Del. Seatek India Pvt. Ltd.Company Profile.

Del. Seatek India Pvt. Ltd. was incorporated in 2003 to providehigh quality underwater services to the Oil & Gas and MarineIndustries.

The Directors of Del. Seatek India Pvt. Ltd. have serviced theoffshore oil fields in the North Sea, Middle East, South East Asia,West Africa and India through international companies.

Seatek Offshore Pvt Ltd (Mauritius) was incorporated in 2006 toservice our overseas clients for their international projects.

Seatek Oil & Gas Services LLC was formed in 2012 in Abu Dhabito service the ever growing Oil and Gas Industry in the Middle Eastsector.

Services offered:

Saturation and Air Diving Intervention for Construction,

Inspection, Maintenance and Remedial Subsea and Topside works.

Provision of Dive Personnel – Air and Saturation Teams

Industrial Rope Access for inspection, testing, and structural survey

at heights or in areas where access is difficult with any other

techniques

Recruitment and HR Services of personnel Oil and Gas Industry.

Fabrication and Installation of Concrete Mattresses for pipeline

stabilization and protection

Service Agreements and Representation of Overseas Clients.

Introduction

Our Client List and Offshore Diving projects.

Client :QATAR PETROLEUMProject : MARINE MAINTENANCE SERVICES AT MESAIEED PORTWork Scope : Port Maintenance, Call out Services,

Vessel for Marine Maintenance works andDiving Support.

Period : Sept. .2016 – Ongoing

Client :Kreuz Subsea Pte.Ltd.Project : Supply Lifting Frame of Concrete

Mattresses for Offshore PipelineStabilisation.

Location : Mumbai, India.Period : March – April 2017

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

Floating Hose Change out, Pressure testing,Boat landing installation

Location : Ravva Field, India.Vessel : MV Mahananda.Period : March - April 2017

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

Location : Bhogat, India.Vessel : MV Poorna.Period : February 2017

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

SBM Annual Mantainence with ABS

Location : Bhogat, India.Vessel : MV Poorna.Period : March 2017

Client :Kreuz Subsea Pte.Ltd.Project : Manufacture and Supply of Concrete

Mattresses for Offshore PipelineStabilisation.

Location : Mumbai, India.Period : March 2017

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

Location : Bhogat, India.Vessel : MV Poorna.Period : March 2017

No Client Project / Description Locations Start Date CompletionDate

1Transocean

DDKG2 : Diving Services forThruster Checks, Fishnet Removaland Vessel External support works

Kakinada,AndhraPradesh

24.01.2017 31.01.2017

2 ABANOFFSHORELTD

UWILD - Aban IceMumbaiHigh

13.02.2017 18.02.2017

3Transocean Rig Actinia : UWILDD

MumbaiHigh

23.03.2017

4 ABANOFFSHORELTD

UWILD - Aban IIIMumbaiHigh

04.04.2017 17.04.2017

5

6

7

UWILDDs and Remedials conducted for ABS and IRS CLASS SurveysFor Jackup Rigs, Semi Submersibles and Drill ships.

Using Commercial Diving and Rope Access techniquesYear 2017 – 2018.

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Post Monsoon Surveyfor SPM and Tanker Berthing checksand Tanker Loading /UnloadingOperations.

Location : Bhogat, India.Vessel : MV Poorna.Period : November 2016

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

Location : Bhogat, India.Vessel : MV Poorna.Period : December 14th – 31st 2016

Client :Vishwakarma / Smit SubseaProject : Provision for Diving Equipment,

for Salvage of Vessels at Kattupalli.

Location : Kattupalli, Chennai, India.Installation : Kattupalli JettyPeriod : December 2016 – January 2017

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

Location : Bhogat, India.Vessel : MV Poorna.Period : January 2017

Client :Cairn India Limited.Project : Provision for Diving team for SPM

Maintenance

Location : Bhogat, India.Vessel : MV Poorna.Period : October 2016

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Post Monsoon Surveyfor SPM and Tanker Berthing checksand Tanker Loading /UnloadingOperations.

Location : Bhogat, India.Vessel : MV Poorna.Period : November 2016

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Survey for SPM andTanker Berthing checks and TankerLoading /Unloading Operations.

Location : Bhogat, India.Vessel : MV Poorna.Period : December 14th – 31st 2016

Client :SapuraKencana TL OffshoreSdn Bhd.

Project : Manufacture and Supply of ConcreteMattresses for Offshore PipelineStabilisation.

Location : Mumbai, India.Period : Nov. 2016 - March 2017

Client :QATAR PETROLEUMProject : MARINE MAINTENANCE SERVICES AT MESAIEED PORTWork Scope : Port Maintenance, Call out Services,

Vessel for Marine Maintenance works andDiving Support.

Period : Sept. .2016 – Oct.2022.

Client :Transocean GSF 140.Project : GSF 140 Diving Support

Work Scope : UWILD of Underwater structuresReplacements of Clamps on Riser and HydraulicUmbilical from -10msw to -55 msw usingMixed Gas Diving System and Heliox dive mixtures.

Period : 30th Oct.2016 – ongoing.

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Post Monsoon Surveyfor SPM and Tanker Berthing checksand Tanker Loading /UnloadingOperations.

Location : Bhogat, India.Vessel : MV Poorna.Period : Oct.2016

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Remedialworks for SPM and FieldMantainence .Floating Hose Changeout.Platform Boat landing Surveyand corrective actions.

Location : Ravva Field, A.P. India.Vessel : MV. Collard Tide.Period : Sept. 2016.

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Post Monsoon Surveyfor SPM and Tanker Berthing checksand Tanker Loading /UnloadingOperations.

Location : Bhogat, India.Vessel : MV Poorna.Period : Sept.2016

Client :Mangalore Refineries andPetrochemical Limited

Project : 1 year Service Contract for Provision for IndustrialRope Access Services during Shutdowns.

Work Scope : Inspection of all Pipelines, structures and PressureVessels at Heights using Ultrasonic ThicknessGauging, CVI and GVI inspection techniques.

Location : Mangalore Refinery, Manglore.

Period : Sept. 20th – 30th 2016.

Client :Patel Construction CompanyProject : Design, Engineering, Supply, Erection & Commissioning of On

Shore and Off Shore Pipeline Sea Discharge of 25 MLDLocation : Anjar, Kutch, India.Vessel : 4no.x Spud Barges with Excavators, Cranes and Support Tugs.Period : 28.10.2015 – Ongoing

Client :Reliance InduatriesProject : CRP Platform Underwater InspectionLocation : KG D6, East Coast of IndiaPeriod : 25th Jan.2016 – 23rd Feb.2016

Client :Cairn India Limited.Project : Provision Of Diving Services for

Bhogat SPMLocation : Bhogat, India.Vessel : Ocean Garnet.Period : 6th Feb. 2016 – 13th Feb. 2016

Client :Cairn India Limited.Project : Provision of Diving Services, Jacket

Certification and Free SpanRectification at Ravva and CB/OS-02 - 4 year IMR ContractAnnual Survey and Anode Installation

Location : Ravva Field, East Coast of India.Vessel : MV Saisowbhagya.Period : 2nd March – 8th March 2016

Client :Cairn India Limited.Project : Provision of Diving Services, Jacket

Certification and Free SpanRectification at Ravva and CB/OS-02 - 4 year IMR Contract

5 no. Platform Inspection Lump Sum Contract.

Location : Ravva Field, East Coast of India.Vessel : MV Saisowbhagya .Period : 9th Feb. – 1st March 2016

Client :Cairn India Limited.Project : Ravva and CB/OS-02 4 year IMR Contract

RAVVA Field SPM-2 Track and BogieWheel Change out.

Location : Ravva Field, India.Vessel : VOS Triton .Period : 13th Oct 2015 – 25th Oct. 2015.

Client :TransoceanProject : DDKG# 2 Inwater Thruster Changeout

Annual UWILD under ABS requirementsLocation : Kakinada, India.Vessel : Dhirubhai Ambani Deepwater KG # 2.Period : 30th Oct 2015 – 26th Nov. 2015.

Client :Swiber Offshore Construction LimitedProject : Fabrication of Concrete MattressesLocation : Mumbai, India.Period : 19.11.2015 – Ongoing

Client : Technip India Limited.Project : Supply of Concrete Mattresses.

6m x 3m x 0.3m Mattresses withHandling Frame.

Location : Kakinada, A.P. India.Period : April 2015 – May 2015.

Client :Cairn India Limited.Project : Ravva and CB/OS-02 4 year IMR Contract

Provision for Diving Services,Inspection and Remedial works forSBM Survey and Pre- Tanker checksPressure Testing of Sus Sea Hose andFloating hose and commissioningworks.

Location : Bhogat, India.Vessel : Ocean Garnet.Period : 4th Oct 2015 – 18th Oct. 2015.

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Remedialworks for SPM and FieldMantainence

Location : Ravva Field, A.P. India.Vessel : MV. Collard Tide.Period : Dec.2014. – May 2015

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Remedial works forSPM – Phase III20”Subsea Hose and Subsea UmbilicalInstallation, Floating Hose Changeoutwith Pressure Testing andcommissioning works.

Location : Bhogat, India.Vessel : Coastal Triumph.Period : April 2015 – May 2015.

1. Subsea Hose Changeout

No Client Project / Description Locations Start Date CompletionDate

1Transocean

DDKG – 2 – Fishnet Removal, over boatIntakes plugging / Unplugging for internalrepairs

Reliance Field 11.03. 2015 23.03.2015

2Transocean

Semi Sub ActiniaUWILD : DivingABS CLASS Survey

Kakinada 13.03.2015 13.04.2015

3Transocean

Semi Sub GSF 140Installation of Cofferdam on Hidrophoneand Sea Chest Locations.

Kakinada 19.04.2015 05.05.2015

4 Transocean Semi Sub GSF 140Phase # 2Installation of Cofferdam for Crackrectification and Hydrophone close outs.

GangavaramPort, Vizag.

02.07.2015 09.07.2015

5 Great Drill Jackup GD ChhayaABS CLASS UWILDD Survey

Heera Field,India.

10.11.2015 24.11.2015

6 DynamicDrilling &Services Pvt.Ltd.

Jackup Dynamic VisionABS CLASS UWILDD SurveyUnderwater andRope Access work

MumbaiHigh

06.02.201630.01.2016

18.02.201603.02.2016

7

UWILDDs and Remedials conducted for ABS and IRS CLASS SurveysFor Jackup Rigs, Semi Submersibles and Drill ships.

Using Commercial Diving and Rope Access techniquesYear 2015 – 2016.

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Remedial works forSPM – Phase II

Location : Bhogat, India.Vessel : Coastal Triumph.Period : Dec.2014.

Client :Cairn India Limited.Project : Provision for Diving Services,

Free Span rectification on LA and LBPipelinesRavva and CB/OS-02 4 year IMR Contract.

Location : Suvali, India.Vessel : MV Meghna.Period : 2nd Jan. – 21st Jan.2015

2. RC Platform Boat Landing Removal and Installation of new boatlanding.

Client :Cairn India Limited.

Project : Provision of Diving Services, Jacket

Certification and Free Span Rectification at Ravva

and CB/OS-02 - 4 year IMR Contract

SBM and Field maintenance activities.

Location : Ravva and Cambay Blocks, India.

Vessel : MV Collard Tide.Period : Aug.2014 - Ongoing

Client :Cairn India Limited.Project : Provision for Diving Services,

Inspection and Remedial works forSPM – Phase I

Location : Bhogat, India.Vessel : Coastal Triumph.Period : Oct.2014.

Client :Cairn India Limited.Project : Provision of Diving Services, Jacket

Certification and Free SpanRectification at Ravva andCB/OS-02 - 4 year IMR Contract

SBM and Field maintenance activities.

Location : Cambay Blocks, Suvali, India.Vessel : Coastal Triumph.Period : Nov.2014 – Dec.2014

Client : HPCL Mittal Energy LimitedProject Consultants : Engineers India Ltd.Project : Free Span Rectification of 48 inch Pipeline from SPM to LFP

at Mundra.

Location : Gulf of Kutch, Near Mundra Port , India.

Vessel : IBIS Barge and AHT Sea Melody.Period : April – June 2014

Diver Installed UnderwaterGrout Bags for PipelineSupports.

No Client Project / Description Locations Start Date CompletionDate

1 Shelf DrillingJackup C.E.ThrontonUWILDD and Rope Access Services forABS CLASS Survey

Bombay High 27.1.2014 22.12.2014

2 TransoceanDrill Ship GSF ExplorerSubsea Remedial Works as perABS CLASS Survey

Rajamundhary,India.

21.06.2014 02.07.2014

3 TransoceanSemi Sub M.G. HulmeSubsea inspections and remedial worksfor ABS CLASS Survey

Kakinada, india 16.06.2014 24.07.2014

4 TransoceanDrill Ship GSF ExplorerIndustrial Rope Access Worksconducting DROPS and Remedial works

Rajamundhary,India

20.08.2014 02.10.2014

5 Great ShipRig GD ChitraUWILDD and Rope Access Services forABS CLASS Survey

Bombay High 25.10.14 12.11.2014

6 Shelf Drilling

Rig – C.E. ThortonUWILD : Diving and Rope AccessABS CLASS Survey Bombay High 27.11.2014 22.12.2014

7

8

9

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackup Rigs, Semi Submersibles and Drill ships.

Using Commercial Diving and Rope Access techniquesYear 2014 – 2015.

Client :Cairn India Limited.

Project Exposed Pipeline Rectification works

Location : Suvali, West Coast India.Period : January 2014 – February 2014

Client :Cairn India Limited.

Project : Provision of Diving Services, Jacket Certification and Free

Span Rectification at Ravva and CB/OS-02

- 4 year IMR Contract

Location : Ravva and Cambay Blocks, India.

Vessel : MV Collard Tide.Period : February 2014 – July 2014

Client :CCC Underwater Engineering UEProject : Provision of Dive Teams for Air and Saturation Diving

Inspection and Construction Diving.

Location : Middle East and India.

Vessel : CCC Pioneer, HLS 2000, Maridive Constructor, DLB 750Period : Sept. 2006 – Ongoing

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackup Rigs, Semi Submersibles and Drill ships.

Using Commercial Diving and Rope Access techniquesYear 2013 - 2014

No Client Project Locations Actual

Description Start Date CompletionDate

1 TransoceanSemi Sub M.G. HulmeTopside inspections Using Rope AccessTechniqques for ABS Class Survey

Kakinada 05.03.2014 19.03.2014

2 TransoceanSemi Sub ActiniaTopside Inspections using Rope Accesstechniques.

Kakinada 21.02.2014 26.02.2014

3 TransoceanDrill Ship GSF ExplorerSubsea Remedial Works

OffshoreKakinada

10.02.2014 15.02.2014

4 Shelf DrillingRig J T AngelRope Access for Remedial Works

Pipavav Yard 06.01.2014 23.02.2014

5 TransoceanRig F G MclintockUWILD : Diving and Rope Access

Mumbai High 12.12.2013 17.01.2014

6 Shelf DrillingRig Ron TappmeyerUWILD : Diving and Rope AccessGusset Plate Renewal using Rope Access

Mumbai High 09.11.2013 17.01.2014

7 Shelf DrillingRig J T AngelUWILD : Diving and Rope Access

Mumbai High 22.11.2013 06.01.2014

8

Global RemoteIntegrated

Access SolutionsPvt Ltd

Rig Aban IV – Underwater Weld CrackRemoval with Underater burr grindingand rectification works.

Goa 09.10.2013 14.10.2013

9 TransoceanRig GSF 140Remedial Works and UWILDD

OffshoreKakinada

10.08.2013 14.10.2013

10 Greatship (India)Ltd

Rig GD ChetnaABS CLASS UWILDD Survey Bassin Field 12.11.2013 14.11.2013

11 TransoceanRig Trident – XIICorrosion cap Installation

Pipavav 28.04.2013 09.05.2013

12 TransoceanRig MG HulmeUWILDD for Semi-Submersible MGHulme

Vizac 22.03.2013 30.04.2013

Client : Great Offshore / Engineers India Ltd. (EIL)

Project Mangalore Refinery and Petrochemicals Ltd.

(Phase # 2 Completion)

Installation of Collar Clamps on 48” Spool Piece on

PLEM side and Pipeline Flanges.

Final Pressure testing of 48” pipeline.

Installation of Altimeter and Subsea assistance for

SBM commissioning.

Vessel : Malaviya # 3.Location : Mangalore, West Coast India.Period : Oct.2013 – Nov.2013

Client : Great Offshore / Engineers India Ltd. (EIL)

Project Mangalore Refinery and Petrochemicals Ltd.

Gasket change and Leak rectification

works on 48” tie in Spool (PLEM to Pipeline)

Installation of Grout bags for Pipe Stabilisation works

Vessel : GAL ConstructorLocation : Mangalore, West Coast India.Period : April – June 2013

Client : Hyundai Heavy Industries, KoreaProject Indian Oil Co. Ltd. SBM # 1

Gasket change and Leak rectification

works on 48” tie in Spool (PLEM to Pipeline)

Installation of Collars on Subsea Hoses.

Installation of Anodes with Underwater Welding

Installation of Fabrication aids of the PLEM

Vessel : Hyundai HD2500Location : Paradip, East Coast India.Period : Feb. 2013 – March. 2013

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackups, Semi Submersibles and Drill ships.Year 2012 - 2013

No Client Project Locations Actual

Description Start DateCompletion

Date

1 ONGC ,Mumbai

Rig Sagar ShaktiUWILDD for Rig Sagar Shakti

Mumbai High 28.12.2012 10.01.2013

2

PipavavTechnicalServices Pvt.ltd.Pipavav Gujrat.

Anode replacements with Rope Accesson Rig Noble Kennedy Delaney

Pipavav Shipyard

10.11.2012 15.11.2012

3

PipavavTechnicalServices Pvt.ltd.Pipavav Gujrat.

NDT with Rope Access on Rig NobleKennedy DalaneyCarrying Out all technical Services for RigNKD. Operate the installed equipmentsand Manpower Required for the SubjectWork.

Pipavav Shipyard

18.06.2012 11.07.2012

4

TransoceanHolding LLCTransoceanMumbai

Top Site ABS – Rig - RAN DOLPH YOSTTop Site Rig Inspection with Rope AccessTeam, Welding, MPI , CVI and remedialwork

Pipava, Gujrat 07.05.12 17.11.2012

5

DeepwaterPacific 1 INC. -IndiaTransocean,Mumbai

Top Site ABS – Rig DDKG1Top Site Rig Inspection with Rope AccessTeam, Welding, MPI , CVI and remedialwork

Paradip 15.05.12 21.05.12

6

Sedco ForexInternationalDrilling Inc.TransoceanHouse - India

UWILD under ABS – Trident –IITop Side and UWILDD, MPI ProjectWorks

Mumbai High 19.04.12 08.05.12

7Triton HoldingsTransocean,Mumbai

UWILD under ABS – Rig Trident XII Mumbai High 10.04.12 30.04.12

8Greatship(India) Ltd.Mumbai

UWILD under ABS – Rig GD – ChetnaUWILDD of Rig with Diving Team

NhavaSeva,NaviMumbai

31.03.12 19.04.12

9Triton HoldingsTransocean,Mumbai

UWILD under ABS – CETAnode Replacement , Top Side andUWILDD, Replacement & MPI Of Brace,Project Works

Goa 19.03.12 30.04.12

Client : Hyundai Heavy Industries, Korea

Project Pipeline, SPM installationand Tie ins for IOCL Ltd.

Season IIIComplete Diving Services

Vessel : Hyundai HD2500Location : Paradip, East Coast IndiaPeriod : Dec. 2012 – Feb. 2013

Client : Hyundai Heavy Industries, Korea

Project Pipeline, SPM installationand Tie ins for IOCL Ltd.

Season IIComplete Diving Services

Vessel : Hyundai HD1000Location : Paradip, East Coast IndiaPeriod : November 2011 – April 2012

2011-2012

1Transocean,Mumbai

Topside Rope Access Survey and UWILD,under ABS.

Mumbai High 08.09.11

2Transocean,Mumbai

Topside Rope Access Survey and UWILD,under ABS

Mumbai High 04.03.11 14.05.11

2009-2010

3 Transocean (India) Ron Tappmeyer - UWILDMumbai High,India

22.09.09 01.12.09

4 Transocean (India) MODU C E Thornton - UWILDMumbai High,India

08.09.09 01.12.09

5 Transocean (India) Rig Trident II - UWILDMumbai High,India

01.04.09 14.05.09

6 2008-2009

7 Transocean (India) Rig Trident 12 - UWILDMumbai High,India

27.01.09 06.03.09

8 Transocean (India) Rig J.T.Angel - UWILDMumbai High,India

19.09.08 04.11.08

9 Transocean (India) Remedial Works on Drillship D534East Coast ,India.

01.04.08 15.04.08

2007-2008

10 Transocean (India)Remedial Works on Drillship Deepwater

FrontierEast Coast, India 17.03.08 24.03.08

11 Transocean (India) Remedial Works on Charles Kirk Rhien Jr. East Coast, India 02.12.07 17.12.07

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackups, Semi Submersibles and Drill ships.Year 2007 - 2011

Client : Leighton Contractors (India)Project : SPM System for Cairn Energy Ltd

Complete Air Diving Services forPipelaying, SBM Installation,installation of Tie Spool.

Vessel : Leighton EclipseLocation : Gujurat, IndiaPeriod : October 2010 – June 2011

Client : Hyundai Heavy Industries, Korea

Project : SPM System and PipelineInstallation for IOCL LtdSeason IComplete Diving Services

Vessel : Hyundai HD2500Location : Paradeep, East Coast IndiaPeriod : December 2010 – April 2011

Client : Indian Oil CorporationProject :SBM J Tube Repair worksVessel : SBMLocation : Vadinar, IndiaPeriod : 14th Dec.2011 – 15th Jan.2012

Client : Vantage DrillingProject : Remedial Underwater worksVessel : Platinum ExplorerLocation : Offshore Kakinada, IndiaPeriod : 20th Nov. – 29th Nov. 2011

Client : Leighton Contractors (India)Project : SPM System for Cairn Energy Ltd

Complete Air Diving ServicesVessel : Leighton MYNXLocation : Gujurat, IndiaPeriod : October 2010 – June 2011

Client : Neptune Marine ServicesAustralia

Project : IRM Works for Qatar GasVessel : DP2 Neptune TridentLocation : Offshore QatarPeriod : January 2010 – May 2010

Client : K2 Specialist Services M.EProject : Inspection & Diving Suopport

ServicesLocation : Abudhabi,U.A.EPeriod : July 2010 -Ongoing

Client : Leighton Contractors (India)Project : I0200 SPM System for HPCL

48” Pipelaying,SBM installation,Installation of 2 x 48” Tie in Spools.

Vessel : Leighton StealthLocation : Visakhapatnam, IndiaPeriod : December 2009

Client: Seatek Offshore Pvt LtdProject: Fabrication of Air/Mix Gas Diving

SystemLocation: Mumbai , IndiaPeriod: 01.07.09 to Ongoing

Client: Helix Energy Systems, HoustonProject: Supply of Construction Crew on

DPDSV Rem ForzaLocation: East Coast, , IndiaPeriod: July – September 2009

Client: Leighton (India) Pvt Ltd

Project: Fabrication of 30nos Concrete

Mattress Size: Length 5 mtrs x

width 3 mtrs x height 300 mm

Location: Mumbai, India.Period: August – September 2009

Client: Leighton India Pvt.LtdProject: Fabrication of Concrete

Sleepers for Subsea pipelines.ONGC Pipeline replacement -2

Location: ONGC, Mumbai High, IndiaPeriod: February – March 09.

Client: Sea-Struct Pty. Ltd.A Neptune Marine Services Co.

Project: Leighton India for PRP II,Fabrication of 70 no. Sea Mats forpipeline crossovers/ stabilisation.

Location: Mumbai High, IndiaPeriod: October 2008

Client: Leighton India Pvt.LtdProject: IOCL Residual Works.

Dive Support for 12 inch pipelay with Diffuser.Installation of 25 meter 12” Tie in Spool piece.

Location: Paradeep, India.Period: January - February 09.

Client: Cal Dive InternationalProject: DPDSV Eclipse

Base Support Services, Supplyof Rigging and Diving Personnel,Supply of Diving Gases, ProjectConsumables, Specialised Tools.

Location: Reliance KG D6 – East Coast of IndiaPeriod: Jan 2008 – December 2008

Client: Helix Energy Solutions – Houston USAProject: DPDSV Eclipse

Base Support Services and hireof heavy plant equipment,Torque tools, etc.

Location: Reliance KG D6 – East Coast of IndiaPeriod: Jan 2008 – March 2009

Client: Upstream Petroleum, AustraliaGolden Dream Shipping, Norway

Project: Crystal Sea Import Flow line RepairLocation: Platform N1 Bombay High North Field.Phase – 1: August 2006 – January 2007

Seatek India carried out complete project management, engineering,preparation and approval of work scope, procurement, fabrication,mobilisation, offshore topside and sub sea works, third party verification,documentation and reporting.

Client: Clough Engineering, AustraliaProject: Panna Field DevelopmentLocation: Panna Field, Offshore IndiaPeriod: 2005 - 2006

Project support services, Fabrication of Offshore Components andInstallation AidsProcurement and Sourcing of Project Permanent and Temporary MaterialsLogistic support, Deployment of skilled manpower for top side and sub seaactivities, Hire of plant and machineries.

Client: Logos – Russia / Russian Technology Centre, IndiaProject: Design and Fabrication.Location: Gujarat and Hyderabad, IndiaPeriod: 2006 till date

Complete Design, Fabrication and Logistics of Weaponry / Armamentsimulator housings for the Indian Defence.

The Seatek Office was the centre of execution of the complete second phaseof the Hazira Pipeline Stabilisation Project carried out by Clough Oil and Gasin India.Responsibilities included Project Management, Manpower deployment,Procurement, Fabrication, Hire of Heavy plant and machinery, Marinespread, Set up and operations of Fabrication Yard for Sub Sea ConcreteMattresses, Transportation of 315 concrete sea mats, 15 tons each, to Hazirafor stabilisation of 12 inch gas pipeline.

Our client’s comments for the Project.

“The local company, SEATEK INDIA is supplying the necessaryoffice space, infrastructure and liaison services to Clough to make itall happen in the Epicenter of one of world’s most chaotic andbureaucratic metropolises.”

Client: Clough Engineering – AustraliaProject: Hazira Pipeline StabilisationLocation: Mumbai and Hazira, IndiaPeriod: 2004 - 2005

Supply of Marine Support Vessels, Transport of Equipment to Offshoreconstruction barges including supply of heavy Machinery and fabrication ofcustom made non conventional tools for carrying out sub sea works.

Client: Clough Engineering – AustraliaProject: Hazira Pipeline StabilisationLocation: Hazira, West Coast, IndiaPeriod: 2003 - 2004

Suffolk Offshore Services Limited – West Africa:2002 - 2004.Supply of skilled manpower for Offshore and Marine Projects such as Air andSat Divers, Life Support Supervisors, Technicians, Construction crews, etc.Procurement of specialized underwater equipment and fabrications of custommade tools.

Del. Seatek India Pvt. Ltd.: Contacts.Hormuz Aderianwalla Delzad KaraniMob : + 91 9820313118. Mob: + 91 9821418369Email: [email protected] Email: [email protected] Tel : + 91 22 2418 2852 Fax : +91 22 24182852Address : C-13/14, Antophill Warehousing Complex, Barkat Ali Road,

Wadala (E), Mumbai : 400037.

Seatek Oil & Gas Services LLC (Abu Dhabi)Mandar ApteMob : +971 50 6898678Office : +971 2 5538817 Fax : +971 2 5538816Email : [email protected] URL : www.seatek.aeAddress : P.O. Box 36880, Abu Dhabi, United Arab Emirates.