HOMEPAGE
QHSE MANUAL – SAF006 – ARRIVAL LOG
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 21 IRON ROUGHNECK “STRUCK BY” INCIDENT RESULTS IN FATALITY
ALERT 13 – 22 EQUIPMENT FAILURE DURING PERFORATING RESULTS IN NEAR MISS
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF SEPTEMBER, 2013
WHAT’S NEW?
Page 28 of 38
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF SEPTEMBER, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF SEPTEMBER, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF SEPTEMBER, 2013
KRA
UPLOADED KRA (KEY RESULT AREA) REPORT FROM JULY TO SEPTEMBER 2013.
ISM / ISPS HOMEPAGE
SEPTEMBER 2013
MANAGEMENT SYSTEM HOMEPAGE ISM 102 MANAGEMENT SYSTEM MANUALS STRUCTURE
SAF 114 QHSE SITE ORIENTATION/INDUCTION
SAF 005 OFFSHORE QHSE ORIENTATION TOPICS
SAF 008 REPORT OF QHSE MEETING
QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ALERTS & ADVISORIES:
TRAINING –
TRAINING BULLETIN #05-13 TRAINING INSTITUTES
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF AUGUST, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF AUGUST, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF AUGUST, 2013
QHSE STATISTICS
WHAT’S NEW?
Page 29 of 38
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF AUGUST, 2013
ISM / ISPS HOMEPAGE
UPDATED ISM DESIGNATED PERSONS
AUGUST 2013
MANAGEMENT SYSTEM HOMEPAGE QHSET HOMEPAGE UPDATED INFORMATION HAS BEEN UPLOADED IN THE FOLLOWING ICONS.
QHSET ORGANISATION CHART: UPDATED THE ABAN SINGAPORE AND QHSET DEPARTMENT ORGANOGRAM
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 19 CONFLICTING PROCEDURES RESULTS IN RESTRICTED
WORK CASE ALERT 13 – 20 DROPPED OBJECT RESULTS IN NEAR MISS
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JULY, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JULY, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JULY, 2013
UPLOADED THE OJT MODULE “WAREHOUSEMAN PART 2”
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JULY, 2013
KRA
WHAT’S NEW?
Page 30 of 38
UPLOADED KRA (KEY RESULT AREA) REPORT FROM JAN TO JULY 2013.
ISM / ISPS HOMEPAGE NO REVISION
JULY 2013
MANAGEMENT SYSTEM HOMEPAGE QHSET HOMEPAGE
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 17 FALL FROM HEIGHTS RESULTS IN FATALITY ALERT 13 – 18 BODY POSITIONING NEAR SUSPENDED LOAD RESULTS IN
MEDICAL TREATMENT CASE
TRAINING
TRAINING BULLETIN #03-13 OJT MOTORMAN AND WAREHOUSEMAN
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JUNE, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JUNE, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JUNE, 2013
UPLOADED THE OJT MODULES FOR MOTORMAN AND WAREHOUSEMAN
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JUNE, 2013
ISM / ISPS HOMEPAGE NO REVISION
WHAT’S NEW?
Page 31 of 38
JUNE 2013
MANAGEMENT SYSTEM HOMEPAGE QHSET HOMEPAGE
QHSET ALERTS & ADVISORIES:
ABAN BULLETIN –
QHSET BULLETIN#5 INCIDENT REPORTS & INVESTIGATION
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 13 UNSECURED BASKET PIN RESULTS IN DROPPED OBJECTS ALERT 13 – 14 MIS-HANDLED SUB RESULTS IN FIRST AID
ALERT 13 – 15 UNEXPECTED MOVEMENT OF CARGO BASKET RESULTS IN FIRST AID CASE
ALERT 13 – 16 WHIPPING OF CABLE (STORED ENERGY) RESULTS IN INJURY
SHELL BULLETIN –
GUMUSUT-KAKAP FLOATING PRODUCTION SYSTEM (FPS)- FATALITY
EQUIPMENT BULLETINS -
NATIONAL OIL WELL VARCO –
10744143-PIB REV 01– DROPPED OBJECT INVOLVING STABBING GUIDE ASSEMBLY ON PH-100 PIPE HANDLER
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF MAY, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF MAY, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF MAY, 2013
TRAINING BULLETIN #02-13 TRAINING REPORTING CHANGES INDIA
WHAT’S NEW?
Page 32 of 38
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF MAY, 2013
INCIDENT REPORTS AND INVESTIGATION
UPLOADED ALL THE INJURY ILLNESS REPORTS (SAF002), INCIDENT REPORTS (SAF001) AND INITIAL INCIDENT INVESTIGATION REPORTS FOR THE YEAR 2011, 2012 TILL TO DATE.
ISM / ISPS HOMEPAGE NO REVISION
MAY 2013
MANAGEMENT SYSTEM HOMEPAGE QHSET HOMEPAGE
QHSET ALERTS & ADVISORIES:
ABAN BULLETIN –
QHSET BULLETIN#4 I MADE A DIFFERENCE
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 11 FAILURE TO PROPERLY MAKE UP THE TOP DRIVE/SAVER SUB CONNECTION RESULTS IN EMPLOYEE INJURY
ALERT 13 – 12 EMPLOYEE STANDING IN LINE OF TRAVEL RESULTS IN INJURY
EQUIPMENT BULLETINS -
NATIONAL OIL WELL VARCO –
10744143-PIB REV 01– DROPPED OBJECT INVOLVING STABBING GUIDE ASSEMBLY ON PH-100 PIPE HANDLER
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF APRIL, 2013
WHAT’S NEW?
Page 33 of 38
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF APRIL, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF APRIL, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF APRIL, 2013
UPDATED AND UPLOADED EMERGENCY RESPONSE PLANS OF – DD1, DD2, DD3, DD4, DD5, DD6, DD7, DD8, ABAN2, ABAN3, ABAN4, ABAN5, ABAN6, ABAN7, TAHARA, MUMBAI OFFICE, BRUNEI OFFICE
ISM / ISPS HOMEPAGE NO REVISION
APRIL 2013
MANAGEMENT SYSTEM HOMEPAGE QHSE MANUAL
SAF 210 PERSONAL INJURY/ILLNESS CLASSIFICATION ATTACHMENT A: PERSONAL INJURY CLASSIFICATION FLOWCHART
SAF300 PERMIT TO WORK SYSTEM ATTACHMENT A : PERMIT TO WORK PROCESS FLOWCHART
SAF302 WORKING OVER WATER
ATTACHMENT A AND ATTACHMENT B: WORKING OVER WATER PROCESS FLOWCHART SAF310 CONFINED SPACE ENTRY
ATTACHMENT A AND ATTACHMENT B: CONFINED SPACE ENTRY PROCESS FLOWCHART SAF320 LOCKOUT/TAG OUT (ENERGY ISOLATION)
ATTACHMENT A AND ATTACHMENT B: THE ISOLATION PROCESS FLOWCHART
QHSET HOMEPAGE
QHSET ALERTS & ADVISORIES:
ABAN BULLETIN –
QHSET BULLETIN#3 FLOWCHART PROCESS
QHSET ALERTS & ADVISORIES:
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
WHAT’S NEW?
Page 34 of 38
ALERT 13 – 08 CAUGHT BETWEEN INCIDENT RESULTS IN FIRST AID
INJURY ALERT 13 – 09 HIGH PRESSURE RELEASE RESULTS IN INJURY ALERT 13 – 10 HOT WORK OPERATIONS RESULTS IN DROPPED OBJECT
EQUIPMENT BULLETINS -
NATIONAL OIL WELL VARCO –
10734973-PIB REV 01– DROPPED OBJECT INCIDENT INVOLVING IBOP CRANK ASSEMBLY
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF MARCH, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF MARCH, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF MARCH, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF MARCH, 2013
ISM / ISPS HOMEPAGE NO REVISION
MARCH 2013
MANAGEMENT SYSTEM HOMEPAGE QHSE MANUAL
SAF 330 PROCESS FOR ASSESSING RISK (PAR) – ADDED LINK FOR FORM SAF-023, PROMPT CARD (HARD COPY & ELECTRONIC COPY)
SAF 350 FALL PROTECTIONS -
6.2F3 FULL BODY HARNESSES MAY ONLY BE KEPT IN SERVICE FOR A MAXIMUM OF FIVE (5) YEARS FROM THE DATE OF ISSUE. THIS IS SUBJECT TO REGULATORY AND/OR CONTRACTUAL REQUIREMENTS WHICH MAY DICTATE HARNESSES BEING REMOVED FROM SERVICE PRIOR TO THE FIVE YEAR MAXIMUM.
WHAT’S NEW?
Page 35 of 38
SAF 023 PROMPT CARD
DRILLING OPERATIONS
GOP 115 MONTHLY OPERATIONS REPORT
REFERENCE –
2.1 ATTACHMENT A – MONTHLY OPERATIONS REPORT TEMPLATE
2.2 ATTACHMENT B - EXAMPLE OF MONTHLY OPERATIONS REPORT
QHSET HOMEPAGE
KEY PERFORMANCE INDICATORS – UPLOADED QHSET ACTIVITY PLAN AND KEY PERFORMANCE INDICATORS FOR THE YEAR 2013
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF FEBRUARY, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF FEBRUARY, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF FEBRUARY, 2013
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF FEBRUARY, 2013
ISM / ISPS HOMEPAGE NO REVISION
FEBRUARY 2013
MANAGEMENT SYSTEM HOMEPAGE QHSET HOMEPAGE
QHSET ALERTS & ADVISORIES:
ABAN BULLETIN –
QHSET BULLETIN#2 MONTHLY REPORTING FLOWCHART
WHAT’S NEW?
Page 36 of 38
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 04 LOWER MARINE RISER PACKAGE (LMRP) CONNECTOR
FAILURE ALERT 13 – 05 DRILL PIPE DISLODGED FROM PIPE BIN DURING DRIFTING
OPERATIONS ALERT 13 – 06 POOR COMMUNICATION AMONGST CREW RESULTS IN
INJURY ALERT 13 – 07 IMPROPER HAND REPLACEMENT RESULTS IN MINOR
INJURY
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF JANUARY, 2013
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF JANUARY, 2013
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF JANUARY, 2013
UPLOADED OJT MODULE ON “DRILLER”
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF JANUARY, 2013
SAFETY MOMENT VIDEOS
ABAN SM 38 - NEAR HIT RUNNING CASING ABAN SM 39 - CARRYING TOO MUCH AND TRIP HAZARD ON STAIRS ABAN SM 40 - ISOLATION
ISM / ISPS HOMEPAGE NO REVISION
NOTE: WHAT’S NEW ARCHIVE CAN BE ACCESSED ONLINE ONTO MANAGEMENT SYSTEM USING THE FOLLOWING LINK – MANAGEMENT SYSTEM/ WHAT’S NEW ARCHIVE
JANUARY 2013
WHAT’S NEW?
Page 37 of 38
MANAGEMENT SYSTEM HOMEPAGE QHSET HOMEPAGE
QHSET ALERTS & ADVISORIES:
ABAN BULLETIN –
QHSET BULLETIN#1 ON INCIDENT REPORTING
TRAINING – ON THE JOB TRAINING BULLETIN #01-13 – OJT DRILLER
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS –
ALERT 13 – 01 FALL FROM V-DOOR RESULTS IN NEAR MISS ALERT 13 – 02 LACK OF COORDINATION DURING RIG-UP LEADS TO
INJURIES ALERT 13 – 03 VESSEL TO VESSEL TRANSFER HOSE WHIPLASH RESULTS
IN FATALITY
EQUIPMENT BULLETINS -
NATIONAL OIL WELL VARCO –
10729506-PIB REV 01 – ST-120 IRON ROUGHNECKS
TRAINING
UPLOADED FLEET TRAINING COMPLIANCE SUMMARY REPORT FOR THE MONTH OF DECEMBER, 2012
UPLOADED FLEET TRAINING ATTENDEES SUMMARY REPORT FOR THE MONTH OF DECEMBER, 2012
UPLOADED OJT SUMMARY REPORT FOR THE MONTH OF DECEMBER, 2012
QHSE STATISTICS
UPLOADED QHSE MONTHLY INCIDENT REPORT FOR THE MONTH OF DECEMBER, 2012
KRA
UPLOADED KRA (KEY RESULT AREA) REPORT FOR THE YEAR 2012.
WHAT’S NEW?
Page 38 of 38
ISM / ISPS HOMEPAGE NO REVISION
NOTE: WHAT’S NEW ARCHIVE CAN BE ACCESSED ONLINE ONTO MANAGEMENT SYSTEM USING THE FOLLOWING LINK – MANAGEMENT SYSTEM/ WHAT’S NEW ARCHIVE