28
Demand Response in California- From Hot Summer to Any Time DR Mary Ann Piette Director, Demand Response Research Center Lawrence Berkeley National Laboratory

Demand Response in California- From ... - Golden Gate ASHRAE · Increase Fan qty. reduction Pre-cooling Cooling valve lim it Boiler lockout Slow recovery Extended shed period Common

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Demand Response in California- From Hot Summer to Any Time DR

    Mary Ann Piette

    Director, Demand Response Research Center

    Lawrence Berkeley National Laboratory

  • Presentation Outline

    • The Past – Demand Response for Extreme Events• The Present –Any Time Dispatchable Resource• Automate Once – Use Many Times• Future – Quantifying Resource Availability on Multiple Time Scales

    • Summary and Next Steps

  • The Past – DR for Extreme Events

    Development of automated DR started in 2002 – Cost - Develop low-cost, automation infrastructure– Technology – Evaluate reliability & readiness– Capability – Evaluate strategies to modify loads

    OpenADR - open standard for price & reliability signalsOpenADR - used for utility and ISO Automated DR programs

  • Linking Energy Efficiency and DR

  • 1/9/2015 5

    Demand Response Simplified

    Schedule

    Price

    Signaling Congestion

    Reliability

    Economics

    Intermittent Resources

    Objectives Data Model Automation

    Standards

    Control Strategies

    D

    Manual

    Automated

    Centralized

    Gateway

    Embedded

  • Monthly reports on DR programs are available by each utility

  • OpenADR Fundamentals

    Provides non‐proprietary, open standardized DR interface

    Allows electricity providers to communicate DR signals directly to existing customers

    Uses common XML language and existing communications such as the Internet

    $/kWhPrice Signal OpenADR

    Data Model InternetComm

    Pricing Data Models

    Physical Communications

    Client ServerClient ServerAuto‐DR

    Building ActionBuilding Action

    End‐Use Controls

    Control Strategies

  • Historic focus on Seasonal Grid StressOpenADR PG&E Demand Bid Test Day

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    18000

    20000

    12:0

    0 AM

    1:00

    AM

    2:00

    AM

    3:00

    AM

    4:00

    AM

    5:00

    AM

    6:00

    AM

    7:00

    AM

    8:00

    AM

    9:00

    AM

    10:0

    0 AM

    11:0

    0 AM

    12:0

    0 PM

    1:00

    PM

    2:00

    PM

    3:00

    PM

    4:00

    PM

    5:00

    PM

    6:00

    PM

    7:00

    PM

    8:00

    PM

    9:00

    PM

    10:0

    0 PM

    11:0

    0 PM

    12:0

    0 AM

    Who

    le B

    uild

    ing

    Pow

    er (k

    W)

    CPP MA Baseline

    OpenADR Cumulative Shed in July 2008

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    0:00

    1:00

    2:00

    3:00

    4:00

    5:00

    6:00

    7:00

    8:00

    9:00

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    Pow

    er [M

    W]

    Seattle Municipal Tower Mckinstry Target - T1284 3/10 BL OAT Reg BL

    Test Period

    OpenADR Northwest Test on Cold Morning

    8

  • Control Strategies Evaluated in Previous Demos

    HVAC Lighting Other

    Building use Glo

    bal t

    emp.

    adj

    ustm

    ent

    Duc

    t sta

    tic p

    res.

    Incr

    ease

    SAT

    Incr

    ease

    Fan

    VFD

    lim

    itC

    HW

    tem

    p. In

    crea

    seFa

    n qt

    y. re

    duct

    ion

    Pre-

    cool

    ing

    Coo

    ling

    valv

    e lim

    itBo

    iler l

    ocko

    utSl

    ow re

    cove

    ryEx

    tend

    ed s

    hed

    perio

    dC

    omm

    on a

    rea

    light

    dim

    Offi

    ce a

    rea

    light

    dim

    Turn

    off

    light

    Dim

    mab

    le b

    alla

    stBi

    -leve

    l sw

    itchi

    ngN

    on-c

    ritic

    al p

    roce

    ss s

    hed

    ACWD Office, lab X X X X X X XB of A Office, data center X X X X XChabot Museum X X2530 Arnold Office X X50 Douglas Office X XMDF Detention facility XEchelon Hi-tech office X X X X X X X XCenterville Junior Highschool X XIrvington Highschool X XGilead 300 Office XGilead 342 Office, Lab X XGilead 357 Office, Lab X XIKEA EPaloAlto Furniture retail XIKEA Emeryville Furniture retail XIKEA WSacto Furniture retailOracle Rocklin Office X XSafeway Stockton Supermarket XSolectron Office, Manufacture X XSvenhard's Bakery XSybase Hi-tech office XTarget Antioch Retail X XTarget Bakersfield Retail X XTarget Hayward Retail X X X XWalmart Fresno Retail X X

    68.0

    69.0

    70.0

    71.0

    72.0

    73.0

    74.0

    75.0

    76.0

    77.0

    78.0

    79.0

    80.0

    81.0

    82.0

    Customer

    Tem

    pera

    ture

    (F)

    NormalModerateHigh

    CPPAve. temp. increase (mod): 2.75 FAve. temp. increase (high): 1.88 FDBPAve. temp. increase: 2.3 F

    DBP CPP one-level GTACPP two-level GTA

    Ret

    ail

    Mus

    eum

    Offi

    ce 1 Ret

    ail 1

    A

    Offi

    ce 3

    Gov

    ernm

    ent 1

    Ret

    ail 2

    Scho

    ol

    Lab/

    Offi

    ce2

    Gov

    ernm

    ent 2

    Gov

    ernm

    ent 3

    Gov

    ernm

    ent 4

    Ret

    ail 3 O

    ffice

    4

    Lab/

    Offi

    ce

    Ave

    rage

    Ave

    rage

    Ave

    rage

    9

  • DR Data from 22 Commercial Buildings

    -200

    -100

    0

    100

    200

    300

    400

    500

    600

    Scho

    ol 1

    Scho

    ol 2

    Offi

    ce/D

    ata

    Cen

    ter 2

    Offi

    ce/L

    ab 1

    Ret

    ail 1

    Offi

    ce/D

    ata

    Cen

    ter 1

    Offf

    ice/

    Lab

    2

    Ret

    ail 2

    Offi

    ce/L

    ab 3

    Offi

    ce 2

    Offi

    ce 5

    Ret

    ail 3

    Bake

    ry

    Offi

    ce 1

    Mus

    eum

    Offi

    ce 3

    Offi

    ce 4

    Det

    entio

    n C

    ente

    r

    Ret

    ail 4

    Ret

    ail 5

    Ret

    ail 6

    Offi

    ce/D

    ata

    Cen

    ter 3

    CPP Sites

    Dem

    and

    redu

    ctio

    n (k

    W)

    Average Shed Estimated Shed

  • Demand Response Strategies Guide for Commercial Buildings

    HVAC Systems3 . 1 . 1 . G l o b a l t em p er a t u r e a d j u s t m e n t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 03 .1 .2 . Pass ive therma l mass storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253 .1 .3 . Duct s ta t ic pressure decrease . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263 . 1 . 4 . F an var i ab l e f r eq ue nc y dr i ve l i m i t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 73 . 1 . 5 . S u p p l y a i r t e m p e r a t u r e i n c r e a s e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 83 .1 .6 . Fan q uant i ty reduc t ion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 293 .1 .7 . Coo l ing va lve l imi t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 303 . 1 . 8 . Ch i l l e d w a t e r t em p e r a t u r e i n c r e a se . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 313 .1 .9 . Ch i l l e r demand l imi t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 323 .1 .10 . Ch i l le r quant i t y reduct ion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 343 .1 .11 . Rebound avo idance st ra teg ies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

    Lighting Systems3.2 .1 . Zone sw i tch ing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 373 . 2 . 2 . L u m i n a i r e / l am p sw i t c h i n g . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 83 .2 .3 . Stepped d imming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 413 .2 .4 . C o n t i n u o us d i mmi n g . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2

    M i s c e l l a n e o u s E q u i p m e n t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 3

    Non‐Component‐Specific Strategies3 .4 .1 . Demand l im i t s t ra tegy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 453 .4 .2 . Pr ice ‐ l eve l response st ra tegy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46

    4. Implementation of DR Strategies 4.1. DR Strategy Development and Commissioning...................................................47

  • DR Quick Assessment Tool

    0

    50

    100

    150

    200

    250

    300

    350

    0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00Time

    Who

    le B

    uild

    ing

    Pow

    er

    kW

    Baseline Pre-cooling with linear temp set upPre-cooling with exponential temp set up No pre-cooling with exponential temp set upPre-cooling with step temp set up

    High Price Period

    `

    Simple free EnergyPlus tool for retail and office buildings to provide DR estimates for common HVAC and lighting strategies

    0.0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    1.0

    #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11

    Ave

    rage

    Dem

    and

    Savi

    ngs

    (W/S

    q ft

    )

    Actual data Simulation Results

    Excellent performance predicting DR in southern Calif.Included modeling pre-cooling strategies

  • OpenADR Interoperability Progress

    2002  to 2006 2007 2008 2009 2010 2011 2012

    Research initiated by LBNL/ CEC

    Pilots and field trialsDevelopments, tests (Utilities)

    OpenADR 1.0 Commercialization(PG&E, SCE, and SDG&E)

    Official OpenADR specification (1.0) by LBNL/CEC*

    1. OpenADR Standards Development- OASIS (EI TC), UCA, IEC

    2. NIST Smart Grid, PAP 09

    1. Anytime DR Pilots- Wholesale markets- International demonstrations- Dynamic pricing, renewables2. All end-use sectors

    Certification/Testing (v2.0)

    Communication Standards Development:1. Research and development2. Pilots and field trials3. Standards development4. Conformance and interoperability

    EI 1.0 standards- OpenADR profiles

    OpenADR 2.0 specifications- Products, commercialization- International standards (IEC)

    Over 250 MWautomated in California

    National outreach with USGBC

  • OpenADR 2.0 Application

    14

    *Figure Source: OASIS Energy Interop Draft Standards (http://www.oasis‐open.org/committees/energyinterop/) 

  • • As of summer, 2014, 234 MW, 1200 accounts currently enrolled• ~$215/kW statewide average enablement cost• Additional sites in SMUD, Palo Alto, coming to LADWP• Additional sites with WIFI Communicating Thermostats

    Current Status OpenADR in California

  • Demand Response and Baseline Models

    Utilities use 10 previous days as baselineMay use a morning adjustmentRegression, built from baseline

    o Time-of-week indicator variableso Piecewise linear temperature dependence

    ˆ L u(ti,T(ti)) i uT(ti)

    [Mathieu, Price, Kiliccote, and Piette, 2011. IEEE Transactions on Smart Grid]

  • Renewables and Managing the “Duck” Curve

    Source: Sanders, H., “CEC IEPR Demand Response Workshop”, June 17, 2013, slide 3.

  • New Markets for Responsive Loads

    Product Physical Requirements

    Product Type General DescriptionHow fast to respond

    Length of response

    Time to respond

    How often called

    Regulation Response to random unscheduled deviations in 

    scheduled net load

    30 sec Energy neutral in 15 

    min

    5 min Continuous w/in specified bid 

    period

    Flexibility Load following reserve for un‐forecasted wind/solar 

    ramps

    5 min 1 hr 20 min Continuous w/in specified bid 

    period

    Contingency Rapid & immediate response to supply loss

    1 min ≤ 30 min ≤ 10 min ≤ Once/day

    Energy Shed or shift energy consumption over time

    5 min ≥ 1 hr 10 min 1‐2 x/day & 4‐8 hr notification

    Capacity Ability to serve as an alternative to generation

    Top 20 hrs coincident w/balancing authority peak

  • Ancillary Services

    Regulation rectifies small discrepancies between load and 5-minute real time dispatch Receives operating point instruction and

    responds within 4 sec Energy neutral, although not in practice

    Operating Reserves respond when a contingency event occurs to restore balance. respond within 10 minutes event duration typically 10-30 minutes Includes Synchronous and Non-Synchronous

  • Fast DR – Evaluating how loads can act like generators – Development of communication, control and telemetry requirements– Understanding markets and market participation rules– Research concepts supported with field tests

    -100

    -50

    0

    50

    100

    150

    0:05

    0:45

    1:25

    2:05

    2:45

    3:25

    4:05

    4:45

    5:25

    6:05

    6:45

    7:25

    8:05

    8:45

    9:25

    10:0

    5

    10:4

    5

    11:2

    5

    12:0

    5

    12:4

    5

    13:2

    5

    14:0

    5

    14:4

    5

    15:2

    5

    16:0

    5

    16:4

    5

    17:2

    5

    18:0

    5

    18:4

    5

    19:2

    5

    20:0

    5

    20:4

    5

    21:2

    5

    22:0

    5

    22:4

    5

    23:2

    5Time of Day

    Dem

    and

    (kW

    )

    Forecasted - Actual Hourly Forecasted Bids

    Advanced Applications- Using Demand-side Resources for Grid Reliability with DR and Microgrids

    Architecture

    Loads

    CommunicationLatency

  • Evaluating Which Loads are Most Flexible

    21

    Commercial

    Residential

    Municipal

    Agricultural

    Response ParametersFlexibility range (reg up, reg down, both)

    Speed of Response Store, Shift or Shed

    Size of ResponseControllable

    Sizing of ResourceMin and max daily consumption requirements

    Cycling Rate Impacts (wear/tear)

    Impacts on Overall ResponseRebound/Recovery Issues

    Charge/DischargeIndependence

    How to PredictPredictable or Variable (daily, seasonal, 

    geographic)Time or Operational dependence

    How it ParticipatesIndividual or Aggregated

    LOADS FLEXIBILITY FILTER ANCILLARY SERVICESPRODUCTS

    MODELS

    *Builds on 10 years of field work by DRRC

  • 5 Field Studies Beyond Hot Summer Days

    • Cold mornings for winter peak regions (Seattle)• Non-spin reserve ancillary services (No. Cal)• Regulation ancillary services (No. Cal)• Economic dispatch - integrated price signals (NY NY)• Fast telemetry for small commercial (No. Cal.)

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    0:00

    1:00

    2:00

    3:00

    4:00

    5:00

    6:00

    7:00

    8:00

    9:00

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    Pow

    er [M

    W]

    Seattle Municipal Tower Mckinstry Target - T1284 3/10 BL OAT Reg BL

    Test Period

    Site Glo

    bal t

    emp.

     adj

    ustm

    ent

    Duct

     stat

    ic p

    res. d

    ecre

    ase

    SAT 

    decr

    ease

    Fan 

    VFD 

    limit

    RTU Shu

    t off

    Duty

     Cyc

    ling RT

    Us

    Pre‐

    heat

    ing

    Pre‐

    cool

    ing

    Fan‐

    coil un

    it of

    fCy

    cle 

    elec

    tric h

    eate

    rsCy

    cle 

    AHU Fan

    sCy

    cle 

    VAVs

    Set u

    p CO

    2 Se

    tpoi

    nts

    Com

    mon

     are

    a lig

    ht d

    imOffi

    ce are

    a lig

    ht d

    imTu

    rn o

    ff lig

    htDi

    mm

    able

     ballast

    Bi‐le

    vel s

    witc

    hing

    Non

    ‐crit

    ical

     pro

    cess

     shed

    Elev

    ator

     cyc

    ling

    Slow

     Re c

    over

    y

    McKinstry S W S S WTarget ‐ T1284 WS WS WSSeattle Municiple Tower WS W W WSSeattle University WS W W S W W W W W

    HVAC Lighting Other

  • Fast DR in Commercial BuildingsBuildings can provide ramping- Costs will be lower if used in many DR programs- How often can load be called?

    0

    100

    200

    300

    400

    500

    600

    0:05

    0:45

    1:25

    2:05

    2:45

    3:25

    4:05

    4:45

    5:25

    6:05

    6:45

    7:25

    8:05

    8:45

    9:25

    10:0

    5

    10:4

    5

    11:2

    5

    12:0

    5

    12:4

    5

    13:2

    5

    14:0

    5

    14:4

    5

    15:2

    5

    16:0

    5

    16:4

    5

    17:2

    5

    18:0

    5

    18:4

    5

    19:2

    5

    20:0

    5

    20:4

    5

    21:2

    5

    22:0

    5

    22:4

    5

    23:2

    5

    Time of Day

    Dem

    and

    (kW

    )

    Actual 5 min. Data Hourly Forecast with reduction Forecasted Data

    PLP EVENT

    SiteAvailable Capacity 

    (MW)Min. Operating Limit 

    (MW)Max. Operating Limit 

    (MW)Ramp Rate (MW/min.)

    UC Merced 0.16 0 0.17Reg up: 0.022       

    Reg down: 0.022West Hill Farms 0.03 0 0.16 Reg up/down:0.03

    SMCC 0.2 0 0.2Reg up: 0.05        

    Reg down_1: 0.066   Reg down_2: 0.134

  • Integrated Sensing and Communication: Low-Cost Telemetry of Demand Side Ancillary Services

    • Low-cost, Internet connected embedded systems enable telemetry and control

    • $50/kW site enablement vs traditional at $300/kW• Demonstrated across 12 sites and four load types

  • Metrics for Response

  • Title 24 - SECTION 120.2 –CONTROLS FOR SPACE-CONDITIONING SYSTEMS

    (h) Automatic Demand Shed Controls.DDC to Zone level be programmed to allow centralized demand shed for non-critical zones:

    Controls have capability to - remotely setup cooling temp by 4 F or more in non-critical zones with EMCS

    Controls require following features:- Manual control. Manual control by authorized facility operators to allow adjustment of heating

    and cooling set points globally from a single point in the EMCS; and- Automatic Demand Shed Control. Upon receipt of a DR signal, space-conditioning systems

    conduct a centralized demand shed, as specified in Sections 120.2(h)1 and 120.2(h)2.

    26

    StartTime

    EndTime

    ACTIVE IDLEPeriod

    Pri

    ce

    Nor.

    Mod.

    HighL

    oad

    Lev

    el

    1

    2

    3

    0

    StartTime

    EndTime

    ACTIVE IDLEPeriod

    Pri

    ce

    Nor.

    Mod.

    HighP

    rice

    Nor.

    Mod.

    HighL

    oad

    Lev

    el

    1

    2

    3

    0Loa

    d L

    evel

    1

    2

    3

    0

  • Occupant Controlled Smart Thermostat in Title 24OCSTs are self-certified by manufacturer to Energy Commission to

    meet T24. Spec focuses on 3 interfaces:Communications, User Display and HVAC System Interface

    Appendix JA5.2.3.1 Price Signals Price signals allow utility or entity to send a signal or message to occupant’s OCST to provide pricing info to occupant and initiate DR Control for DR Period utilizing a DR Signal.

    JA5.2.3.2 Demand Response Periods This event class allows utility to initiate DR Control for DR Period utilizing a DR Signal. Signal attributes shall be specified within messaging protocol.

    Messaging Protocols in CEC List are Apples and Oranges

    ZigBee Wireless Mesh BACnet MSTPANSI 709.1OpenADR 2.0Enocean Wireless Protocol

  • Summary

    Key Issues• California has a vibrant set of DR programs• Continued changes in goals and motivations• Growing capabilities of buildings to provide

    services to the electric grid• New telemetry and control systems provide

    low cost automationAcknowledgements / Sponsors –California Energy Commission, US DOE, Bonneville Power Administration, PG&E, SCE