Upload
hatuyen
View
236
Download
5
Embed Size (px)
Citation preview
Page 4 Ref: WAME/gc/16
Index THE COMPANY ............................................................................................................................ 3
GROUP STRUCTURE .................................................................................................................... 4
Company Profile
Page 2 Ref: WAME/gc/16
INDEX
THE COMPANY ............................................................................................................................ 3
GROUP STRUCTURE .................................................................................................................... 4
GROUP MANAGEMENT STRUCTURE .............................................................................................. 5
GROUP FINANCIAL INFORMATION...................................................................................................6
GROUP MANAGEMENT ................................................................................................................ 7
KEY CLIENTELE . ......................................................................................................................... 9
PROJECTS ................................................................................................................................ 10
AWARDS AND CERTIFICATES . .................................................................................................... 55
GROUP RESOURCES ................................................................................................................. 64
FACILITIES ............................................................................................................................... 72
Page 3 Ref: WAME/gc/16
THE COMPANY Wade Adams (Middle East) Limited, registered in 1995, is the holding and/or management company of the following:-
Wade Adams Contracting (L.L.C.), Dubai, United Arab Emirates (since 1991) (formerly Union Transporting and Contracting Company (UTCC) (since 1976))
Wade Adams Sharjah (L.L.C.), Sharjah, U.A.E. (since 2002)
Wade Adams Emirates, Abu Dhabi, U.A.E. (since 2011)
Wade Adams Oman, Muscat, Oman (since 2009)
Wade Adams (Bahrain) W.L.L., Bahrain (since 2003)
Gulf Consolidated Contractors W.L.L.(GCC), Qatar (since 2003)
Hilal Bil Badi & Partners Contracting Company W.L.L.(HILALCO), Abu Dhabi, U.A.E. (since 1993)
Union Energy Inc., BVI, registered as a Branch in HFZ, Sharjah, U.A.E. (since 1998)
The roots of Wade Adams Contracting (L.L.C.) go back to 1976 when a prominent local family formed Union Transporting and Contracting Company (UTCC). Even today many of the senior management team of erstwhile UTCC continue to serve Wade Adams in various capacities. Wade Adams Group specialised in all aspects of Design and Build, EPIC and Employer designed to build construction services. Wade Adams has a proven track record in executing Airport Infrastructure, Buildings, Dams, District Cooling, Energy, Industrial, Landscape and Theme, Marine, MEP, Road and Bridges, Residential Infrastructure and Utility Network projects.
The Company works to high standards and stringent HSE requirements as is evident by the certification of the integrated management systems of all Group Companies to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 by Bureau VERITAS. Wade Adams has a firm order book of approximately AED 4.00 billion (US$ 1.1 billion), an employee force of over 11,000 and strategic investments in land, buildings (including its own labour camps to house the large workforce), plant and equipment and is in an enviable position to consolidate its position as one of the major contractors in the Gulf region and take on further challenges. Wade Adams (Middle East) Limited is registered and operates under the laws of the British Virgin Islands.
Wade Adams Contracting LLC, Dubai Improvements of Al Safooh Roads
Page 4 Ref: WAME/gc/16
GROUP STRUCTURE
Wade Adams (Gulf) Limited 100% owned by “WAME”
Wade Adams (Middle East) Limited
(“WAME”)
Wade Adams Contracting (L.L.C)
Dubai & Northern Emirates
Gulf Consolidated Contractors (WLL)
Doha, Qatar
Wade Adams Bahrain W.L.L
Bahrain
Wade Adams Sharjah (L.L.C) Sharjah, United Arab Emirates
Hilal Bil Badi & Partners Contracting Company (WLL)
Abu Dhabi (HILALCO)
Wade Adams Emirates L.L.C
Abu Dhabi
Wade Adams Oman LLC
Muscat, Oman
Union Energy Inc., BVI
Branch at Hamriya free Zone, Sharjah
Bouvardia Management Limited
100% owned by “WAME”
Wade Adams Contracting (L.L.C)
Qatar - Branch
Page 5 Ref: WAME/gc/16
GROUP MANAGEMENT STRUCTURE
Project execution & Profit Centers
Business Segments
WAME Board of Directors
WAME Group Executive Committee Chairman/President – Kypros Tsentas
Group Managing Director – John Papadouris Group General Manager – Kyriakos Antzoulis
Corporate & Project Management Office, Dubai
Ma
na
ger
Wad
e A
dam
s C
on
tracti
ng
L.L
.C
Du
bai, U
AE
Ma
na
ger
Wad
e A
dam
s S
harj
ah
L.L
.C
Sh
arj
ah
, U
AE
Ma
na
ger
Wad
e A
dam
s E
mir
ate
s L
.L.C
Ab
u D
hab
i, U
AE
Ma
na
ger
Wad
e A
dam
s O
ma
n L
LC
Mu
sc
at,
Om
an
Ma
na
ger
Wad
e A
dam
s B
ah
rain
W.L
.L
Ma
nam
a, B
ah
rain
Ma
na
ger
Gu
lf C
on
so
lid
ate
d C
on
tracto
rs W
LL
(G
CC
)
Do
ha,
Qa
tar
Ma
na
ger
Hilal
Bil B
ad
i &
Part
ners
Co
ntr
ac
tin
g C
o. W
LL
(H
ILA
LC
O)
Ab
u D
hab
i, U
AE
Un
ion
En
erg
y I
nc.
Ham
riya F
reezo
ne, S
harj
ah
, U
AE
STRATEGIC SUPPORT
BUSINESS
DEVELOPMENT
CONTROLLING
CORPORATE FINANCE& LEGAL
CORPORATE
GOVERNANCE
GROUP TREASURY
HUMAN
RESOURCES
INTERNAL AUDIT
IT
RISK MANAGEMENT
PROJECT SUPPORT
ADMINISTRATION
ACCOUNTING
CONTRACTUAL
ESTIMATION
HEALTH & SAFETY
PLANNING
PLANT
QUALITY
SOURCING &
PROCUREMENT
TECHNICAL
Civil
Infrastructure Buildings
Landscaping &
Theming Works
Oil & Gas
Storage
Earthworks
District Cooling
Roads
Bridges &
Underpasses
Industrial
Airports
Marine Works Utility Networks
Dams Residential
Page 6 Ref: WAME/gc/16
GROUP FINANCIAL INFORMATION
Page 7 Ref: WAME/gc/16
GROUP MANAGEMENT Name Nationality Designation Qualification
Corporate Management
Kypros Tsentas Cypriot Chairman / President B.Sc. Civil Engineering John Papadouris British Group Managing Director Associate Civil
Engineering Degree Kyriakos Antzoulis Cypriot Group General Manager B.Sc. (Hons) Civil
Engineering
Group Managers Keith Waiting British Group Contracts Manager Fellow of the Royal
Institution of Chartered Surveyors
N.M. Naushad Indian Group Admin and Human
Resources Manager Master Degree in Business Administration, B. Com. Degree, Diploma in Personnel Mgmt. & Industrial Relations
Asharaf Ali Indian Group IT Manager Masters in
Engineering(Applied Electronics)
Basanth Nandish Indian Group Audit Manager B. Tech. in Civil
Engineering, M. Sc. in Quality Assurance MBA in Personnel Mgmt.
Col Musharaf Khan Indian Group HSE Manager
I Dip (OSH), Grad IOSH, MIIRSM, NEBOSH
Page 8 Ref: WAME/gc/16
Country Managers Marios Spanos Cypriot Manager Hilalco
Abu Dhabi B.Eng. (Civil Engineering)
Michael Tsialis Cypriot Manager Wade Adams
Contracting & Wade Adams Emirates
M.S Construction Engineering and Management
Nikos Tanteles Cypriot Manager - Wade Adams
Sharjah and Country Manager - Oman
M.Sc. Civil Engineering
Nabil Shehade American Country Manager - Qatar Bachelor of Science in
Engineering
CFO’s / Financial Controllers
Rakesh Kabra Indian Chief Financial Officer -
UAE & Oman Chartered Accountant
Rajindh Munindradasa
Srilankan Chief Financial Officer - Qatar
Chartered Accountant
Page 9 Ref: WAME/gc/16
KEY CLIENTELE WADE ADAMS CONTRACTING LLC
Dubai Health Care City
Dubai Industrial City
Dubai Municipality
Dubai Properties
Dubai Silicon Oasis
Dubai Sports City
Dubai Technology & Media Free Zone Authority (TECOM)
Dubai Water & Electricity Authority
Emaar Properties PJSC
Jebel Ali Free Zone Authority (JAFZA)
Meraas Development
Meydan Sobha LLC - FZ
Nakheel LLC
Roads & Transport Authority, Dubai
Tatweer WADE ADAMS SHARJAH
Air British Petroleum (Air BP)
Directorate of Public Works, Sharjah
Sharjah Airport Authority
Sharjah Municipality
Sharjah Aviation Services Company (SASCO) HILAL BIL BADI & PARTNERS CONTRACTING COMPANY WLL
Al Ain Municipality
Abu Dhabi Airport Company (ADAC)
Abu Dhabi Company for Onshore Oil Operation (ADCO)
Abu Dhabi Municipality
Public Works Department, Abu Dhabi
Tourism Development & Investment Company (TDIC)
GULF CONSOLIDATED CONTRACTORS
Qatar Petroleum
Gulf Warehousing Company
WADE ADAM BAHRAIN
Ministry of Works and Housing
WADE ADAM EMIRATES
Abu Dhabi National Oil Company (ADNOC)
WADE ADAM QATAR
Impresa Costruzioni Guiseppe Maltauro Al Mugharraq Port in Sir Bani Yas Island Abu Dhabi Note: The above lists are in alphabetical order.
Hilalco, Abu Dhabi
Breakwater developments Project
Page 10 Ref: WAME/gc/16
PROJECTS TYPICAL PROJECTS Airports
Page 11 Ref: WAME/gc/16
Bridges & Underpasses
5
th Interchange, Sheikh Zayed Road (Dubai)
Al Sufooh Area Underpass (Dubai)
Mamzar Interchange (Dubai)
Garhoud Interchange (Dubai)
Page 12 Ref: WAME/gc/16
Bridges & Underpasses
Ras Al Khor Interchange (Dubai)
Palm Jumeirah Road (Dubai)
Al Reef Interchange (Abu Dhabi)
Page 13 Ref: WAME/gc/16
Buildings
Sir Baniyas Island Hotel (Abu-Dhabi)
Residential Building at Umm Al Hassan (Bahrain)
Wade Adams Workshop and office facility (Dubai)
Page 14 Ref: WAME/gc/16
Bulk Earthworks / Grading
Dui By-pass road
Page 15 Ref: WAME/gc/16
Infrastructure
Dubai Internet City (Dubai)
Works at Sharjah World & Trade Center (Sharjah)
Emirates Hills (Dubai)
Page 16 Ref: WAME/gc/16
Landscaping
Page 17 Ref: WAME/gc/16
Marine Works
Break water developments (Abu-Dhabi)
Land reclamation – Al Raha Beach Resort (Abu-Dhabi)
Land reclamation (Bahrain)
Page 18 Ref: WAME/gc/16
Oil & Gas
Page 19 Ref: WAME/gc/16
Road works
Dubai Creek Roads (Dubai)
Al Sahil Road (Abu-Dhabi)
Al Reef (Abu Dhabi)
Clock tower road (Dubai)
Wali Al Ahed Roads (Bahrain)
Khorfakhan Corniche (Khorfakhan)
Page 20 Ref: WAME/gc/16
Utilities
Page 21 Ref: WAME/gc/16
Others
Al Wathba Camel Race Track (Abu Dhabi)
Clock Tower Roundabout (Al Ain)
Deep Excavation Works (Al Falah, Abu Dhabi)
Pumping Station Works (Dubai)
Pumping Station Works (Dubai)
Page 22 Ref: WAME/gc/16
PROJECT LISTS Wade Adams Group has carried out numerous projects over the years. Extending its influence and competencies, the Company now has the strength to carry out works in all areas of civil engineering. The chart below identifies under broad categories, the number of projects the Company has executed over the past 10 years. These categories include infrastructure, bridges & underpasses, road works, bulk earthworks / grading, utilities (which include water, irrigation, sewerage, drainage pipelines, telecommunication lines, electrical cabling), pumping stations, marine works, buildings and some miscellaneous works such as airport runways, landscaping and similar works. WADE ADAMS GROUP
Bridges & Underpasses, 30
Building, 8
Bulk Earthworks / Grading, 39
Infrastructure, 113
Marine Works, 3
Misc, 23
Road works, 70
Utilities, 53
Roads & Infrastructure, 22
Page 23 Ref: WAME/gc/16
WADE ADAMS CONTRACTING LLC
Category No. of Projects Value (DHS MN)
Bridges & Underpasses 18 3,039.39
Bulk Earthworks / Grading 18 264.37
Infrastructure 82 8,247.84
Misc 11 135.33
Road and Bridge works 5 1,596.44
Road works 26 1,855.76
Utilities 38 2,245.21
Roads & Infrastructure 14 582.31
Grand Total 212 17,966.61
Bridges & Underpasses, 18
Bulk Earthworks / Grading, 18
Infrastructure, 82
Misc, 11
Road and Bridge works, 4
Road works, 26
Utilities, 38 Roads & Infrastructure, 14
Note: Project details are for the Wade Adams Contracting LLC projects (completed and ongoing) commencing October 2004
Page 24 Ref: WAME/gc/16
List of Ongoing Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
EM 712
R879/1 JAFZA FLYOVER NEAR IC10 OVER SHEIKH ZAYED ROAD
ROAD AND TRANSPORT AUTHORITY
HYDER CONSULTING MIDDLE EAST LTD
Road & Bridge Works
104.62 24-Apr-16 4-Nov-17
EM 711
DUBIOTECH, PALM JUMEIRAH, TECOM B & C AND JUMEIRAH LAKE TOWERS DISTRICT COOLING PROJECTS - EMP-TR-0158. CONSTRUCTION, COMPLETION & MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWORKS FOR DUBIOTECH MAF CITY CENTER, TECOM B, PALM JUMEIRAH CRESCENT & TRUNK, AND THE VALVE & AIR VENT CHAMBER FOR TECOM C, JUMEIRAH LAKE TOWERS, PALM JUMEIRAH CRESCENT & TRUNK.
EMPOWER DIRECTOR-PROJECT EMPOWER
District Cooling Works
29.45 12-Apr-16 8-Oct-16
EM 710
BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION & MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWORKS FOR DAMAC PARAMOUNT HOTEL, BBDM CORRIDOR EXTENSION TO JUMA AL MAJID TOWER AT SHEIKH ZAYED ROAD AND BB CREEK UPPER & LOWER SIDES - EMP-TR-0154
EMPOWER NIL District Cooling
Works
41.90 03-Mar-16 29-Aug-16
EM 709
MRHE-22 HTA: INFRASTRUCTURE WORKS FOR 346 HOUSES AT MAKAN DISTRICT, HATTA, UAE - TENDER NO. A2/2015/35
MOHAMMED BIN RASHID HOUSING ESTABLISHMENT
JOUZY CONSULTING ENGINEERS
Infrastructure Works
113.98 24-Mar-16 21-Feb-17
EM 708
DMS 145102 DEIRA ISLAND A: CONSTRUCTION OF ROAD AND UTILITIES
PALM DEIRA LLC TBA Road & Utilities Works
407.00 TBA TBA
EM 707
R999/4A DUBAI WATER CANAL- PHASE 4A ROAD AND TRANSPORT AUTHORITY
PARSONS OVERSEAS LIMITED
Infrastructure Works
306.00 17-Jan-16 12-Oct-16
EM 706
R1013/1 IMPROVEMENTS OF AL SHINDAGHA CORRIDOR (SANA JUNCTION)
ROAD AND TRANSPORT AUTHORITY
PARSONS OVERSEAS LIMITED
Roads, Bridges Works
611.107 10-Jan-2016 29-Dec-17
EM 705
MBR DUBAI HILL ESTATE - GOLF IRRIGATION PUMPING STATION
DUBAI HILL ESTATE LLC
PARSONS OVERSEAS LIMITED
Irrigation Pumping Station Works
5.33 18-Feb-16 04-Aug-16
EM 704
P125 PROSPECT HEIGHTS - PHASE 1 (TIJARA TOWN)
DUBAI LAND RESIDENCES LLC
AECOM Middle East Ltd
Road & Infrastructure Works
45.301 26-Oct-15
22-Apr-16
EM 703
R902/4B EXTENSION OF ACADEMIC CITY ROAD ROAD AND TRANSPORT AUTHORITY
M/S CDM SMITH INC. Roads, Bridges And Underpass Works
474.31 11-Oct-15
10-Oct-17
EM 702
R1023 DIRECTIONAL RAMP FROM AL KHAIL ROAD TO FINANCIAL CENTRE ROAD
ROAD AND TRANSPORT AUTHORITY
ITALCONSULT Bridges Works
119.20 11-Oct-15
09-Oct-16
EM 701
DUBAI LAND RESIDENTIAL COMPLEX (DLRC), DUBAI HEALTH CARE CITY II (DHCC II) & TECOM A - DISTRICT COOLING PROJECT. CONSTRUCTION,
EMPOWER TBA Utilities
19.00 03-Sep-15 31-May-16
Page 25 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
COMPLETION & MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWORKS, 5 NOS. SEMI-PERMANENT PLANTS AND DISMANTLING & SHIFTING OF WTC TEMPORARY PLANT - EMP-TR-0142
EM 700
DS158 - MAIN IRRIGATION LINES AT SHEIKH ZAYED ROAD
DUBAI MUNIPALITY MWH Irrigation Works 309.79 04-Nov-15 21-Jan-15
EM 698
0107 - JEBEL ALI HILLS, INFRASTRUCTURE WORKS - PACKAGE 3
MERAAS DEVELOPMENT LLC
PARSONS OVERSEAS LIMITED
Infrastructure Works
216.897 24-May-15 13-Nov-16
EM 697
REEM OASIS DEVELOPMENT, SHALLOW SERVICES AND INTERNAL ROADS - PACKAGE 4 & 5
AL ARYAM PHASE 2 LLC (EMAAR DUBAI LLC IS THE DEV. MGR)
HALCROW INTERNATIONAL PARTNERSHIP
Roads & Shallow Services
106.47 10-Feb-15 9-May-16
EM 696
TRA/RDS/R971/1 DEVELOPMENT OF JUMEIRAH CORNICHE CONSTRUCTION OF ACCESS TO MARINA CLUB
ROAD AND TRANSPORT AUTHORITY
TBA Junction Improvement Works
6.2 1-Feb-15 17-Mar-15
EM 695
CONTRACT NO. MSD1/419/DM1/022 INFRASTRUCTURE WORKS - PACKAGES 1 & 2
MEYDAN SOBHA LLC – FZ
AE7 Infrastructure Works
543.356 18-Jan-15 2-Mar-17
EM 693
WORKS AT MR. HILAL BIL BADI'S HOUSE IN DUBAI HILAL BIL BADI To Be Advised TBA
TBA 5-Jan-15
TBA
EM 691
R902/2A IMPROVEMENT OF SHEIKH MOHAMMED BIN ZAYED ROAD
ROAD AND TRANSPORT AUTHORITY
M/S CDM SMITH INC. Roads & Infrastructure Works
227.37 23-Nov-14 21-Nov-16
EM 690
DMS 139243A CONSTRUCTION OF ROADS & SEWERAGE NETWORK FOR DEIRA ISLAND A
THE PALM DEIRA LLC TBA Roads and Sewerage Works
101.91 9-Nov-14 8-May-16
EM 689
INTERNATIONAL MEDIA PRODUCTION ZONE (IMPZ) DISTRICT COOLING PROJECT, BUSINESS BAY (BB) AL HABTOOR TOWER DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION AND MAINTENANCE , IN THE DEFECTS LIABILITY PERIOD, THE CHILLED WATER PIPING NETWOKRKS AT THE INTERNATIONAL MEDIA PRODUCTION ZONE AND BUSINESS BAY AL HABTOOR TOWER - EMP-TR-0120
EMPOWER TBA District Cooling Works
40.90 20-Oct-14 16-Jun-15
EM 686
9022 – AL KHAWANEEJ LABOR CITY MERAAS DEVELOPMENT
KHATIB & ALAMI Infrastructure Works
37.90 18-Sep-14 17-Sept-15
EM 680
CYCLE TRACK UNDERPASS AT MEYDAN ROAD AND TRANSPORT AUTHORITY
PARSON OVERSEAS LTD
Infrastructure Works
19.2 01-Sep-14 27-Feb-15
EM 673
JUMEIRAH VILLAGE & JUMEIRAH PARK - DMS 137664, INTERIM ACCESS ROAD BETWEEN JUMEIRAH VILLAGE & JUMEIRAH PARK - GATE #5
JUMEIRAH VILLAGE LLC
To be Advised Infrastructure Works
10.50 29-May-14 28-Nov-14
EM 670
DP043-13 MUDON P-123 - ROADS & INFRASTRUCTURE CONSTRUCTION
DUBAI LAND RESIDENCES LLC
AECOM MIDDLE EAST Ltd
Road & Infrastructure
57 19-Jan-14 31-Jul-15
Page 26 Ref: WAME/gc/16
List of Completed Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 699
P1136FZ.C300 JAFZA SOUTH STREET LIGHTING PHASE 3
JEBEL ALI FREE ZONE AUTHORITY
(JAFZA)
WSP MIDDLE EAST
Street Lighting Works
14.65 TBA TBA
EM 694
MSD1/419/D1/023 BICYCLE & JOGGING TRACKS MEYDAN SOBHA LLC – FZ
AE SEVEN MORSE ARCHITECTURE &
ENGINEERING CONSULTANCIES LLC
(AE7)
Bicycle & Jogging Tracks
80.99 21-Jan-15 14-Sep-15
EM 692
GREEN COMMUNITY EXPANSION PHASE 3 AT DIP, ENABLING WORKS CONTRACT
PROPERTIES INVESTMENT LLC
AECOM / Dewan Architects & Eng. Earthworks
9.84 1-Dec-14 28-Feb-15
EM 688
ENGINEERING WORKS FOR DSOA, JUNCTION IMPROVEMENT FOR ACADEMIC CITY ROAD
DUBAI SILICON OASIS AUTHORITY
KHATIB & ALAMI Roads & Infra Works
20.40 19-Oct-14 17-Apr-15
EM 687
MBR GARDENS DEVELOPMENT, DUBAI HILLS ESTATE, SHALLOW SERVICES AND INTERNAL ROADS, MAIN ROAD 2 & 3 - PACKAGE 04
DUBAI HILLS ESTATE LLC (EMAAR PROPERTIES PJSC IS THE DEV. MGR.)
PARSONS OVERSEAS LIMITED
Roads & Services
47.00 22-Oct-14 20-May-15
EM 685
MBR GARDENS DEVELOPMENT - DUBAI HILLS ESTATE, SHALLOW SERVICES OF MAIN ROAD-1 EXTENSION AND TEMPORARY SPINE ROAD
DUBAI HILLS ESTATE LLC (EMAAR PROPERTIES PJSC IS THE DEV. MGR.)
PARSONS OVERSEAS LIMITED
Roads & Infrastructure Works
15.30 23-Jul-14 23-Oct-14
EM 684
0107 JEBEL ALI HILLS, INFRASTRUCTURE WORKS MERAAS DEVELOPMENT
PARSON OVERSEAS LTD
Infrastructure Works
27.18 31-Aug-14 28-Dec-14
EM 683
ARABIAN RANCHES II - PHASE 2, DEEP SERVICES - ADDITIONAL ROAD WORKS AT PA 14
EMAAR PROPERTIES PJSC
PARSONS Road Works 1.55 20-Aug-14 19-Sep-14
EM 682
P1136FZ.C200 JAFZA SOUTH LED STREET LIGHTNING PHASE 2
JEBEL ALI FREE ZONE AUTHORITY (JAFZA)
WSP MIDLLE EAST Infrastructure Works
15.5 07-Sep-14 05-Mar-15
EM 681
AL MINHAD AIRBASE, PAVEMENTS WORKS FOR AL MINHAD AIRBASE (SUB-CONTRACT)
AL SAHRAA GENERAL TRANSPORT & CLEARANCE
NIL Pavement Works
2.7 To be advised To be advised
EM 679
ARABIAN RANCHES II - PHASE 2, DEEP SERVICES PACKAGE
EMAAR PROPERTIES PJSC
PARSONS Drainage & Sewerage Works
5.73 16-Jun-14 13-Feb-15
EM 678
MBR GARDENS DEVELOPMENT, DUBAI HILLS ESTATE, DEEP SERVICES IN MAIN ROAD 2 & 3
EMAAR PROPERTIES PJSC
PARSONS Drainage & Sewerage Works
25.83 12-Ju-14
12-Feb-15
EM 677
DUBAI DESIGN DISTRICT (D3) COOLING PROJECT - CONSTRUCTION, COMPLETION AND MAINTENANCE, IN THE DEFECTS LIABILITY PERIOD, OF THE CHILLED WATER PIPING, BUSINESS PARK AREA (PACKAGE 1) - EMP-TR-0114
EMPOWER EMPOWER District Cooling Project
13.19 10-Jul-14 10-Dec-14
EM 676
DS133/2 AL QUOZ 2nd SEWERAGE NETWORKS (C355) STAGE 2
DUBAI MUNICIPALITY
ITALCONSULT Sewerage Networks
18.20 10-Jun-14 21-Apr-15
EM 675
MBR GARDENS DEVELOPMENT - DUBAI HILLS ESTATE, IRRIGATION PUMPING STATION WORKS (IPS-01)
EMAAR PROPERTIES PJSC
PARSONS Irrigation & Pumping Station Works
28.64 18-Jun-14
13-Apr-15
Page 27 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 674
MBR GARDENS DEVELOPMENT - DUBAI HILLS ESTATE, GOLF COURSE GRADING WORKS
DUBAI HILLS ESTATE LLC
PARSON OVERSEAS LTD
Earthworks 26.98 20-Feb-14
27-Oct-14
EM 672
P1135FZ.C100 HEAVY VEHICLE GATES IN JAFZA SOUTH
JEBEL ALI FREE ZONE AUTHORITY (JAFZA)
AECOM Middle East Infrastructure Works
17.93 16-Mar-14 31-Jan-15
EM 671
R978/1 JUMEIRAH JOGGING TRACK ROAD AND TRANSPORT AUTHORITY
PARSON OVERSEAS LTD
Infrastructure Works
98
16-Feb-14 2-Oct-14
EM 669
MBR DEVELOPMENT - PHASE 1, SHALLOW SERVICES & INTERNAL ROADS
EMAAR PROPERTIES PJSC
PARSONS Roads & Infrastructure Works
21.94 4-Nov-13 5-Mar-14
EM 668
COMPREHENSIVE IMPROVEMENTS OF THE PARALLEL ROAD (Contract-3C1)
ROAD AND TRANSPORT AUTHORITY
PARSON OVERSEAS LTD
Road Works 77.84 20-Oct-13 13-Feb-15
EM 667
P1135FZ JAFZA SOUTH INFRASTRUCTURE PHASE 5 JEBEL ALI FREE ZONE AUTHORITY (JAFZA)
AECOM MIDDLE EAST Infrastructure Works
15.52 31-Oct-13 28-Apr-14
EM 666
P1136FZ JAFZA SOUTH SOLAR STREET LIGHTING JEBEL ALI FREE ZONE AUTHORITY (JAFZA)
WSP MIDDLE EAST Solar Street Lighting Works
9.25
24-Sep-13
14-June-14
EM 665
VILLA COMPLEX PHASE III, INFRASTRUCTURE PACKAGE (P-048/C)
DUBAI SILICON OASIS AUTHORITY
ARCHGROUP Infrastructure Works
29.75
18-Aug-13
17-Sep-14
EM 664
CTSS/BUF/VIP/006B - DEVELOPING THE FACILITIES WITHIN NAD AL SHEBA COMPLEX, PHASE 2 - INFRASTRUCTURE AND LANDSCAPE WORKS
ROADS AND TRANSPORT AUTHORITY
DAR AL-HANDASAH CONSULTANTS
Infrastructure and Landscape Works
53.60 21-Jul-13 22-Nov-13
EM 663
DS138/2A NAD EL SHIBA 4th, DRAINAGE PUMPING STATION
DUBAI MUNIPALITY MWH Drainage Pumping Station
17.5 7-Apr-13 6-Apr-14
EM 662
VILLA COMPLEX PHASE III, GRADING PACKAGE (P-048/A)
DUBAI SILICON OASIS AUTHORITY
ARCHGROUP Grading Package
3.29 21-Mar-13 19-May-13
EM 661
ARABIAN RANCHES 2 DEVELOPMENT, AL QUDRA ROAD "U" TURN ACCESS
EMAAR PROPERTIES PJSC
PARSONS Road Works 3.02 16-Feb-12 15-Jul-13
EM 660
DS190/2 SEWER NETWORK & RISING MAIN AT AL QUOZ INDUSTRIAL AREA
DUBAI MUNICIPALITY
To be Advised Sewerage Works
25.94 10-Feb-13 11-May-14
EM 659
ARABIAN RANCHES 2 DEVELOPMENT, UTILITY CONNECTION & DEEP SERVICES - PACKAGE 1
EMAAR PROPERTIES PJSC
PARSONS Utilities & Services Package
30.71
13-Jan-13
12-Jan-14
EM 658
BUSINESS BAY DISTRICT COOLING PROJECT - CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE SOUTH EAST (TP03 & TP04) PIPE NETWORK - EMP-TR-0081
EMPOWER
EMPOWER
Utilities 7.11 5-Dec-12 3-May-13
EM 657
JAP014 - JUMEIRAH LAKES TOWERS INFRASTRUCTURE WORKS
(DMCCA) FAITHFUL+GOULD & WILBUR SMITH ASSOCIATES
Infrastructure Works
16.39 31-Mar-12 2-Nov-13
EM 656
R824/1 ROADS IN AL QUOZ 3 ROADS AND TRANSPORT AUTHORITY
AL TURATH ENGINEERING CONSULTANTS
Roads & Infrastructure Works
21.73 17-Nov-12 12-Sep-13
Page 28 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 655
THE VILLA REMAINING WORKS (V2036), COMPLETION OF THE VILLA PHASE III WORKS
DUBAI PROPERTIES LLC
AECOM Roads & Infrastructure Works
9.32 11-Nov-12 11-Apr-13
EM 654
VH01/CO2B FINAL ROADS & INFRASTRUCTURE WORKS
VICTORY HEIGHTS GOLF AND RESIDENTIAL DEVELOPMENT LLC
DIAR CONSULT Roads and Infrastructure Works
3.15
15-Dec-12
14-Aug-13
653
TECOM-C DISTRICT COOLING PROJECT, JBR AL BATEEN DISTRICT COOLING PROJECT - CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD OF THE SEMI-PERMANENT PLANT, CHILLED WATER DISTRICT COOLING PIPE NETWORKS AND TO UNDERTAKE MATERIAL SHIFTING. EMP-TR-0071
EMPOWER EMPOWER Utilities 13.10 22-Apr-12 28-Apr-13
EM 652
DUBAI WATERFRONT - BADRAH & VENETO, INFRASTRUCTURE WORKS N018-040-03-10
NAKHEEL PJSC DAR AL HANDASAH Infrastructure Works
137.00 19-Jun-11 16-Jun-12
EM 651
BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE NORTH WEST PIPE NETWORK EXTENSION.
EMPOWER EMPOWER Utilities 13.053 12-Jul-11 6-Feb-12
EM 650
DN600 TRANSMISSION PIPELINE IN CENTRAL AREA
FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)
Utilities 18.98 19-Jun-11 16-Jun-13
EM 649
BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT. CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE TP05 & TP11 DISTRICT COOLING DISTRIBUTION PIPE NETWORK EXTENSION
EMPOWER EMPOWER Utilities 7.72 16-May-11 13-Aug-11
EM 648
IMPROVEMENTS OF THE 5TH INDUSTRIAL INTERSECTION / SHARJAH (EMIRATES ROAD). SECOND STAGE: IMPROVEMENTS OF AL DHAID INTERCHANGE, KING ABDUL AZEEZ INTERCHANGE AND UNIVERSITY CITY INTERCHANGE
MINISTRY OF PUBLIC WORKS AUTHORITY
PARSONS OVERSEAS LTD
Roads, Bridges and Services
468.89
17-Apr-11
4-Jun-13
EM 647
ARABIAN RANCHES DEVELOPMENT, DISTRICT 8 POLO VILLAS, INFRASTRUCTURE WORKS
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD.
Infrastructure Works
12.275
27-Mar-11
31-Oct-11
EM 646
DSOA VILLA COMPLEX - INFRASTRUCTURE WORKS PHASE II (P-009/C)
DUBAI SILICON OASIS AUTHORITY
KHATIB & ALAMI Infrastructure 3.154
3-May-11
31-Dec-11
EM 645
ENGINEERING WORKS FOR DSOA SEWERAGE CONNECTION FOR DEVELOPERS (P-042)
DUBAI SILICON OASIS AUTHORITY
KHATIB & ALAMI Utilities 1.50 1-Jan-11
16-Apr-12
EM 644
BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT, TENDER FOR THE CONSTRUCTION, COMPLETION AND MAINTENANCE IN THE DEFECT LIABILITY PERIOD OF THE MAIN (NORTH WEST) PIPE NETWORL-EMP-TR-0056
EMPOWER EMPOWER Utilities 21.50 4-Dec-10 31-Dec-11
Page 29 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 643
BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT, CONSTRUCTION, COMPLETION & MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE TP11 SEMI-PERMANENT DISTRICT COOLING PLANT & CHILLED WATER PIPE NETWORK
EMPOWER EMPOWER Utilities 3.85 25-Nov-10
12-Feb-11
EM 642
BUSINESS BAY PHASE 1 & 2 DISTRICT COOLING PROJECT, CONSTRUCTION, COMPLETION & MAINTENANCE IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE TP04 SEMI-PERMANENT DISTRICT COOLING PLANT & CHILLED WATER PIPE NETWORK - EMP - TR - 0047
EMPOWER EMPOWER Utilities 3.86 25-Nov-10 12-Feb-11
EM 641
IMPROVEMENT OF AL HAMIDIYA INTERCHANGE, EMIRATES OF AJMAN
MINISTRY OF PUBLIC WORKS AUTHORITY
INDROESSE INFRASTRUCTURE
Roads & Bridges
208.62 19-Dec-10 12-Jul-12
EM 640
BUSINESS BAY PHASE 1 &2; DISTRICT COOLING PROJECT TO CONSTRUCT, COMPLETE AND MAINTAIN IN THE DEFECTS LIABILITY PERIOD, THE WORKS IN CONNECTION WITH THE ELECTRICAL EQUIPMENT CONCRETE FOUNDATIONS, SEMI-PERMANENT DISTRICT COOLING PLANT (TP10) AND CHILLED WATER PIPE NETWORK
EMPOWER EMPOWER Utilities 4.60 21-Sep-10 13-Jan-11
EM 639
JAP014 - JUMEIRAH LAKES TOWERS, JLTE ROADS AND INFRASTRUCTURE
NAKHEEL LLC WILBUR SMITH ASSOCIATES / FAITHFUL+GOULD
Roads & Infrastructure
53.79 26-Aug-10 31-Jul-12
EM 638
DUBAI LAND RESIDENTIAL COMPLEX, SKY COURTS DISTRICT COOLING PROJECTS
EMPOWER EMPOWER Utilities 6.50 1-Jul-10 27-Oct-10
EM 637
BUSINESS BAY PHASE 1 &2 D.C. LINE 7, DISTRICT COOLING PROJECT
EMPOWER EMPOWER Utilities 3.10 1-Jul-10 18-Sep-10
EM 636
ENGINEERING WORKS FOR DSOA (P-002), RE-PLANNING OF BLOCKS 6 & 27, STORM WATER MITIGATION PLAN & STORAGE SOLUTION
DUBAI SILICON OASIS
KHATIB & ALAMI
Utilities
4.70
1-Jul-10
28-Sep-10
EM 635
PT – 79 DUBAI INDUSTRIAL CITY ROADS & INFRASTRUCTURE, RESUMPTION OF WORKS CONTRACTS 3, 4 & 6 PROPOSED WORKS.
TAMDEEN TECOM INVESTMENTS
CANSULT MAUNSELL LIMITED
Roads & Infrastructure
104.07 01-Mar-10 31-Mar-12
EM 634
CWI 220/2009 SUPPLY, INSTALL TEST AND COMMISSION 100MM TO 450MM WATER DISTRIBUTION NETWORK OF FIBER CEMENT GLASS REINFORCED EPOXY PIPES AT VARIOUS LOCATIONS IN DUBAI INCLUDING CHANGE OF HOUSE CONNECTION AND ASSOCIATED WORKS.
DEWA
NIL
Utilities
127.0
04-Nov-09
1-May-12
EM 633
R842/4 IMPROVEMENTS OF AL KHAIL ROAD,ALKHAILROAD - UMMSUQAIM ROAD JUNCTION 17
ROADS & TRANSPORT AUTHORITY
CANSULT MAUNSELL LIMITED
Road and Bridge Works
308.00
6-Jun-09
6-Jul-10
EM 632
R882/2 IMPROVEMENT OF AL SAFOOH AREA NETWORK ROADS R3 & R5, PARKING AT METRO STATIONS
ROADS & TRANSPORT AUTHORITY
PARSONS DE LEUW CATHER OVERSEAS
Road works
46.90
15-Feb-09
15-Jun-09
Page 30 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 631
IMPZ ROADS & INFRASTRUCTURE(P-067A), RECTIIFICATION WORKS
TAMDEEN, TECOM INVESTMENTS
HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure 1.78 11-Nov-08 3-Jan-09
EM 630
THE PALM JUMEIRAH, GATEWAY TOWERS ROADWAY ACCESS
NAKHEEL LLC
PARSONS DE LEUW CATHER OVERSEAS
Road works 78.00 09-Oct-08 7-Apr-09
EM 629
VICTORY HEIGHTS GOLF & RESIDENTIAL DEVELOPMENT, ADDITIONAL DEFERRED ROADS & INFRASTRUCTURE WORKS
VICTORY HEIGHTS DEVELOPMENT
KHATIB & ALAMI Infrastructure 29.09 10-Sep-07 28-Feb-10
EM 628
DUBAI HEALTH CARE CITY – PHASE II, VARIATION – ADDITIONAL WORKS
DUBAI HEALTH CASE CITY
PARSONS DE LEUW CATHER OVERSEAS
Infrastructure 82.58 10-Aug-08
4-Oct-09
EM 627
BUSINESS BAY DM CORRIDOR, DISTRICT COOLING DISTRIBUTION PIPE NETWORK
EMPOWER MAUNSELL CONSULTANCY
Utilities 79.14 2-Aug-08 30-Nov-09
EM 626
R 777 / 4A DUBAI CREEK CROSSINGS SEVENTH CROSSING
ROADS & TRANSPORT AUTHORITY
PARSONS DE LEUW CATHER OVERSEAS
Bridges & Underpasses
693.01 25-Jun-08 2010
EM 625
PALM JEBEL ALI -NO 23-040-02-03, CONSTRUCTION OF ROADS & INFRASTRUCTURE TO CRESCENT E
NAKHEEL LLC HYDER CONSULTING MIDDLE EAST LTD.
Infrastructure 605.82 22-Jun-08 2010
EM 624
1047 VILLA COMPLEX FOR DSOA - PHASE II, INFRASTRUCTURE PACKAGE (P - 009/C)
DUBAI SILICON OASIS
ARCHGROUP Infrastructure 145.5 1-Jul-08 2009
EM 623
THE PALM DEIRA, DI FRONT INFRASTRUCTURE WORKS
NAKHEEL LLC WILBUR SMITH ASSOCIATES
Infrastructure 49.37 1-Jun-08 2008
EM 622
DS145 - AL BARSHA SOUTH 1 SEWERAGE & DRAINAGE (C 671)
DUBAI MUNICIPALITY
AL TURATH / DR. AHMED ABDEL WARITH CONSULTING ENGINEERS
Utilities 229.60 2-Jul-08 2010
EM 621
260 KEY VILLAS AT DUBAILAND / P-103, INFRASTRUCTURE WORKS
DUBAI PROPERTIES MAUNSELL CONSULTANCY
Infrastructure 20.30 2-Jun-08 2009
EM 620
CONSTRUCTION SERVICES FOR MAIN IRRIGATION TANK & PUMPING STATION IN DUBAILAND TREZ/112
TATWEER DUBAI LLC
KHATIB & ALAMI Utilities 161.16 4-May-08 2009
EM 619
THE VILLA @ DUBAI LAND (P 117), REMAINING INFRASTRUCTURE WORKS
DUBAI PROPERTIES MAUNSELL CONSULTANCY
Infrastructure 209.67 15-Jan-08 2009
EM 618
THE PALM JUMEIRAH, CRESCENT CARRIAGEWAY REINSTATEMENT
NAKHEEL LLC ASSOCIATED CONSULTING ENGINEERS INT'L
Road works 38.16 25-Feb-08 30-Jun-08
EM 617
CIVIL WORKS FOR ACMS, PDC AND SCADA NAKHEEL LLC ASSOCIATED CONSULTING ENGINEERS INT'L
Misc. 9.27 19-Feb-08 15-Sep-08
EM 616
PHASE III EAST, PRECINCTS 2-10: INFRASTRUCTURE - SERVICES AND ROADS
NAKHEEL LLC MOUCHELL PARKMAN Infrastructure 304.52 26-Apr-08 2010
EM 615
DUBAI INDUSTRIAL CITY, ROAD & INFRASTRUCTURE
DUBAI INDUSTRIAL CITY
CANSULT LIMITED Infrastructure 184.54 16-Feb-08 2009
EM 614
558 KEY VILLAS AT DUBAI LAND P113 DUBAI PROPERTIES CANSULT LIMITED Utilities 4.63 26-Jan-08 24-May-08
Page 31 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 613
DUBAI SPORTS CITY, VEHICULAR BRIDGE / FILTRATION ROOM, CONTRACT No. DSC/P/5010/07
DUBAI SPORTS CITY LLC
KHATIB & ALAMI Bridges & Underpasses
23.26 16-Oct-07 2009
EM 612
R762/3 DUBAI BYPASS PHASE III, AL QUDRA BRIDGE
ROADS & TRANSPORT AUTHORITY
WILBUR SMITH ASSOCIATES
Bridges & Underpasses
82.29 4-Dec-07 2009
EM 611
JAP006/PJ THE PALM JUMEIRAH POINTE INFRASTRUCTURE
NAKHEEL LLC ASSOCIATED CONSULTING ENGINEERS (ACE)
Infrastructure 59.9 27-Dec-07 11-Mar-08
EM 610
DUBAI WATERFRONT - MADINAT AL ARAB N 018-040-03-02&04 AL OUD DISTRICT A STAGE 1&2,PHASE-3 EAST PRECINCT 1, INFRASTRUCTURE & ROADS
NAKHEEL LLC MOUCHELL PARKMAN Infrastructure 22.00 16-Oct-07 13-Mar-08
EM 609
ARABIAN RANCHES DEVELOPMENT RESIDENTIAL VILLAS, DISTRICT 7 (A, B, C & H) PHASE II, INFRASTRUCTURE WORKS AND STREETSCAPE
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD
Infrastructure 24.382 1-Oct-07 30-Jun-08
EM 608
REMAL HOUSING PROJECT AT DUBAILAND , GRADING PACKAGE
MIZIN DAR Bulk Earthworks / Grading
19.29 10-Sep-07 8-Dec-07
EM 607
CW/119A/2007 SUPPLY, INSTALLATION, TESTING & COMMISSIONONG OF FIBRE CEMENT/ GLASS REINFORCED PLASTIC/GLASS REINFORCED EPOXY/ DUCTILE IRON WATER TRANSMISSION PIPE LINES & ASSOCIATED WORKS AT VARIOUS LOCATIONS IN EMIRATES OF DUBAI (1200 MM DIA
PIPELINE ALONG SHK. ZAYED ROAD)
DUBAI ELECTRICITY & WATER AUTHORITY
DUBAI WATER & ELECTRICITY AUTHORITY
Utilities 67.600 8-Jul-07 2009
EM 606
CW/211A/2007 SUPPLY, INSTALLATION, TEST & COMMISSION 100 MM TO 450 MM DIA WATER DISTRIBUTION NETWORK OF FIBRE CEMENT/GLASS REINFORCED PLASTIC/GLASS REINFORCED EPOXY PIPES AT VARIOUS LOCATIONS IN DUBAI INCLUDING CHANGE OF HOUSE CONNECTIONS & ASSOCIATED WORKS
DUBAI ELECTRICITY & WATER AUTHORITY
DUBAI WATER & ELECTRICITY AUTHORITY
Utilities 86.38 4-Jul-07 2009
EM 605
P-122 TECOM ROADS IMPROVEMENTS, INFRASTRUCTURE WORKS
DUBAI PROPERTIES PARSONS DE LEUW CATHER OVERSEAS
Bridges & Underpasses
87.660 18-Aug-07 2009
EM 604
DUBAI BYPASS PHASE IV - PART 2 ROADS & TRANSPORT AUTHORITY
WILBURTH SMITH ASSOCIATES
Road works 361.27 1-Jul-07 2009
EM 603
TIJARRA TOWN (GLOBAL EXCHANGE CITY), INFRASTRUCTURE CONTRACT
DUBAI PROPERTIES MAUNSELL CONSULTANCY SERVICE LTD.
Infrastructure 120.81 7-Jul-07 27-Dec-08
EM 602
N 018-040-03-02 & 04 DUBAI WATERFRONT - MADINAT AL ARAB AL OUD DISTRICT A - CONSTRUCTION COMPLETION AND MAINTENANCE OF INFRASTRUCTURE & ROAD WORK -AL OUD DISTRICT A (STAGE 1 & 2)
NAKHEEL LLC MOUCHELL PARKMAN Infrastructure 325.52 26-Jul-07 2009
EM 601
R880 DEVELOPMENT OF MIRDIF INTERCHANGE ROADS & TRANSPORT AUTHORITY
AL BURJ AFRICON Bridges & Underpasses
213.66 15-May-07 10-Jul-07
Page 32 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 600
THE PALM JUMERIAH, CRESCENT SEWER SYSTEM & OTHER SERVICES
NAKHEEL LLC ASSOCIATED CONSULTING ENGINEER INT'L (ACE)
Utilities 136.35 3-May-07 1-Aug-08
EM 599
DSO VILLA COMPLEX - PHASE 2, GRADING WORKS
DUBAI SILICON OASIS ARCHGROUP CONSULTANTS
Bulk Earthworks / Grading
28.97 1-May-07 28-Aug-07
EM 598
DS 164 SEWAGE PUMPING STATION (SN) AND ITS NEW RISING MAINS
DUBAI MUNICIPALITY KHATIB & ALAMI Utilities 540.68 1-May-07 2010
EM 597
INSTALLATION & COMMISSIONING OF 11 KV CABLES
DUBAI ELECTRICITY & WATER AUTHORITY
NIL Utilities 10.80 11-Mar-07
EM 596
P-123/M2035 MUDON P-123, ROADS AND INFRASTRUCTURE PACKAGE A
DUBAI PROPERTIES MAUNSELL CONSULTANCY
Infrastructure 258.00 17-Feb-07 2008
EM 595
N035-40-01-C-040 DUBAI MARITIME CITY, INFRASTRUCTURE CONTRACT NO. 3 (CP 404)
NAKHEEL LLC MOUCHELL PARKMAN Infrastructure 360.23 15-Feb-07 2009
EM 594
DUBAI SPORTS CITY - AREAS 1,2 & 4, SEWERAGE TREATMENT PLANT CIVIL WORKS
M/S. EAGLE ELECTRO MECHANICAL COMPANY
HYDER CONSULTING Misc. 18.12 2-Jan-07 2009
EM 593
DI-OPC-CONTRACT-INF-01-07-002 DUBAI INDUSTRIAL CITY - PHASE I, ROADS AND INFRASTRUCTURE (CONTRACT 4)
DUBAI INDUSTRIAL CITY
CANSULT LIMITED Infrastructure 303.21 16-Jan-07 2008
EM 592
DI-OPC-CONTRACT-INF-01-07-002 DUBAI INDUSTRIAL CITY - PHASE I ROADS AND INFRASTRUCTURE (CONTRACT 3)
DUBAI INDUSTRIAL CITY
CANSULT LIMITED Infrastructure 362.52 16-Jan-07 2008
EM 591
MIRDIF BUILDINGS, ROADS & INRASTRACTURE WORKS
DUBAI PROPERTIES CANSULT Infrastructure 124.960 26-Nov-06 13-Oct-07
EM 590
DUBAI STUDIO CITY - BOUTIQUE STUDIOS, URBAN SETTLEMENT AND INFRASTRUCTURE
DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY
MAUNSELL CONSULTANCY PVT LTD.
Infrastructure 23.21 2-Jan-07 15-Jun-07
EM 589
DUBAI HEALTH CARE CITY PHASE II, ROADS & SERVICES (AREAS 4 & 5)
SAMA DUBAI L.L.C. PARSONS DE LEUW CATHER OVERSEAS LIMITED
Infrastructure 41.83 12-Dec-06 9-Nov-07
EM 588
DUBAI SPORTS CITY, CANAL INFASTRUCTURE & BRIDGES
DUBAI SPORTS CITY LLC
KHATIB & CRACKNELL Bridges & Underpasses
57.02 2-Jan-07 2008
EM 587
ARABIAN RANCHES DEVELOPMENT DISTRICT - 6 (A,B,C,D,E & F) INFRASTRUCTURE WORKS PHASE II
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD
Infrastructure 22.71 20-Sep-06 19-Sep-07
EM 586
R/882/2 IMPROVEMENT OF AL SAFOOH AREA NETWORK ROADS R3 & R5
ROADS & TRANSPORT AUTHORITY
PARSONS DE LEUW CATHER
Bridges & Underpasses
312.01 18-Sep-06 2009
EM 585
ACACIA GARDENS TECOM SITE ABYAAR REAL INVESTMENT DEVELOPMENT
MAUNSELL CONSULTANCY SERVICES LTD
Infrastructure 12.37 19-Oct-06 15-Jun-07
EM 584
ARABIAN RANCHES DEVELOPMENT DISTRICT - 7 (D,E,FG)
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD
Infrastructure 54.49 2-Sep-06 1-Sep-07
EM 583
P-088 DUBAI STUDIO CITY, ROADS AND INFRASTRUCTURE - PHASE 1
DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY
HOK Infrastructure 40.57 2-Sep-06 3-Mar-07
Page 33 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 582
JAP006-C105 THE PALM JUMEIRAH BRIDGES AND VIADUCTS & RAMP ADDITIONAL WORKS FOR FRONDS L,M & O
NAKHEEL LLC PARSONS DE LEUW CATHER
Bridges & Underpasses
57.36 19-Aug-06 31-Jan-07
EM 581
SD-0411.B.47 DUBAI HEALTH CARE CITY PHASE II ROADS & SERVICES (AREAS 1,2 & 3)
SAMA DUBAI L.L.C. HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure 140.47 5-Aug-06 28-Oct-07
EM 580
P-103 254 KEY VILLAS AT DUBAILAND/ P-103, INFRASTRUCTURE CONTRACTS
DUBAI PROPERTIES MAUNSELL CONSULTANCY SERVICES LTD.
Infrastructure 1.55 20-May-06 18-Dec-06
EM 579
P-125 GLOBAL BUSINESS EXCHANGE CITY DUBAI PROPERTIES MAUNSELL CONSULTANCY
Bulk Earthworks / Grading
22.12 28-Oct-06 24-Feb-07
EM 578
ARABIAN RANCHES DEVELOPMENT, INFRASTRUCTURE WORKS-PHASE II, DISTRCIT 5A & B
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD.
Infrastructure 25.31 1-Jul-06 27-Dec-06
EM 577
558 VILLAS AT DUBAILAND / P-113, ROAD & INFRACTURE WORKS
DUBAI PROPERTIES CANSULT LIMITED Infrastructure 52.92 12-Sep-07 8-Aug-08
EM 576
DIP-0410.B.47 LA VILLE CONTEMPORAINE - THE LAGOONS, ROADS & SERVICES (AREA 2)
DUBAI INTERNATIONAL PROPERTIES
HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure 63.63 1-Jul-06 15-May-07
EM 575
R800/2A DIRECTIONAL RAMPS AT WIMPY INTERCHANGE
ROADS & TRANSPORT AUTHORITY
DE LEUW CATHER OVERSEAS LTD.
Bridges & Underpasses
67.3 20-May-06 19-May-07
EM 574
CW/347/2004 DEVELOPMENT OF F.C. WATER DISTRIBUTION PIPELINES NETWORKS OF WIAMETERS VARYING FROM 100 TO 300 MM IN VARIOUS PARTS OF DUBAI
DUBAI ELECTRICITY & WATER AUTHORITY
NIL Utilities 56.568 5-Apr-06 4-Jun-08
EM 573
R882/1 IMPROVEMENTS OF AL SAFOOH AREA ROAD NETWORK ROADS R1 & R2
ROADS & TRANSPORT AUTHORITY
SYSTRA MV Bridges & Underpasses
185.74 20-May-06 30-Nov-07
EM 572
P-088 DUBAI STUDIO CITY DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY
HOK Bulk Earthworks / Grading
7.62
1-Apr-06
29-Jul-06
EM 571
WIDENING OF AL QUDRA ROAD TATWEER DUBAI LLC PARSONS DE LEUW CATHER
Road works 43.25 11-Mar-06 5-Nov-06
EM 570
DIRECT ACCESS OF SHEIK ZAYED ROAD TO IBN BATTUTA MALL
NAKHEEL LLC SYSTRA MV Road works 13.13 29-Jul-06 25-Jan-07
EM 569
DISTRICT 3B - ARABIAN RANCHES DEVELOPMENT INFRASTRUCTURE WORKS - PHASE II
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD
Infrastructure 28.18 20-Feb-06 18-Aug-06
EM 568
P 117 THE VILLA @ DUBAI LAND ROAD & INFRASTRUCTURE
DUBAI PROPERTIES MAUNSELL CONSULTANCY
Infrastructure 168.23 15-Jul-06 13-Oct-07
EM 567
VH01/C02 VICTORY HEIGHTS GOLF & RESIDENTIAL DEVELOPMENT (ROADWORKS & INFRASTRUCTURE WORKS)
VICTORY HEIGHTS GOLF RESIDENTIAL & DEVELOPMENT LLC
KHATIB & ALAMI CONSOLIDATED ENGINEERING CO.
Infrastructure 120.95 2-May-06 20-Feb-08
EM 566
DUBAI SPORTS CITY, AREAS 1,2 & 4 INFRASTRUCTURE WORKS
DUBAI SPORTS CITY LLC
KHATIB & ALAMI CONSOLIDATED ENG. CO
Infrastructure 137.33 11-Feb-06 5-Jul-07
Page 34 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 565
P-100/1 MIRDIF VILLAS ROAD & INFRASTRUCTURE
DUBAI PROPERTIES CANSULT LIMITED Infrastructure 86.332 22-Jan-06 2009
EM 564
THE VILLA AT DUBAI LAND (PACKAGE: EARTHWORKS)
DUBAI PROPERTIES MAUNSELL CONSULTANCY
Bulk Earthworks / Grading
32.28 14-Jan-06 12-Jul-06
EM 563
JAP 003 IBN BATTUTA MALL - ROADWORKS, PARKING & SIGNALISED JUNCTION
NAKHEEL LLC PARSONS INTERNATIONAL LTD
Road works 9.7 10-Dec-05 9-Apr-06
EM 562
INFRASTRUCTURE WORKS - PHASE 2 FOR DSO SITE (P012)
DUBAI SILICON OASIS KHATIB AND ALAMI Infrastructure 84.72 1-Oct-05 31-Aug-06
EM 561
DUBAI INTERNATIONAL FINANCIAL CENTRE IP02 & IP06/08 WESTERN ROAD AND SERVICE DIVERSION
DUBAI INTERNATIONAL FINANCIAL CENTRE
MAUNSELL CONSULTANCY
Infrastructure 55.67 24-Sep-05 24-Sep-06
EM 560
ARABIAN RANCHES DEVELOPMENT INFRASTRUCTURE WORKS TO DISTRICT 4A & B
EMAAR PROPERTIES PJSC
PARSON INTERNATIONAL LTD
Infrastructure 21.36 20-Jul-05 15-Jan-06
EM 559
R659/10 IMPROVEMENT OF INTERCHANGE NO. 5 DUBAI MUNICIPALITY DE LEUW CATHER OVERSEAS
Bridges & Underpasses
304.50 5-Jul-05 19-May-07
EM 558
P447FZ FREE ZONE SOUTH INFRASTRUCTURE, PHASE 3B
PORTS, CUSTOMS & FREE ZONE CORPORATION
KHATIB & ALAMI Road works 45.73 2-Jul-05 1-Jul-06
EM 557
INTERNATIONAL MEDIA PRODUCTION ZONE/P-067A
DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY
HALCROW Infrastructure 244.1 2-Jul-05 21-Jun-07
EM 556
ARABIAN RANCHES DEVELOPMENT DISTRICT 7, INFRASTRUCTURE WORKS, DEEP SERVICES, SECTOR E,G, & H
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LIMITED
Infrastructure 20.20 25-Apr-05 21-Aug-05
EM 555
PP20 GATE PRECINCT WEST ROAD EXTENSION DUBAI INTERNATIONAL FINANCIAL CENTRE
TURNER INTERNATIONAL
Road works 4.57 18-Jun-05 3-Nov-05
EM 554
R 572/1- ROADS IN AL HAMAR, PHASE 2 DUBAI MUNICIPALITY HYDER CONSULTING M.E. LTD.
Road works 47.73 23-May-05 17-May-06
EM 553
INFRASTRUCTURE WORKS TO DISTRICT 3A - ARABIAN RANCHES DEVELOPMENT
EMAAR PROPERTIES PJSC
PARSONS Infrastructure 6.67 28-Apr-05 21-Aug-05
EM 552
DUBAI SPORTS CITY ADVANCE GRADING WORKS
DUBAI SPORTS CITY LLC
KHATIB & ALAMI Bulk Earthworks / Grading
23.04 24-Apr-05 22-Jul-05
EM 551
VILLA COMPLEX FOR DUBAI SILICON OASIS PHASE 1 (P-006/C)
DUBAI SILICON OASIS ARCHON Infrastructure 36.02 19-Feb-05 19-Feb-06
EM 550
ENGINEERING WORKS FOR DUBAI SILICON OASIS/P(010)
DUBAI SILICON OASIS KHATIB AND ALAMI Infrastructure 146.59 19-Feb-05 19-Feb-06
EM 549
DUBAI INTERNATIONAL FINANCIAL CENTRE - IP01/01 INTERIM SERVICES DIVERSION
DUBAI INTERNATIONAL FINANCIAL CENTRE
MAUNSEL CONSULTANCY
Utilities 21.00 30-Jan-05 20-Dec-05
EM 548
JUMEIRAH BEACH RESIDENCE PE049/2 PACKAGE - ROADS AND INFRASTRUCTURE
DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY
DESIGN AND ARCHITECTURE (DAR)
Misc. 11.15 15-Jan-05 14-Jul-05
EM 547
IBN BATTUTA MALL (PREVIOUSLY THE GARDEN SHOPPING MALL)
NAKHEEL LLC PARSONS/ PROJECT MANAGEMENT
Misc. 21.18 4-Jan-05 31-May-05
Page 35 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
TURNER INTERNATIONAL
EM 546
INFRASTRUCTURE WORKS TO DISTRICT 6- ARABIAN RANCHES DEVELOPMENT
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL
Infrastructure 18.48 10-Nov-04 9-May-05
EM 545
CITY OF ARABIA- EARTHWORKS CONTRACT REF. 3727 (D)/6.1/04/004
ILYAS AND MUSTAFA GALADARI MANAGEMENT INVESTMENT & DEVELOPMENT LLC
P&T ARCHITECTS AND ENGINEERS LTD.
Bulk Earthworks / Grading
21.36
28-Oct-04
7-Mar-05
EM 542
R 757/3 AL QUDRA BRIDGE DUBAI MUNICIPALITY ITAL CONSULT Bridges & Underpasses
19.65 8-Sep-04 4-Feb-05
EM 541
JUMEIRAH BEACH RESIDENCE (P055) PACKAGE NO. 0522-SITE WIDE INFRASTRUCTURE AND UTILITIES
DUBAI TECHNOLOGY & MEDIA FREE ZONE AUTHORITY
CANSULT Infrastructure 85.37 20-Nov-04 12-Feb-06
EM 540
ENGINEERING WORKS FOR DUBAI SILICON OASIS "DSO"-GRADING WORKS FOR DSO REMAINING AREA
DUBAI SILICON OASIS KHATIB & ALAMI Bulk Earthworks / Grading
11.39 1-Aug-04 28-Jan-05
EM 538
EMIRATES LIVING DEVELOPMENT DM LATERAL ROAD
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL
Road works 11.56 15-May-04 14-Oct-04
EM 537
ARABIAN RANCHES DEVELOPMENT INFRASTRUCTURE DISTRICT #8
EMAAR PROPERTIES PJSC
NIL Infrastructure 12.41 3-May-04 30-Oct-04
EM 536
ENGINEERING WORKS FOR DUBAI SILICON OASIS 'DSO' - ADDITIONAL AREA GRADING /P005
DUBAI SILICON OASIS KHATIB & ALAMI Bulk Earthworks / Grading
10.75 21-Apr-04 18-Oct-04
EM 535
CW/062/2003 SUPPLY, INSTALL, DISTRIBUTION A.C. PIPELINES NETWORK FROM 100 MM TO 300 MM AT VARIOUS LOCATIONS IN DUBAI
DUBAI ELECTRICITY & WATER AUTHORITY
Utilities 52.23 24-Mar-04 13-May-06
EM 534
JAP014-C02 DMCC INDUSTRIAL AREA AND JUMEIRAHLAKE TOWERS INFRASTRUCTURE & LANDSCAPING
NAKHEEL LLC WILBUR SMITH ASSOCIATES
Infrastructure 324.83 24-Apr-04 2009
EM 533
ENGINEERING WORKS FOR DUBAI SILICON OASIS FAST TRACK GRADING
DUBAI SILICON OASIS KHATIB & ALAMI Bulk Earthworks / Grading
0.97 29-Feb-04 29-Apr-04
EM 532
JAP 006-C105 THE PALM JUMEIRAH BRIDGES VIADUCTS AND RAMPS
NAKHEEL LLC PARSONS, Bridges & Underpasses
48.66 10-Apr-04 4-Feb-05
EM 530
R 757/2 PALM ISLAND (JUMEIRAH)M ROAD CORRIDOR AND ACCESS SCHEME
DUBAI MUNICIPALITY DELEUW CATHER OVERSEAS LTD.
Bridges & Underpasses
234.50 7-Jun-04 28-Jan-06
EM 529
JAP001-022 - THE GARDENS INTERCHANGE NAKHEEL LLC DE LEUW CATHER OVERSEAS LTD
Bridges & Underpasses
59.20 2-Oct-03 30-Sep-04
EM 527
ALTERNATE ROUTE FOR SHARJAH TO RAS AL KHAIMAH ROAD CONTRACT 1
MINISTRY OF PUBLIC WORKS & HOUSING
HALCROW INTERNATIONAL
Road works 184.86 18-Jun-03 27-May-05
EM 523
EMIRATES HILLS DEVELOPMENT THE SPRINGS PHASE 1 & THE MEADOWS PHASE 2 - INFRASTRUCTURE WORKS
EMAAR PROPERTIES PJSC
PARSONS INTERNATIONAL LTD.
Infrastructure 68.41 9-Jan-03 8-Feb-04
EM 514
JAP 005 JUMEIRAH ISLANDS, PACKAGE 2 INFRASTRUCTURE WORKS
NAKHEEL LLC PARSONS INTERNATIONAL
Infrastructure 114.46 21-Apr-02 30-Jun-04
Page 36 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
COMPLETION DATE
EM 511
DS 117/3 MAIN PUMPING STATION "K", PHASE III
DUBAI MUNICIPALITY KHATIB & ALAMI AND METCALF & EDDY INTERNATIONAL INC.
Utilities 72.21 2-Mar-02 1-Mar-04
CWIP 115
LABOUR ACCOMODATION AT JEBEL ALI, BLOCK B - PHASE II
WADE ADAMS PORT SAEED ENGINEERING
Building 12.2 15-Dec-05 15-Jul-06
CWIP 114
LABOUR ACCOMODATION AT JEBEL ALI BLOCK B (4 NOS.)
WADE ADAMS - Building 14 1-Feb-05 31-Oct-05
Page 37 Ref: WAME/gc/16
WADE ADAMS SHARJAH (LLC)
Category Total Value (DHS MN)
Bulk Earthworks/Grading 7 602.06
Infrastructure 6 526.11
Misc. 1 125.38
Road Works 16 545.61
Utilities 4 73.35
Grand Total 34 1,872.51
Bulk Earthworks/Grading, 7
Infrastructure, 6
Misc, 1
Road Works, 16
Utilities, 4
Note: Project details are for the Wade Adams Sharjah LLC projects (completed and ongoing) commencing October 2002
Page 38 Ref: WAME/gc/16
List of Completed Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
SH 134
SHARJAH INTERNATIONAL AIRPORT NEW RUNWAY AT 250M SEPARATION, MAIN CIVIL WORKS AND AIRSIDE SYSTEMS PACKAGE
GOVT. OF SHARJAH DEPARTMENT OF CIVIL AVIATION
HALCROW INTERNATIONAL PARTNERSHIP
Earthworks 436.74 1-Dec-11 31-Jan-14
SH 133 SASCO EXPANSION PROJECT SHJ/007/TC02, ADDITIONAL STORAGE FACILITIES FOR SASCO DEPOT AT SIA
SHARJAH AVIATION SERVICES COMPANY LLC (SASCO)
MOTT MACDONALD LTD. Utilities 28.00 22-Aug-11 2012
SH 132 SHARJAH INTERNATIONAL AIRPORT, NEW RUNWAY AT 250M SEPARATION, ADVANCE PACKAGE
SHARJAH AIRPORT AUTHORITY
HALCROW INTERNATIONAL PARTNERSHIP
Earthworks 77.790 24-Feb-11 2011
SH 131 CONTRACT R201 INTERNAL ROADS IN RAMLA AREA
SHARJAH MUNICIPALITY
HALCROW INTERNATIONAL PARTNERSHIP
Road Work 61,800
04-Jan-10 2011
SH 130
HAMRIYAH DEEPWATER HARBOUR STORAGE YARDS
SHARJAH PORTS AUTHORITY
HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure
123.558 05-Mar-08
2009
SH 129 ROADS & DRAINAGE IN TURFANA AND RIFAA
SHARJAH MUNICIPALITY HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure 201.10 5-Mar-08 2009
SH 128 SHARJAH INTERNATIONAL AIRPORT, APRON EXPANSION PROJECT
SHARJAH AIRPORT AUTHORITY
HALCROW INT’L PARTNERSHIP
Misc. 125.38 1-May-07
2009
SH 127 R447 ROADS IN AL SHAHBA AND AL DARARI
SHARJAH MUNICIPALITY HALCROW INTERNATIONAL PARTNERSHIP
Road Works 120.46 14-May-06 3-Jan-08
SH 126 STARS ISLAND DEVELOPMENT - ADVANCED EARTHWORKS
AL HANOO HOLDING COMPANY
HALCROW INTERNATIONAL PARTNERSHIP
Bulk Earthworks / Grading
32.45 29-Jun-05 27-Nov-05
SH 125 ROADS & WATER WORKS FOR AREA II - TENDER ED1150 SAIF-ZONE
SHARJAH AIRPORT INTERNATIONAL FREEZONE
MAUNSELL CONSULTANCY Infrastructure 156.45 1-Oct-06 31-Mar-06
SH 124 UMM AL QUWAIN INDUSTRIAL AREA AL TAMMER REAL ESTATE EST.
HALCROW INTERNATIONAL PARTNERSHIP
Road Works 42.71 3-Mar-05 3-Mar-06
SH 123 CONTRACT R 473 RAHMANIYA AREA DEVELOPMENTS
DIRECTORATE OF PUBLIC WORKS - SHARJAH
HALCROW INTERNATIONAL PARTNERSHIP
Bulk Earthworks / Grading
46.72 4-Feb-05 6-Dec-05
SH 122 ED 1136 SEWERAGE, IRRIGATION, WATER AND LANDSCAPE WORKS FOR AREA 1- SCOPE IRRIGATION AND WATER NETWORK AREA 1
SHARJAH AIRPORT INTERNATIONAL FREEZONE
MAUNSELL CONSULTANCY Utilities 16.62 29-Jan-05 29-Jun-05
SH 121 R403 AL FALAJ AREA ROADS SHARJAH MUNICIPALITY HALCROW INTERNATIONAL PARTNERSHIP
Road Works 32.43 13-Oct-04 12-Aug-05
SH 119 AL SUBAIKHA AREA - FOUL DRAINAGE SHARJAH MUNICIPALITY HALCROW INTERNATIONAL PARTNERSHIP
Utilities 25.12 6-Sep-04 6-Sep-05
SH 118 CAR RACE TRACK HH SHEIK MARWAN BIN RASHID AL MUALLA, CHAIRMAN OF LAND DEPT, CAR RACE CLUB
NIL Road Works 1.65 17-Jul-04 17-Aug-04
SH 117 A- SUPPLY/INSTALLATION SEWAGE & WATER PIPES FOR AREA 42 / B- SUPPLY/INSTALLATION DRAINAGE & IRRIGATION WORKS-PHASE 1
SAIF ZONE ENGINEERING DEPT
NIL Utilities 3.61 1-May-04 14-Aug-04
Page 39 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
SH 116 CONTRACT R404 AL JAZZAT AREA ROADS SHARJAH MUNICIPALITY HALCROW INTERNATIONAL PARTNERSHIP
Road Works 46.45 26-May-04 26-May-05
SH 115 CONTRCT R 416 - EARTHWORKS AT DHAID ROAD
DIRECTORATE OF PUBLIC WORKS - SHARJAH
HALCROW INTERNATIONAL PARTNERSHIP
Bulk Earthworks / Grading
0.61 17-Feb-04 17-Apr-04
SH 114
CONTRACT R 132 - AL NAHDA LINK ROAD TO JUNCTION 8 E
DIRECTORATE OF PUBLIC WORKS - SHARJAH
HALCROW INTERNATIONAL PARTNERSHIP
Road Works
154.13
4-Mar-04
23-May-05
SH 113 CONSTRUCTION OF ROADS IN AREA A2 AT SAIF ZONE
SAIF ZONE ENGINEERING DEPT
SAIF ZONE Road Works 4.43 1-Mar-04 31-May-04
SH 112 SHARJAH SHOOTING CLUB SHEIKH ABDULLAH AL THANI
GODWIN AUSTEN JOHNSON - AL KHATIB CRACKNELL
Road Works 1.93 1-Jul-03 31-Mar-04
SH 111 CONSTRUCTION OF 10 KILOMETER ROADS IN NEW SAIF -ZONE EXTENSION AREA
SHARJAH AIRPORT INTERNATIONAL FREEZONE
HORIZON CONSULTING ENGINEERS
Road Works 9.14 27-Jul-03 1-Jun-03
SH 110 CONTRACT R 249 KHORFAKKAN POWER STATION ROAD UPGRADING
DIRECTORATE OF PUBLIC WORKS - SHARJAH
HALCROW INTERNATIONAL PARTNERSHIP
Road Works 13.70 17-Jun-03 17-Jun-03
SH 109 INDUSTRIAL AREA 18 - INFRASTRUCTURE DEVELOPMENT
AL NOUF REAL ESTATE KHATIB & ALAMI Infrastructure 35.28 1-Jun-03 1-Apr-03
SH 108 SHARJAH INSTITUTE OF TECHNOLOGY - INFRASTRUCTURE WORKS FOR MALE CAMPUS
DIRECTORATE OF PUBLIC WORKS - SHARJAH
HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure 5.16 3-Nov-02 21-Dec-02
SH 107 SHARJAH INSTITUTE OF TECHNOLOGY - INFRASTRUCTURE WORKS FOR NURSING COLLEGE
SHARJAH ELECTRICITY & WATER AUTHORITY
HALCROW INTERNATIONAL PARTNERSHIP
Infrastructure 4.32 3-Nov-02 21-Dec-02
SH 106 KALBA LAGOON - EARTH WORKS/EDGE WALL
DIRECTORATE OF PUBLIC WORKS - SHARJAH
HALCROW INTERNATIONAL PARTNERSHIP
Bulk Earthworks / Grading
5.41 14-Aug-02 12-Mar-03
SH 105 CONSTRUCTION OF PERIMETER ROADS OF 6 KMS SHARJAH AIRCRAFT PARKING
SHARJAH AIRPORT AUTHORITY
N/A Road Works 1.55 27-Feb-02 27-Jun-02
SH 105 CONSTRUCTION OF PERIMETER ROADS OF 6 KMS SHARJAH (1 LPO) / AIRCRAFT PARKING (2 LPOs)
SHARJAH AIRPORT AUTHORITY
N/A Road Works 1.54 27-Feb-02 25-May-02
SH 104 SHARJAH INSTITUTE OF TECHNOLOGY- ADVANCED EARTHWORKS
RULER’S OFFICE HALCROW INTERNATIONAL PARTNERSHIP
Bulk Earthworks / Grading
2.33 13-Feb-02 3-Jun-02
SH 103 FREIGHT TERMINAL MAIN GATE ROAD WORKS
SHARJAH AIRPORT AUTHORITY
HORIZON CONSULTING ENGINEERS
Road Works 0.71 13-Jan-02 15-Mar-02
SH 102 (EM 506)
EXTERNAL WORKS CONTRACT FOR SHARJAH WORLD TRADE & EXPO CENTRE
DIRECTORATE OF PUBLIC WORKS - SHARJAH
CANSULT LTD. Road Works 11.40 30-Sep-01 20-Apr-02
SH 101 R 234 ROADS IN INDUSTRIAL AREA 1 TO 6 SHARJAH MUNICIPALITY HALCROW INTERNATIONAL PARTNER SHIP
Road Works 41.58 8-Aug-01 16-Nov-02
Page 40 Ref: WAME/gc/16
HILAL BIL BADI & PARTNERS CONTRACTING COMPANY WLL
Category Total Value (DHS MN)
Bridges & Underpasses 3 221.25
Building 5 564.03
Bulk Earthworks / Grading 10 272.01
Infrastructure 18 2,757.31
Marine Works 3 224.84
Misc. 10 154.57
Road Works 17 648.07
Utilities 8 889.04
Roads & Infrastructure 8 1,203.31
Grand Total 73 6,934.43
Bridges & Underpasses, 3
Building, 5
Bulk Earthworks / Grading, 10
Infrastructure, 18 Marine Works, 3
Misc, 10
Road Works, 17
Utilities, 8 Roads & Infrastructure, 8
Note: Project details are for the Hilalco projects (completed and ongoing) commencing October 2002.
Page 41 Ref: WAME/gc/16
List of Ongoing Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 535
U.A.E. NUCLEAR POWER PLANT PROJECT (UNPP) - PAVEMENT WORK FOR CP-12 AREA
HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.
AND SAMSUNG C&T CORPORATION
CONSTRUCTION J.V. (HSJV)
HSJV Road Works 12.22 18-APR-16 31-OCT-17
AD 534
PHASE 1 UTILITY WORKS FOR TAWAZUN INDUSTRIAL PARK IN AL AJBAN, ABU DHABI RFP: TIP/PED2085/CPD/ADZ/15
TAWAZUN INDUSTRIAL PARK (TIP)
PARSONS INTERNATIONAL LTD
Utilities 64.85 03-APR-16 02-APR-17
AD 533
MRHE-22 HTA: INFRASTRUCTURE WORKS FOR 346 VILLAS AT MAKAN, HATTA, U.A.E.
MOHAMMED BIN RASHID HOUSING EST.
Jouzy Consulting Engineers
Infrastructure Works 113.97 24-Mar-16 21-Feb-17
AD 532
INTERNAL ROADS AND INFRASTRUCTURE FOR THE NEW RESIDENTIAL LANDS IN AL MAQTAA CHANNEL IN ABU DHABI
ABU DHABI CITY MUNICIPALITY
AECOM Road & Infrastructure 112.41 13-Mar-16 03-Sep-17
AD 531
CONTRACT NO. 6103-203 LANDSIDE CONSTRUCTION WORKS FOR THE NEW DELMA COMMERCIAL PORT
ABU DHABI PORTS COMPANY (ADPC)
HSJV Infrastructure & Building Works
69.89 30-Dec-15 29-Dec-16
AD 530
YAS ISLAND DEVELOPMENT WEST YAS PAVEMENT CONSTRUCTION
NATIONAL WHEEL J&P LLC
Kellogg Brown & Root Services (KBR)
Pavement Works 9.80 01-Jan-16 31-Mar-16
AD 529
ASPHALT WORKS FOR ZIRKU AIRPORT RUNWAY EXTENSION AT ZIRKU ISLAND
ABU DHABI MARINE OPERATING COMPANY (ADMA OPCO) / ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S.A.
Archirodon Construction (Overseas) Co. S.A.
Road Works 2.79 TBA TBA
AD 528
P042 SIR BANI YAS ISLAND, PACKAGE: C64 DESIGN AND CONSTRU-CTION OF COASTAL PROTECTION MAIN WORKS, NORTH BEACH AND NORTH MARINA.
TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)
Worley Parsons Engineering Pvt Ltd
Marine Works 209.87 23-Jul-15 23-Oct-16
AD 527
BARAKAH NUCLEAR POWER PLANT (BNPP), U.A.E. STEEL STRUCTURAL WORKS
HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD. AND SAMSUNG C&T CORPORATION CONSTRUCTION J.V. (HSJV)
HSJV Structural Works 12.23 01-Jun-15 31-Jan 17
AD 521
ROAD, INFRASTRUCTURE AND PUBLIC REALM FOR SECTOR E-25 - PHASE 1
Abu Dhabi City Municipality AECOM / Hyder Consulting
Road and Infrastructure Works
69.99 TBA TBA
AD 520
SB-02 SAADIYAT BEACH VILLAS INFRASTRUCTURE WORKS - CONTRACT NO.P137-C01.
Tourism Development & Investment Company
Parsons International Ltd
Infrastructure Works 19.40 07-Sep-14 04-Jul-15
AD 517
BARAKAH NUCLEAR POWER PLANT/UAE CIRCULATING WATER INTAKE/DISCHARGE CONDUITS WITHIN THE FOOTPRINTS OF UNITS 3 & 4.
Hyundai Engineering & Construction Co. Ltd. and Samsung C&T Corporation Construction J.V. (HSJV)
HSJV Utilities 270.24 07-Feb-14 30-Sep-16
AD 516
WORLD DESSERT The Zoo & Aquaruim Public Institution in Al Ain
Hyder Consulting Middle East
Buildings, Infrastructure and
Utility works 251.49 01-April-14 30-June-15
Page 42 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 515
MR. HILAL AL BADI'S HOUSE IN ABU DHABI Mr. Hilal Al Badi Al Dhaheri Parsons International Ltd
Buildings, Infrastructure and
Utility works 35.00 01-Oct-14 01-Oct-17
AD 513
UPGRADE INFRASTRUCTURE AT AL QUOA, WADI AL FLAIE AND AL HAYER AREAS IN AL AIN
Abu Dhabi Sewerage Services Company (ADSSC)
Parsons International Ltd
Infrastructure 119.89 02-Feb-14 02-Feb-16
AD 511
BANIYAS RESIDENTIAL DEVELOPMENT (411 VILLAS) ROAD AND UTILITIES INFRASTRUCTURE WORKS
Engineers Office KEO International Consultants
Road and Utilities Infrastructure
205.59 13-Oct-13 12-Jan-15
AD 509
FRAMEWORK CONTRACT FOR GENERAL CONSTRUCTION WORKS BASED ON TASK ORDERS
Abu Dhabi Ports Company ADPC General Miscellaneous Construction
1.00 to 20.00
1-Jul-14 1-Jul-18
AD 507
BARAKAH NUCLEAR POWER PLANT / U.A.E. - CIRCULATING WATER INTAKE STRUCTURE UNITS 1 TO 4
Hyundai Engineering & Construction Co. Ltd.
Construct Reinforced Concrete
219.906 4-May-13 3-Feb-17
AD 505
SOUTH AIRFIELD DEVELOPMENT AND REHABILITATION CONSTRUCTION - PACKAGE 2
Abu Dhabi Airports Company (ADAC)
Jacobs International Holdings Inc
Taxiways, Roads and Fencing
536.00 23-Jul-13 14-Jan-15
AD 501
AL AIN WILDLIFE PARK AND RESORT - SITE WIDE INFRASTRUCTURE PHASE 1
Al Ain Zoo & Aquarium Public Institution
Hyder Consulting ME
Design & Build 55.00 22-May-12 2014
AD 492
BRAKA NUCLEAR POWER PLANT PROJECT RETAINING WALL & UCT WORKS
Hyundai Engineering & Construction Co Ltd
Hyundai Utilities 45.55 7-Nov-11 2014
Page 43 Ref: WAME/gc/16
List of Completed Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT
AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 526
AL DHAFRA AIRBASE DEMOLITION AND RECONSTRUCTION OF EXISTING RUNWAY - CONTRACT NO. CMW-12023-B001
U.A.E. ARMED FORCES COMMAND OF MILITARY WORKS
Infrastructure 69.96 TBA TBA
AD 525
PROTECTION OF AIRPORT RUNWAY AGAINST SEA EROSION IN DELMA ISLAND, WESTERN REGION
DEPARTMENT OF MUNICIPAL AFFAIRS WESTERN REGION MUNICIPALITY
CMW Marine Works 19.73
28-Mar-15 15-Sep-15
AD 524-
A
MISCELLANEOUS WORKS AT SAADIYAT BEACH RESIDENTIAL INFRASTRUCTURE (SB12 TO SB18) - CONTRACT P088 C03 - PURCHASE ORDER P-1009278
Tourism Development & Investment Company (TDIC)
Parsons International Ltd
Road and Infrastructure Works
0.50 18-Jan-15 18-Mar-15
AD 523
DESIGN & BUILD OF CODE C PARKING LAYOVER AT ABU DHABI NTERNATIONAL AIRPORT - CONTRACT NO. ADAC 034 2014
TDIC Parsons International Ltd
Design & Build 5.99 17-Sep-14 05-Nov-14
AD 522
HILALCO NEW OFFICE, LIWA TOWER, ABU DHABI
HILALCO HILALCO Internal Fit Out Works 2.00 03-Aug-14 03-Nov-14
AD 519
BARAKAH NUCLEAR POWER PLANT/UAE PAVEMENT WORK FOR HEAVY EQUIPMENT ROAD - SUBCONTRACT NO. C-057.
Hyundai Engineering & Construction Co. Ltd. and Samsung C&T Corporation Construction J.V.
HSJV Road Works and
Utilities 8.76 15-Jul-14 30-Apr-15
AD 518
SERVICE ROAD AT SWEIHAN AIRBASE Command of Military Works / Al Sahraa General Transport & Clearance
Al Sahraa General Transport Clearance
Road Works 1.15 13-Jul-14 12-Aug-14
AD 514
TEMPORARY ACCESS ROAD QASR AL SARAB AREA, EARTH AND ROAD WORKS
Tourism Development & Investment Company (TDIC)
TDIC Earth and Road works
4.05 05-Feb-14 20-Feb-14
AD 512
DESIGN, SUPPLY AND INSTALLATION OF STORM WATER NETWORK UPGRADE AROUND TRANSFER BAGGAGE FACILITY BUILDING AT ABU DHABI INTERNATIONAL AIRPORT CONTRACT NO. ADAC/045/2013
Abu Dhabi Airports Company ADAC Storm Water Network 534.70 12-Feb-14 12-April-14
AD 510
THE EXPANSION OF ADIA, CAPACITY ENHANCEMENT PROGRAM. CONTRACT AUH.06.11.0436 SOUTH SIDE PERIMETER SECURITY GATES & PARKING ENHANCEMENT CONSTRUCTION WORKS
Abu Dhabi Airports Company (ADAC)
Dorsch Consult Construction works for Gates & Parking
39.228 03-Sep-13 02-Apr-14
AD 508
EARTH WORKS AND ROAD WORKS. PROJECT: 10019 SWEIHAN AIR BASE
CMW/Kier Construction LLC WS Atkins and Partners Overseas
Earthworks and Road works
32.861 15-Sep-13 15-Feb-14
AD 506
SIR BANI YAS ISLAND CENTRAL DEVELOPMENT ZONE - LOOPING AND SEPARATION OF IRRIGATION RING MAIN
Tourism Development & Investment Company (TDIC)
Parsons International Ltd
Looping and Separation of Irrigation Ring Main
18-Jun-13
12-Feb-14
AD 504
REINSTATEMENT OF ROADS AROUND GLENELG SCHOOLS AT SAS AL NAKHIL, PROJECT NO. 7003 - AGREEMENT NO. 147003C1
Abu Dhabi National Oil Company (ADNOC)
ADNOC
Road Works 29.64 29-Oct-12 2013
Page 44 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT
AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 503
ROAD WORKS ALONG MUROOR ROAD
Al Habtoor Leighton LLC To be Advised
Road Works 0.68 26-Sep-12 2012
AD 502
PAVEMENT WORKS FOR SWEIHAN AIR BASE Alsahraa General Transport & Maintenance (ASG)
ASG Pavement works 81.91 1-Sep-12 2013
AD 500
SAADIYAT BEACH VILLAS PHASE 1, ROADS AND MISCELLANEOUS WORKS PACKAGE
Tourism Development & Investment Co. (TDIC)
Parsons International Ltd
Roads & Misc. works package
12.66 8-May-12 2012
AD 499
ERMINAL 3 (T3) EARLY SITE WORKS CONSTRUCTION, CONTRACT NO. AUH.06.12.0455
Abu Dhabi Airports Company (ADAC)
Ghafari Associates LLC
Road, Utilities etc. 17.62 1-Aug-12 2012
AD 498
SHEIKH ZAYED DESERT LEARNING CENTRE AND U.A.E. WORLD DESERT GRADING AND RAMP & TUNNEL ACCESS WORKS
Ed Zublin AG Chalabi Architekten & Partners (CAP)
Road and Utilities 43.40 6-May-12 2013
AD 497
P132 - SAADIYAT BEACH ACCESS, CIVIL AND LANDSCAPE WORKS
Tourism Development & Investment Company
Parsons International Ltd
Design & Build Civil & Landscape Works
9.00 12-Mar-12 2012
AD 496
GRANDSTAND TEMPORARY MARKING AND LANDSCAPING WORKS
Abu Dhabi National Exhibition Company (ADNEC)
ADNEC Landscaping 1.45 7-Jan-12 2012
AD 495
ABU DHABI BREAKWATER DEVELOPMENT ROADS AND INFRASTRUCTURE WORKS
National Investment Corporation
Parsons International Ltd
Roads and Infrastructure
73.01 03-Jan-12 2013
AD 494
RUWAIS HOUSING COMPLEX EXPANSION PHASE III EXTERNAL INFRASTRUCTURE WORKS FOR PACKAGES 10 & 12 PROJECT NO. 6056
Abu Dhabi National Oil Company (ADNOC)
ADNOC Infrastructure 68.42 14-Dec-11 2013
AD 493
KHALIFA PORT AND INDUSTRIAL ZONE (KPIZ) PROJECT - INDUSTRIAL ZONE AREA A - SECONDARY INFRASTRUCTURE PHASE 1 PACKAGE 1
Abu Dhabi Ports Company (ADPC)
International Bechtel Co. Ltd
Infrastructure 285.47 17-Oct-11 2013
AD 491
HODARIYAT BRIDGE - PAVEMENT & UTILITY WORKS
Overseas Ast - VSL Middle East JV
Parsons International Ltd
Road and Utility Works
12.91 1-Aug-11 2011
AD 490
NWDZ & SAVANNAH LODGE SEWER SYSTEM AND REED BED TREATMENT PLANTS (STP 02 & STP-04, CONTRACT NO. P042-C044
Tourism Development & Investment Company (TDIC)
Parsons International Ltd
Utilities 16.26 3-Apr-11 2011
AD 489
AL RUWAIS REFINERY EXPANSION PROJECT - ASPHALT PAVING WORKS
Samsung Engg/Bin Asheer Transport & Gen Contr. Est
Bin Asheer Road works 7.80 28-Nov-10 2011
AD 488B
EASTERN MAJLIS REHABILATION WORKS-CONTRACT NO. P042-C46
Tourism Development & Investment Company (TDIC)
TDIC Utilities 0.50 3-Apr-11 2011
AD 488A
SIR BANI YAS ISLAND PRIORITY PROJECTS EQUESTRIAN CENTRE AND SAVANNAH LODGE WATER CONNECTIONS
Tourism Development & Investment Company (Tdic)
Parsons International Ltd.
Utilities 3.46 24-Oct-10 2011
AD 487C
P030 ZAYED NATIONAL MUSEUM PACKAGE C06: CONSTRUCTION OF REMOTE SERVICE FACILITY AND MAIN BUILDING SUBSTRUCTURE WORKS.
Al Habtoor-Murray & Roberts WSP Utilities 5.00 20-Jan-11 2011
Page 45 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT
AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 487B
BARRIERS INSTALLATION WORK IN ADCOP PROJECT (MP 21 – KP280)
Abu Dhabi Crude Oil Pipeline/China Petroleum Engineering Construction Corporation
ILF Consulting Engineers
Utilities 1.62 1-Dec-10 2011
AD 487A
EASTERN MANGROVE PROJECT EXTERNAL SERVICE CONNECTION INCLUDING HDPE PIPELINE WITH FIRE HYDRANT
Brookfield Multiflex Hyder Consulting Middle East LTD
Infrastructure 4.20 1-Nov-10 2011
AD 486
MWD - MOTOR WORLD DEVELOPMENT PROJECT INFRASTRUCTURE WORKS PHASE 1
Aldar Properties PJSC RMJM / AECOM Infrastructure 64.00 9-Aug-10 2011
AD 485
DESIGN AND BUILD CONTRACT OF MAIN ENTRY, PARKING, LINEAR PARK PERIPHERY THEMED RETAINING WALL
Zoo & Aquarium Public Institution
Designer: Hyder Consulting
Infrastructure 159.00 7-Jun-10 2013
AD 484
IMPROVEMENT,DEVELOPMENT,UPGRADING AND MAINTENANCE OF INFRASTRUCTURE FACILITIES INCLUDING MINHAJ AND STRATEGIC PROJECTS - LIWA CITY EAST
Western Region Municipality Euroestudios Infrastructure 94.8 30-May-10 2011
AD 483
PACKAGE 1, INFRASTRUCTURE WORKS FOR RIHAN HEIGHTS AT ZAYED SPORTS CITY, SECTOR W-57, ABU DHABI
Mubadala Capital and Real State LLC
WS Atkins & Partners Overseas
Infrastructure 27.80 1-May-10 2011
AD 482
EXPANSION OF ABU DHABI INTERNATIONAL AIRPORT CONTRACT NO. CT294/ADAC092-MUBADALA STRATA INFRASTRUCTURE PHASE 1 FOR AL AIN INTERNATIONAL AIRPORT
Supervision committee for the expansion of the Abu Dhabi International Airport (SCADIA)
Mouchel Middle East Ltd
Roads & Infrastructure
49.00 20-Mar-10 2010
AD 481
AL FALAH COMMUNITY DEVELOPMENT INFRASTRUCTURE WORKS VILLAGE 1
ALDAR Properties Flour Mideast Ltd Infrastructure 418.478 01-Mar-10 2012
AD 480
MISCELLANEOUS WORKS AT SIR BANIYAS ISLAND
Tourism Development Investments Company (TDIC) Anantara
Tourism Development Investments Company (TDIC) Anantara
Misc. 7.00 27-Sep-09 2010
AD 480D
SIR BANIYAS ISLAND PRIORITY PROJECTS ENABLING WORKS CONTRACT
Tourism Development Investments Company (TDIC) Anantara
Turner & Townsend International Ltd.
Infrastructure 26.084 24-Feb-10 2010
AD 479
WIDENING OF EASTERN CORNICHE ROAD CONTRACT NO.4
Department of Municipal Affairs - Municipality of Abu Dhabi city
Parsons International Ltd.
Road Works
67.55
6-Jul-09
2010
AD 478
EXPANSION OF ABU DHABI INTERNATIONAL AIRPORT T1 - T3 BUSINESS PARK GRADING, ROADS & INFRASTRUCTURE CONTRACT NO. WBS: 1,13,1.2
Supervision Committee for the Expansion of the Abu Dhabi International Airport (SCADIA)
Stanley Consultants INC.
Roads & Infrastructure
159.83
25-Jun-09
2010
AD 477
CONTRACT NO. P-088 - WORKS PACKAGE 003 SAADIYAT BEACH RESIDENTIAL INFRASTRUCTURE (SB 12 THROUGH SB 18) AND EDGE PROTECTION WORKS (SB 18, 20,21 & 22)
Tourism Development & Investment Company (TDIC)
Parsons International Ltd.
Infrastructure
205.80
14-Jun-09
2010
Page 46 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT
AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 476
KHALIFA PORT AND INDUSTRIAL ZONE (KPIZ) PROJECT CONTRACT NO. 1001-250 TAWEELAH ROAD DUALLING
Abu Dhabi Ports Company (ADPC)
Abu Dhabi Ports Company (ADPC)
Road Works
68.14
31-May-09
2010
AD 475
INFRASTRUCTURE WORKS – HYDRA VILLAGE (AL REEF VILLAS) ABU DHABI
Pal Technology (Hydra Properties)
National Engineering Bureau
Infrastructure 355.00 20-Jun-09 2011
AD 474
PARK ROTANA MIXED USE DEVELOPMENT, ABU DHABI SECTOR E- 48, PLOT NO. 367 EXTERNAL DRAINAGE WORKS
TERNA S.A.
-
Infrastructure
3.60
18-Apr-09
2009
AD 473A
MARINE WORKS: DELMA JETTY CONSTRUCTION
Department of Municipal Affairs Western Region Municipality
Eurostudios
Infrastructure 35.50 13-Dec-2009 2011
AD 473
IMPROVEMENT, DEVELOPMENT, UPGRADING AND MAINTENANCE OF INFRASTRUCTURE FACILITIES AND PROJECTS - (SIR BANIYAS - ZONE 7)
Department of Municipal Affairs - Western region municipality
Eurostudios
Infrastructure
235.00
22-Mar-09
2014
AD 472
AL AIN WILDLIFE PARK & RESORT PROJECT DESIGN AND CONSTRUCTION OF SITE
Zoo & Aquarium Public Institution
CH2M Hill
Infrastructure
500.00
9-Mar-09
2011
AD 471
EXPANSION OF THE ABU DHABI INTERNATIONAL AIRPORT - DESIGN AND BUILD APRON AND INCIDENTAL WORKS AT AIR BANI YAS ISLAND AIRPORT - CONTRACT # CT205/ADAC039
Supervision Committee for the Expansion of the Abu Dhabi International Airport (SCADIA)
Stanley Consultants and Halcrow International Partnership
Misc.
32.36
16-Feb-09
2009
AD 470
ADNEC PHASE 5 - IDEX 2009 HIGHWAY CONTRA FLOW WORKS PROVISION OF CONSTRUCTION SERVICES
Abu Dhabi National Exhibition Company (ADNEC)
Hyder Consulting
Road Works
28.38
1-Dec-08
2009
AD 469
POLICE AND CIVIL DEFENCE FACILITY - SIR BANI YAS ISLAND
Tourism Development & Investment Company (TDIC)
Cansult Maunsell
Misc.
6.20
15-Oct-08
2009
AD 465
ADNEC - NEW EXHIBITION FACILITIES - PHASE 2 PACKAGE NO.EX0001-ADNECP2 EXTERNAL ROADWORKS AND RAMP PACKAGE
ADNEC / Mace International Ltd
Mace International Ltd
Bridges & Underpasses
49.99 1-Jul-08 2009
AD 464
PARIS-SORBONNE UNIVERSITY ABUDHABI, AL REEM ISLAND -STRUCTURAL FILL
Al Habtoor Parsons International Ltd.
Bulk Earthworks / Grading
18.00 22-May-08 2008
AD 462
BREAK WATER DEVELOPMENT MARINA VILLAGE - ROADS AND PARKING
ADUC NCIL Road Works 18.00 23-Sep-07 2008
AD 461
P058 - SIR BANIYS HOTEL DEVELOPMENT PACKAGE: C06 - HOTEL REFURBISHMENT: EXTERNAL WORKS
Tourism Development & Investment Company (TDIC)
Bovis Lend Lease Infrastructure 250.00 24-Jun-07 2009
AD 460
P058 - SIR BANI YAS HOTEL DEVELOPMENT PACKAGE: C05 - HOTEL REFURBISHMENT: INTERNAL WORKS
Tourism Development & Investment Company (TDIC)
Bovis Lend Lease Building 30.00 24-Jun-07 2009
AD 459
ADISC RESIDENTIAL, LEISURE & COMMERCIAL COMPOUND ENABLING WORKS
Private Property Management Private Property Management
Bulk Earthworks / Grading
8.40 7-Jul-07 2007
AD 457
TEMPORARY TDIC HEAD OFFICE (KHALIFA PART) SITE WORKS CONTRACT P045-C03
Tourism Development & Investment Company (TDIC)
Tourism Development & Investment Company (TDIC)
Misc. 5.70 6-Mar-07 2007
Page 47 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT
AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 456
ETIHAD INTERIM TERMINAL ABU DHABI INT'L AIRPORT EARTH WORKS & ROAD WORKS
Al Habtoor WS Atkins Road Works 35.00 4-Nov-06 2008
AD 455
ABU DHABI GOLF CLUB LANDSCAPING & ROAD WORKS
Tourism Development & Investment Company (TDIC)
Frederic R. Harris Inc. Infrastructure 5.25 21-Oct-06 2007
AD 453
ADWEA CONTRACT NO. 2257 INTERCONNECTION OF ADCO/ TRANSCO POWER NETWORKS LOT 2 OVERHEAD LINES 400 KV AND 220 KV OVERHEAD TRANSMISSION LINES ACCESS ROAD/ PLATFORM WORKS
ADWEA/KEC International Limited
Lahmeyer International
Bulk Earthworks / Grading
9.65 4-Dec-04 2005
AD 452
AL WATHBA CAMEL RACE TRACK Crown Prince (Pvt) Management
WS Atkins Road Works 26.49 11-Jul-04 2005
AD 451
JETTY UPGRADE - JEBEL DHANNA CONTRACT NO. 6115.01/EC 10549
Abu Dhabi Company For Onshore Oil Operation (ADCO)
ADCO Marine Works 14.97 7-Feb-04 2004
AD 450
BU HASA INFRASTRUCTURE UPGRADE ASPHALT ROAD WORKS Al Habtoor Engineering (HEE) ADCO Road Works 1.43 13-Mar-04 2004
AD 449
ADWEA CONTRACT NO. G1046 400 KV OVER HEAD LINE FROM E48 TO MUSSAFAH
ADWEA/KEC International Limited
PB Power Limited
Road Works
7.36
8-May-04
2004
AD 448
CONFERENCE PALACE HOTEL EXTERNAL WORKS PACKAGE BP 14A & B
Arabian Construction Company
Turner Construction International
Infrastructure 37.19 16-Jun-03 2004
AD 447
URGENT WATER WORKS FOR ABU DHABI ISLAND
Abu Dhabi Distribution Company (ADDC)
ADDC Utilities 1.54 8-Jun-03 2004
AD 446
CONSTRUCTION OF NEAD PHASE-1, DEVELOPMENT - INFRASTRUCTURE PACKAGE
Abu Dhabi Company For Onshore Oil Operation (ADCO)
Hyder Consulting Infrastructure 121.13 1-Feb-03 2004
AD 445
CONSTRUCTION OF BRIDGES AT OFFICERS CITY AND BETWEEN TWO BRIDGES CITY CONTRACT NO. 999
Abu Dhabi Municipality
Frederic R. Harris Inc.
Bridges & Underpasses
53.05
23-Nov-02
2004
AD 444
SITE PREPARATION FOR ULG-LSGO PLANT AT RUWAIS
Granite/Technip- Colflexip Mace International Ltd
Bulk Earthworks / Grading
7.70 15-Nov-02 2003
AD 443
AMIRI FLIGHT PACKAGE 1 - ADVANCE EARTH WORKS
Amiri Flight Halcrow International Bulk Earthworks / Grading
11.30 7-Oct-02 2003
AD 441
SHUWEIHAT WATER TRANSMISSION SCHEME LOT B - MIRFA TO MUSSAFAH
Teisai/Adwea Tebodin Bulk Earthworks / Grading
137.60 1-Nov-02 2004
AD 440
IMPROVEMENTS TO CLOCK TOWER ROUNDABOUT
Al Ain Municipality Scott Wilson Kilpatrick & Co. Ltd.
Road Works 28.50 17-Sep-02 2003
AD 439
SHUWEIHAT WATER TRANSMISSION SCHEME TEMPORARY FACILITIES FOR LOT A,B,C & D
Marubeni/Teisei Corporation Taisei Corporation Utilities 6.26 21-Aug-02 2003
AD 438
TRIP PROJECT NO. 997 EAST ROAD WIDENING IP 43A TO IP145
Abu Dhabi Municipality De Leuw Cather International
Road Works 43.05 16-Sep-02 2002
AD 437
WATER SUPPLY TO CONFERENCE PALACE HOTEL CONTRACT D - 1599
Abu Dhabi Distribution Company (ADDC)
ADDC Utilities 1.99 30-Jun-02 2003
AD 436
AL RAHA BEACH RESORT - ABU DHABI MARINE WORKS
Al Habtoor For Private Department
DMJM/Test Utilities 20.00 18-Jun-02 2003
Page 48 Ref: WAME/gc/16
OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT
AMOUNT (DHS MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
AD 435
FILLING AT AL DHAFRA AIR BASE ZONE 1 B CONTRACT MW-241-2001
Directorate Of Military Works Stanley Consultants Inc.
Bulk Earthworks / Grading
29.95 6-May-02 2002
AD 430
MISCELLANEOUS FILLING WORKS Works Department DIWI consult Bulk Earthworks / Grading
12.00 22-Jun-02 2003
AD 429
THIRD BRIDGE CROSSING FOR ABU DHABI ISLAND CONTRACT 2
Works Department Rendel Palmer & Tritton
Bridges & Underpasses
107.20 19-Jan-02 2005
AD 428
INCREASED DIGESTER CAPACITY MAFTAQ WTW CONTRACT NO. 512/2
Abu Dhabi Municipality Sewerage Projects Committee
Parsons International Ltd.
Misc. 18.29 01-Aug-02 2004
802 WORKSHOP AT MAFRAQ Building 2.75 1-May-02 -
Page 49 Ref: WAME/gc/16
GULF CONSOLIDATED CONTRACTORS LLC
Category Total Value (QAR MN)
Bridges & Underpasses 1 160.75
Bulk Earthworks / Grading 4 141.16
Infrastructure 7 1,102.26
Misc 1 27.16
Road Works 10 1,833.08
Utilities 4 545.72
Grand Total 27 3,810.13
Bridges & Underpasses, 1
Bulk Earthworks / Grading, 4
Infrastructure, 7
Misc, 1
Road Works, 10
Utilities, 4
Page 50 Ref: WAME/gc/16
List of Ongoing Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT
(MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION DATE
QR 733
MAINTENANCE OF TSE NETWORK FRAME WORK
ASHGHAL Nil Maintenance
of TSE Network
TSE Frame Contract
31-May-15
28-May-20
QR 732
MRPSC/023/2014-2015/L ROADS AND INFRASTRUCTURE IN DOHA INDUSTRIAL AREA (PACKAGE 2), PROJECT ID:IA 13/14 C 067 ST WORK ORDER No. QS001-P02
PUBLIC WORKS AUTHORITY - ASHGHAL
Programme Management -
Parsons Brinckerhoff,
General Engineering - Dar Al Handasah (Design)
& AECOM (Supervision)
Roads & Infrastructure
1.23 B TBA TBA
QR 731
DESIGN & CONTRUCT NEW ORBITAL HIGHWAY & TRUCK ROUTE (P023) CONTRACT 1: NEW DOHA PORT TO ORBITAL HIGHWAY
JOANNOU & PARASKEVAID ES LTD. (J&P)
Road Works 40.00 27-Apr-15 28-Jun-15
QR 730
MRPSC/020/2012-2013/L ROAD AND INFRASTRUCTURE FOR COMMERCIAL STREET IN AL KHOR AREA - IA/13-14/C 02 ST
PUBLIC WORKS AUTHORITY (ASHGHAL)
KHATIB & ALAMI / WSP
Roads & Infrastructure
Works 245.00 14-Jan-14 27-Jul-15
QR 721
CONSTRUCTION OF ROADS UTILITY CROSSING AND STREET LIGHTING IN THE INDUSTRIAL AREA-MESAIEED (PACKAGE 6) GC09100600
QATAR PETROLEUM
To be appointed Infrastructure 604.5 20-Dec-09 11-Nov-15
Page 51 Ref: WAME/gc/16
List of Completed Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT
(MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
QR729 ER-112124 MIXING OF RECLAIMED MATERIALS AND FILLING WORKS
QATAR FERTILISER COMPANY (QAFCO)
To be Appointed
Mixing Of Reclaimed
Materials & Filling Works
9.90 12-Jun-13 2013
QR 727
PWA/GTC/063/2010-2011 CONSTRUCTION OF DOHA AND RAYYAN SEWERAGE IMPROVEMENTS TO EXISTING TSE NETWORK CP731, PROJECT CODE: IA 10-11 C 002 G
PUBLIC WORKS AUTHORITY
(ASHGHAL) To be Appointed Utilities 46.51 15-Mar-12 2013
QR 725
GC11101500 ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) FOR DUKHAN COASTAL FACILITIES ACCESS ROAD
QATAR PETROLEUM
To be Appointed Road Works 25.65 27-Sep-11 2013
QR 724
EPIC FOR DUAL CARRIAGEWAY FROM RAS LAFFAN AVENUE TO SEALINE AVENUE (SOUTH OF ORYX - GTL) AND HALUL AVENUE EXTENSION
QATAR PETROLEUM
To be Appointed Earthworks, Road Works, Utilities & Electrical Works
112.96 25-Sep-11 2013
QR 723 GC11103600 EPIC FOR TEMPORARY SAFETY ROAD IMPROVEMENTS TO EXISTING SEALINE ROAD IN MESAIEED
QATAR PETROLEUM
To be Appointed Road Works 73.781 23-Jul-11 2012
QR 720
GT 08115900 EPIC FOR NEW SOUTH SIDE ROAD AND GRADING OF CORIDOR AT RAS LAFFAN INDUSTRIAL CITY. CONTRACT NO. GT 08115900
QATAR PETROLEUM
To be appointed Infrastructure 148.0 29-Oct-09 2011
QR 718
QATALUM PROJECTS SERVICE AREAS AND POTROOM BUILDING CONTRACT NO. 1010060
SNC- Lavalin International Inc
NIL Infrastructure 102.4
13-Aug-09 15-Sep-10
QR 717
EARTHWORKS AND CIVIL WORKS AT AQUA PARK SALWA ROAD
Aqua Masters Associated Consulting Engineers (ACE)
Earthworks/ Civil Works
1.8 01-Jan-09 30-Apr-09
QR 716
CONSTRUCTION OF LAY DOWN AREA FOR TRUCKS AT QATALUM PROJECT
Qatalum NIL Bulk Earthworks / Grading
1.0 17-Jun-09 20-Sep-09
QR 715
QATALUM PROJECT SERVICE AREA AND POTROOM BLDG TENDER NO. 5532165-C037, QASCO CHANNEL ENLARGEMENT- CONTRACT NO. 101037
SNC –Lavalin International Inc.
Qatalum Infrastructure 25.70 02-Jan-09 30-Apr-09
QR 714 GC07107100 EPIC OF VEHICLE LAYBYS AND ROAD UPGRADE OF POINT 'N' POINT 'U' UMMBAB ROAD IN DUKHAN FIELDS
Qatar Petroleum Qatar Petroleum Road Works 35.33 28-Sep-08 27-Sep-09
QR 713 C 039.1 EXCAVATION AND CONCRETE WORKS FOR MISC BUILDINGS AT QATALUM PROJECT
Snc Lavlin International
Qatalum Misc. 27.16 5-Aug-08 22-Feb-09
QR 712 CONSTRUCTION OF ROADS AND LANDSCAPING IN DUKHAN FIELDS
Qatar Petroleum Qatar Petroleum Road Works 81.46 10-Dec-07 2009
QR 711 ASPHALT LAYING WORKS Al Huda Engineering Works
Road Works 17.69 5-Nov-07 28-Feb-08
Page 52 Ref: WAME/gc/16
QR 710 D05P1 AL WUKAIR WAREHOUSES FOR GULF WAREHOUSING COMPANY
Gulf Warehousing Company
Al Fereej Consultancy & Design
Bulk Earthworks / Grading
25.40 1-Jan-07 30-Apr-07
QR 709 GTC 05/275/ED CONSTRUCTION OF ROADS, UTILITY CROSSING AND STREET LIGHTNING IN THE INDUSTRIAL AREA - MESAIEED (PACKAGE 2)
Qatar Petroleum Qatar Petroleum Infrastructure 84.55 18-Apr-06 17-Jun-07
QR 708 GTC 05/253/MIC ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) OF STREET LIGHTING SYSTEM AND VEHICLE CRASH BARRIERS BETWEEN AL WAKRAH AND MESAIEED
Qatar Petroleum Halcrow Utilities 39.31 10-Apr-06 9-Jul-07
QR 707 TEMPORARY CAMP/SITE FACILITIES (PHASE I & II, TSF) FOR CHIYODA - TECHNIP (JV) AT RAS LAFFAN
Qatar Kentz (W.L.L.) Chiyoda Technip Infrastructure 10.73 9-May-05 6-Nov-05
QR 706 CONTRACT NO. GTC 04/214/ED CONSTRUCTION OF ROADS UTILITY CROSSINGS AND STREET LIGHTNING IN THE INDUSTRIAL AREA
Qatar Petroleum Qatar Petroleum Infrastructure 126.38 21-Dec-04 20-Mar-06
QR 705 DESIGN AND CONSTRUCTION OF NEW MAIN WITH APPROACH ROAD AND RECONSTRUCTION OF 3 NOS. SOAKAWAY PITS AT DPS IN THE DUKHAN FIELDS
Qatar Petroleum Qatar Petroleum Road Works 2.18 21-Nov-04 20-May-05
QR 704 QATAR MOTORCYCLE GRAND PRIX RACE TRACK LAYING OF ASPHALT WEARING COURSE
Midmac Contracting Co. Wll
Parsons Road Works 0.66 5-Jun-04 15-Jun-04
QR 702 GTC 166/ED/02 ENGINEERING, PROCUREMENT, INSTALLATION AND CONSTRUCTION OF DUAL CARRIAGEWAY BETWEEN DUKHAN & UMM BAB
Qatar Petroleum DHV (Design Consultant)
Bridges & Underpasses
160.75 1-Oct-02 Feb-05
Page 53 Ref: WAME/gc/16
WADE ADAMS (BAHRAIN) WLL
Category Total Value (Dhs MN)
Bridges & Underpasses 1 24.8
Building 1 10.75
Dredging & Reclamation 1 249
Grand Total 3 284.55
Bridges & Underpasses, 1
Building, 1
Dredging & Reclamation, 1
Note: Project details are for the Wade Adams Bahrain projects commencing October 2003
Page 54 Ref: WAME/gc/16
List of Completed Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT
(MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION
DATE
BA 404 DREDGING, RECLAMATION AND SHORELINE PROTECTION WORKS FOR BANDER SEEF DEVELOPMENT , BUSAYTEEN AND WEST HIDD RECLAMATION
Al Ghanah Contracting Gredeco Ansari Dredging & Reclamation
209.00 20-Mar-04 20-Jun-05
BA 402 RESIDENTIAL BUILDING AT UMM AL HASSAN GF +4+ PENTHOUSE
SATCO Bahrain Engineering Bureau
Building 10.75 28-Jun-03 01-Apr-04
BA 401 WALI AL AHEAD FLYOVER AND ASSOCIATED ROADWORKS
Ministry Of Works And Housing
Cowi Almoayed Gulf
Bridges & Underpass
24.80 05-Oct-02 06-Dec-03
Wade Adams Bahrain, Wali Al Ahed Flyover
Wade Adams Bahrain, Land Reclamation
Page 55 Ref: WAME/gc/16
WADE ADAMS EMIRATES LLC
Category Total Value (Dhs MN)
Road Works 1 74.20
Civil Works 1 1.10
Utilities 3 821.32
Grand Total 5 896.62
Road Works, 1
Civil Works, 1
Utilities, 3
Page 56 Ref: WAME/gc/16
List of Ongoing Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT
(MN)
DATE OF COMMENCEMENT
ORIGINAL COMPLETION DATE
WE 305
CONSTRUCTION OF FIVE (5) MARINE SERVICE STATIONS IN NORTHERN EMIRATES, AGREEMENT NO. EPD14061
ADNOC Distribution ADNOC
Construction of Marine Service Stations
115.72 TBA TBA
WE 304
ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) FOR REPLACEMENT OF CRACKED TANKS IN TEN (10) SERVICE STATIONS IN ABU DHABI & RAS AL KHAIMAH
ADNOC Distribution ADNOC EPC for Cracked Tanks
38.6 02-Jun-14
02-Jun-15
WE 303
INTERNAL ROADS AT VARIOUS LOCATIONS IN AL AIN, STAGE 18, CONTRACT 1
Al Ain City Municipality Jacobs International Road Works 74.12
01-Jun-14
30-Nov-15
List of Completed Projects OUR REF
PROJECT NAME CLIENT CONSULTANT CATEGORY CONTRACT AMOUNT
(MN)
DATE OF COMMENCEMEN
T
ORIGINAL COMPLETION DATE
WE 301
AGREEMENT NO. MD12035 REPLACEMENT OF UNDERGROUND FUEL STORAGE TANKS AT SERVICE STATION AL QUOZE #880
ADNOC DISTRIBUTION
ADNOC CIVIL WORKS 1.1 TBA TBA
WE 302
DESIGN & CONSTRUCTIION OF BOUNDARY WALL FOR WAREHOUSE OPEN YARD AT ABU DHABI INTERNATIONAL AIR PORT
Abu Dhabi Airports Company (ADAC)
ADAC Design & Construction of Boundary Wall
667 TBA TBA
Page 57 Ref: WAME/gc/16
AWARDS AND CERTIFICATES AWARDS
Winner of Best RTA Safety Contractor – Large Scale
Quality Group Membership
Recognition from Ministry of Public Works
In Recognition for Corporate Social Responsibility Initiatives
Page 58 Ref: WAME/gc/16
ISO CERTIFICATES Wade Adams Middle East Limited
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
Page 59 Ref: WAME/gc/16
Wade Adams Contracting LLC
ISO 9001:2008 ISO 14001:2004
OHSAS 18001:2007
Page 60 Ref: WAME/gc/16
Wade Adams Sharjah (LLC)
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
Page 61 Ref: WAME/gc/16
Hilal Bil Badi & Partners Contracting Company WLL
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
Page 62 Ref: WAME/gc/16
Gulf Consolidated Contractors LLC
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
Page 63 Ref: WAME/gc/16
Wade Adams Oman L.L.C. (WAO)
ISO 9001:2008 ISO 14001:2004
OHSAS 18001: 2007
Page 64 Ref: WAME/gc/16
GROUP RESOURCES MANPOWER SUMMARY OF MANPOWER - TABLE
Employees
Number of staff for the years
2009 2010
2011
2012
2013
2014
2015
2016
Administration Staff 357 327 354 413 339 412 466 542
Camp employees/cooks 430 483 489 462 404 382 375 401
Draughting 96 82 76 64 55 71 80 93
Drivers/Operators 1840 1869 1725 1,598 1,480 1599 1684 1718
Engineers 116 118 157 155 125 165 176 192
Foremen 680 670 563 592 562 636 664 667
HSE staff 69 51 49 58 61 70 81 93
Labourers 5049 3922 3362 3,812 3,328 3262 3785 3908
Land Surveying 180 142 129 102 94 109 126 143
Managers / Section Heads 76 59 52 50 35 40 41
52
Mechanics/Workshop staff 421 354 324 317 314 640 378
396
MEP Engineers 39 33 28 33 28 36 41 39
Quantity Surveying 89 92 85 68 55 70 73 95
Tradesmen (Construction)* 2821 2169 2130 2,875 2402 3124 3781 3275
Total 12,263 10,371 10,024 10,599 9,282 10,616 11,751 11,614
* Note: Tradesmen include carpenters, masons, steel fitters, pipe fitters and grade checkers.
Page 65 Ref: WAME/gc/16
Summary of Manpower – Chart
2016
2014
2012
2010
0
500
1000
1500
2000
2500
3000
3500
4000
Page 66 Ref: WAME/gc/16
PLANT, EQUIPMENT AND VEHICLES
0
100
200
300
400
500
600
700
800
900
DEWATERINGEQUIPMENT
ELECTRICALEQUIPMENT
HEAVYEQUIPMENT
HEAVYVEHICLE
LIGHTEQUIPMENT
LIGHT VEHICLE MOBILEEQUIPMENT
PICKUPS STATIONARYPLANT
WORKSHOPTOOLS &
EQUIPMENT
264
383
548 545
889
356
28
435
123
46
Page 67 Ref: WAME/gc/16
LIST OF PLANT, EQUIPMENT AND VEHICLES
Heavy Equipment
Description Quantity
1 SKID LOADER 82
2 BACK HOE LOADERS 71
3 WHEEL LOADER 64
4 CRAWLER EXCAVATOR 61
5 GRADERS 29
6 TELESCOPIC LOADERS 28
7 VIBRATORY ROLLERS 35
8 PNEUMATIC TYRE ROLLERS 34
9 TANDEM ROLLERS 35
10 MOBILE & CRAWLER CRANE 25
11 BULL DOZER 18
12 WHEEL EXCAVATORS 22
13 DUMPER 10
14 PAVER FINISHER 16
15 POWER ROAD SWEEPERS 7
16 CRAWLER DRILL MACHINE 2
17 AERIAL WORKING PLATFORM 2
18 FORK LIFT 3
19 TOWER CRANE 2
20 SCISSOR LIFTING PLATFORM 1
21 MILLING MACHINE 1
22 TRENCHER 1
Page 68 Ref: WAME/gc/16
Heavy Vehicles
Description Quantity
1 SIX WHEEL TRUCK 184
2 WATER TANKER 77
3 TIPPER TRAILER 62
4 HIAB – GRAB/HOOK 58
5 PASSENGER BUS 72
6 TRANSIT MIXER 22
7 CESSPIT TANKER 11
8 DIESEL / BITUMEN TANKER 15
9 FLAT TRAILER 9
10 GREASE TRUCK 12
11 LOW BED TRAILERS 11
12 SPRAY TANKERS 6
13 FOUR WHEEL TRUCK 4
14 CONCRETE PUMP 2
Page 69 Ref: WAME/gc/16
Stationary Plant
Description Quantity
1 STATIC DIESEL TANKER 33
2 STATIC CONTAINER 26
3 FUEL METER PUMP 31
4 WEIGH BRIDGE 11
5 STATIC MC TANKER 6
6 WETMIX PLANT 3
7 ASPHALT PLANT 160 & 240T/HR 5
8 CONCRETE BATCHING PLANT 2
9 BATCHING PLANT ATTACHMENT 3
10 SCREENING PLANT 2
Dewatering Equipment
Description Quantity
1 VACUUM PUMPS 6" 170
2 PRESSURE PUMPS 48
3 BOOSTER PUMPS 35
4 JETTING PUMPS 9
5 DIAPHRAGM PUMPS 1 Mobile Equipment
Description Quantity
1 MOBILE WATER TANKERS 22
2 MOBILE TRAILERS 6
Page 70 Ref: WAME/gc/16
Light Equipment
Description Quantity
1 PLATE COMPACTORS 195
2 CONCRETE VIBRATORS 120
3 HAND ROLLER 78
4 CONSTRUCTION MACHINERIES 67
5 PARTNER CUTTER 44
6 WELDING MACHINES 58
7 MOBILE AIR COMPRESSORS 49
8 STATIC AIR COMPRESSORS 50
9 ASPHALT CUTTERS 19
10 KERBSTONE CUTTER, TILE CUTTER 18
11 STEEL BAR BENDERS 32
12 STEEL BAR CUTTERS 27
13 FUEL METER PUMP 12
14 BEAM VIBRATOR 1
15 SAND BLASTING MACHINES 11
16 CONCRETE MIXERS 23
17 GUARD RAIL MACHINE 3
18 POWER TROWELS 4
19 CABLE TRAILER 8
20 WOOD JOINERY EQUIPMENTS 2
21 CHIPPING MACHINES 2
22 PLATFORM POWER CLIMBER 1
23 FLOOR POLISHING MACHINE 1
24 CONVERTER 1
25 PLANNING MACHINE 2
26 VIBRATORY HAMMER 1
27 HYDRAULIC DRUM CUTTER 1
Page 71 Ref: WAME/gc/16
Light Vehicles – Saloons
Description Quantity
1 ALL PURPOSE LARGE 332
2 SALOON CARS 24 Pickups
Description Quantity
1 P/UP - DOUBLE CABIN 276
2 P/UP - LONG BODY 72
3 MINI BUS (14+1 SEATS) 41
4 MINI BUS (29+1 SEATS) 11
5 P/UP - TIPPERS 18
6 RECOVERY VEHICLE 2
7 FIBER GLASS BOAT 2
8 QUAD BIKE, YAMAHA 12
9 HONDA MOTOR CYLCE 1
Electrical equipment
Description Quantity
1 GENERATORS (0-500 KVA above) 368
2 MOBILE ELEC CABLE TRAILERS 8
3 CABLE WINCHES 7
Workshop tools & Equipment
Description Quantity
1 DYDRAULIC PRESS 19
2 TYRE CHANGER 10
3 STEAM WASHER 6
4 HYDRAULIC FLOOR CRANE 6
5 LATHE MACHINE 4
6 RECYCLING MACHINE (WATER) 1
Page 72 Ref: WAME/gc/16
FACILITIES
WORKSHOP
Wade Adams maintains fully functional workshop facilities with highly experienced staff. Together they are able to maintain the fleet as per manufacturer’s recommendations. Servicing and repairs are carried out in-house with limited downtime.
Workshop supervisors & mechanics
Page 73 Ref: WAME/gc/16
CAMP Residential accommodation owned by Wade Adams has the capacity to house over 10,000 people. The accommodation maintains the highest standards possible ensuring the resident’s needs are met, considering comfort and cultural backgrounds to food and leisure preferences.
Catering facilities cater for the varied cuisine choices with 24 kitchen amenities each catering to a different cultural cuisine.
Work-life balance is greatly supported by the company and facilities for various sports have been provided within the accommodation. These include basketball, badminton, football, volleyball and table tennis. Cable television is provided at every dining hall allowing for various programs in different languages and for different nationalities.
Page 74 Ref: WAME/gc/16
CONTACTS
Wade Adams (Middle East) Limited Omar Hodge Building Wickhams Cay 1, P. O. Box 313, Road Town, Tortola British Virgin Islands
Corporate and Project Management Office, Dubai Tel: +971 4 453 5000 Fax: +971 4 450 8087 E-mail: [email protected]
Wade Adams Contracting (L.L.C.)
P.O. Box 4337, Dubai United Arab Emirates Tel: +971 4 453 5000 Fax: +971 4 450 8087 E-mail: [email protected]
Wade Adams Sharjah L.L.C.
P.O. Box 38200, Sharjah, United Arab Emirates Tel: +971 453 5000 Fax: +971 450 8087 E-mail: [email protected]
Wade Adams Emirates L.L.C
P.O.Box 42443 Abu Dhabi, United Arab Emirates Tel. No. 02 6819777 Fax No. 02 6819778 E-mail: [email protected]
Wade Adams Oman LLC
P.O. Box 26, Muscat, Sultanate of Oman Tel: +968 24499463 Fax: +968 24499472 E-mail: [email protected]
Gulf Consolidated Contractors W.L.L.
(Local Company – Managed by WAME) P.O. Box 22501, Doha, Qatar Tel: +974 44850602 Fax: +974 44850599 E-mail: [email protected]
Hilal Bil Badi & Partners Contracting Company W.L.L. (HILALCO)
P.O. Box: 28177, Abu Dhabi, United Arab Emirates Tel: +971 2 6998999 Fax: +971 2 4488655 E-mail: [email protected]
Union Energy Inc. Omar Hodge Building Wickhams Cay 1, Road Town, Tortola British Virgin Islands Registered Branch in Hamriya Free Zone, Sharjah, U.A.E. P.O. Box 41523, Sharjah, United Arab Emirates Tel: +971 6 5263188 Fax: +971 6 5263078 E-mail: [email protected]