Upload
jaylin-ridgeway
View
219
Download
2
Tags:
Embed Size (px)
Citation preview
Gathering Data on Construction Waste
Peter JohnsonKier Construction Division
Sustainability Manager
Who are Kier ?
• Major Building and Civil Engineering Company
• Work in the retail, health, education, defence, leisure and commercial sectors
• One of the largest builders of social housing in the UK
• Major player in the facilities management sector
• Involved in Property Development
Who am I ?
Measuring Waste
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
2004 2005 2006 2007 2008
All change in 2008
• Introduction of Site Waste Management Plans
• Commitment to complete Business in the Community CR Index Survey
• Client Requests• Appointment of a Construction Division
Sustainability Manager• Government construction strategy – ½
waste to landfill.
The Road Test
Why Chose SmartWaste ?
• Based on an existing & proven system • Potential to develop a bespoke version• Version already being used by Sainsbury• Being considered by other retailers & clients• Piloted by Kier South East• Data backed up daily by BRE• Easily accessed • System likely to be around a long time• Training and backup support available from BRE• Provide data for Kier Key Performance
Indicators• BREEAM
Q. What sort of data can we get from Smart
Waste?
Q. Is it of any use?
R.I.R.O.
Major Waste Streams
1. Soils2. Inert3. Concrete (blocks)4. Timber5. Bricks6. Metal 7. Gypsum (plasterboard)8. Packaging (cardboard & polythene)
Duty of Care
It went where?
But my site’s not like his!
Third Party Access
Measuring Waste - KPIs
1. Total construction waste produced/turnover
2. % of construction waste to landfill
Kier Construction Division waste figures, for the period July ‘08 –
December ‘08
Source of Waste UnitsWaste
ProducedWaste to Landfill
% to Landfill
Construction m3 61,353 23,660 39%
Demolition m3 19,003 3,640 19%
Excavation m3 175,806 119,916 68%
Total CDE m3 256,162 147,216 57%
Thank you
Questions?