2006_1114CA.pdf 1 Technical Archives DATE: 14 November 2006 CLIENT: Patriot Plumbing, Torrance, CA LOCATION: 11653 So. Sierra Bonita, Los Angeles, CA JOB: 50' sewer lateral replacement from rear of house to property line, replacing 4” VCP bell-and-spigot line with 4” SDR17 PE, pulling upstream SPECIAL CONDITIONS: Dry, compacted soil, combination 90º turn approximately 12 to 14 feet downstream from pulling pit TOOLS: TC24 hydraulic ram, Enerpac 13HP high-pressure pump PROJECT LOG

2006 1114 Ca

Embed Size (px)

Citation preview

Page 1: 2006 1114 Ca

2006_1114CA.pdf 1

Technical Archives

DATE:14November2006

CLIENT:PatriotPlumbing,Torrance,CA

LOCATION:11653So.SierraBonita,LosAngeles,CA

JOB:50'sewerlateralreplacementfromrearofhousetopropertyline,replacing4”VCPbell-and-spigotlinewith4”SDR17PE,pullingupstream

SPECIALCONDITIONS:Dry,compactedsoil,combination90ºturnapproximately12to14feetdownstreamfrompullingpit

TOOLS:TC24hydraulicram,Enerpac13HPhigh-pressurepump

PROJECT LOG

Page 2: 2006 1114 Ca

2006_1114CA.pdf 2

Fusingneartheentrypit,aslopingembankmentatsidewalk’sedge.

Page 3: 2006 1114 Ca

2006_1114CA.pdf 3

3/4”swagedcableisstrungthroughthesewerfromedgeofsidewalktohouse.

Page 4: 2006 1114 Ca

2006_1114CA.pdf 4

Sewerpathindicatedbydashedgreenline,withpullingpitatrightforeground.Note90ºbendbehindtree(twoop-posing45ºbends)13’to14’downstreamfrominitialpullingpit.Suchbendsarenotusuallyrecommended,butocca-

sionallymaybenegotiatedwhenclosetotheentrypit(whereasherethebendisclosetotheexit,orpullingpit).

Page 5: 2006 1114 Ca

2006_1114CA.pdf 5

Crewexcavatestofreecableembeddedinground.Asexpected,the90ºbendclosetotheexitpitcausedthecableto“cutthecorner”andsliceintocompactedsoiloutsidethesewer’spath.Maximumhydraulicpressures

wereappliedandwaterwasintroducedtotheline,butthecornerwastooabruptandtoofarfromtheentry.

Page 6: 2006 1114 Ca

2006_1114CA.pdf 6

Withinafewfeetoftheresistanceplate,thecablehasalreadybrokenoutsideclaysewer.Asmorehydraulicpressurewasapplied,thecableonlycutfurtheroutsidethesewerpath,intothecornerandunderthetree,while

theburstinghead50’downstreamdidnotevencompletelyentertheline.

Page 7: 2006 1114 Ca

2006_1114CA.pdf 7

Cameralocatingthecombination90ºcornerfromtheexploratoryexcavation.Anotherexcavationnearthecornerwillbecomethenewpullingpit.

Page 8: 2006 1114 Ca

2006_1114CA.pdf �

Tostraightenoutthepullandcreateabettersewerpath,anewexitpitwillbeduginfrontoftheworkeratright.

Page 9: 2006 1114 Ca

2006_1114CA.pdf 9

Diggingthenewexitpit.

Page 10: 2006 1114 Ca

2006_1114CA.pdf 10

Amoredirectsewerpathiscutinfrontofthetree,ratherthanfollowtheoriginalpatharoundbehindit.

Page 11: 2006 1114 Ca

2006_1114CA.pdf 11

Pullingfromtherelocatedexitpit.Evenwithwaterintroducedtothisstraight-linesectionofclaypipe,mid-rangepressures(translatingto14–16tonsofforce)arerequiredtoburst.

Page 12: 2006 1114 Ca

2006_1114CA.pdf 12

Reroutedupperportionofsewerpath,priortoconnectionwithnewPEsection.