Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector –Linac System OverviewInjector –Linac System Overview E. BongE. Bong
LCLS FACLCLS FACOctober 27, 2005October 27, 2005
LCLSLCLS
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector - Linac System OverviewInjector - Linac System Overview
Installation – Progress & Emphasis
Region Designs
Diagnostics
Gun, Linac & RF
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector and Linac Installation DatesInjector and Linac Installation Dates
(RF phase: (RF phase: rfrf = 0 is at accelerating crest)= 0 is at accelerating crest)
SLAC linac tunnelSLAC linac tunnel research yardresearch yard
Linac-1Linac-1Aug-NovAug-Nov
20062006
Linac-2Linac-2July-SepJuly-Sep
20072007
Linac-3Linac-3July-SepJuly-Sep
20072007
BC-1BC-1Aug- NovAug- Nov
20062006
BC-2BC-2July-SepJuly-Sep
20072007 LTULTUOct 2007Oct 2007Dec 2007Dec 2007
DL-1DL-1Aug-NovAug-Nov
20062006
undulatorundulatorSLAC linacSLAC linac 21-1b21-1b21-1d21-1d XX
RF GunRF GunNov 2006Nov 2006
21-3b21-3b24-6d24-6d
25-1a25-1a30-8c30-8c
E-DumpE-DumpDec 2007Dec 2007Feb 2008Feb 2008
Inj VaultInj VaultJun-JulJun-Jul20062006
L0a&b
L0a&b
rfrfgungun
Installation in SLAC Linac tunnel only during down-time
Forces priority to components and systems in Linac housing
Linac-Linac-XXAug-NovAug-Nov
20062006
Linac Down: August – November 2006
July – September 2007
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Installation
PORCU
PINE CATHODE
HOLDE
R
UHV A
LL METAL
GATE VALVES
SPOOLS FRO
M VALVE
SEAL
LONG B
ELLOWS
ASSEM
BLY
TREATMEN
T CHAM
BER
VACUU
M PUMPS
Drive Laser June 2006
Laser Launch July 2006
Gun Region July 2006
Accel Region June 2006
Heater Region June 2006
Wall Region October 2005
Injection Region Aug-Nov 2006
Spect Region Aug-Nov 2006
Waveguide through wall and up penetration October 2005
Gun installation November 2006 Following Hot Test in Klystron Lab
Injector Commissioning Start December 2006
Priority – Linac Housing Installation
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Linac 2006 Installation
Quad + BPM, YCOR,XCOR,
QE, Toroid
Emittance Diagnostics.
Bunch Compressor &
Diagnostics
Two short accelerator structures, refurbished
Quads+BPMs,X&YCOR
Linac 1 (L1)
Electrons
Bunch Compressor 1 (BC1)
L1 design and details complete & in fab Short structures available
X-Band design complete & in fab
BC1 Compressor articulation design & details complete & in fab
BC1 emittance diagnostics section design going
BLM moved to SLAC design, two devices, need for feedback
Must install during 2006 downtime
Remove 5 S-Band Structures
X-Band Structure
(NLC)
LX
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Wall Region
Spans through shielding walls separating Injector Vault form Linac Housing.October 2005 installation included pipes through walls and stopper. 2006 installation of wire scanners, profile monitors and quad on Linac side of shielding wall.Device designs complete and in fab or on hand.Low risk for 2006 install.
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Insertion/SAB Region
Support modal analysis complete stiffened as result to meet vibration tolerance.Common OTR optics design late. Special OTR at spect end from ANL. Magnets designs complete. On order or received except spect bend. Chamber designs complete.Second least mature region design.
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
L1 RegionAll detail drawings complete and part on hand or in fabrication less correctors
Low risk for 2006 installation
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
XL4 Klystron fabrication complete. Waveguide fabrication in progress.Structure support design complete & in fabNeed LLRF, modulator modsVacuum assy install required.Region operation not necessary for ’06/’07 commissioning.
X-Band System (LX)
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
BC1 Articulation Region Design
Beamline segment from X-Band system to structure BC1-Out diagnostics section.
Compressor articulation in fabrication at outside vendor. Fabrication halted and restarted to modify chamber to provide sufficient aperture for BLM.
Manget design reviewed at vendor.
Compressor diagnostics incomplete. Manpower added.
Most risk in diagnostics package; collimator, BPM & OTR.
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
BC1-Out Region Design
Beamline segment from BC1 compressor articulation to structure Li21-2b.
Downstream emittance section layout complete. Uses existing wire scanner, quadrupole, stopper and BPM designs with support stands modified to mount on accelerator lightpipe.
Collaboration with UCLA on single shot bunch length monitor dropped. Design to be done at SLAC. Two devices to be built. See later talk. Design most at risk. Relative bunch length measurement required for RF feedback.
SLAC Engineer and top physics support assigned to BLM project
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Vault
Installation of stub columns started.
Water system design critical to commissioning start.
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Waveguide Design
Installation penetration-wall October ’05
Installation Vault & Gallery starting Spring ’06.
Waveguide design complete, fabrication underway. Waveguide supports in final design.
3-D Layout integrated into Injector system assembly.
Gun and structures fed from Li-20-6, 7 & 8 klystrons, T-Cav fed from Li-20-5d structure exhaust.
Old waveguide runs have been disconnected from Klystrons.
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Gun Region
Installation July 2006 except gun November 2006
Component designs in check
Gun in fabrication hot test to be performed in Klystron test lab must have priority
Solenoid delivered Spectrometer bend design complete
YAG/OTR optics package incompleteBase support design incomplete
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Accelerator Region
Installation June 2006
Dual feed structure in fabrication
Quads delivered
Solenoid due next week
Need floor support design
L0a and solenoid on common support girder to allow relative alignment in lab prior to install.
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Heater Region Design
Beamline segment Between Accelerators and Shielding Wall
Installation June 2006
Undulator installation 2007
Transverse structure on hand.
Quads received
OTR actuator design complete need optics
Bend magnet design reviewed at vendor
Floor support design in progress
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Region Design Status (2006 Install)Region Design Status (2006 Install)Linac Housing First Priority (due to fixed down)
Wall Region Complete
Insertion Region In Process
SAB Spectrometer Region In Process
L1 Complete
LX Complete
BC1 Articulation Complete, BC1-Out In Process
Injector Vault Second PriorityGun Region In Process
Accelerator Region In Process
Heater Region In Process
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Actions to Achieve 2006 Installation Goals
Monitor P3 schedule against design and fabrication activitiesMonitor critical path to installation against device fabrication progressAnalyze any schedule variance impact on installation Adjust assignments to recover from any schedule varianceComplete Injector & Linac region designsPrioritize design activities based on downtime schedule datesComplete Gun fabrication and testingReceive & test vendor magnetsComplete X-Band component fabricationFabricate Insertion/SAB, L1, BC1 Articulation & BC1 Diagnostics SectionComplete water system design and installFinish detailed installation plan, update P3Complete commissioning plans, update P3
Eric BongLCLS FAC Injector-Linac System Overview [email protected] 27, 2005
Injector Design / Diagnostics / Injector Design / Diagnostics / Gun & Linac RF DesignGun & Linac RF Design
Conclusion
Progress is being made toward completing beamline and component design for 2006 installation supporting January 2007 commissioning but with some riskPriority of design activities must be placed on components to be installed in Linac Housing during 2006 downtimeInjector Vault water system design and installation must be expedited