67
Public Works Committee Agenda Councilmembers: Dana RalphDennis HigginsElizabeth Albertson, Chair Unless otherwise noted, the Public Works Committee meets at 4:00 p.m. on the 1 st & 3 rd Mondays of each month. Council Chambers East, Kent City Hall, 220 4th Avenue South, Kent, 98032-5895. For information please contact Public Works Administration (253) 856-5500. Any person requiring a disability accommodation should contact the City Clerk’s Office at (253) 856-5725 in advance. For TDD relay service call the Washington Telecommunications Relay Service at 1-800-833-6388. November 5, 2012 4:00 p.m. Item Description Action Speaker Time Page 01. Approval of Minutes Dated October 22, 2012 YES None 03 03 02. Contract/2013 Water Treatment Chemicals - with JCI Jones Chemicals, Inc. & Cascade Columbia Distribution YES Sean Bauer 05 09 03. Contract/GeoEngineers for Geotech Services James St Pump Station YES Kelly Casteel 05 23 04. Contract/A Plus Removal and Recycling for Contamination Cleanup James Street Pump Station YES Kelly Casteel 05 29 05. Contract/The Eastman Company Appraiser for Lower Russell Road Levee YES Mark Madfai 05 33 06. Contract/Certified Land Services Corporation - Negotiator for Lower Russell Road Levee Yes Mark Madfai 05 37 07. Contract/GeoEngineers for Milwaukee II Levee YES Mark Madfai 05 45 08. Contract/AECOM for Milwaukee II Levee YES Mark Madfai 05 51 09. Information Only/SE 256 th Street Proposed LID Update NO Chad Bieren 10 63 10. Information Only/223 rd St. Traffic Calming - Update NO Rob Knutsen 10 65 11. Information Only/Flood Season Prevention Planning & Report on King County Efforts NO Mike Mactutis/ Greg Reed 20 67 1

Public Works Committee Agenda - Granicus

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Public Works Committee Agenda - Granicus

Public Works Committee Agenda Councilmembers: Dana Ralph♦Dennis Higgins♦Elizabeth Albertson, Chair

Unless otherwise noted, the Public Works Committee meets at 4:00 p.m. on the 1st & 3rd Mondays of each month. Council Chambers East, Kent City Hall, 220 4th Avenue South, Kent, 98032-5895. For information please contact Public Works Administration (253) 856-5500.

Any person requiring a disability accommodation should contact the City Clerk’s Office at

(253) 856-5725 in advance.

For TDD relay service call the Washington Telecommunications Relay Service at 1-800-833-6388.

November 5, 2012

4:00 p.m.

Item Description Action Speaker Time Page

01. Approval of Minutes Dated October 22, 2012 YES None 03 03

02. Contract/2013 Water Treatment Chemicals -

with JCI Jones Chemicals, Inc. & Cascade

Columbia Distribution

YES Sean Bauer 05 09

03. Contract/GeoEngineers for Geotech Services –

James St Pump Station

YES Kelly Casteel 05 23

04. Contract/A Plus Removal and Recycling for

Contamination Cleanup – James Street Pump

Station

YES Kelly Casteel 05 29

05.

Contract/The Eastman Company – Appraiser for

Lower Russell Road Levee

YES Mark Madfai 05 33

06. Contract/Certified Land Services Corporation -

Negotiator for Lower Russell Road Levee

Yes Mark Madfai 05 37

07. Contract/GeoEngineers for Milwaukee II Levee YES Mark Madfai 05 45

08. Contract/AECOM for Milwaukee II Levee YES Mark Madfai 05 51

09. Information Only/SE 256th Street Proposed LID

– Update

NO Chad Bieren 10 63

10. Information Only/223rd St. Traffic Calming -

Update

NO Rob Knutsen 10 65

11. Information Only/Flood Season – Prevention

Planning & Report on King County Efforts

NO Mike Mactutis/

Greg Reed

20 67

1

Page 2: Public Works Committee Agenda - Granicus

This page intentionally left blank.

2

Page 3: Public Works Committee Agenda - Granicus

PUBLIC WORKS COMMITTEE

Minutes of Monday, October 22, 2012

COMMITTEE MEMBERS PRESENT:

Committee Chair Elizabeth Albertson and Committee members Dana Ralph and Dennis

Higgins were present. The meeting was called to order at 4:02pm

Item 1 – Approval of Meeting Minutes Dated October 1, 2012:

Higgins MOVED to approve the minutes of October 1, 2012. The motion was

SECONDED by Ralph and PASSED 3-0.

Item 2 – Sound Transit South Corridor Light Rail Study:

The Committee heard a presentation by Cathal Ridge, South Corridor Development

Manager of Sound Transit, regarding light rail project in the South Corridor. Sound

Transit is kicking off their environmental analysis of the project this month which will

focus on the portion of the project between South 200th Street in SeaTac and the Federal

Way Transit Station.

The presentation outlined the steps giving a timeline for the project and listed

opportunities for public comment (see below).

A flier was given to Councilmembers with dates for upcoming open house meetings. The

first is November 8th at Highline Community College in Building 2 from 4:00-7:00 pm.

The second meeting is November 13th at Truman High School Gym from 4:00-7:00 pm.

Sound transit is reaching out to hear comments and suggestions from anyone who is

interested. There are four ways to give or submit comments:

1. In person, at public or agency scoping meetings

2. Email at [email protected]

3. Mail at Sound Transit c/o Kent Hale, Sr. Environmental Planner

401 S Jackson Street Seattle, WA 98104

4. Online: www.soundtransit.org/FWextension

Information Only/No Motion Required

Item 3 – Consultant Services Agreement – Allen Brackett Shedd State Route

516 to S. 231st Way Levee Project:

Beth Tan gave a presentation to the committee about the SR 516 to 231st Way Levee

Project. Completing the SR 516 to S. 231st Way Levee adjacent to the Lakes Community

requires additional property from the condominium associations of Bridgewater III,

Bridgewater IV, and Regatta at the Lakes. This acquisition will not include any

condominiums, but will include common area property. North of this area the levee

adjacent to Marina Pointe will not need additional property, but will require a levee

maintenance inspection easement to complete the accreditation.

The consultant services agreement with Allen Brackett Shedd is to provide a real estate

appraisal of the impacted properties and assess the value of the project’s impacts. Their

3

Page 4: Public Works Committee Agenda - Granicus

PUBLIC WORKS COMMITTEE

Minutes of Monday, October 22, 2012

service includes impacted areas involving approximately 273 units with extensive public

involvement and communication with property owners.

This levee reach, in combination with the other levee segments along the Green River,

protects the Kent Valley businesses and residential areas from flood risks. Laporte

added that levee documents have all been reviewed by FEMA. The documents have also

been sent to King County Staff. LaPorte also noted that new levee work will meet 500

year flood protection standards.

Councilmember Ralph confirmed that we are purchasing property that is open space and

no structures will have to be moved.

Ralph MOVED to recommend Council authorize the Mayor to sign the Allen

Brackett Shedd Contract Agreement for the Real Estate appraisal services of

property on the State Route 516 to S. 231st Way Levee Project in the amount of

$58,000 upon concurrence of the language therein by the City Attorney and

Public Works Director. The motion was SECONDED by Higgins and PASSED

3-0.

Item 4 – Joint Funding Agreement for the Cooperative Data-Collection Program

with the U.S. Geological Survey:

Environmental Engineering Supervisor Alex Murillo noted that this is an on-going

program with the U.S. Geological Survey (USGS) for stream data collection. The City of

Kent will contribute $60,080 to the annual program costs of $106,205 with the USGS

providing the remainder.

These gages provide valuable information on stream and weather conditions, including

water surface elevations, flow levels and amounts of precipitation. Information is used

to calibrate stream flow models and increase the accuracy of city design of stormwater

flood projection models. The gages, through their link to internet web sites, allow staff

and the public to monitor stream flow levels from remote locations.

This contract will provide for operation, maintenance and data collection at five gages.

Two are located on Mill Creek, one on Springbrook Creek and two on Rock Creek.

Gage information is available to the public real-time at

http://waterdata.usgs.gov/wa/nwis/current?type=flow

This is an ongoing contract that is signed yearly with USGS. Council members Ralph

and Albertson mentioned that they have visited some of these sites and they have an

understanding of what the gages are.

Murillo was asked by committee members if the cost could be shared equally in the

future. Murillo will look into it for next year.

4

Page 5: Public Works Committee Agenda - Granicus

PUBLIC WORKS COMMITTEE

Minutes of Monday, October 22, 2012

Ralph MOVED to recommend Council authorize the Mayor to sign the Joint

Funding Agreement for Water Resources Investigations between the City of

Kent and the U.S. Geological Survey upon concurrence of the language therein

by the City Attorney and Public Works Director. The motion was SECONDED by

Higgins and PASSED 3-0.

Item 5 – Information Only/Mill Creek - Springbrook Creek Basin Capital:

Environmental Engineering Supervisor Alex Murillo provided an update on City projects

along Mill Creek and Springbrook Creek. Murillo noted that a lot of focus is on levee

improvements to reduce flooding from the Green River. He went on to briefly explain

what is being done to prevent flooding in the valley creek systems.

• Mill Creek upper detention dam improvements, raising the dam 5.5 feet to allow for

more storage and reduce flooding under the Central Ave S stormwater force main

improvements project.

• We are installing 1.5 miles of pipe under the sidewalk along Central Ave to reduce

flooding in the valley near James St. The final phase of the project is to construct the

James Street pump station at Mill Creek.

• The Mill Creek, James Street to Central Ave flood storage and stream habitat

improvements project will relocate the stream and reduce flooding.

• 76th Ave S culvert replacement and stream improvements project; widen culverts and

reduce flooding.

• 64th Ave S channel culvert replacement project at S 226th St and Union Pacific RR

Spur will install larger culverts to reduce flooding.

• Green River Natural Resources Area flood storage and water quality improvements;

improving the regional storm water facility to reduce flooding.

• Upper Meridian Valley Creek flood protection and stream enhancement project will

move the creek away from properties and reduce flooding.

A slide related to the National Pollutant Discharge Elimination System (NPDES)

stormwater pond cleaning was presented.

Information Only/No Motion Required

Item 6 – Information Only/Vactor Site and Screener:

Jens Vincent Stormwater Supervisor gave a power point presentation on the soils

screener that was purchased with grant funds from the Washington State Department of

Ecology.

The purchase of the soil screener has allowed Public Works Operations crews to:

1. Filter out trash and debris from catch basin solids collected during cleaning and maintenance.

2. Aerate solids to speed the composting process 3. Eliminate the cost of renting a screener

5

Page 6: Public Works Committee Agenda - Granicus

PUBLIC WORKS COMMITTEE

Minutes of Monday, October 22, 2012

4. Provide low-cost topsoil for roadside plantings

These elements are increasing efficiency, and allow staff to maintain their schedule of

catch basin maintenance and repairs while simultaneously saving money on rental costs

and staff time.

Vincent noted that a chase truck is being requested in the 2013/2014 budget. He

explained that a chase truck would provide tools, signage and traffic control for the

Vactor trucks when they are being used to extract soils.

Information Only/No Motion Required

Item 7 – Information Only/Adopt-a-Street Program Update:

Gina Hungerford gave a presentation regarding the City’s Adopt-A-Street program.

Since the successful inauguration of the Adopt-a-Street program in April, the program

has grown to 13 groups with more in the process of forming. 49 volunteers are picking

up litter on their adopted streets, making our City more beautiful.

The dedication and commitment of all these volunteers is making a big difference in

beautifying the city and helps to protect water resources.

Interested parties who would like to Adopt-a-Street can find more information at http://kentwa.gov/content.aspx?id=21445&terms=adopt%20a%20street. Or for more

information, contact Gina Hungerford at [email protected] or call 253-856-5549.

Information Only/No Motion Required

Item 8 – Information Only/Green Kent Day October 27th:

Matt Knox, Environmental Ecologist gave an informative Power Point presentation on

Green Kent Day. Knox noted that the Green Kent Partnership combines the talents of

Parks, Public Works and Kent volunteers to improve and enhance Kent’s 1,189 acres of

parks and natural areas. Approved by City Council in September of 2009, the program

trains volunteer land “stewards” to lead and teach other volunteers how to restore

Kent’s natural areas. To date, we have trained over 30 stewards and now have 13

actively encouraging and leading others.

Green Kent Day is scheduled for Saturday, October 27 we expect to recruit up to 100

volunteers to plant native plants from 9:00 am–12:00 pm at two sites – Morrill Meadows

Park and the Green River Natural Resources Area.

A VIP tour is also planned for State Representatives, Councilmembers, the Mayor and

other dignitaries the tour will highlight the Green Kent partnership and these two special

areas. A donated barbecue from Farrington Court will be held at the conclusion of the

event for all volunteers and VIP’s at Morrill Meadows Park.

6

Page 7: Public Works Committee Agenda - Granicus

PUBLIC WORKS COMMITTEE

Minutes of Monday, October 22, 2012

Council members Ralph and Albertson commented that they will be at Green Kent Day

helping out. Knox encouraged people to go online to www.greenkent.org to sign up for

Saturday’s event. There will be tools available to use provided but people are

encouraged to bring their own as well.

Information Only/No Motion Required

Item 9 – Information Only/Sewer Collection System & Sewer Pump Stations:

Dave Brock, Utility Engineer gave a brief Power Point presentation on the sewer

collection system and sewer pump stations. Brock noted that Kent has approximately

211 miles of sanitary sewer system. Much of the system has reached the end of its

service life (50 to 70 years) and is in need of repairs or replacement. Brocks’

presentation gave an overview of the condition of the sewer infrastructure and touched

on damage from fats, oils and grease (F.O.G.).

Brock noted that in 1990, 25% of the sewer rate was for Kent and 75% for King County

METRO. In 2012, Kent’s sewer rate is down to 16% and 84% for King County METRO.

LaPorte commented that the increase in the last several years to the sewer rates have

been related to the costs to pay for King County’s Brightwater sewage treatment plant.

We will be delivering the need to increase rates very soon.

Information Only/No Motion Required

The meeting was adjourned at 5:32 p.m.

Kristin Lykken

Council Committee Recorder

7

Page 8: Public Works Committee Agenda - Granicus

This page intentionally left blank.

8

Page 9: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 25, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Sean M. Bauer, Interim Water Superintendent Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: 2013 Water Treatment Chemical Contract with JCI Jones Chemicals, Inc., and Cascade Columbia Distribution

Item - 2

Summary: The City advertises annually for water treatment supply chemicals. The use of these chemicals meets state and federal regulations for drinking water standards.

The treatment chemicals are used to treat potable drinking water and improve its quality. Gas chlorine is used to disinfect and protect against contamination, Sodium

Hydroxide is used to adjust the pH for corrosion control, Sodium Fluoride is used to help prevent dental cavities in young children, and Potassium Permanganate is used in the removal of iron and manganese to prevent staining of plumbing fixtures

(sinks, tubs, etc).

Budget Impact: There is no unbudgeted fiscal impact as this is an annual cost which is planned for and budgeted. Funding comes from the Water Utility operating budget. The City

advertises for bids to ensure we are receiving the products at the lowest cost.

Motion: Move to recommend Council authorize the Mayor to sign the 2013

Water Treatment Chemical Supply Agreement with JCI Jones Chemicals, Inc. for Gas Chlorine and 25% Sodium Hydroxide, in an amount not to

exceed $107,130.00, and the 2013 Water Treatment Chemical Supply Agreement with Cascade Columbia Distribution for Sodium Fluoride and

Potassium Permanganate in an amount not to exceed $31,250.00 subject to final terms and conditions acceptable to the City Attorney and Public Works Director.

9

Page 10: Public Works Committee Agenda - Granicus

This page intentionally left blank.

10

Page 11: Public Works Committee Agenda - Granicus

11

Page 12: Public Works Committee Agenda - Granicus

12

Page 13: Public Works Committee Agenda - Granicus

13

Page 14: Public Works Committee Agenda - Granicus

14

Page 15: Public Works Committee Agenda - Granicus

15

Page 16: Public Works Committee Agenda - Granicus

16

Page 17: Public Works Committee Agenda - Granicus

17

Page 18: Public Works Committee Agenda - Granicus

18

Page 19: Public Works Committee Agenda - Granicus

19

Page 20: Public Works Committee Agenda - Granicus

This page intentionally left blank.

20

Page 21: Public Works Committee Agenda - Granicus

21

Page 22: Public Works Committee Agenda - Granicus

22

Page 23: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 24, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Kelly Casteel, P.E., Design Engineering Supervisor Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Contract/GeoEngineers Inc. for Geotech Services - James Street Pump Station

Item - 3

Summary: The City’s James Street Stormwater Pump Station is located just north of James Street near Woodford Ave North. This pump station cannot keep up with existing

flows on James Street and needs to be replaced. GeoEngineers, Inc. was selected to conduct subsurface explorations and laboratory testing as a basis for developing

geotechnical design recommendations related to design and construction of the project.

This new pump station will help alleviate local flooding of James Street at Mill Creek.

Geotechnical work is highly specialized work that includes drilling borings to depths of 40 feet below ground surface and performing laboratory tests on excavated soils.

Budget Impact:

This contract is budgeted and will be paid through the stormwater utility.

Motion: Move to recommend Council authorize the Mayor to sign a Consultant

Services Agreement with GeoEngineers, Inc. for developing geotechnical design recommendations related to the design and construction of the proposed James Street Pump Station in an amount not to exceed $19,309,

subject to final terms and conditions acceptable to the City Attorney and Public Works Director.

23

Page 24: Public Works Committee Agenda - Granicus

This page intentionally left blank.

24

Page 25: Public Works Committee Agenda - Granicus

EXHIBIT A SCOPE OF SERVICES GEOENGINEERS, INC.

PROPOSED JAMES STREET PUMP STATION KENT, WASHINGTON

FILE NO. 0410-184-00

SCOPE OF SERVICES – GEOTECHNICAL

The purpose of our services is to conduct subsurface explorations and laboratory testing as a basis for developing geotechnical design recommendations related to the design and construction of the proposed James Street Pump Station in Kent, Washington. We understand that a storm sewer pump station will be constructed at 740 Woodford Avenue North, northeast of the intersection of East James Street and Woodford Avenue North. The site is located about 100 to 150 feet west of Mill Creek.

The pump station will include a vault consisting of three 10-foot-diameter concrete manholes connected with 6-foot-diameter concrete pipe. The vault base will be about 20 feet below existing site grades. The pump station will be operated using an electric pump with a back-up generator and an on-site fuel source. Up to 4 feet of fill will be placed to establish planned grades. The site will be surfaced with gravel and an asphalt concrete paved road will provide access. Roof structures will be constructed over the pump and generator. The roof structures will be supported on shallow pier foundations.

Our geotechnical scope of services in support of design will include the following items:

1. Review existing soil and groundwater information, including select in-house reports and published geologic maps.

2. Conduct a site visit prior to subsurface explorations to coordinate exploration locations and site safety issues.

3. Coordinate clearance and location of existing underground utilities in the project area. We will contact the Washington Utilities Coordinating Council “One Call” service prior to beginning explorations. We will also retain a private utility locate service to check for underground utilities at the site.

4. Drill two borings to depths of 40 feet below ground surface (bgs) using hollow stem auger drilling techniques. We will install monitoring wells in both of the explorations. We will also install an electronic piezometer in one of the wells. The electronic piezometer will collect and store groundwater level data from multiple readings per day.

5. Complete laboratory analysis of select soil samples. We anticipate that our laboratory program will consist of grain-size analyses and moisture content determinations.

6. Provide at least two rounds of groundwater monitoring. We will measure groundwater levels in the wells during installation to provide data for our design report. We will also retrieve groundwater data from the electronic piezometers and measure levels again prior to construction bidding to provide more up-to-date groundwater information for contractors prior to bid.

25

Page 26: Public Works Committee Agenda - Granicus

City of Kent | October 25, 2012 Page 2

File No. 0410-184-00

7. Provide a discussion of temporary shoring and dewatering. We are assuming that the dewatering and shoring system will be designed by the contractor. We will provide a general discussion of shoring and dewatering issues at the site and comment on the feasibility of different shoring and dewatering methods. We will also provide lateral earth pressures for the design of shoring systems and an order of magnitude estimate of dewatering quantities.

8. Provide recommendations for pipe bedding, pipe support and excavation backfill. We will provide recommendations for imported fill, reuse of on-site soil as appropriate and compaction requirements.

9. Provide recommendations for fill placement and compaction on the surface of the site. We will include recommendations for imported fill and compaction requirements.

10. Provide recommendations for shallow foundations and small drilled pier foundations for support of equipment pads and roof structures. We will discuss bearing surface preparation and shallow drilled pier construction. We will also provide design criteria, including allowable soil bearing pressures and allowable lateral resistance values for the design of foundation elements.

11. Complete buoyancy calculations on the proposed underground structures based on measured groundwater levels and the provided dimensions and weight of the structure. We will provide a discussion of methods for restraining the structure if buoyancy is determined to be a problem.

12. Prepare a geotechnical design report presenting the results of our explorations and summarizing our findings and recommendations. We anticipate this report will be available three weeks after site explorations are complete. We will also prepare a brief technical memorandum presenting the second round of groundwater monitoring data and revising our recommendations if appropriate. This memorandum will be provided during the spring or summer, after winter groundwater levels have been measured.

13. Provide additional consultation as required and requested. We anticipate that this could include meetings or plan review. We have budgeted 6 hours for a project engineer to cover this contingency.

Our scope and budget does not include any construction management, monitoring or inspections. We will provide a scope and budget for these services upon request.

LJS:GHS:tt

Attachment:

Exhibit B-1. Fee Estimate

Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record.

26

Page 27: Public Works Committee Agenda - Granicus

Classification Hours x Rate = Cost

Principal (Garry Squires) 6 x $200.00 = $1,200.00

Project Engineer 2 (Lyle Stone) 48 x $150.00 = $7,200.00

Staff Engineer 1 (Various) 24 x $100.00 = $2,400.00

Support 8 x $85.00 = $680.00

Subtotal Personnel $11,480.00

Other Expenses

Subcontracted Drilling $6,350.00

Private Utility Location Services $230.00

Laboratory (6 Sieve Analyses and 4 Moisture Content Determinations) $574.00

Expendables (Mileage, electronic piezometer, etc.) $675.00

Subtotal $7,829.00

$19,309.00

EXHIBIT B

Total Estimated Costs

GEOTECHNICAL ENGINEERING SERVICES

CITY OF KENTENGINEERING DEPARTMENT

FEE ESTIMATE

PROPOSED JAMES STREET PUMP STATIONKENT, WASHINGTON

FILE NO. 0410-184-00

File No. 0410-184-00October 25, 2012

27

Page 28: Public Works Committee Agenda - Granicus

This page intentionally left blank.

28

Page 29: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 24, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Kelly Casteel, P.E., Design Engineering Supervisor Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Contract with A Plus Removal and Recycling - James Street Pump Station

Item - 4

Summary: The City’s James Street Stormwater Pump Station is located just north of James

Street near Woodford Ave North. This pump station cannot keep up with existing flows on James Street and needs to be replaced. The proposed pump station requires the acquisition of additional property to locate the pumps, wet wells,

generator, electrical controls and associated piping and shelters. Therefore, the house located at 704 Woodford Avenue was purchased and demolished. The

existing heating oil tank contaminated soil on site which requires special handling for removal, disposal and subsequent soil sampling of surrounding soil per Department of Ecology regulations.

This new pump station will help alleviate local flooding of James Street at Mill Creek.

Contaminated soil removal, disposal and soil sampling is highly specialized work. City staff does not possess the specialized skills, licenses or equipment to perform

this work.

Budget Impact: This contract is budgeted and will be paid through the stormwater utility.

Motion: Move to recommend Council authorize the Mayor to sign a Contract with A

Plus Removal and Recycling for removal and disposal of contaminated soils for the construction of the proposed James Street Pump Station in an amount not to exceed $16,734, subject to final terms and conditions

acceptable to the City Attorney and Public Works Director.

29

Page 30: Public Works Committee Agenda - Granicus

This page intentionally left blank.

30

Page 31: Public Works Committee Agenda - Granicus

31

Page 32: Public Works Committee Agenda - Granicus

This page intentionally left blank.

32

Page 33: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 25, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Mark Madfai, P.E., Design Engineering Supervisor Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Contract with The Eastman Company – Appraiser, Lower Russell Road Levee

Item – 5

Summary:

The City is currently preparing design plans for the Russell Road Lower-Lowest Levee reach. This levee reach extends from S. 231st St to S. 212th St. The City has identified locations where property needs to be purchased in order to construct the

secondary levee. The properties identified include four full property acquisitions of residential parcels. The City applied for and received a King County Conservation

Futures grant in the amount of $400,000 for these property acquisitions. The grant is expected to be awarded early next year after the County’s budget is adopted in December. We would like to get the appraiser, negotiator and relocation consultants

under contract so appraisals can be prepared and ready for the negotiations/relocations once the grant is received.

Budget Impact:

Funding for this contract is included in the existing project budget

Motion: Move to recommend Council authorize the Mayor to sign the Consultant Services Agreement with The Eastman Company in the amount not to

exceed $27,000 to provide property appraisal services for the Russell Road Lower-Lowest Levee, subject to final terms and conditions

acceptable to the City Attorney and Public Works Director.

33

Page 34: Public Works Committee Agenda - Granicus

This page intentionally left blank.

34

Page 35: Public Works Committee Agenda - Granicus

35

Page 36: Public Works Committee Agenda - Granicus

This page intentionally left blank.

36

Page 37: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 25, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Mark Madfai, P.E., Design Engineering Supervisor Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Contract/Certified Land Services Corporation – Negotiator for Lower Russell Road Levee

Item - 6

Summary:

The City is currently preparing design plans for the Russell Road Lower-Lowest Levee reach. This levee reach extends from S. 231st St to S. 212th St. The City has identified locations where property needs to be purchased in order to construct the

secondary levee. The properties identified include four full property acquisitions of residential parcels. The City applied for and received a King County Conservation

Futures grant in the amount of $400,000 for these property acquisitions. The grant is expected to be awarded early next year after the County’s budget is adopted in December. We would like to get the appraiser, negotiator and relocation consultants

under contract so appraisals can be prepared and ready for the negotiations/relocations once the grant is received.

Budget Impact:

Funding for this contract is included in the existing project budget and any reimbursable costs will be billed to the grant.

Motion: Move to recommend Council authorize the Mayor to sign the Consultant Services Agreement with Certified Land Services Corporation in an

amount not to exceed $72,708 to provide property negotiation and relocation services for the Russell Road Lower-Lowest Levee, subject to

final terms and conditions acceptable to the City Attorney and Public Works Director.

37

Page 38: Public Works Committee Agenda - Granicus

This page intentionally left blank.

38

Page 39: Public Works Committee Agenda - Granicus

39

Page 40: Public Works Committee Agenda - Granicus

40

Page 41: Public Works Committee Agenda - Granicus

41

Page 42: Public Works Committee Agenda - Granicus

42

Page 43: Public Works Committee Agenda - Granicus

43

Page 44: Public Works Committee Agenda - Granicus

This page intentionally left blank.

44

Page 45: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 24, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Mark Madfai, P.E., Design Engineering Supervisor Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Contract/GeoEngineers - Milwaukee II Levee

Item - 7

Summary: In order to certify the Forster Park/Hawley Road levee, the portion from 3rd Ave. to SR 167 must include levee improvements. A secondary levee will be constructed from where the Horseshoe Bend Levee improvements currently leave off at 3rd Ave.

S to connect to the Foster Park Levee.

The majority of the secondary levee in this area will consist of a levee wall due to limited space available and to minimize impacts and property acquisition at adjacent businesses. This wall will be a continuation of the levee wall currently being

constructed on the Horseshoe Bend levee, which ends at 3rd Ave. S.

GeoEngineers performed the geotechnical analysis and certification report for the Horseshoe Bend Levee from the east end up to 3rd Ave. and also Foster Park.

Budget Impact:

The cost of this design work will be billed to the stormwater utility.

Motion:

Move to recommend Council authorize the Mayor to sign the Consultant

Services Agreement with GeoEngineers, Inc. to provide Geotechnical

Engineering Services for the Milwaukee II Levee Project in an amount not

to exceed $52,001 subject to final terms and conditions acceptable to the

City Attorney and Public Works Director.

45

Page 46: Public Works Committee Agenda - Granicus

This page intentionally left blank.

46

Page 47: Public Works Committee Agenda - Granicus

47

Page 48: Public Works Committee Agenda - Granicus

48

Page 49: Public Works Committee Agenda - Granicus

49

Page 50: Public Works Committee Agenda - Granicus

This page intentionally left blank.

50

Page 51: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 24, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Mark Madfai, P.E., Design Engineering Supervisor Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Consultant Services Agreement/AECOM - Structural Design Engineering Services for the Milwaukee II Levee

Item - 8

Summary: In order to certify the Forster Park/Hawley Road levee, the portion from 3rd Ave. to SR 167 must include levee improvements. A secondary levee will be constructed

from where the Horseshoe Bend Levee improvements currently leave off at 3rd Ave. S to connect to the Foster Park Levee.

The majority of the secondary levee in this area will consist of a levee wall due to limited space available and to minimize impacts and property acquisition at adjacent

businesses. This wall will be a continuation of the levee wall currently being constructed on the Horseshoe Bend levee, which ends at 3rd Ave. S.

AECOM performed the structural engineering design for the levee retaining walls for the Horseshoe Bend and Boeing levee walls currently under construction.

Budget Impact: The cost of this design work will be billed to the stormwater utility.

Motion:

Move to recommend Council authorize the Mayor to sign the Consultant

Services Agreement with AECOM for the structural design of the flood

walls for the Milwaukee II Levee Project in an amount not to exceed

$27,188.12, subject to final terms and conditions acceptable to the City

Attorney and Public Works Director.

51

Page 52: Public Works Committee Agenda - Granicus

This page intentionally left blank.

52

Page 53: Public Works Committee Agenda - Granicus

53

Page 54: Public Works Committee Agenda - Granicus

54

Page 55: Public Works Committee Agenda - Granicus

55

Page 56: Public Works Committee Agenda - Granicus

56

Page 57: Public Works Committee Agenda - Granicus

57

Page 58: Public Works Committee Agenda - Granicus

58

Page 59: Public Works Committee Agenda - Granicus

59

Page 60: Public Works Committee Agenda - Granicus

60

Page 61: Public Works Committee Agenda - Granicus

61

Page 62: Public Works Committee Agenda - Granicus

This page intentionally left blank.

62

Page 63: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: November 2, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012 From: Chad Bieren, P.E., City Engineer

Subject: Information Only/SE 256th Street Proposed LID - Update

Item - 9

Summary:

Staff will discuss the status of the project.

Motion:

Information Only/No Motion Required

63

Page 64: Public Works Committee Agenda - Granicus

This page intentionally left blank.

64

Page 65: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500

Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 24, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: November 5, 2012

From: Steve Mullen, Transportation Engineering Manager Through: Chad Bieren, P.E., City Engineer

Subject: Information Only/SE 223rd Drive/SE 224th Street Neighborhood Traffic Calming Program Progress

Item - 10

Summary: Residents from the residential neighborhood along the SE 223rd Drive/SE 224th

Street corridor, between 116th Avenue SE and 132nd Avenue SE have expressed concerns about vehicle speeds and cut-through traffic. These concerns were

heightened by a fatality collision on August 22, 2012. Staff provided a map of the vicinity showing the existing roadway network and

results of traffic studies conducted along the roadway, at the Public Works Committee meeting of September 17, 2012. Staff will provide an update of actions

taken to work with neighborhood residents to identify specific traffic concerns, discuss potential countermeasures, and develop a neighborhood traffic calming plan to manage traffic throughout the neighborhood.

Budget Impact:

No new impact

Motion:

Information Only/No Action Required

65

Page 66: Public Works Committee Agenda - Granicus

This page intentionally left blank.

66

Page 67: Public Works Committee Agenda - Granicus

PUBLIC WORKS DEPARTMENT

Timothy J. LaPorte P.E., Public Works Director

Phone: 253-856-5500 Fax: 253-856-6500

Address: 220 Fourth Avenue S.

Kent, WA 98032-5895

Date: October 29, 2012

To: Chair Elizabeth Albertson and Public Works Committee Members

PW Committee Meeting Date: November 5, 2012 From: Michael Mactutis, Environmental Engineering Manager Greg Reed, Utility Superintendent

Through: Timothy J. LaPorte, P.E., Public Works Director

Subject: Information Only/Flood Season – Prevention Planning & Report on King County Efforts

Item - 11

Summary: Environmental Engineering Manager Michael Mactutis and Utility Superintendent

Greg Reed will provide an update on the City of Kent’s preparations for the upcoming 2012-13 Flood Season as well as report on King County’s efforts.

Budget Impact:

None

Motion: Information Only/No Motion Required

67