55
Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination mechanism 3 4. GBS Annual review 7 5. Media and non-state actor involvement 9 6. Timetable of the GBS events 10 List of Annexes Annex 1: PFM Review Areas and Mechanisms for Review Annex 2: TOR for the Joint GBS Secretariat Annex 3: Guidance for CWGs on GBS Annex 4: Format for CWG GBS progress report (incl. format for summary of progress against PAF) Annex 5: Format for GBS Annual Review Report Annex 6: Revised Performance Assessment Framework (PAF) for GBS Review 2009 Annex 7: Template for key issue concept note Annex 8: Guidance note on Satisfactory Sector/Programme Reviews Annex 9: Sector Review Template Annex 10: TOR for the Facilitators of the GBS Annual Review Event

DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

1

DRAFT PROGRAMME OF WORK

GBS ANNUAL CYCLE 2010

Table of Contents

Page

1. Objectives 2

2. The Annual GBS Cycle 2

3. Coordination mechanism 3

4. GBS Annual review 7

5. Media and non-state actor involvement 9

6. Timetable of the GBS events 10

List of Annexes

Annex 1: PFM Review Areas and Mechanisms for Review

Annex 2: TOR for the Joint GBS Secretariat

Annex 3: Guidance for CWGs on GBS

Annex 4: Format for CWG GBS progress report (incl. format for summary of progress

against PAF)

Annex 5: Format for GBS Annual Review Report

Annex 6: Revised Performance Assessment Framework (PAF) for GBS Review 2009

Annex 7: Template for key issue concept note

Annex 8: Guidance note on Satisfactory Sector/Programme Reviews

Annex 9: Sector Review Template

Annex 10: TOR for the Facilitators of the GBS Annual Review Event

Page 2: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

2

1. Objectives and Underlying Principles

The objective of the GBS annual review cycle is to monitor and assess Government and

GBS Partners‟ performance in meeting their commitments as agreed in the GBS

Partnership Framework Memorandum (PFM) of January 2006. Being a year-long process

rather than a one-time event, the GBS review constitutes of an annual cycle of ongoing

dialogue, culminating in the GBS Annual Review meeting in November based on which

GBS Partners provide their financial commitments for the next three years. The annual

review process is aligned with the Government‟s planning, budgeting and MKUKUTA

review cycles. It includes an assessment of progress in implementing MKUKUTA as

well as progress in the areas identified in the Performance Assessment Framework (PAF).

This programme of work for the GBS Annual Cycle 2010 outlines GBS review areas,

review mechanisms and reporting requirements; milestones and timelines; the GBS

dialogue structure; and organizational arrangements for the GBS Annual Review event in

November 2010. It is set in the context of the current developments of aligning GBS to

the greatest extent possible with the PER process in order to avoid transaction costs and

parallel structures and processes. In the spirit of alignment, the work programme is aimed

to utilize as much as possible the existing dialogue structures at reform, sector and cluster

level for ongoing GBS dialogue throughout the year.

2. THE GBS ANNUAL REVIEW CYCLE

The GBS annual review cycle constitutes an annual cycle of ongoing dialogue at sector,

reform and MKUKUTA cluster level, culminating in the GBS Annual Review meeting in

November, based on which GBS Partners provide their financial commitments for the

next three years. The annual review process is aligned with the Government‟s planning,

budgeting and MKUKUTA review cycles.

The key milestones of the 2010 GBS Annual Review Cycle are as follows:

MKUKUTA/PER Cluster Working Group Meetings on GBS to monitor

progress against the PAF and PFM to be scheduled and conducted in May,

August, September and October 2010.

A semi-annual TROIKA Plus meeting between Government, represented by

Permanent Secretaries and GBS Partners Troika+ will review progress against

PAF periodically and decide on key issues in August/September.

The GBS Annual Review Meeting from November 2010.

A semi-annual TROIKA Plus meeting will finalize the GBS Annual Review

Report including agreed actions from key issue sessions and the PAF for the

GBS cycle 2010 in November 2009.

Indicative GBS commitments for FY 2010/11 by GBS Partners 3 weeks after

GBS Annual Review Meeting.

Page 3: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

3

Confirmed GBS commitments for FY 2011/12 by GBS Partners 6 weeks after

finalization of the GBS Annual Review Report and the PAF 2011.

Key underlying processes feeding into the GBS Annual Review Cycle:

The Public Expenditure and Financial Accountability Review (PEFAR) process

Budget process including Budget Guidelines and Budget Execution Reports

MKUKUTA/MKUZA Review and MKUKUTA Annual Implementation Report

PER/MKUKUTA Consultative meetings

Sector and core reform reviews.

3. Coordination mechanism

DECISION-MAKING

Troika+ meetings will be the main decision-making body of the GBS annual review cycle.

The semi-annual Troika+ and Permanent Secretary level representation will decide on

key issues for the Annual Review and agree on the PAF 2011 contents. Preceding the

Troika+ meetings Joint GBS Secretariat meetings will take place to prepare the agenda.

Monitoring of progress against the PAF, key issues proposals and preparatory analytical

work will be carried out in PER Main and CWG meetings.

GBS DIALOGUE IN PER MAIN AND CWGS

Responsibilities of CWGs on GBS

As stated in the Partnership Framework Memorandum, Government and GBS Partners

recognize the importance of “regular, open, respectful, and frank dialogue” for the

“smooth and effective operation of GBS”. Underlying review processes at reform, sector

and cluster level provide the main avenues for information generation, detailed discussion

and dialogue, whereby information and analysis will be drawn as much as possible from

the MKUKUTA monitoring system. CWGs will coordinate and consolidate inputs from

sectors and reform programmes. The GBS Annual Review will then bring the analysis

together, reporting on findings from CWGs, and focus on key issues as identified by

CWGs.

In order to meet the requirements of the GBS process CWGs will in addition to their PER

related responsibilities implement, track progress, and hold regular dialogue on the

agreed actions (underlying processes, temporary process actions and progress against

outcome indicators) outlined in the PAF. More guidance on the role of CWGs work is

provided in Annex 3. CWG leads take responsibility for coordinating CWG members‟

inputs in, following up and reporting on the implementation of the activities agreed in the

PAF.

Page 4: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

4

CWGs LEADERSHIP

CWG LEAD CWG DEPUTY LEAD DP CO-LEAD

CWG 1: Ms. Faini

Mr. Mwaimu Yuzuro Ozeki

JICA

CWG 2:Mrs. Mwasha

Director Poverty Eradication Division

MOFEA

John Moore

Canada

CWG 3:Mr. Mathias

Kabunduguru

Director Policy and Planning

PO - PSM

Mr. Singi Madata

Reform Coordination Unit,

State House

Darren Welch

DfID

CWG 4 & 5: Mr. B.

Shallanda,

Director Policy Analysis

MOFEA

Mrs. Monica Mwamunyange

Ahadi Msangi (PFM)

Paolo Zacchia

Simon Gill

World Bank

Joint GBS Secretariat Cluster Support

Cluster 1- Allice Matembele, Alex Mpangala and Angus Miller.

Cluster II- Omar Mkima, Andambike Mololo and Paulina Mroso.

Cluster III- Alex Mwakisu, Neema Mkwizu and Elikana Balandya.

Cluster IV- Mukajungu Kamuzora, Adrian Njau and Elikana Balandya.

Role of the Joint Government-DP GBS Secretariat

On the basis of the GBS work programme, the Joint Government-DP GBS Secretariat

will undertake continuous follow up with PER CWG leads on their GBS work

programme implementation (see annex 2 - ToR for the Joint GBS Secretariat), while the

PER Secretariat will undertake PER related follow-up.

CWG meetings on GBS

With the understanding that regular dialogue in PER/MKUKUTA CWGs addresses the

broader PER agenda, PER/MKUKUTA CWGs hold quarterly meetings specifically on

GBS in addition to their usual meeting schedule within the PER –May, August,

September and October. These meetings serve to discuss GBS related issues and take

stock of progress against the PAF.

The main agenda of these four CWG meetings will be the following:

Page 5: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

5

(a) May – week of 24 – 28:

2010 GBS annual work programme

Agree on specific dates for underlying processes/sector reviews

Review progress against the temporary process actions outlined in the PAF

and prepare consolidated quarterly progress report to the PER main. For PER

Macro/PFM this will also include the assessment of quarterly budget

execution reports.

Assessment of quarterly budget execution reports (PER Macro/PFM).

(b) August – week of 23 – 27

Review progress against the temporary process actions in the PAF

Assess performance of the outcome indicators, drawing on the MKUKUTA

monitoring system Propose key issues for dialogue at the Annual Review and

submit to Joint GBS Secretariat

Keep track of GBS Partner performance in adhering to their disbursement

schedule (PER Macro, Resource Allocation and Public Financial

Management)

(c) September – week of 27 – 30

Discuss and prepare PER CWGs‟ Annual GBS progress reports in the

required format (see Annex 4) as inputs into the GBS Annual Review

Report, which will be presented and discussed at the GBS Annual

Review

Present a one page concept note on the agreed key issues and agree on

analytical work which could serve as background for key issue

discussion at GBS Annual Review.

Review progress against the temporary process actions in the PAF

(d) October – week of 18 - 22

Finalize the CWG reports, including assessment of underlying processes,

TPAs and outcome indicators.

Finalize the key issue presentations for the GBS annual review

Propose TPAs and outcome indicators for PAF 2011

Outputs of the CWG meetings on GBS:

Minutes of CWG meetings on GBS

PAF updates agreed

Progress Report assessing the Government‟s and GBS Partners‟ performance

against the PAF, which is incorporated into the GBS Annual Review Report

Selection of maximum of five key issues (if possible, a joint list of key issues –

otherwise separate Government and GBS Partner proposals) and submission of

issues to Joint GBS Secretariat following the May meeting, so before the August

meeting.

Page 6: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

6

Revisions of the PAF matrix for 2011 in the CWG‟s relevant PAF area

After each meeting, CWG leads submit to PER Main a consolidated CWG progress

report on PAF implementation. In addition, they provide PER Main minutes of their

meetings. Adherence to the CWG meeting schedule will be monitored by the GBS

Secretariat and the PER Main. CWG leads will make follow up on outstanding issues

between the meetings when needed.

PER Main meetings

Specific PER Main meetings may be allocated after GBS meetings of PER/MKUKUTA

CWGs discussing PER CWG progress on the PAF, implementation status updates of

PER/MKUKUTA CWG work programmes, and other GBS related issues. They may thus

serve as a wider forum for ongoing GBS dialogue.

PER Main meetings will be the main coordination body for assessing progress across the

CWGs in PAF implementation.

The main agenda items for PER Main meetings on GBS will include:

- Update on budget preparation

-Update on status of PAF implementation

-Update on timing and outcomes of sector reviews

The PER Main will be attended by members from the Government, DPs and non-

state actors. Whereas Government membership consists of the lead and deputy lead

MDAs of the four CWGs (and sector/thematic areas leads when required); DPs are

represented by DP lead (and/or deputy lead) from the respective CWGs (and

sector/thematic areas leads when required). Non-state actors membership will

follow a similar arrangement (i.e. non-state actors participating in CWGs select

leads to represent them in the PER Main meetings).

The GBS-DP Chair (assisted by DP-CWGs leads) will be the spokesperson in the

PER-Main meetings on all issues related to GBS.

Participation and membership in CWG meetings for GBS dialogue

These meetings will be attended by regular members of the PER/GBS, whereby they

consist of members from the Government, DPs and non-state actors. Whereas

Government membership is comprised by the lead and deputy lead MDAs of the

underlying sectors and thematic areas under a particular cluster, DPs are represented in

the cluster by lead DPs from the sectors and thematic areas under the respective cluster.

Each CWG has a lead and deputy lead from Government central ministries. Non-state

actors should have a similar arrangement.

Page 7: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

7

Joint GBS Secretariat representatives that have been assigned to the respective CWGs

will also be present (for any guidance, if required, and follow up) and may, if necessary,

assist PER CWG leads in arranging or facilitating CWG meetings.

4. GBS Annual Review

As proposed in the new dialogue structure, an Annual National Policy Dialogue

mechanism consisting of PER Consultative meeting, Poverty Policy Week and GBS

Annual Review will take place from November 2010. In the proposed sequence of events,

the national stakeholder meetings will precede the GBS Annual Review. Discussions in

these national stakeholder events will also cover issues that are relevant to GBS Partners

in the areas of budget, macroeconomic stability, resource allocation and poverty

reduction and service delivery.

The GBS annual review cycle will culminate in a GBS Annual Review event in

November 2010, which will serve as the forum for the Government and GBS Partners to

agree on a joint overall assessment of their performance relative to the PAF and to

discuss key issues that require further attention. This joint review will serve as the

primary basis for GBS Partners to determine their GBS disbursements for the next

financial year. In their assessment, Government and GBS Partners should use, wherever

applicable, the findings from the draft MKUKUTA Annual Implementation Report. The

draft report‟s timely availability prior to the GBS Annual Review for discussion in the

CWGs is therefore of great importance.

The GBS Annual Review 2010will have two pillars;

(1) A consolidated presentation of progress and challenges in the implementation of

the PAF over the last twelve months by each CWG.

(2) Substantive discussion on a limited list of jointly pre-agreed Key Issues. Key

Issues (i) are key in that they could jeopardize the achievement of Government

objectives of growth and poverty reduction and (ii) require proper addressing or

else they could have implications for GBS functioning and funding over the

medium term as they a) are sufficiently large in nature to warrant raising to a

higher level, or b) are issues that are not able to be resolved at the CWG level. As

implied in the new dialogue structure, key issues dealing with budget,

macroeconomic stability, resource allocation and poverty reduction and service

delivery could be covered in the preceding national consultative forums.

Objectives of the GBS Annual Review

Specifically, the GBS Annual Review serves as a forum for the Government and GBS

Partners to jointly:

Assess and discuss progress against Government priorities (as identified in

MKUKUTA) of economic growth and poverty reduction on the basis of CWG

progress reports and identified key issues;

Page 8: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

8

Assess Government and GBS Partner performance against the PAF and

commitments outlined in the Partnership Framework Memorandum on the basis

of CWG progress reports and identified key issues;

Identify next steps on key issues and progress reports, including updated PAF

matrix, if needed

Based on the joint assessment, GBS Partners give an indication of their disbursement

schedule within three weeks after the Annual Review and firm commitments within 6

weeks following receipt of the Annual Review Report.

Outputs of the GBS Annual Review 2010

The GBS Annual Review 2010 will produce the following outputs:

GBS Annual Review 2010 Report incl. CWG progress reports, Executive

Summary which provides a joint overall assessment of Government and GBS

Partner performance relative to the PAF and Partnership Framework

Memorandum, summary of key issue discussions that outlines agreed next steps

and the PAF for 2010.

Agreed PAF for GBS cycle 2010

Joint press release for the wrap-up session of the GBS Annual Review

Role of the Joint Government-DP GBS Secretariat and the facilitators

The GBS Secretariat will take responsibility for following up with CWG leads on the

timely submission of all information that is needed to produce the above listed outputs

and for consolidating the GBS Annual Review Report with the assistance of the

facilitator(s), who will have documented experience in writing aid review memoires. The

facilitator(s) will prepare the meeting minutes of the GBS Annual review Sessions. The

facilitator(s) will also prepare meeting summaries at the end of each day of the GBS

Annual Review, which highlight main findings (progress and challenges), as well as

agreements or recommendations on the way forward. They will be presented at the

beginning of the following day‟s session. This will help to facilitate the preparation and

agreement of the executive summary of the GBS Report, which contains the joint overall

performance assessment and agreed / recommended next steps.

The facilitator(s) prepare the first draft of the executive summary based on agreed daily

meeting summaries, which will be commented by Government CWG members and by

GBS Partners before being endorsed by the Permanent Secretary - Ministry of Finance &

Economic Affairs and the Troika Plus from the DP GBS group.

GBS Annual Review structure and level of participation

Page 9: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

9

The proposed structure of the GBS Annual Review and level of participation are as

follows:

GBS Annual Review Structure consists of:

1) Launch of the PER- MKUKUTA Consultative meeting and GBS Annual Review in

November 2010

2) Summary of progress against PAF 2010.

3) Key Issue sessions with high level participation from Government and GBS Partners.

4) Wrap-up of GBS Annual Review.

Guidance on the conduct of key issues sessions and key issues selection procedure

CWGs (GOT and GBS DPs) identify at their August meeting a maximum of 5

key issues and prepare a 1-2 page concept note (see Annex 7 for the contents of

the note). If an agreement between Government and DPs cannot be achieved,

Government and DP CWG leads prepare separate lists.

Government and GBS Partners submit key issue proposals to the Joint GBS

secretariat

The Joint GBS secretariat considers the proposals and makes a recommendation

for approval by the Troika + in September

Key issue background papers shared by end September to guide preparation of

each key issue. Government and GBS partners work together on the content for

each key issue, providing the technical information and analysis well in advance

of the annual review

Government and GBS partners make joint presentations not exceeding 20

powerpoint slides. The session will end with agreed messages to address the key

issue in the next year‟s cycle.

5. Media and non-state actor involvement

In order to ensure adequate media coverage of the GBS Annual Review, press officials

will be involved in the launch and wrap up meetings of the GBS Annual Review event

and the Government (Ministry of Finance and Economic Affairs) will make a press

statement at the launch and wrap up of the event. The press personnel will also be briefed

on the GBS process by receiving a media pack and meeting with MOFEA in order to

improve the reporting in the local media. In addition, a joint press release between

Government and GBS Partners will be issued at the end of the review.

Press release before the GBS Annual review

Press release after the Annual Review

Press release of firmed commitments 6 weeks after the finalization of GBS AR

Report

Non-state actors will be invited one month before the annual review to nominate one

representative to speak on their behalf for each key issue session and in break-out

sessions on technical issues.

Page 10: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

10

6. Timetable of GBS events

Event Timing Main outputs

CWG meetings May Review of work programme

Review of progress against PAF

2010 and agreed messages from

PAF 2008

Troika+ meeting with all

concerned PS‟s

June Assessment of progress against

PAF 2009 and outstanding issues

from PAF 2008

CWG meetings August Review of progress against PAF

2009 and discussion on key issues

CWG meetings September Review of progress against PAF

2009 and presentation of concept

notes key issues

MoFEA produces a draft

MKUKUTA Annual

Implementation Report

September

Key issue papers are shared

with key stakeholders

Late September Draft key issue papers

Roundtable of key issue

papers

October Draft agreement on key issue

challenges and ways forward

CWG meetings October Finalization of CWG progress

reports and PAF 2009 assessment

GBS Annual Review November Annual review report finalized 3

weeks after the AR, DPs GBS

commitments within 3 weeks after

the AR

Troika+ meeting with all

concerned PS‟s

1-2 weeks after

Annual Review

Agreement of annual review report

and PAF 2011

GBS Partners communicate

GBS disbursements for FY

2011/2012 and firm up

commitments for next 3 years

6 weeks after

finalization of AR

report

Completion of the 2010 GBS cycle

Annex 1 PFM Review Areas and Mechanisms for Review

Page 11: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

11

PFM Review Areas and Mechanisms for Review

The GBS annual review cycle focuses on assessing Government and GBS Partner

performance in meeting their responsibilities as spelled out in the Partnership Framework

Memorandum. The table below lists those responsibilities as review areas and outlines

the mechanisms through which they can be implemented or assessed.

Government responsibilities as specified in the PFM

Review mechanisms

Manage GBS Partners‟ contributions to the national budget in support of MKUKUTA implementation, and keep adequate financial records of the contributions

Consistent with GBS Technical Note, MOFEA provides quarterly internal audit reports, an annual external audit reports of GBS accounts (deposits in GBS forex account and transfers to consolidated revenue fund) and the annual audit report of the National Audit Office (NAO) to GBS Partners

Ensure implementation of MKUKUTA in accordance with standards of performance jointly agreed with the GBS Partners and outlined in the PAF

Implementation of the MKUKUTA takes place through on-going sector and national processes and is reported through the MKUKUTA monitoring system. MKUKUTA/PER CWGs monitor and assess progress against PAF and report on it at GBS Annual Review.

Government prepares timely MKUKUTA Annual Implementation Report to feed into domestic processes and the GBS Annual Review. Relevant findings of the MKUKUTA Annual Implementation Report are discussed by the MKUKUTA/PER CWGs.

Monitor and report on the implementation of MKUKUTA

Ensure that total expenditures and sector allocations effectively reflect economic growth and poverty reduction commitments and account fully for the use of funds

The Public Expenditure and Financial Accountability Review (PEFAR) process provides an important review mechanism of expenditures, sector allocations and budget accountability. Dialogue on budget guidelines and budget execution takes place through the MKUKUTA/PER Macro.

MOFEA provides annual audit report of NAO on the Public Accounts of Tanzania to GBS Partners after submission to Parliament, which is due 9 months after the end of the fiscal year covered. Paymaster General provides a structured response to Controller Auditor General as stipulated in the Public Audit Act.

Strengthen public financial management and public procurement, which shall be

MKUKUTA/PER CWGs, in particular MKUKUTA/PER Macro, Resource

Page 12: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

12

assessed annually through the PAF Allocation and Public Financial Management monitor and assess progress in public financial management and procurement against PAF and report on it at GBS Annual Review

Ensure open and fruitful dialogue on the MKUKUTA, sector strategies, MTEFs, and Budget Guidelines by guaranteeing the timely availability of all necessary documentation to relevant stakeholders, including GBS Partners

On-going dialogue processes at sector, reform and cluster level are reviewed and improved through the PER and JAST processes. Government ensures relevant documents at each level are shared timely with all stakeholders.

Lead annual reviews in order to – in conjunction with GBS Partners – monitor and report on GBS performance in accordance with the PAF matrix.

Government calls for and organizes GBS Annual Review

GBS Partner responsibilities as specified in the PFM

Review mechanism

Establish an agreed disbursement schedule GBS Lead Partner submits agreed disbursement schedule of all GBS partners to MOF. This includes:

(1)Within three weeks of the conclusion of the Annual Review, the GBS Chair will communicate to the Government planned GBS contributions of GBS Partners for the next three years (FYs n+1, n+2 and n+3)

(2)Within six weeks following receipt of the Final Report of the Annual Review, the GBS Lead Partner will confirm to the Government GBS Partners‟ GBS disbursement schedules for the next financial year (n+1).

Endeavour to coordinate their disbursements in line with the Government‟s budgetary requirements, including providing timely GBS in the first half of the financial year, and, whenever possible, in the first quarter

PAF matrix contains an indicator on development partners performance and this is reported on at the GBS Annual Review

Endeavour to provide the Government with three-year advance information on planned GBS contributions and to minimize year-to-year fluctuations of pledged amounts

MKUKUTA/PER Macro, Resource Allocation and Public Financial Management monitors GBS Partners‟ planned contributions and reports on GBS Partner performance at GBS Annual Review

Maintain a GBS Partners‟ decision-making DPs communicate their representative to

Page 13: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

13

structure, including a GBS Partners‟ Secretariat and nominate one GBS Partner to act as their representative

the Government and share their TOR with the Government.

Eliminate bilateral conditions and bilateral administrative and reporting requirements

Joint GBS Secretariat establishes and maintains a matrix of bilateral conditions

Increasingly mount joint missions, undertake joint analysis, and use joint procedures

DP GBS Secretariat collects and coordinates information on joint missions, joint analysis and use of joint procedures and shares information with the Joint GBS Secretariat.

Participate in Government-led Annual Reviews and provide such information as may be necessary, to monitor and report on GBS performance in accordance with the PAF

Participation of GBS Partners and information sharing will be coordinated through the DP GBS Chair and the DP GBS Secretariat.

Endeavour to deliver more aid through GBS

GBS DPs formulate plans to increase the proportion of GBS in the context of implementing JAST. MOFEA records composition of aid by DP and reports on it at GBS Annual Review. MOFEA and GBS DPs will encourage non-GBS DPs to shift to providing GBS as stipulated in the JAST.

Page 14: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

14

Annex 2 Terms of Reference of the Joint GBS Secretariat

Objective

The overall objective of the Joint GBS Secretariat is to facilitate the smooth functioning

of the GBS process, including the ongoing GBS dialogue throughout the year, the

implementation of Government and DP commitments related to GBS, as well as the GBS

Annual Review.

Membership and leadership

The Joint GBS Secretariat is composed of designated Government officials from the

Ministry of Finance and Economic Affairs and the GBS Partner Secretariat (PRBS

Secretariat) including the Lead of the GBS Coordination Group1. Selected members of

the PER and the MKUKUTA Secretariats are also associated with the Joint GBS

Secretariat in order to allow for easier information flow between the three Secretariats

and for strengthening linkages between the GBS, PER and MKUKUTA processes.

The Ministry of Finance and Economic Affairs of the Government of Tanzania chairs the

Joint GBS Secretariat.

Main responsibilities

Main responsibilities of the Joint GBS Secretariat are to:

Coordinate and administer the GBS process;

Monitor and follow up on the implementation of activities as agreed in the

Performance Assessment Framework (PAF), GBS Partnership Framework

Memorandum (PFM), the GBS Annual Review and other agreements relevant

to the GBS facility.

Ensure communication between the Government and GBS Development

Partners;

Specific Tasks

Specific tasks under the main responsibilities are the following:

1. Prepare the GBS Annual Cycle Work Programme and coordinate agreement on it

between Government and GBS Partners.

2. Monitor and follow up on GBS work programme implementation and link with

the different dialogue structures in place at the reform, sector and MKUKUTA

cluster level through:

1 This is the designated technician of the GBS lead agency and/or any other designated technician of the

GBS Troika+.

Page 15: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

15

a. regular direct communication with CWGs leads or MDAs responsible for

specific PAF actions

b. following up on CWG submission of quarterly status updates to the

Ministry of Finance and Economic Affairs (MOFEA) and their annual

CWG progress reports to the GBS Annual Review.

c. attending GBS specific CWG meetings and assist in facilitating these

meetings, if required by the CWG lead

d. attending other relevant meetings of the PER and other processes, as

deemed necessary (e.g. PER Main meetings that focus on GBS, PER

Consultative Meeting etc.)

e. reporting on CWG progress in GBS work programme implementation at

Joint GBS Secretariat meetings

3. Follow up on other fundamental requirements for the implementation of the GBS

process, such as audit requirements and other documents as specified by the GBS

Partnership Framework Memorandum, in particular the MKUKUTA Annual

Implementation Report.

4. Prepare, organize, coordinate and facilitate the GBS Annual Review:

a. Coordinate joint Government and GBS Partner inputs into the GBS

Annual Review, such as CWG progress reports, CWG progress

presentations, proposed key issues, questions for key issues sessions, etc.

b. Review Government and GBS Partner proposals of key issues for the GBS

Annual Review and make recommendations to the Permanent Secretary –

MOFEA and the Troika Plus for their endorsement of the key issues

c. Make all organizational and logistical arrangements for GBS Annual

Review meetings, including the preparation and dissemination of

invitations and the provision of all necessary documents to respective

participants

d. Supervise the work of the GBS Annual Review facilitators

e. Provide all necessary administrative assistance during the GBS Annual

Review to ensure a smooth event

f. Coordinate Government and GBS Partner agreement on joint documents

such as the joint press release and the Executive Summary.

g. Coordinate the finalization of the GBS Annual Review (GBS Annual

Review Report and up-dated PAF for the next GBS cycle) in close liaison

with the CWGs.

5. Follow up on the timely submission of planned and confirmed disbursement

schedules by GBS Partners and their actual GBS disbursements throughout the

year.

6. Ensure regular communication on the GBS process and facility between the

Government and GBS partners

a. Ensure a forum for permanent exchange on issues arising at the technical

level;

Page 16: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

16

b. Organize and facilitate meetings of the Permanent Secretary - MOFEA,

with the Troika Plus on issues relevant to the GBS facility and process.

7. Any other task as assigned by agreement of the Permanent Secretary- MOFEA

and the Troika Plus.

Meetings

The Joint GBS Secretariat meets on a monthly basis every second Tuesday of the month

or more often, if required. The Chair of the Joint GBS Secretariat calls for the meetings,

which are prepared by the Government side of the Secretariat. The Government side also

prepares minutes of Joint GBS Secretariat meetings and circulates them for comments to

the DP side before they are approved in the next Joint GBS Secretariat meeting.

Troika + minutes will be prepared and agreed by the joint GBS secretariat

Page 17: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

17

Annex 3 Guidance on GBS for Cluster Working Groups (CWG)

Government leadership

All Cluster Working Groups are led by the Government of Tanzania. This means that the

Government takes leadership in producing all required outputs in co-operation and

agreement with GBS Partners and in presenting relevant outputs at the GBS Annual

Review.

Responsibilities of the Government CWG Lead are the following:

Collect information on dates for sector reviews with assistance from Joint

GBS/PER secretariat, ensure annual outcome indicators are included in the PAF

and follow-up to agreed actions in AR report.

Circulate, with support of the Joint GBS Secretariat, the GBS Work Programme

with all annexes including the GBS Work Calendar for CWGs, to all CWG

members, in particular to MDAs that are responsible for specific PAF actions.

This is done immediately after the launch of the GBS cycle in April. If required,

Government CWG leads, with support of the Joint GBS Secretariat, also provide

clarifications to CWG members on the GBS Work Programme.

Call and organise CWG meetings on GBS to review the status of implementing

PAF actions and prepare inputs for the GBS Annual Review in close collaboration

with the Joint GBS Secretariat. Submit minutes of CWG meetings on GBS to the

Ministry of Finance and Economic Affairs.

Coordinate GBS (PAF) related work of the CWG with inputs from relevant CWG

members and submit outputs of the CWG (Quarterly Status Up-dates, Progress

Report against the PAF, proposed revisions of the PAF, Key Issues of the CWG).

Present the CWG summary assessment of progress against the PAF at the GBS

Annual Review, followed by GBS DP Lead commentary.

Coordinate the preparation of and submit CWG progress report on GBS, which is

incorporated into the GBS Annual Review Report by 23 December 2010

Coordinate and submit CWG inputs to other parts of the GBS Annual Review

Report, e.g. comments on the Joint Statement / Executive Summary or GBS

Annual Review meeting minutes.

GBS Partner Leads have the following responsibilities:

Coordinate inputs of GBS Partner members in CWGs on GBS specific issues

Support Government CWG lead in preparing / coordinating CWG outputs

Forge consensus among GBS Partner members in CWGs on relevant outputs or

comments on such outputs

Page 18: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

18

Serve as focal point for the Government in communication with GBS Partner

members of a particular CWG

Outputs

CWGs will be responsible for the following key products:

I. Up-dates of PAF progress

II. Selection of a maximum of five key issues within the CWG (August)

III. CWG Progress Report assessing the Government‟s and DP‟s performance against

the PAF (October)

IV. Proposed revisions of the PAF for the areas relevant to the CWG

(September/October)

V. Finalized CWG Progress Report for inclusion in the GBS Annual Review Report

(December)

I. Status Up-dates:

Advice on Content:

This will be a short narrative up-dating on the status of the implementation of the PAF

2010. CWGs are particularly encouraged to highlight challenges and areas of

underperformance in order to ensure remedial action before the GBS Annual Review.

Advice on Process:

Government CWG lead requests MDAs responsible for specific PAF actions to

provide a status up-date.

PAF action provided to Joint GBS Secretariat 1 week in advance of the CWG

meeting on GBS.

Joint GBS Secretariat compiles MDA inputs on status up-dates and circulates

them to all members of the CWG 2-3 days in advance of the meeting.

CWG meeting discusses progress and challenges, verifies PAF up-dates and

agrees on the way forward.

Government CWG lead submits status up-date and minutes of the CWG meeting

on GBS to the Ministry of Finance and Economic Affairs.

II. CWG Progress Report against the PAF

In order to assess performance against the PAF for the GBS Annual Review, CWGs will

submit a consolidated CWG Progress Report against the PAF, following the structure of

the attached template (Annex 4: Format for CWG GBS Progress Report). This Report is

incorporated into the GBS Annual Review Report.

Page 19: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

19

The report is prepared jointly by the CWG. It may be however that there are divergences

in the assessment of progress between Government and GBS DP members. Divergences

should be clearly identified and reflected in the text. Advice on the content is provided in

the Annex 4.

III. Selection of a maximum of five key issues (August)

The GBS Annual Review will include high level sessions on a limited number of selected

key issues. Key Issues (i) are key in that they could jeopardize the achievement of

Government objectives of growth and poverty reduction and (ii) if not properly addressed

could have implications for PRBS functioning and funding over the medium term as they

a) are sufficiently large in nature to warrant raising to a higher level, or b) are issues that

are not able to be resolved at the CWG level.

Each CWG submits the key issue proposals to Joint GBS Secretariat following the May

meeting. From the submitted list of key issues by the CWGs, Government and GBS

Partners will select a maximum of 5 key issues for the GBS Annual Review.

Advice on Content:

The proposed key issues should be submitted using the template provided in the

Annex 7.

The concept note should explain why the proposed key issue would be relevant to

be discussed at the GBS Annual Review, considering the above outlined

characteristics of key issues.

It should also outline specific questions or issues (e.g. challenges that require

recommendations on the way forward) to be addressed on each key issue at the

GBS Annual Review.

Advice on Process:

August CWG meetings will discuss key issues and submit a one page concept

note (see example in Annex 7) at the September Cluster meeting.

IV. Proposed revisions of the PAF for relevant CWG areas (September/October)

The CWG will propose amendments to the PAF for the GBS annual cycle 2009 in

advance of the GBS Annual Review. Principles for proposing amendments of the PAF

are the following:

Maintain the current structure of the PAF (Underlying Processes, Temporary

Process Actions and Outcome Indicators)

If possible, simplify the PAF.

Page 20: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

20

For the suggestion of new outcome indicators, rely on the new MKUKUTA and

MKUZA indicators

Advice on Process:

MDAs and GBS partners make suggestions on PAF revisions for areas relevant to

their CWG and submit these revisions to CWG lead at least two weeks in advance

of the September meeting on GBS.

Government CWG lead compiles suggestions on PAF revisions and circulates

them to all CWG members for review at least one week in advance of the

September meeting on GBS.

CWG meeting discusses and agrees on proposed revisions to the PAF. If

Government and GBS Partner members‟ views on revisions differ, they may

however prepare separate proposals

Government CWG lead submits proposed PAF revisions by early October 2008 to

the Joint GBS Secretariat (GBS Partner CWG lead submits separate GBS Partner

proposal to Joint GBS Secretariat, if Government and GBS Partners have been

unable to agree on a joint proposal).

Joint GBS Secretariat finalizes the proposals from CWGs, assists the CWG and

sector leads in reaching agreement on the areas of the PAF where no agreement

has been reached and prepares a draft PAF matrix, which is to be approved by a

Troika + meeting one week in advance of the GBS Annual Review.

Based on key issue discussions in the Annual Review, revisions that may be

needed in the PAF will be agreed on by a Troika + PS meeting after 2 weeks

from the completion of the Annual Review.

(a) Finalized Progress Report for the GBS Annual Review Report (November)

After the GBS Annual Review Meeting, CWGs may revise their Progress Reports

(Output II) based on discussions at the GBS Annual Review. This may be done in a

meeting or through written communication between CWG members. The Government

CWG lead coordinates the finalization of the Progress Report and submits it for inclusion

in the Final GBS Annual Review Report.

Annex 4 Format for CWG Progress Reports

Page 21: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

21

INSTRUCTIONS:

Based on sector progress reports each Cluster Working Group will produce a

consolidated CWG progress report following the instructions below. CWG reports

should focus on progress made and challenges remaining and report on underlying

processes assessed as part of PAF assessment, temporary process actions and

outcome indicators for each sector under the Cluster.

Advice on Content:

The following section provides guiding questions and other advice for the development

of the content of the Progress Report:

1. Summary (maximum 1 page + summary matrix):

1. Have the underlying processes been satisfactory? (see guidance note on

satisfactory sector or programme reviews in annex 8)

2. How many of the 2009 PAF outcome indicators and temporary process actions

have been met?

3. What have been the key areas of good performance?

4. What have been the key areas of weak performance?

5. Based on the above, what is the overall assessment of developments in the PAF

area (please choose “satisfactory” or “not satisfactory”)?

In addition to a text summary, CWGs should add a matrix that summarizes progress

against the PAF.

2. Detailed performance assessment for 2009 (maximum 5 pages):

Wherever possible, sources of information providing evidence for the detailed

performance assessment should be listed (e.g. reports, meetings).This section should

include the following:

a. Review of areas of good and weak performance and suggestions for remedial actions

to overcome observed key challenges (maximum 2 pages). Questions to be addressed

include: What are the key factors enhancing performance and the key factors hindering

performance? What are the key lessons learned? What are the key challenges looking

ahead? As much as possible concrete examples of achievements/lack of results should be

used.

b. Review of the relevant underlying processes (maximum 1 page). Have the underlying

processes been satisfactory (see Annex 8 for Guidance on the definition of satisfactory

sector and programme reviews)? Indicate whether they have been “satisfactory”; or “not

satisfactory”. If not satisfactory, what is needed to ensure the development of satisfactory

review processes?

Page 22: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

22

c. Review of temporary process actions (maximum 1 page). An assessment of the status

of Temporary Process Actions (using the following terms: “on track/achieved”, “delayed

but good progress”, “at risk” or “off track/not achieved”) should be given. If at risk or off

track, the following should be clarified, noting that the final assessment should only be

“achieved” or “not achieved”:

impediments

steps needed for completion

likely timeframe for completion

It should be highlighted whether a particular Temporary Process Action has to be rolled

over to the next year or can be considered completed and covered under an underlying

process.

d. Review of progress on outcome indicators (maximum 1 page). Based on Government

provision of the values for the outcome indicators, the CWG will assess the results in the

light of targets and baselines established in the PAF. For each indicator, the report will

clearly state whether it has been met, and if not, what the key reasons are for the

underperformance.

Advice on Process:

CWG lead with support of the Joint GBS Secretariat circulates CWG Progress

Report template to all CWG members at least 4 weeks in advance of the CWG

meeting on GBS in October.

MDAs that are responsible for specific PAF actions in collaboration and

agreement with the responsible GBS partners provide inputs for the CWG

progress report to Government CWG lead at least two weeks in advance of the

October meeting on GBS. They include relevant findings from the draft

MKUKUTA Annual Implementation Report, which is expected to be available

mid September. Divergent views on aspects of the assessment between

responsible MDAs and responsible GBS Partner may be indicated in the progress

report.

Government CWG lead compiles MDA inputs into a first draft CWG progress

report and circulates it to all CWG members for review at least one week in

advance of the October meeting on GBS.

CWG members provide written comments on the first draft CWG progress report

to the Government CWG lead 2-3 days in advance of the CWG meeting.

CWG meeting assesses overall progress and challenges in the CWG, discusses the

first draft CWG progress report including CWG members‟ comments, and agrees

on way forward for finalizing a joint draft report prior to the GBS Annual Review.

Government CWG lead coordinates the finalization of the joint draft CWG

progress report and its submission by October 2009 to the Joint GBS Secretariat.

[Title]

Progress Report of CWG ... Against the Performance Assessment Framework

Page 23: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

23

(PAF) for GBS Annual Review 2009

Contributors

[GOT and GBS DP Leads, other CWG members by names of individuals or agencies]

Date

[of this version of document]

i) SUMMARY ASSESSMENT [max. 1 page]

Overall Assessment [This is a summary of progress made and challenges faced under the Cluster, including ratings of underlying processes.]

2. DETAILED ASSESSMENT [max. 5 pages]

2.1. Areas of good and weak performance [max. 2 pages]

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment]

[provide assessment on areas of good performance and weak performance with suggestions for remedial actions to overcome observed key challenges, addressing guiding questions provided in Annex 3 – Additional Guidance on GBS for Cluster Working Groups]

2.2. Underlying Processes [max. 1 page]

Page 24: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

24

a) Underlying Process 1: … [put name of first underlying process as in PAF]

Assessment "Satisfactory" or "Unsatisfactory" [choose one]

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment on the first underlying process]

[provide detailed assessment on the first underlying process, addressing guiding questions]

b) Underlying Process 2: … [put name of second underlying process as in PAF]

Assessment "Satisfactory" or "Unsatisfactory" [choose one]

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment on the second underlying process]

[provide detailed assessment on the second underlying process, addressing guiding questions]

……etc. [continue with further underlying processes if applicable]

[insert proposed PAF revisions to the underlying processes, e.g. the formulation of temporary process actions for unsatisfactory underlying processes – see Annex 8: Guidance Note on Satisfactory Sector Reviews]

Page 25: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

25

2.3. Temporary Process Actions [max. 1 page]

a) Temporary Process Action 1: … [put name of first temporary process action as in PAF]

Assessment "On Track/Achieved", "Delayed but Good Progress", "At Risk" or "Off Track" [choose one]

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment of the first temporary process action]

[provide detailed assessment on the first temporary process action, addressing issues listed as guidance – for final assessment, choose “Achieved” or “Not achieved”]

b) Temporary Process Action 2: … [put name of second temporary process action as in PAF]

Assessment "On Track/Achieved", "Delayed but Good Progress", "At Risk" or "Off Track" [choose one]

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment of the second temporary process action]

[provide detailed assessment on the second temporary process action, addressing issues listed as guidance - for final assessment, choose “Achieved” or “Not achieved”] Groups ]

…..etc. [continue with further temporary process actions if applicable]

Page 26: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

26

2.4. Outcome Indicators [max. 1 page]

a) Outcome Indicator 1: … [put name of first outcome indicator as in PAF]

Assessment "On Track/Achieved", "At Risk" or "Off Track/Not Achieved" [choose one]

Indicator Values Baseline 2005: …

Status 2007: …

Target 2010: …

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment on the first outcome indicator]

[provide detailed assessment on the first outcome indicator, addressing issues listed as guidance]

b) Outcome Indicator 2: … [put name of second outcome indicator as in PAF]

Assessment "On Track/Achieved", "At Risk" or "Off Track/Not Achieved" [choose one]

Indicator Values Baseline 2005: …

Status 2007: …

Target 2010: …

Main Sources of Information

[list documents, surveys, meetings etc. that provide evidence for the assessment on the second outcome indicator]

[provide detailed assessment on the second outcome indicator, addressing issues listed as guidance]

…..etc. [continue with further outcome indicators if applicable]

Page 27: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

27

Page 28: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

28

Annex 5: Format for GBS Annual Review Report 2010

1. Executive Summary / Joint Statement

1.1. Overall Assessment

1.2. Summary of Performance Against PAF 2010

1.3. Summary Findings from GBS Annual Review Key Issues Sessions, including

agreed key messages

2. Introduction

3. Objectives of GBS Annual Review 2010

4. Detailed Progress against PAF matrix

5. Cluster Working Groups Reports

5.1. CWG 1: MKUKUTA Cluster 1 - Growth and Reduction of Income Poverty

5.2. CWG 2: MKUKUTA Cluster 2 - Improvement of Quality of Life and Social

Well-Being.

5.3. CWG 3: MKUKUTA Cluster 3 - Governance and Accountability

5.5. CWG 4 & 5: PER Macro, Resource Allocation and Public Financial

Management

6. Assessment of the Performance of GBS Partners

7.

8. Joint Press Release

9.

10. Annex I – Revised PAF matrix 2011

11. Annex II – List of Participants

Page 29: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

29

Annex 6: Revised Performance Assessment Framework (PAF) for GBS Review 2010

ANNEX 10

PAF 2010 – 15 MARCH 2010

S/N CLUSTER WORKING GROUP ONE

UNDERLYING PROCESS

1 Energy Sector Review (MEM)

2 Agriculture Sector Review (MAFS)

3 BEST Programme Review (PMO)

4 Joint Infrastructure Sector Annual Review (MOID)

5 Natural Resources Sector Review focusing on Wildlife and Forestry (MNRT)

TEMPORARY PROCESS ACTIONS

1 Government to ensure a construction contract has become effective and the contractor has

mobilized by August 2010 which ensure that additional power generation capacities of at

least 160 MW will be operational by December 2011 ( MEM)

2 Draft new Statistics Bill enhancing autonomy of the NBS is submitted to Cabinet by

December 2010.

3 Government to implement key actions of Natural Resources (forestry, wildlife and fisheries)

accountability and transparency action plans following the timetable specified in the M&E

framework. (MNRT & MLD)

4 GoT will present a time bound ROADMAP to improve the Business Environment in

Tanzania by March 2010 and implement selected critical short term priority actions detailed

in this plan by October 2010. (PMO)

5 Finalise an Agricultural Marketing Strategy by July 2010 on the basis of a ToR agreed by

Cluster by the first week of March, and implement key measures to improve the marketing

Page 30: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

30

environment for private sector by December 2010. (MITM)

6 Phased elimination of all local crop cess taxes from 5% to 3% to 0% within two fiscal years

to be included in the Finance Bills FY 2010/11 and 2011/12, and offset by a transfer while

the overhaul of local taxation is carried out (PMO)

7 Draft bill and regulatory framework for PPP submitted to the Parliament by April 2010 and

implementation of PPP policy including operational PPP Agency by November 2010 (PMO)

OUTCOME INDICATORS

S/N Outcome

Indicators

Baselin

e 2005

2008 Target

2009

Actual

2009

Targe

t 2010

Targe

t 2011

Targe

t 2012

MKUKU

TA

Target

1 Income

Poverty rate

for Mainland

and Zanzibar

(MOFEA)

TBA

on

basis of

Nation

al

Panel

Survey

7. 8. 9. 10. 11. 12. 13.

2 Total

electricity

installation

capacity and

utilization,

MW and %

(MEM)

889

MW

62%

1,046

MW

75%

1,091

MW

79%

1,092

MW

70%

1,137

MW

71%

1,297

MW

72%

1,297

MW

77%

14.

3 % of

population

with access to

electricity

(MEM)

8.2% 9.8% 10.9% 14% 14.5% 15% 15.5% 20%

Page 31: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

31

4 % of trunk and

regional roads

network in

good and fair

condition

(MOID)

82% 90% 92% 95% 93%2 94% 95%

15.

5 % of rural

roads that are

passable (good

and fair)

(MOID)

50% 57% 60% 58.5% 60 %3 65% 70% 75%

6 Time taken for

a container

from off-

loading until

clearing from

port (import

data) (MOID)

20.1

days

22.6

days

18

days

21.8/18

days

16

days

12

days

10

days

12

days

7 Hectares of

land under

irrigation

(MOWI)

249,99

2

289,7

45

316,42

5

317,24

5

340,44

5

370,44

5

400,44

5

430,445

8 Fertilizer

consumption4

119,21

1

149,4

86

208,22

9

275,21

9

280,00

0

326,25

4

362,14

0

16.

17.

9 Increased ratio

2 The 2010 target is lower than the actual 2009 figure as the trunk and regional roads network has just been increased by 3000 km. New roads are reclassified from a lower class. 3 Due to budget constraints and increased road rehabilitation to be covered the target might not be reached. This figure is suggested to be based on a supplementary condition survey to be carried out by the districts in September/October. 4 Please note that projections for fertilizer for 2011 and 2012 will be revised based on the actuals for 2009 and 2010.

Page 32: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

32

of farm gate to

export price

from the 2009

baseline as

established by

the Coffee and

Cashew

boards5

Cashew6

69.9 69.9 73 73 73.7 74.1 74.4 18.

19. Arabica Coffee

(North)7

49 53 74 82 83 83 84 20.

21. Arabica coffee

(South)

56 66 73 82 83 83 84 22.

23. Robusta

37 53 84 96 82 85 85 24.

10 Enabling

environment

for private

sector led

growth

improved as

reflected in

“Doing

Business”

ranking

150

(Doing

Busine

ss (DB)

2006)

127

(DB

2009)

120

(DB

2010)

131 120

(DB

2011)

99

(DB

2012)

99

(DB

2013)

25.

5 Baseline data and targets are preliminary. GOT and DPs will jointly undertake technical work to finalize and agree on the definitions, the baselines, and the targets by end April 6 Arabica Coffee Conversions:1 Kg of Patchment equals to 800 grams of clean coffee 7 Robusta Coffee Conversions:1 Kg of dry cherry equals to 500 grams of clean coffee General Note for crops: TIME SERIES projections based on trend analysis indicate a gradual increase. Figures for 2009 and 2010 target are higher as a result of increased subsidy (EPA funds and WB loan)

Page 33: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

33

(PMO)

11 The number of

days taken by

the

commissioner

of lands to

approve a

transfer of a

certificate of

rights

occupancy and

the lands

registry to

register the

transfer

reduced from

28 to 14 by

2011 (MLH)

28

(2007) 26. 24 14-21 19 14 14

27.

12 Total value of

revenue

received from

concessions

and licenses (if

any) for

forestry,

fishing,

wildlife and

minerals (Tsh

billion) (MLD,

MEM, MNRT)

Forestr

y

&

beekee

ping

TSh

21.6

(2007/0

8)

Fisheri

es Tsh

2.2

(2005/0

28. Forestr

y &

beekee

ping

TSh

23.7,

Fisheri

es TSh

8.5,

Wildlif

e TSh

29.2,

Minera

Forestr

y &

beekee

ping

TSh

23.7,

Fisheri

es TSh

8.5,

Wildlif

e

(Actual

collecti

Forestr

y &

beekee

ping

TSh

23.8,

Fisheri

es TSh

8.5,

Wildli

fe TSh

21.4,

Miner

Forestr

y &

beekee

ping

TSh

29.1,

Fisheri

es Tsh

9.1,

Wildli

fe

TSh

21.9,

Forestr

y

&

beekee

ping

TSh

32.1,

Fisheri

es Tsh

10.3,

Wildli

fe

Ths

29.

Page 34: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

34

6)

Wildlif

e Tsh

11.6

(2007/0

8)

Minera

ls USD

60

million

(2007/0

8)

ls Tsh

45.5,

Oil &

Gas

TSh

14.7

on up

to Sept

2009)

TSh

15.8),

Minera

ls Tsh

45.5.

Oil &

Gas

Tshs

14.7

als

Tsh

47.8,

Oil &

Gas

Tsh

15.6

Miner

als

TSh

50 Oil

& Gas

TSh

17.0

22.4,

Miner

als

Tsh.

52.0

Oil &

Gas

TSh

17.34

CLUSTER WORKING GROUP II (CWG 2)

UNDERLYING PROCESS

1 Education Sector Review (MOEVT)

2 Health Sector Review (MOHSW)

3 Water Sector Review (MOWI)

4 HIV and AIDS Sector Review (TACAIDS)

5 Review of Environment as a cross cutting issue8 (VPO)

TEMPORARY PROCESS ACTIONS

1 Education Sector Human Resources Situational Analysis carried out according to the agreed

TOR with the data collection initiated by June 2010 and first draft finalized by November 2010

(MOEVT)

2 Capacity building plans based on the water sector capacity development framework are in place

by March 2010 and on budget by June 2010 for all MOWI departments, minimum 75% of all

LGAs; and minimum 90% of all other implementing agencies (such as Urban Water Authorities,

Water Basins)(MOWI)

8 The review of environment will focus on the implementation of the water catchment and land degradation strategies.

Page 35: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

35

3 An analytical framework is established (related to MTEF and PER) to monitor the allocation and

disbursement of funds to key Health Sector Strategic Plan - 3 areas (LGA, HRH, MCH,

Eds/Medical supplies) (MOHSW, PMORALG)

4 At least 3 out of 5 MDAs (Agriculture, Health, Infrastructure, Water, and Energy & Minerals)

have finalized environmental action plans for the sector and ministries by September 2010 and

ensures that the action plans are in accordance with the guidelines for such action plans as

described in the Environmental Management Act 2004 (VPO)

OUTCOME INDICATORS

S/

N

Outcome

Indicators

Baseli

ne

2005

2008 Target

2009

Actual

2009

Target

2010

Target

2011

Targ

et

2012

MKUK

UTA

Target

1 Number of

Districts

allocating budget

to EMA

implementation

(VPO)

0 11 50 121 132 133 133

2 Percentage of

cohort

completing

Standard VII

(MOEVT)9

66.9% 65.0% 69% 62.4% 63% 65% 67% 90%

(primar

y)

3 Percentage of

cohort

completing

Ordinary - Level

Secondary

87.3% 94.4% 86 % 84.9% 86% 87% 88%

9 Actual gender disaggregated data is available in the 08/09 annual performance report and will be available in every subsequent annual performance report. Regional disaggregation is part of the sector dialogue.

Page 36: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

36

Education (Form

IV) (MOEVT)10

4 Percentage of

cohort

completing

Advanced - Level

Secondary

Education (Form

VI) (MOEVT)11

98.2% 73.2% 95% 103.4

%

95% 96% 97%

5 Transition rate

from Standard

VII to Form I

Gender

disaggregated

(MOEVT)12

Averag

e36.1%

B:36.6

G:35.6

Average

56.7%

B: 63.5

G: 49.6

49 % 51.6% 54 % 56 % 58% 50%

6 Gross enrolment

in Higher

Education

(MOEVT)

0.27% 1.23%

(Total

82,428)

1.6% 2.5% 2.8 % 3.2% 3.6% 2.0%

7 Qualified teacher

/ pupil ratio in

primary

(MOEVT)

1:73 1:63 1:63 1:60 1:60 1:58 1:56 1:45

8 Qualified teacher

/ pupil ratio in

secondary

schools

1:51 1:51 1:48 1:57 1:55 1:53 1:51

10 Gender disaggregated data will be available after the completion of actual data collection 11 Gender disaggregated data will be available after the completion of actual data collection 12 Regional disaggregation is part of the sector dialogue.

Page 37: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

37

(MOEVT)

9 Sustaining the

high proportion

(equal to or

above 85%) of

children that

receive three

doses of vaccine

against

diphtheria,

pertussis, tetanus,

and Hepatitis B

under two years

(MOHSW)13

81% 85% 85% 86% 85% 85% 85% 85%

10 Proportion of

births taking

place at health

facilities as a

proxy of births

attended by

skilled

H/Workers

(MOHSW)14

41% 51% 60% 52% 60% 65% 67%

11 Sustaining the

high (80%)

Tuberculosis

completion

82.6% 84,8% 80 % 87.4% 85 % 85 % 85% 80%

13 Regional disaggregation is part of the sector dialogue. 14 Regional disaggregation is part of the sector dialogue.

Page 38: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

38

treatment rate

(MOHSW)15

12 Number of

people with

advanced HIV

infection

receiving ARV

combination

therapy, gender

disaggregated

(MOHSW)16

20,588

Male

7,466

Female

13,122

69,250

Male

62,861

Female

114,897

193,978 248,28

0

Male

80,000

Female

146,00

0

350,000 440,00

0

13 Percentage of the

population that

has access to

clean and safe

water from a

piped or

protected source

(MOWI)

Rural/

Urban

53%/

73%

Rural/

Urban

57.1%/

79.9%

61.9% /

85%

58.3%

/ 83%

60% /

84%

65% /

90%

Rural /

Urban

65% /

90%

CLUSTER WORKING GROUP III (CWG 3)

UNDERLYING PROCESS

1 Public Service Management Reform Programme (POPSM)

2 Accountable governance (POPSM)

3 Anti-corruption (incl. NACSAP and agreed anti-corruption reporting frameworks)

(GGCU/PCCB)

4 Local Government Reform Programme (PMO RALG)

5 Legal Sector Reform Programme (MOCAJ)

TEMPORARY PROCESS ACTIONS

15 Regional disaggregation is part of the sector dialogue. 16 The figures are cumulative figures of all persons ever put under ARV treatment.

Page 39: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

39

1 The Government implements the approved LSRP M&E framework with annual data collection

on all LSRP relevant MKUKUTA indicators and 50% of all outcome indicators. (MOCAJ)

2

Government to strengthen governance reform implementation by Sept. 2010 by:

i) Operationalising common procedure for implementation of core Government reforms based

on the recommendation adopted by the JCC of 13th November 2009 (RCU – STATE HOUSE)

ii) Identifying for each reform programme, based on current institutional practice, at least 2

measurable indicators that are result (impact) instead of process (input) based, to be used for

annual reporting on progress on core reforms by 1 October 2010.

(RCU – STATE HOUSE)

3 Review and develop proposals for the amendment of the local Government Finance Act, 1982

attendant memorandum, regulations and manuals to provide for enhanced autonomy in

budgeting and planning as well as ensuring more efficient, accountable and transparent financial

management shared with key stakeholders by June 2010 (PMORALG)

4 (i)The Government to maintain efforts to fight both petty and grand corruption at all levels and

provide quarterly updates in line with PCCA, 2007

(ii)NACSAP M&E framework to be in place by June 2010 (PCCB)

5 The Government will, by December 2010, issue to LGAs a circular which will inform them

about Government's decision to fold the recurrent grants into one for personal emoluments (PE)

and one for other charges (OC) for each LGA effective from the financial year 2011/12. (PMO

RALG)

6 (i)The Government shall put in place measures, including incentives, to ensure adequate staffing

in persistently understaffed areas by June 2010 to be implemented in FY 2010/11.

(ii)The Government shall reduce overall expenditure on duty facilitating allowances and

honoraria in Ministries, Departments and Agencies and promote positive use of allowances in

underserved areas in line with the principles of MTPP by June 2010 (POPSM)

OUTCOME INDICATORS

S/

N

Outcome

Indicators

Baselin

e 2005

2008 Target

2009

Actual

2009

Target

2010

Target

2011

Target

2012

MKUKUT

A

Target

Page 40: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

40

1 Percentage of

total

government

budget allocated

directly to

LGAs, which

does not go

through

ministerial

votes and is

calculated on a

formula basis,

identifying

separately the

contribution of

CDCF funds

(PMORALG)

16.1%

17% 23% N/A17

25% 25%

2 Percentage of

court cases

outstanding for

2 years or more

(MOCAJ)

27.9

(2004)

25.9% 25.9% 25.9% 23% 20%

CLUSTER WORKING GROUP IV (CWG 4)

UNDERLYING PROCESS

1 Public Financial Management Reform Program (MOFEA)

2 Annual Audit Cycle (MOFEA NAO)18

3 Macroeconomic Stability (Latest PSI review) (MOFEA)

17 Percentage of total government budget allocated directly to LGAs equals 25.6% for 2009, but consultation is on-going to specify whether the transfers „are not going

through ministerial votes‟ and/or „are calculated on a formula-basis‟. 18 As stipulated in the Public Audit Act, CAG reports for central and local government and public bodies submitted to Parliament within 9 months from end of financial

year and PMG provides a structured response

Page 41: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

41

4 Assessment of Development Partners Performance (Predictability of Direct Budget Support)

(MOFEA)

5 Effective PER policy dialogue to inform the budget process (MOFEA)

6 DPs and GoT on adhere to JAST Principles, PFM, Accra Agenda for Action in terms of reducing

funding on project/basket and increasing funding on GBS (MOFEA)

TEMPORARY PROCESS ACTIONS

1 Implementation of the agreed time-bound action plan derived from the NAO audit of IFMS.

(only actions implementable in 1 year) (ACGEN)

2 Adoption of the Due Diligence study, including recommendation to transform the Office of the

Treasury Registrar into an Autonomous Body, and relevant steps taken to start implementing

said recommendation.

3 Implementation of PFM action plan based on agreed assessment criteria

4 PEFA for Zanzibar carried out and results shared with key stakeholders by September 2010

5 Complete a comprehensive study on revision of the Public Corporations Act to harmonize the

legislation relating to public corporations, and ensure strengthened corporate governance and

accountability consistently across parastatals by January 2011.

OUTCOME INDICATORS

S/

N

Outcome

Indicators

Baseli

ne

2005

2008 Targe

t 2009

Actual

2009

Target

2010

Target

2011

Targe

t

2012

MKUK

UTA

Target

1 NAO reaches

level 3 of

Afrosai

capability model

by 2010 (NAO)

Audit

manu

al

which

is in

line

with

INTO

SAI

prepa

red

The

Public

Audit

Act

was

enacte

d on

June

11

Finalization of

review on risk-based

auditing Finalization

of independent

quality assurance

review

1)Reco

mmend

ations

on risk-

based

auditing

introdu

ced to

all

auditees

2)Imple

Page 42: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

42

mentati

on of

recomm

endatio

ns from

indepen

dent

quality

assuran

ce

review

2 Average level of

compliance of

procuring

entities with the

Procurement Act

2004 to reach

80% by 2011

(PPRA)

39%

(2006/

2007)

43% 55% 50% 65% 80% 80%

3 Credible cash

flow and

procurement

plans in 9

MDAs (Health,

Education,

Infrastructure

Development,

Water, MoFEA,

Agriculture,

Energy and

Minerals,

Page 43: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

43

Livestock

Development

and

PMORALG)

agreed with

MoFEA for the

FY 10/11 budget

and execution

monitored19

(MOFEA)

4 Approved

budget broadly

in line with

policy objectives

(MKUKUTA,

sector policy

priorities) also

as measured by

percentage of

total resources

net of debt

service allocated

to MKUKUTA

interventions.

(MOFEA)

(68)

(2007/

08)

(68) (70) YES

(68)

YES

(68)

YES

(68)

5 Expenditure

outturns

deviation

compared to

original

18% 16.7

%

14.50

%

13.1% 12.9% 11.9% 10.9%

19 (i) Assessment will be based on quarterly releases, and (ii) releases will consider implementation status and standard requirements such as certificates in Infrastructure

Page 44: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

44

approved budget

(recurrent MDA

only- vote

level), excluding

salary

adjustments,

contingency and

debt service

(MOFEA)

6 Fiscal Deficit

(after grants)

as % of GDP

consistent with

PSI targets

(MOFEA)

6% 0.0% 4.4% 4.7% 5.7 % 4.7% 4.3% 3%

7 Inflation rate consistent with PSI targets (MOFEA)

4.5% 9.3% 7% 10.7% 6.%-8% 5% 5% 4%

8 Deviation of

actual disbursed

budget support

from the forecast

provided by

budget support

partners at least

six weeks after

receiving the

report from the

<5%

<5% <5% <5%

30.

31.

<5% 32.

<5% <5% <5%

Page 45: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

45

annual review of

budget support

20

9

Percentage of

total GBS flow

disbursed within

the first and

second quarter

of the

Government

fiscal year21

90% 90% 90%

10 Quarterly GBS

disbursement

estimates have

been agreed with

donors before

the beginning of

the fiscal year

YES NO YES YES YES 10

20 Excluding variable tranches 21 Except for DP‟s entering into a new bilateral agreement

Page 46: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

ANNEX 7 TEMPLATE FOR KEY ISSUE CONCEPT NOTE

Key issue:

[Name here]

Brief description of the issue:

[Describe the key issue briefly; background, key features and why it has become “a key

issue” for budget support (potential showstopper, cross-cutting, persistent problem in

MKUKUTA/budget implementation etc.)]

Expected outcome of the key issue discussion:

[The key issue discussion should have objective(s), which should be known in advance. Why

do we talk about this key issue? What do we want to have as an outcome of the discussions;

how do we structure the session to ensure the targets are met in terms of presentation and

responsibilities (GoT/DP side).

Ideally, a key issue dialogue should take place well in advance of the annual review and the

conclusions would be presented in the AR. However, as most likely a session and preliminary

discussions in the lead up to annual review will not in itself be sufficient enough to fully

solve the issue, it is important that clear commitments are made on both sides, that next steps

are planned, i.e. how the follow up is made, and decided what process will ensure that agreed

outcomes are met prior to next year‟s annual review.]

Supporting analytical work:

[Evidence has shown that a good key issue session needs supporting analytical work. List

here the work already completed or planned and how it will support the substantive

discussions in the session. If not completed yet, give dates when work should be completed –

to ensure it is available well in advance of the AR.]

Government/DP lead(s) on key issue preparation:

[List here those DPs willing to lead work on this as well as those involved in producing

supporting analytical work.]

Page 47: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

47

ANNEX 8: DEFINITION OF SATISFACTORY SECTOR REVIEW

GUIDANCE NOTE FOR

SECTOR, THEMATIC AREA AND PROGRAMME REVIEWS

A PROPOSED DEFINITION OF „A SATISFACTORY REVIEW‟

IN TERMS OF CONTENTS AND PROCESS

1.0 INTRODUCTION:

1.1 Purpose of the Guidance Note:

The Public Expenditure Review (PER) is a key guiding process for the Government in

implementing the reform agenda across public financial management processes. The

PER is the process for participation of all stakeholders in the development of policy

and its effective implementation at sector and cluster level to ensure the goals for the

National Growth and Poverty Reduction Strategy (MKUKUTA) are met. The

implementation of the MKUKUTA and reporting on the Performance Assessment

Framework (PAF) governing General Budget Support (GBS) and the Joint Assistance

Strategy for Tanzania (JAST) centre on the alignment, update and regular review of

Cluster Strategies and performance. In addition to programme reviews, sector and

thematic area working groups also produce periodic reviews. All of these reviews are

an important element of the PER as inputs into the budget and continue to be central

in the Cluster-based approach for monitoring MKUKUTA.

The sector/programme reviews are also essential for the appraisal of targets under the

Performance Assessment Framework (PAF) in the GBS annual cycle. It is therefore

important to have clearly defined criteria for determining whether a review has been

„satisfactory‟. This note sets out the definition and functions of a review and criteria

for judging the results of the review.

This note therefore consists of two separate parts:

a) Section 1 and Section 2 provide generic guidance and criteria for conducting

successful sector/programme reviews developed for the consumption of all

development stakeholders in a given sector of thematic area.

b) Section 3 and Section 4 provide specific guidance to the GBS process by outlining

the process for determining whether the sector/programme review was

satisfactory to meet the requirement of the GBS Partnership Framework

Memorandum and the Performance Assessment Framework (PAF). These

sections are addressed to the Government of Tanzania and its GBS partners.

1.2 What is a sector, thematic area or programme review?

A sector, thematic area or programme review is a periodic event to assess sector or

programme performance against agreed results and targets. It brings together findings

and outputs from ongoing sector and programme dialogue throughout the year and

related planning and budgeting, monitoring and evaluation processes. Sector, thematic

area and programme reviews also assesses the quality of the ongoing stakeholder

dialogue throughout the year. These reviews are relevant for the Government in its

implementation of MKUKUTA, going beyond the interventions specifically identified

in the PAF. For many if not all sector- and thematic area- working groups and

programmes, full realization of the terms of reference for a review remains some way

Page 48: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

48

off. Getting review processes to function as envisaged is a major challenge for all of

the participants: Government, Development Partners (DP) and domestic stakeholders.

1.3 General Objectives of a Sector, Thematic Area or Programme Review:

(b) Planning and budgeting: As integral components of the national planning and

budgeting processes, sector, thematic area, and programme reviews are expected

to provide a feedback on sector performance and a forum for discussing sector

policy and expenditure plans. In combination with integration at the cluster level,

reviews provide essential input to national policy, plans and budgets; and they

are expected to provide the base for performance monitoring and policy

dialogue for all stakeholders.

(c) Accountability: Sector, thematic area, and programme reviews allow

stakeholders to hold each other to account and also to evaluate ongoing

stakeholder consultation processes, that are based on publicly available

information and that allow for broad based domestic feedback and analysis. As

such reviews are potentially a key supplement to existing systems for domestic

accountability. They can contribute to a broad public awareness of sector issues

that will facilitate the role of formal institutions of accountability, especially

Parliament. This allows accountability to DPs to be fulfilled in a way that is

supportive of broad accountability to all stakeholders. For GBS, domestic

review processes provide the preferred mode of linkage between Government

performance and the PAF matrix and for assessing overall MKUKUTA

performance.

2.0 CRITERIA FOR A SATISFACTORY SECTOR, THEMATIC AREA OR

PROGRAMME REVIEW:

A sector, thematic area or programme review should be based on regular stakeholder

dialogue throughout the year. The reference in the PAF matrix to a “satisfactory

review” implies the following:

2.1 Timing

(a) Reviews should be held regularly. Each sector shall decide on the appropriate

time format for its sector review. Sector reviews and timing will also be decided

in conjunction with the relevant Cluster Working Groups (CWGs). If in a given

year no review event takes place, the Government will share the relevant

information on sector performance coming out of the regular progress

assessments and related dialogue that take place within respective sectors,

thematic areas or programmes as part of the annual planning and budgeting

process with the other stakeholders.

(b) Timing should be harmonized with other events.

(c) Timing should allow for review outcomes to be fed into other processes such as

planning and budgeting, MKUKUTA monitoring, PER, and GBS. This includes

that review agendas should focus on outputs or recommendations that can be

taken forward to the budget preparation process.

Page 49: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

49

(d) The length of a review event should be such that it allows for adequate time for

consultation and discussion. This will be decided by the Government in

agreement or consultation with other regular members of programme dialogue

and sector and thematic area working groups.

2.2 Stakeholder Participation and Leadership:

(a) The Government calls for, invites participants, organises, and chairs the reviews.

(b) Relevant documentation will be shared with all stakeholders in good time to

allow the participants to effectively prepare for and participate in the review

with meaningful contributions. In the preparation for the review event, members

of sector, thematic area and programme working groups will agree on the time

frame for making information and documentation available to all participants.

(c) The Government identifies and invites all relevant stakeholders in consultation

with the DP and non-state actor members of the working groups. Agreement on

the balance of representation of different stakeholder categories is sought among

working group members.

(d) Invitation of DPs is through the relevant DP sector or programme lead.

Invitation of non-state actors will also be through the relevant umbrella

organisation or NSA sector lead where one exists. Each of these will bear

responsibility for inviting their own constituencies and for organising their

participation.

2.3 Review Agenda

The review should take stock of developments in the sector, thematic area, or

programme and assess performance against agreed results and targets. Taking into

account contributions of different stakeholders to each of the following review areas,

the tasks for the review include to:

(a) Monitor and review budgets in terms of their alignment with policies, strategies

or relevant strategic plans, and MKUKUTA. Monitor and review the

implementation of sector, thematic area or programme activities and budget

execution.

(b) Monitor, review and report on progress on MKUKUTA goals and targets, using

RIMKU where possible.

(c) Monitor, assess and report on results and outcomes in the sector/thematic area,

detailing progress, challenges and constraints in implementing policies, strategic

plans and programme plans, including progress on sector or programme

indicators.

(d) Monitor, follow up on, and review sector or thematic area performance in terms

of M&E systems, including progress on public sector core reforms and their

specific application to the sectors.

(e) Monitor and assess the functioning of public financial management systems (e.g.

procurement, auditing…);

Page 50: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

50

(f) Review actions on previous year recommendations;

(g) Identify priorities and actions for the coming year;

(h) Assess the quality of ongoing dialogue within the working group and

consultation with other stakeholders.

The review should be undertaken making best use of existing information recognising

the importance of reliable and timely information for the review process22

. The

guidance note fully recognizes that sector/thematic area reviews are integral parts of

MKUKUTA monitoring system, and therefore seeks to rely on rather than duplicate

relevant elements of the existing Poverty Monitoring systems.

A sector, thematic area or programme-specific Performance Assessment Framework

may be used to assess the quality of the performance of a sector/thematic area in the

above listed review areas across the year; a generic example is offered in the Annex to

this document. The framework should include an assessment of both process and

performance on agreed targets and results under three categories of:

ii) Budgeting and Financing;

iii) Progress on agreed targets and results; and

iv) Accountability.

2.4 Review Outputs and Follow-Up:

(a) The findings of the review will be documented in a review report that will be

produced under Government leadership, in consultation with the stakeholders

that participated in the review.

(b) Issues arising from review processes will be taken up by stakeholders in the

sector, thematic area or programme dialogue over the coming year. Stakeholders

responsible for following up on a certain issue should communicate to others on

their progress.

3.0 PROCESS FOR DETERMINING WHETHER A SECTOR, THEMATIC AREA

OR PROGRAMME REVIEW HAS BEEN SATISFACTORY

3.1 The GBS Annual Review will identify which sector, thematic area or programme

will be assessed under the PAF in the coming year. The respective review will then

be included as an underlying process in the revised PAF for the next GBS Annual

Review. Interim measures or indicators may be specified for those sectors and

programmes that do not yet have adequate reviews, with the intention that such

reviews should be developed as soon as possible.

3.2 The quality of a sector, thematic area or programme review will be determined after

the review by the stakeholders that participated in the review event, using the above

outlined criteria, the review report, and an agreed sector assessment framework (see

outline example in Annex 1) to determine whether progress over the year in the

22

Examples of information which can feed into the review event: Sector PER studies, other sector specific surveys commissioned to further support the review process, PHDR…

Page 51: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

51

sector, thematic area or programme is satisfactory in terms of (1) budget/financing,

(2) outcomes and results and (3) accountability.

3.3 The sector, thematic area, or programme review report and the stakeholder

assessment on its quality will be forwarded to the relevant Cluster Working Group

(CWG), where it will be discussed along with updates on any subsequent remedial

action taken. On this basis, the CWG will make its own judgment on the quality of

the review and will include it in the CWG progress report for the GBS Annual

Review as part of its assessment on progress against the PAF.

3.4 The CWG will provide its judgment on the quality of a review through its CWG

progress report to the GBS Annual Review, where performance and review quality

may be further discussed. The judgment will be finalised through endorsement of

the GBS Annual Review Report, which includes the CWG report.

4.0 WHAT IF A REVIEW IS UNSATISFACTORY?

If a given sector, thematic area, or programme review fails to meet the criteria

outlined above, and follow up actions after the review have failed to remedy these

shortcomings, next steps will need to be decided in the subsequent GBS Annual

Review:

(a) In preparation for the GBS Annual Review, the identified concerns will be

discussed by the Cluster Working Group and a summary note, outlining the key

issues and proposing specific actions to improve areas which led to unsuccessful

review outcome, prepared. The proposed specific actions can be used as

temporary process actions that need to be undertaken by the sector or thematic

area working group, or programme, over the coming year to fill the gap left by

the source of the highlighted concerns.

(b) The note will then be presented at the GBS Annual Review elaborating the

following:

(i) The specific issues that have led to an unsatisfactory review in the sector,

thematic area or programme concerned;

(ii) The temporary process actions that have been identified for the sector,

thematic area or programme to address in order to improve performance

over the coming year.

(c) During the GBS Annual Review, the outcome of the sector, thematic area or

programme review will be discussed further, and agreed temporary process

actions (where appropriate) will be incorporated in the PAF for the following

year.

(d) If the following year‟s GBS Annual Review concludes that there has been a lack

of progress in addressing these temporary actions over the year, there may be

funding consequences. Any such consequences would normally follow only

after assessing the corrective actions taken in the year following an

unsatisfactory review, giving a lead time of approximately eighteen months

between an initial performance problem and implications for financing.

Page 52: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

52

Decisions in this regard may, however, only take effect in financial year n+1 and

should take into consideration the reasons for the lack of progress on temporary

process actions and put these temporary process actions into the context of

overall progress against the PAF.

Page 53: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

53

Annex 8

PERFORMANCE ASSESSMENT FRAMEWORK

FOR SECTORS/THEMATIC AREAS OR PROGRAMMES:

Subject Assessment

A: Financing/Budget

A1 Budgets are consistent with the sector, thematic area or programme

strategy, plan and priorities.

A2 Budget execution/budget allocation is in line with approved budgets.

B Progress on agreed targets and results

B1

Progress on performance indicators, targets and outcomes as

identified in strategic plans, indicator frameworks and the

MKUKUTA for the concerned year.

B2 Progress on achieving milestones agreed in the past review.

B3 Response mechanisms to constraints are functioning.

C Accountability

C1 Quality of working group dialogue and stakeholder consultations

throughout the year.

C2 Information sharing (timeliness and relevance).

C3

Quality of the review event against criteria as outlined in the

guidance note under timing, participation, agenda, output and

follow-up.

Page 54: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

54

Annex 10 Terms of Reference for the facilitators/rapporteurs of the GBS Annual Review

2009

1. Objectives

The objectives of the consultancy are to:

i. Facilitate the smooth functioning of the GBS annual review event and ensure

timely and adequate reporting from the event. The review event involves meetings

between development partners and the Government of Tanzania.

ii. In undertaking this function, the facilitators/rapporteurs should be impartial.

There will be an international and national facilitator/rapporteur during the 2009 GBS

Annual Review. Both facilitators/rapporteurs are expected to call upon a team of

assistants to support them in the process. Both facilitators/rapporteurs and their teams

will cooperate in an optimal manner.

2. Scope and Methodology

The national and international facilitators/rapporteurs will:

Meet with the Joint GBS Secretariat, Cluster Working Group Leads from DPs and

the GoT in the run up to the GBS Annual Review event to agree on how to best

fulfill tasks and finalize the facilitators/rapporteur work programme.

Review the Progress Reports and other documents resulting from the CWGs

preparatory work for the Annual Review.

Attend all sessions during the GBS Annual review and facilitate the discussions in

an impartial manner. Facilitators are expected to ensure that the panels respond

first to each key issue presentation. The facilitators will then facilitate a question

and answer session where they are expected to retain a swift moving, energetic

pace.

Time keeping is of paramount importance in each session and the facilitators and

their teams will be responsible for strict adherence to the scheduled timing.

Attend all Sessions of the Annual Review and take minutes.

After each session of the Annual Review, prepare a summary of the proceeding

including agreed actions and next steps which will be submitted for endorsement

to the plenary at the end of the session.

Draft the Executive Summary of the Annual Review report with all agreed actions

and next steps ;

Draft the GBS Annual Review Report and assist the Joint GBS Secretariat in

finalizing it.

Page 55: DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 · Final draft 1 DRAFT PROGRAMME OF WORK GBS ANNUAL CYCLE 2010 Table of Contents Page 1. Objectives 2 2. The Annual GBS Cycle 2 3. Coordination

Final draft

55

3. Output and Reporting

The national and international facilitators/rapporteurs will report to the Joint GBS Secretariat

and the Chair of the PRBS donor group.

4. Outputs

i. Smooth facilitation of each session of the GBS Annual Review in an impartial

manner with excellent time keeping.

ii. Endorsement of the agreed actions and next steps from each key issue session by

the plenary at the end of the session, and summaries of each session at the GBS

Annual Review., .

iii. Draft Annual Review 2009 Report should be drafted during the GBS Annual

Review event..The final report will, in addition to the executive summary contain

all agreed actions and next steps from the Annual Review. The report will include

CWGs progress reports and other findings resulting from the key issue plenary

discussions.

iv. Minutes of the GBS Annual Review meetings to be submitted to the Joint GBS

Secretariat and the Chair of the PRBS donor group one week after the review

event.

v. Final Draft GBS Annual Review Report including the Executive Summary to be

presented to the Joint GBS Secretariat and the Chair of the PRBS donor group one

week after the review event.

5. Timing and Logistics

A team of two facilitators/rapporteurs will be recruited for the GBS Annual Review

2009. One will be national and the other one international. Both will be in charge of

facilitation and reporting and they are responsible for coordinating their work in an

optimal manner.

The consultancy will be for 10 working days each, (2 days for the familiarization of

the GBS process, 3 days for the review event and 5 days for finalization of the GBS

annual review report).

The annual review event is scheduled for 29-30 November 2010.