Michael Scharfenstein
FAC Meeting [email protected]
April 7, 2005
LCLS ES&HProcess and Documentation
Michael Scharfenstein
FAC Meeting [email protected]
April 7, 2005
IntroductionWork processes to date
Relying on partner institution ISMS programs
Full Time LCLS ESH Support March 16, 2005
Path Forward Establish a uniform & coherent ESH approach
DOE O 413.3 Program Management
DOE O 440.1 Construction Safety Management Guide
Identified needed directives and procedures for systems development
Michael Scharfenstein
FAC Meeting [email protected]
April 7, 2005
Project ESH Documentation
Preliminary Hazards Analysis DocumentBecome the basis for the PSAD
Environmental Assessment
Fire Hazards Analysis
LCLS ESH/Citizens Committee Interface Approach (Algorithm)
Project ESH Directive
Michael Scharfenstein
FAC Meeting [email protected]
April 7, 2005
Project ESH Directive
LCLS Project Management ESH Policy and Expectations
Integration of ESH requirements into project engineering and design
Link to ESH Guidance Documents
Michael Scharfenstein
FAC Meeting [email protected]
April 7, 2005
LCLS ESH GuidanceConventional Facility
Design/Construction Process
Technical Systems
Engineering/Design Process (ESH)
Procurement / ESH Process
Installation & Approval Process
(Accelerator Readiness Review – Precursor)
Michael Scharfenstein
FAC Meeting [email protected]
April 7, 2005
Challenges
Establish project buy-in to a uniform technical system “Design/Engineering Process”