51
Company Profile P.O. Box 130475, Abu Dhabi, UA.E. Room 102, Ahmed Al Fahim Building, Airport Rd., Abu Dhabi, U.A.E. Tel. no.: 02 - 6222993 Fax no.:02 - 6222994 Email : [email protected]

Company Profile - · PDF fileCompany Profile: AIMS GENERAL ... Email: [email protected] / [email protected]. ... MANPOWER RESOURCES. Presented By Harry Mills / PRESENTATIONPRO EQUIPMENTS

  • Upload
    trandan

  • View
    237

  • Download
    5

Embed Size (px)

Citation preview

Presented By

Harry Mills /PRESENTATIONPRO

Company Profile

P.O. Box 130475, Abu Dhabi, UA.E.

Room 102, Ahmed Al Fahim Building, Airport Rd., Abu Dhabi, U.A.E.

Tel. no.: 02-6222993

Fax no.:02-6222994

Email: [email protected]

Presented By

Harry Mills /PRESENTATIONPRO

CONTENT:

THE COMPANY

INTRODUCTION

COMPANY CERTIFICATE

ORGANIZATION

SCOPE OF OPERATIONS

QUALITY MANAGEMENT SYSTEM

HEALTH SAFETY & ENVIRONMENT

COMPANY OBJECTIVES

COMPANY DEPARTMENTS

COMPANY FACILITY

EQUIPMENTS & MAN POWER RESOURCES

SUMMARY OF EXPERIENCE

AIMS GENERAL CONTRACTING COMPANY

PICTORIAL PRESENTATION OF MAJOR WORKS

SUPERVISION WORKS

Presented By

Harry Mills /PRESENTATIONPRO

THE

COMPANY

Presented By

Harry Mills /PRESENTATIONPRO

Company Profile:

AIMS General Contracting Company has started with an

activities that cover the EPC Civil Construction, Electro

Mechanical, Infrastructure and Roads.

Over Seven (7) years in the market with almost AED 45 -

55 Million yearly turnovers, AIMS GENERAL

CONTRACTING COMPANY L.L.C. has established a solid

base and well developed profile to be engaged in the

local market with several projects and started to gain the

respect of the local clients.

Our target is to gain the respect of clients and provide

services of high quality with standards meet the

requirements and deliver the good image for the client.

INTRODUCTION

Presented By

Harry Mills /PRESENTATIONPRO

Company Profile:

AIMS GENERAL CONTRACTING COMPANY L.L.C. had started the

activities on July 2007, started with the infrastructure services and

extended the work to provide activities in construction.

We are located in Ras Al Khaimah and as the company is engaged

successfully into contracting business, we decided to have a branch in

Abu Dhabi. We have been licensed in the Emirate of Ras Al Khaimah for

the past 7 years. Our license numbers are as follows:

Ras Al Khaimah License Registration number : 23473

Abu Dhabi License Registration number : 1158574

We understand the importance of meeting your needs so that we can

assist you in achieving your business goals; that's why we are committed

to completing every project on time and within budget.

We thrive to work with Owners and Engineers to help get projects in

budget and completed on time.

We work closely together with soil engineers to achieve the highest level

of quality.

Based on the specific needs of the client, AIMS General Contracting

Company is experienced in fulfilling the role of construction manager. As

construction manager, we work in tandem with the owner and project

team to outline project criteria and objectives. We offer our full services

to budget, estimate, bid and buyout projects under the owner's interest

and can supervise, coordinate, and direct project operations as the

owner's agent.

AIMS General Contracting Company’s experience in site evaluation

enables us to assist our Clients in site selection by preparing site work

budgets prior to expenditures for topos, surveys, grading plans, utility

plans, or soils reports. We work closely with our clients to determine the

issues of each individual site with regard to governmental issues,

permitting, infrastructure, site layout, utilities, and scheduling.

Presented By

Harry Mills /PRESENTATIONPRO

AIMS General Contracting Company is committed to surpassing the

expectations of our clients, subcontractors, and suppliers by

developing relationships through integrity, professionalism, and

service which yields the highest quality construction projects.

The AIMS General Contracting Company team is made up of over-

achievers who see to it that our customers receive the very best. AIMS

General Contracting Company is quality individuals producing quality

projects. Excellence is our goal as well as our obligation to our clients.

From pre-construction services through project completion, AIMS

General Contracting Company is committed to exceeding our clients'

expectations. Through each process of the complete services provided

by our organization, we maintain and set the industry standards for

professionalism and integrity. Our goal is to ensure that our clients

achieve their goals.

AIMS General Contracting Company works closely with the Architect

and Engineers to ensure a quality project through the preparation of

detailed and comprehensive project budgets and construction

schedules. We develop the most beneficial sequence of construction to

meet the needs of the client. AIMS General Contracting performs a

detailed review of the plans and specifications. Plan reviews done in

cooperation with the Client and the Architect insures the construction

documents will yield better Subcontractor pricing and minimize change

order expense during the project. With our experience, we have a

thorough understanding of the special needs of our clients for accuracy

in planning, budgeting, and scheduling of the construction project.

Company Profile:

Presented By

Harry Mills /PRESENTATIONPRO

COMPANY

CERTIFICATES

Presented By

Harry Mills /PRESENTATIONPRO

Company Certificates

ABU DHABI

Presented By

Harry Mills /PRESENTATIONPRO

Company Certificates

ABU DHABI

Presented By

Harry Mills /PRESENTATIONPRO

Company Certificates

RAS AL KHAIMAH

Presented By

Harry Mills /PRESENTATIONPRO

Company Certificates

RAS AL KHAIMAH

Presented By

Harry Mills /PRESENTATIONPRO

ORGANIZATION

Presented By

Harry Mills /PRESENTATIONPRO

SCOPE OF

OPERATIONS

Presented By

Harry Mills /PRESENTATIONPRO

Scope of Operations:

The scope of operations of AGCC are summarized as follows:

The design, procurement, construction and commissioning of the followingareas:

EPC General Contracting.

Industrial and Domestic Civil Works.

Structural Work (Erection).

Sewerage / Storm Water Piping Work.

Plants Mechanical Erection.

Mechanical Piping Work.

Electro Mechanical Work.

AGCC’s future plan is to expand our scope of operations to include off –shore projects:

Off – shore architectural works, fire walls, thermal and fire rated insulation andcladding.

Off – shore living quarters, modules, control rooms, switch gear room, pumprooms and generators room.

Off – shore top side construction.

Off – shore electro mechanical erection work.

Infrastructural and Road Works.

Presented By

Harry Mills /PRESENTATIONPRO

QUALITY

MANAGEMENT

SYSTEM

Presented By

Harry Mills /PRESENTATIONPRO

ISO 9001:2008 CERTIFICATE

Presented By

Harry Mills /PRESENTATIONPRO

ISO 14001:2004 CERTIFICATE

Presented By

Harry Mills /PRESENTATIONPRO

Quality Management System

Q.M.S.

Through built-in monitoring and implementation procedures, AIMS

General Contracting Company is committed to delivering a quality

construction project and final product. The procedures begin during

the pre-construction phase with in-house plan reviews, budgeting

and value engineering services, and subcontractor selection. After

construction has commenced, quality is achieved through a series

of pre-construction conferences for coordinating the various phases

of work, monitoring shop drawings and submittals for adherence to

plans and specifications, maintaining a clean and safe project site,

and employing qualified and competent field supervision. The

Quality Control procedures mesh together through a concentrated

effort of teamwork involving AIMS General Contracting Company

Estimators, Project Managers, Safety Director and Field Staff to

deliver the Client a successful project.

The QA/ QC systems are implemented on all projects. The Quality

System incorporates the role and responsibility of all personnel in

the company. It begins with the review of tenders, contracts, design,

and procurement and continues right through to process and

document control, inspection, testing and training.

The ISO 9001:2008 Quality Management System manual and

procedure for AGCC is in place and certification of the company is

done by TUV Middle East.

Note: Copy of Quality Manual and Procedure is available upon

request.

Presented By

Harry Mills /PRESENTATIONPRO

QHSE POLICY STATEMENT(Quality "ISO 9001:2008", Environment "ISO 14001:2004" and Health & Safety "OHSAS 18001:2007)

AIMS GENERAL CONTRACTING

COMPANY L.L.C.

Management commitment to continually improve the effectiveness of

Quality Management System.

Maher Muqattash / Adeeb JarjouraManaging Partners

AIMS General Contracting Company L.L.C. Management is committed to deliver value enhanced construction

services as per the consultants approved construction designs to the construction industry with the aim of

enhancing client, consultants, employees, stakeholders satisfaction and improving the environment by

adopting safe working practices.

We construct the structures with our motivated in-house team of Engineering, Procurement, Project and QHSE

team in coordination with sub-contractors and under the supervision of consultant with a collective goal of

enhancing client satisfaction.

AIMS General Contracting Company L.L.C. Management is committed to:

Meet the client requirements comprehensively.

Adopt the management system in line with the requirements of ISO 9001:2008, ISO 14001:2004 and OHSAS

18001:2007 Standards to operate the business.

Adopt client focus, team work, continual improvement and process approach management principles to

perform, manage and improve the effectiveness of construction activities.

Focus on enhancing employee competence by providing effective trainings.

Prevent injury or ill health to the employees & visitors arising from our work activities. Involve the

employees on matters affecting their personal health and safety.

Prevent pollution to the environment with the use of non-polluting techniques and best practices. Involve

the employees on environmental issues and ensure they understand their roles and responsibilities.

Comply with all applicable statutory, regulatory and other requirements while fulfilling the above

commitments.

Communicate the QHSE Policy to the employees, clients, consultants, subcontractors and stakeholders.

Continually improve the performance of QHSE Management System.

Presented By

Harry Mills /PRESENTATIONPRO

HEALTH, SAFETY

&

ENVIRONMENT

Presented By

Harry Mills /PRESENTATIONPRO

OHSAS 18001:2007 CERTIFICATE

At AIMS GENERAL CONTRACTING COMPANY, safety is a primary concern, accordingly AGCC aims to meet the H.S.E. requirement

defined by U.A.E. and worldwide legislation and appropriate corporate standards and believe that the implementation of safety is the

responsibility of all staff employed by AGCC, this includes any sub contractors and third parties that may be involved.

Also AGCC place considerable importance on its role as a corporate and duly recognize its responsibility in maintaining the

environment.

Note: Copy of our HSE Manual is available upon request.

Presented By

Harry Mills /PRESENTATIONPRO

COMPANY

OBJECTIVES

Presented By

Harry Mills /PRESENTATIONPRO

Continual

Improvement

Operational

Excellence

Customer

Focuses

Company Objectives

Experienced

Engineer

Delivering on

timeFull budget

service

Presented By

Harry Mills /PRESENTATIONPRO

COMPANY

DEPARTMENTS

Presented By

Harry Mills /PRESENTATIONPRO

Company Departments

Engineering

Procurement

QA / QC

HSE

Commercial &

Tendering

Projects /

Construction

Finance /

Administration

Planning

Presented By

Harry Mills /PRESENTATIONPRO

COMPANY

FACILITY

Presented By

Harry Mills /PRESENTATIONPRO

Company Facility

Fully furnished office for total area of 160 m2. Consist of the following:

16 Engineering Working Stations

Conference Room

6 Individual Office

Reception

Equipments:

25 nos. Computer sets

Server / Net System

3 Photo copy Machine

4 Printers

5 Scanners

Fax Machine

Internet

LABOUR CAMP:

Ras Al Khaimah Labour camps fully

furnished with a total capacity of 300

persons.

Abu Dhabi provision labour camp with

a total capacity of 500 person can be

increased to 600 person.

STORE AREA:

Ras Al Khaimah Storage for a total area of

2,000 m2.

Abu Dhabi Storage for a total area of 5,000

m2.

Presented By

Harry Mills /PRESENTATIONPRO

Office Facility

Presented By

Harry Mills /PRESENTATIONPRO

Office Facility

Presented By

Harry Mills /PRESENTATIONPRO

Labour Camps

Presented By

Harry Mills /PRESENTATIONPRO

Storage / Yards:

Presented By

Harry Mills /PRESENTATIONPRO

Company Contact Details:

OFFICE ADDRESS:

P.O. Box 130475, Abu Dhabi, United Arab Emirates

Room 102, Ahmed Al Fahim Building (National Printing Center Bldg.), Airport Road,

Telephone No.: 02-6222993 / Email: [email protected]

Email: [email protected] / [email protected]

Presented By

Harry Mills /PRESENTATIONPRO

EQUIPMENT &

MANPOWER

RESOURCES

Presented By

Harry Mills /PRESENTATIONPRO

EQUIPMENTS & TOOLS LIST

S.I. No. Description Qty. Size / Capacity Model Country

1 Komatsu Excavator 1 Kumatso 90 1992 Japan

2 JCB Louder 1 3CX 2009 U.K.

3 JCB Boom Louder 1 540 - 170 2011 U.K.

4 Bob Cat (Caterpillar) 1 226 2007 U.S.A.

5 Steel Cutting Machine 1 Silla 2007 Italy

6 Air Compressor 2 Atlas Copco

7 Steel Bending Machine 1 Atlas 2009 Italy

8 Steel Bending Machine 1 Silla 2007 Italy

9 60 kw Generator (Electrical) 2 Perkins 2009 U.K.

10 15 Kw Generator (Electrical) 1 Perkins 2009 U.K.

11 Generator (Electrical) 5 Honda

12 Diesel Water pump 7

13 Light weight Scaffolding Lots

14 Heavy weight scaffolding & Shuttering

system

Lots

15 3 ton Tipper truck 2 Daihatsu 2009 Japan

16 3 Ton pick up 3 Mitsubishi 2007 Japan

17 1 Ton Double Cabin Pick-Up 4 Toyota 2008 Japan

18 85 Seater Bus 2 TATA

19 33 Seater Bus 3 Mitsubishi 2007 Japan

Equipment and Tools List

Presented By

Harry Mills /PRESENTATIONPRO

EQUIPMENTS & TOOLS LIST

S.I. No. Description Qty. Size / Capacity Model Country

20 15 Seater Bus 4 Toyota 2008 Japan

21 4 Wheel Drive 2 Toyota 2008 Japan

22 4 Wheel Drive 1 Mitsubishi 2008 Japan

23 Saloon Cars 2 Nissan 2013 Japan

24 Saloon Cars 3 Toyota 2008 Japan

25 Hand Tools Lots

26 Cap lock System Shuttering Lots

27 DOKA Shuttering Lots

28 Caravan Offices 4

29 Jack Hammer 8

30 Grinders Lots

31 Drill Machine Lots

32 Roller Compactor 2

33 Plate Compactor 3

34 Concrete Vibrator 4

Equipment and Tools List

Presented By

Harry Mills /PRESENTATIONPRO

MACHINERY

S.I. No. Machine Name No.

1 Grader 14G 6

2 Dozer D8 3

3 Loader 966 3

4 Steel Roller 4

5 Tyre Roller 2

6 Excavator 4

7 Trailer 3 Axel 3

8 Six Wheel Dump Truck 5

9 Mobile Matrix Team 1

This section was established recently, operated and run by a Professional Team with

23 years experience in Roads / Bridges / Infrastructures within UAE, supported by

fleet of Heavy Machineries and experience operators as listed below, with an ability

of increasing the resources as per construction requirement.

Roads and Infrastructure Section

Presented By

Harry Mills /PRESENTATIONPRO

S.I.

No.

NAME Designation

1 Managing Partners 2

2 General Manager 1

3 Administration Manager 1

4 Project Manager 4

5 Project Engineer 4

6 Site Engineer 8

7 QA/QC Engineer 2

8 Safety Engineer 2

9 Planning Engineer 2

10 Procurement Engineer 2

11 Procurement Officer 1

12 Accountant 4

13 HR / Public Relations Officer 2

14 Draftsman 4

15 Secretary 2

16 Supervisor 4

S.I.

No.

NAME Designation

17 Foreman 8

18 Surveyor 2

19 Driver 9

20 Storekeeper 2

21 Operator 5

22 Follow Up Clerk 1

23 Painter 12

24 Office Boy 2

25 Mason 120

26 Carpenter 176

27 Electrician 8

28 Pipe Fitter 6

29 Steel Fixer 145

30 Welder 4

31 Labour 101

Manpower Resources

Presented By

Harry Mills /PRESENTATIONPRO

SUMMARY OF

EXPERIENCE

Presented By

Harry Mills /PRESENTATIONPRO

S.I. No. Project Name Year Main / Sub contractor Project Total Value

1

P:001 - Khuzam Storm Water

Drainage System

The project scope of work is to excavate and install storm water drain

piping system of around 3,500 m. Of G.R.P. Piping including

manhole, excavate and installation of high pressure U-PVC pumping

Main including main pump station tank and pumps.

2007 Sub contract 1,801,299.00

2

P:002 - Drainage Wet Connection

(House Connection)

The project scope of work is to excavate and install house

connection drain to the main drainage line including manholes

chamber at Ras Al Khaimah at various location.

2007 Sub contract 600,000.00

3

P:003 - Dubai Aerospace Flight Academy

The project scope of work is to supply construction of the complete

civil, structural, mechanical, electrical, fire alarm, fire fighting

and H.V.A.C. work for Dubai Aerospace Flight Academy school

building of 2 storey. Total area of around 3,000 m2 and Dubai

Aerospace flight Academy maintenance building and work shops single

storey of a total area 1,500 m2.

2007 Sub contract 9,000,000.00

4

P:004 - Ras Al Khaimah

International Airport Car Parking

The project scope of work is to demolish existing car

parking area and design, supply and construction of a

new car parking area for total of 85 Car Park with

a total area of 4,000 m2 including landscaping.

2008 Main 359,000.00

5

P:006 - Denholm Yam Al Khaleej

Main Office & Workshop Paving Works

The project scope of work is to complete supply and

installation of paving inter lock tiles at work shops and main

office car parking area for a total of 30,000 m2.

Completed

2009Main Contractor 1,741,090.00

6

P:007 - Ras Al Khaimah

Sewerage Treatment Plant Public Work

The project scope of work include excavate and install of

various type and size of drain piping system, i.e. G.R.P.,

Ductile Iron, HDPE, UPVC, etc., including thrust block,

manholes and installing of main valves, meters, etc.

Completed

2009Sub-contractor 2,869,420.24

P:009 - Denholm Yam Al Khaleej

Main Office & Workshop,

Floor Ceramic Tiles & Plumbing Works

The project scope of work is to complete supply and installation of main

office and workshop office ceramic floor tiles of total 4,000 m2 and

plumbing work including drawing water supply and sanitary drainage.

7Completed

2009780,755.00Main Contractor

Summary of Experience

Ras Al Khaimah Projects

S.I. No. Project Name Year Main / Sub contractor Project Total Value

1

P:001 - Khuzam Storm Water Drainage System

The project scope of work is to excavate and install storm

water drain piping system of around 3,500 m. Of G.R.P.

Piping including manhole, excavate and installation of high

pressure U-PVC pumping Main including main pump

station tank and pumps.

Completed

2008 Sub-contractor 1,809,674.40

2

P:002 - Drainage Wet Connection

(House Connection)

The project scope of work is to excavate and install house

connection drain to the main drainage line including

manholes chamber at Ras Al Khaimah at various location.

Completed

2008 Sub-contractor 171,428.00

3

P:003 - Dubai Aerospace Flight Academy

The project scope of work is to supply construction of the complete

civil, structural, mechanical, electrical, fire alarm, fire fighting

and H.V.A.C. work for Dubai Aerospace Flight Academy school

building of 2 storey. Total area of around 3,000 m2 and Dubai

Aerospace flight Academy maintenance building and work shops single

storey of a total area 1,500 m2.

Completed

2008 Sub-contractor 9,266,138.00

4

P:004 - Ras Al Khaimah

International Airport Car Parking

The project scope of work is to demolish existing car

parking area and design, supply and construction of a

new car parking area for total of 85 Car Park with

a total area of 4,000 m2 including landscaping.

Completed

2008 Main Contractor

Presented By

Harry Mills /PRESENTATIONPRO

Project Name Year Main / Sub contractor Project Total Value

8

Main Contractor9

Sub contract

10

P:010 - Promenade Walk Development at

Ras Al Khaimah Corniche

The project scope of work is to supply and construction of total

14 nos. New Building double and single storey for a total area of

5,000 m2 including landscaping.

2008 13,948,000.00

P:011 - Ras Al Khaimah, Industrial Area,

Construction of 3,200 m3 Concrete Tank.Construction of WWT & Re-use Plant – Water Tanks, capacity 1,200

m3 /d . Excavating for water tank. Soil treatment adding one layer

of 20cm thick sub-base with 95% of compaction shall be used below the

PCC. Construction of the tanks. Insulating of water stop.

Completed

2009 1,354,875.00

Main ContractorCompleted

2010415,000.00

S.I. No.

P:013 - 2 Commercial Store

Concrete ,finishing and steel works along with

interlock and car parking.

P:014 - Ahmad Abdullah Al Marzouque

Excavation and Construction of 2 Storey Villa along

With service block and boundary walls11

Completed

2010Main Contractor 1,147,428.00

P:015 - Mousa Abdullah Mousa

Excavation and construction of 1 floor Villa along

With service block and boundary walls730,000.00Main Contractor

Completed

201012

13

14

P:016 - Mr. Badar Youssif Saif Brougha

Completion of 2 floors villa

Completed

2010Main Contractor 540,815.00

P:017 - Mr. Mohammad Ali Abdulla Bloushe

Completion of a private villa 807,500.00Main Contractor

Completed

2011

P:018 - Mr. Ahmad Ali Ahmad Ali Al Mullah

Completion of a private villa 15

Completed

2011Main Contractor 1,436,950.00

Summary of Experience

Ras Al Khaimah Projects

Project Name Year Main / Sub contractor Project Total Value

Sub contractor

P:010 - Promenade Walk Development at

Ras Al Khaimah CornicheThe project scope of work is to supply and construction of total

14 nos. New Building double and single storey for a total area of

5,000 m2 including landscaping.

Completed

200912,775,772.45

S.I. No.

Presented By

Harry Mills /PRESENTATIONPRO

Project Name Year Main / Sub contractor Project Total Value S.I. No.

18

Completed

2011Main Contractor 4,720,521.00

P:021 - Mr. Hamad Abdullah Salman Al Muhairi

Construction of Investment Commercial Project at

Commercial Centre Al Nakheel.17

19

P:022 - Mr. Khalid Al Shihhi

Construction of a 2 storey private villa

and service block.

Completed

2011Main Contractor 845,000.00

21

20

P:023 - Khadija Ali Ahmad Al Shehi And her sons

Supply and Construction of a complete civil for a

Private villa.

P:024 - Mr. Fahem Essa

Supply & Construction of the whole works of a

project villa with all mechanical, electrical works.

Completed

2011

Completed

2011

Main Contractor

Main Contractor

1,035,000.00

502,900.00

22

P:025 Mr. Ahmad Abdullah Jasem Al Kraz Al Zaab

Construction of the additional villa two storey

+ majlis + driver room

Completed

2012 Main Contractor 436,000.00

P:026 Mr. Majid Ahmad Jassem Villa

Supply and construction for the whole works

Of a private villa

Completed

2014Main Contractor 707,717.00

P:019 - Mr. Abdullah Ali Ahmad

Ali Khdyoh Alshihi

Completion of a double store villa and service block.517,500.00Main Contractor

Completed

201116

P:027 - Mr. Khalid and Mr. Abdullah

Ibrahim Al Manzouri

Supply and construction for the whole works

Of a private villa

P:028 – UAE RED CRESCENT

Sewerage Work.

Completed

2015

Completed

2011

1,425,000.00

245,000.00

Main Contractor

Main Contractor

23

24

TOTAL CONTRACT VALUE Dhs. 46,640,484.09

Summary of Experience

Ras Al Khaimah Projects

Presented By

Harry Mills /PRESENTATIONPRO

S.I. No. Project Name Year Main / Sub contractor Project Total Value

2

P:002 (A.D.) - TAMEER HOLDING

INVESTMENT LLC

TAMEER TOWERS

Supply of Labor for Concrete Casting,

Fixing of Shuttering & Fixing of Reinforcement Steel

Completed

2011Sub-contractor 5,120,500.00

7,222,840.00Sub-contractorCompleted

2011

P:003 (A.D.) - TAMEER HOLDING

INVESTMENT LLC

TAMEER TOWERS

Concrete casting, Supply & Fixing of Shuttering,

Fixing of Reinforcement Steel 3 Basement Floor

3

4

P:004 (A.D.) - ABU DHABI

INTERNATIONAL

SHOOTING CLUB

Sewerage Treatment Plant - Civil Works

Completed

2011Sub-contractor 1,927,088.00

1 P:001 (A.D.) MR. ABDULLAH AL AWADI

& HIS WIFE

Construction of Complex 4+ Service Block

Completed

2011Main Contractor 8,497,707.00

5

P:005 (A.D.) - TAMEER HOLDING

INVESTMENT LLC

TAMEER TOWERS

Concrete casting, Supply & Fixing of Shuttering,

Fixing of Reinforcement Steel for Tower 1

Completed

2011Sub-contractor 31,523,633.00

6P:006 (A.D.) – ABU DHABI PORT COMPANY

KPIZ Contract 1000-209

Offshore Civil Works / Block Masonry

Completed

2011Sub-contractor 1,975,141.00

Summary of Experience

Abu Dhabi Projects

Presented By

Harry Mills /PRESENTATIONPRO

S.I. No. Project Name Year Main / Sub contractor Project Total Value

7

P:007 (A.D.) – GENERAL AUTHORITY OF

ISLAMIC AFFAIRS & ENDOWMENTS

Contract No.: EIEC-2010-01/26789

Construction of Bin Rubeyea Mosque

Completed

2012Main Contractor 6,000,000.00

8P:008 (A.D.) – AL WASITA EMIRATES FOR

CATERING & SERVICES L.L.C.

Ghayathi Labour Camp Accommodation

Completed

2012Main Contractor 31,186,242.00

9

P:010 (A.D.) – UAE ARMED FORCES

COMMAND OF MILITARY WORKS

Building Construction of 2,200m₂, Steel Door outside

Work of interlock + Electrical + Drainage

Completed

2013Main Contractor 7,416,056.0010

P:011 (A.D.) – AL KOUT INDUSTRIAL

PROJECTS L.L.C.

Design, Supply and Installation of Engineering Offices at

Safe Water Chemicals

Completed

2013Main Contractor 2,575,000.00

P:009 (A.D.) – AL WASITA EMIRATES FOR

CATERING & SERVICES L.L.C.

Mushrif Camp Accommodation

On

HoldMain Contractor 3,680,322.00

11

12P:012 (A.D.) – ALDAR BEACH DEVELOPMENT

4 nos.. Fire Hydrant for IKEA and ACE Car park

Completed

2012Sub-contractor 499,272.00

Summary of Experience

Abu Dhabi Projects

Presented By

Harry Mills /PRESENTATIONPRO

S.I. No. Project Name Year Main / Sub contractor Project Total Value

14

13P:013 (A.D.) – (A214) Infrastructure, Landscaping,

Park & Utilities works at Al Sila’a Al Gharbia Emirati

Housing Project – Construction of 5 Nos. Sub Stations.

Completed

2013Sub-contractor 500,000.00

P:014 (A.D.) – AL WASITA EMIRATES GROUP

Ghayathi Labour Camp Accommodation, H.V. Temporary

Power Connection ADDC Substation including

Transformer and QRM

Completed

2013Main Contractor 3,664,632.00

Summary of Experience

Abu Dhabi Projects

15P:015 (A.D.) – NATION RIVIERA TOWERS

Proposed Lay By / Drop Off along Corniche Road,

Abu Dhabi

Completed

2014Sub-contractor 1,563,000.00

16

17

18

19

P:016 (A.D.) – AL WASITA EMIRATES GROUP

Sewerage Treatment Plant 300m³ per day at Ghayathi

Labour Camp Accommodation

Completed

2014Main Contractor 17,128,000.00

P:017 (A.D.) – DENHOLM YAM CONTRACTING CO.

Boundary Wall at Al jazira, ICAD, Mussafah

Completed

2013Main Contractor 2,829,750.00

P:018 (A.D.) – TRIZAC ABU DHABI.

Construction and Maintenance for Mafraq Store

Completed

2013Main Contractor 138,000.00

P:019 (A.D.) – SAFE WATER CHEMICALS

Civil and Mechanical Works for 20tpd ELECTROLYSER

Replacement and Modernization Project

Completed

2014Main Contractor 6,050,000.00

20P:020 (A.D.) – ZUBLIN AG

YAS CLUB – Road Works, Paving and Surfacing

Completed

2014Sub-contractor 1,462,241.00

Presented By

Harry Mills /PRESENTATIONPRO

S.I. No. Project Name Year Main / Sub contractor Project Total Value

21P:021 (A.D.) – ATHENA EMIRATES

YAS Development – Zone K, Sewerage and

Portable Water Works

P:022 (A.D.) – AL WASITA EMIRATES

Modification of Electrical Works

Completed

2014

Main Contractor

499,180.00

Summary of Experience

Abu Dhabi Projects

3,700,000.00

22Completed

2013Main Contractor

Sub-contractor

23P:023 (A.D.) – AL WASITA EMIRATES

AL WASITA HEAD OFFICE Refurbishment and

Modification

Completed

20131,424,017.00

24P:024 (A.D.) – ATHENA EMIRATES

YAS Development – Zone K, Portable Water and

Fire Fighting Networks

Completed

20143,163,048.00Sub-contractor

26P:026 (A.D.) – INTERNATIONAL CAPITAL TRADING

NATION RIVIERA – Design and Build

Fence and Boundary Wall

Completed

2014492,710.00Sub-contractor

28P:028 (A.D.) – EMIRATES INTERNATIONAL STEEL

Construction of Security Rooms, Sub-station, Store

and Offices - ICAD-II, Emirates Steel Yard Facility

On

GoingMain Contractor 7,170,000.00

25P:025 (A.D.) – Y-CRAVE RESTAURANT MANAGEMENT

Design, Supply & Installation of Kae’Kology Restaurant

at Al Najda St., Abu Dhabi

Completed

2014Main Contractor 1,400,000.00

27P:027 (A.D.) – Y-CRAVE RESTAURANT MANAGEMENT

Mechanical & Electrical Installation and Interior Works

of Kae’Kology Restaurant at Yas Island Mall, Abu Dhabi

Completed

2014Main Contractor 240,000.00

29

P:029 (A.D.) – AAAS ARCHITECTURAL &

CONSULTANT ENGINEERS

Complete Civil, Structural, Architectural and

Electro-mechanical Works for Mr. Emad Orikat Villa

On

GoingMain Contractor 4,145,206.00

Presented By

Harry Mills /PRESENTATIONPRO

Summary of Experience

Abu Dhabi Projects

TOTAL CONTRACT VALUE Dhs. 195,763,980.00

30

P:030 (A.D.) – AL ETTIHAD / UNION CHEMICAL

FACTORY

Construction of Store Offices Building and Car

Parking Shed at ICAD-I, Mussafah, Abu Dhabi

On

GoingMain Contractor 1,700,000.00

31P:031 (A.D.) – AL JABER LANDSCAPE LLC

Laying of Precast Concrete Pavers at Al Salam St.

and Ring Road & Entrance to Al Reem Island, Abu Dhabi

Completed

2015Main Contractor 200,020.00

32

P:032 (A.D.) – COMBINED GROUP CONTRACTING

EMIRATES L.L.C.

Fixing / Installation of Precast Concrete Paving

Interlock Tiles at Presidential Palace, Abu Dhabi

Completed

2015Sub-Contractor 20,000.00

33

P:033 (A.D.) – SAFE WATER CHEMICALS

Civil & Structural Works for 40 TPD Modifications and

Connected Auxiliary Works at Safe Water Chemicals

in ICAD-I, Mussafah, Abu Dhabi

On

GoingSub-Contractor 10,400,000.00

34P:034 (A.D.) – ABU DHABI AIRPORT COMPANY

Civil Works at VIP Terminal of Abu Dhabi

International Airport

On

GoingSub-Contractor 594,280.00

35 P:035 (A.D.) – CMW ARMED FORCES / COMMAND OF

MILITARY WORKS

Construction of Recreational Building

On

GoingMain Contractor 15,750,000.00

37P:037 (A.D.) – JOTUN ABU DHABI LLC

Expansion of Tank Farm with Electrical Room &

Compressor Room

On

GoingMain Contractor 1,575,000.00

36P:036 (A.D.) – AL HASSAN ENGINEERING COMPANY

AGIS – Road Works for Construction of CGL

Complex Phase II

On

GoingSub-Contractor 665,400.00

38P:038 (A.D.) – HADEED EMIRATES CONTRACTING LLC

ICT Logistics Park Installation of Interlock, Kerbstone,

Pipes & Electrical Sleeves Encasement

On

GoingSub-Contractor 1,665,695.00

Presented By

Harry Mills /PRESENTATIONPRO

S.I. No. Project Name Year Main / Sub contractor Project Total Value

TOTAL CONTRACT VALUE Dhs.1,178,721.98

02

01

GP:002 – FOURTH DIMENSION GENERAL CONT.

Laying and Levelling

Garage Yard at Tarif Area

Completed

2013Main Contractor 158,721.98

Completed

2014

Summary of Experience

Abu Dhabi Projects

GP:001 – ABU DHABI INVESTMENT COUNCIL

Supply and Installation of Road Markings

and Kerbstone Painting

1,020,000.00Sub-contractor

General Projects

Trading Projects

S.I. No. Project Name Year Main / Sub contractor Project Total Value

01Completed

2010Sub Contractor 6,134.95

TP:001 – AL RAJHI PROJECTS & CONSTRUCTION

JCB Hiring

02Completed

2010Sub Contractor 11,719.23

TP:002 – AL RAJHI PROJECTS & CONSTRUCTION

JCB Hiring

03Completed

2010Sub Contractor 11,507.72

TP:003 – AL RAJHI PROJECTS & CONSTRUCTION

JCB Hiring

04Completed

2010Sub Contractor 11,296.17

TP:004 – AL RAJHI PROJECTS & CONSTRUCTION

JCB Hiring

05Completed

2010Sub Contractor 11,169.23

TP:005 – AL RAJHI PROJECTS & CONSTRUCTION

JCB Hiring

Presented By

Harry Mills /PRESENTATIONPRO

Summary of Experience

Abu Dhabi Projects

Trading Projects

S.I. No. Project Name Year Main / Sub contractor Project Total Value

06Completed

2010Sub Contractor 16,000.00

TP:011 – AL RAJHI PROJECTS & CONSTRUCTION

JCB Hiring

07Completed

2010Sub Contractor 8,133.73

TP:012 – AWADI AL WATHBA GENERAL CONT.

Scaffolding Hiring

08Completed

2010Sub Contractor 29,396.13

AL RAJHI PROJECTS & CONSTRUCTION

Scaffolding Hiring

09Completed

2012Main Contractor 6,400.00

TP:011 – EMIRATES DESIGN & DÉCOR SYSTEM

Modification of floor grating

10Completed

2012Main Contractor 21,000.00

TP:012 – AL WASITA EMIRATES

Supply of Diesel

11Completed

2012Sub Contractor 48,000.00

TP:013 – ALDAR PROPERTIES

Excavation, Supply & Installation of Water Supply

12Completed

2013Main Contractor 393,420.00

TP:015 – UAE RED CRESCENT

6nos. Caravans

13Completed

2013Sub Contractor 100,000.00

TP:016 – NPC – ARABTEC JV

Carrying out relocation of Electrical Manholes

14Completed

2013Sub Contractor 51,300.00

TP:017 – EHAF CONSULTING ENGINEERS

Surveying to locate trenches and excavation

15Completed

2014Sub Contractor 109,500.00

TP:018 – ED ZUBLIN AG

Asphalt Works

16Completed

2014Sub Contractor 50,000.00

TP:019 – TRIZAC ABU DHABI FOR OILFIELD

SUPPLIES & SERVICES.

Entrance to Trizac Yard at Icad 1, Abu Dhabi, UAE

17Completed

2014Sub Contractor 157,600.00

TP:020 – AL WASITA GROUP

Car Parking of Balcony

Presented By

Harry Mills /PRESENTATIONPRO

Summary of Experience

Abu Dhabi Projects

Trading Projects

S.I. No. Project Name Year Main / Sub contractor Project Total Value

18Completed

2014Sub Contractor 100,000.00

TP:021 – AL NASR MIDDLE EAST GEN.

CONTRACTING LLC.

Fixing of Ceramics in Al Raha Beach

19Completed

2014Main Contractor 131,500.00

TP:022 – DENHOLM YAM CONTRACTING

COMPANY LLC.

Const. of Store Room and Block Wall Partition

20Completed

2014Sub Contractor 27,500.00

TP:023 – NPC – ARABTEC JV

Supply of Round Boulders Stone

TOTAL CONTRACT VALUE Dhs. -1,709,217.16

21TP:024 – DENHOLM YAM

New Office Entrance Tiles

Completed

2014Main Contractor 60,960.00

22TP:025 – AL JABER LANDSCAPE LLC

Construction of Sheikh Zayed RoadOn Going Sub Contractor 195,720.00

23TP:026 – DENHOLM YAM CONTRACTING COMPANY

5 Nos. Car Shades for Villa of Mr. Faraj Abdullah, Abu DhabiOn Going Sub Contractor 35,000.00

24

TP:027 – HILL INTERNATIONAL INC. /

INTERNATION CAPITAL TRADING

Design and Build for Office Car Park Entrance Median

at Nation Towers, Abu Dhabi

On Going Sub Contractor 115,960.00

Presented By

Harry Mills /PRESENTATIONPRO

OUR VALUED CLIENTS:

TAMEER INVESTMENTS / AL

RAJHI PROJECTS &

CONSTRUCTIONS L.L.C

AL WASITA EMIRATES FOR

CATERINMG & SERVICES

GENERAL AUTHORITY OF

ISLAMIC AFFAIRS &

ENDOWMENTS

ED ZUBLIN AG

EMCO ENGINEERING L.L.C.

MR. ABDULLAH AL AWADI

& HIS WIFE /

PERFECTION ARCHITECTECS

& ENGINEERS

UAE ARMED FORCES

COMMAND MILITARY

WORKS

DUBAI AEROSPACE

ENTERPRISE

RAS AL KHAIMAH

INTERNATIONAL

AIRPORT

DENHOLM YAM

CONTRACTING

COMPANY L.L.C.

GOVERNMENT OF

RAS AL KHAIMAH

PUBLIC WORKS &

SERVICES DEPARTMENTPublic Works and Services Department

JOG UNION

ENGINEERING

EPECO

ENVIRONMENTAL

PROJECTS &

ENGINEERING CO.

CONSULTING

ENGINEERING

GROUP

AL ZEIN DESIGN ENG.

& CONSULTANTS

L.L.C.

ALDAR

PROPERTIES PJSC

AL HUSAM GENERAL

CONTRACTING COMPANY

AL KOUT INDUSTRIAL

PROJECTS CO. &

SAFEWATER CHEMICALS

L.L.C.

Presented By

Harry Mills /PRESENTATIONPRO

OUR VALUED CLIENTS:

ABU DHABI

INVESTMENT COUNCIL

FOURTH DIMENSION

GENERAL CONTRACTING

WASITA GROUP /

UAE RED CRESENT

EHAF CONSULTING

ENGINEERS

TRIZAC ABU DHABI FOR

OILFIELD SUPPLIESAL SHUAA

ENGINEERING

CONSULTANCY

AL MOBDEA

ENGINEERING

CONSULTANT

HALCROW

YOLES

INTERNATIONAL

ENGINEERING

CENTER

UAE RED

CRESENT

BEST ENGINEERING

CONSULTANT

SHAM DESIGN

AND CONSULTANTNPC

ARABTEC JV

ATHENA

EMIRATES

INTERNATIONAL CAPITAL

TRADING