Page 1: Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

Michael Scharfenstein

FAC Meeting [email protected]

April 7, 2005

LCLS ES&HProcess and Documentation

Page 2: Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

Michael Scharfenstein

FAC Meeting [email protected]

April 7, 2005

IntroductionWork processes to date

Relying on partner institution ISMS programs

Full Time LCLS ESH Support March 16, 2005

Path Forward Establish a uniform & coherent ESH approach

DOE O 413.3 Program Management

DOE O 440.1 Construction Safety Management Guide

Identified needed directives and procedures for systems development

Page 3: Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

Michael Scharfenstein

FAC Meeting [email protected]

April 7, 2005

Project ESH Documentation

Preliminary Hazards Analysis DocumentBecome the basis for the PSAD

Environmental Assessment

Fire Hazards Analysis

LCLS ESH/Citizens Committee Interface Approach (Algorithm)

Project ESH Directive

Page 4: Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

Michael Scharfenstein

FAC Meeting [email protected]

April 7, 2005

Project ESH Directive

LCLS Project Management ESH Policy and Expectations

Integration of ESH requirements into project engineering and design

Link to ESH Guidance Documents

Page 5: Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

Michael Scharfenstein

FAC Meeting [email protected]

April 7, 2005

LCLS ESH GuidanceConventional Facility

Design/Construction Process

Technical Systems

Engineering/Design Process (ESH)

Procurement / ESH Process

Installation & Approval Process

(Accelerator Readiness Review – Precursor)

Page 6: Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

Michael Scharfenstein

FAC Meeting [email protected]

April 7, 2005

Challenges

Establish project buy-in to a uniform technical system “Design/Engineering Process”

Establish SLAC buy-in to the processIdentified Stakeholders