Puente izable de Francia

Citation preview

  • 2013Bridge

    Jacques-Chaban-Delmas technicaldata sheet

    Why build a vertical-lift bridge in the centre of the city ?

    Bridge specifications

    Connecting the boulevards on either side of the river. Providing an impetus for new urban development projects on the banks of the Garonne. Ensuring that the river remains navigable right into the historic centre of Bordeaux, the Port de la Lune. Integrating the architectural and technical project into the urban environment, landscape and heritage. The dimension and design of the bridge allow it to handle different transport systems: Bus, Tram, Train. The constraints and environmental imperatives revealed by impact studies.

    433 m roadway length

    117 m length of mobile, lifting section5 traves including 1 lifting section

    106 m width of navigable passage

    53 m air draft beneath the lifted section

    60 predicted number of lifts in a year

    11 minutes time to raise roadway (and to lower)

    2 x 2 car lanes 2 dedicated public transport lanes

    2 lanes for pedestrians, cycles and users with restricted mobility

    october 2009 Work begins

    november 2009 Construction of the baseplates and cutwaters begins in the Bassens dry docks

    december 2009 Laying of the foundation stone

    june 2010 - march 2011 Baseplates and cutwaters installed

    2011 - summer 2012 Fixed sections of the deck laid

    october 2012 Lifting section installed

    16 mars 2013 Bridges inauguration

    18 march 2013 Opening

    Schedule

    Live

    In pictures !Many movies and photographic reports have shown the lift-bridge called Jacques Chaban-Delmas all along its building process. Find all of them on www.pontchabandelmas.lacub.fr. And get to live the official opening highlights again. Or find out more about the main building stages, as decribed throughout this brochure, such as when the base and its upstream and downstream dolphins were put into position, back in june 2010. You might also have a look on an online movie about a 3D-navigation simulator, designed with the help of the Pilotes de la Gironde navigators association. And, last but not least, you may want to live through the up and down movement of the bridge span, as if you were there, thanks to a permanent webcam settled on the left bank of the river.

    Thus doing, La Cub intends to keep memory of the bridges building and living process and to share it all with you on the Internet : enjoy !

    Left bank - Bacalan

    Longitudinal section and structural outlinescale 1:400

    Right Bank - Brazza

  • Left bank Right bank

    Left bank Right bank

    Left bank Right bank

    Left bank Right bank

    Left bank Right bank

    cutwater

    pillar base

    lifting section

    fixed deck

    Left bank Right bank

    Pillar base Upstream cutwater

    Downstream cutwater

    Dry dock: Length:240m, Width 32m, Depth: 15m

    Left bank Right bank

    The site in 8 steps

    Step 1 Step 2

    Step 3 Step 4

    Step 5

    Step 7

    Step 6

    Step 8

  • Step 1The jettiesNovember 2009 and October 2010: construction of the jetties on the right bankOctober 2010: construction of the jetties on the left bank

    Step 2Prefabrication of base sections and cutwatersNovember 2009: construction in the Bassens drydocks

    Step 3Pillar foundations and cutwaters towed into place and anchoredJune 2010 right bank: structural elements towed into place then driven into the river bedMarch 2011 left bank: same process repeated

    Step 4Foundations laid, tower cranes mounted; construction of the pillars which will hold the fixed deck with the help of cofferdamsMid 2010 to mid-2011

    Cross section and foundation of the towers

    Step 5Constructing and installing the fixed deckSummer 2010: preparation for the final assembly of the fixed deck was performed in Italy by Cimola Company (the main framework is composed of three steel beams), including the pedestrian sectionsJuly 2011: the parts which make up the fixed deck arrived via maritime freight, and were assembled on the right bankDecember 2011: left bank section of the fixed deck laid

    Step 6Construction of the pillars and concrete reinforcement of the fixed deck2011: the four towers were cast on site using formwork moulds.

    Step 7Installation of the lifting mechanism inside the towers; construction of the lifting section; dismantling of the access jetties2012

    Step 8Installation of the lifting section23 october 2012

    Navigation simulator

    From March to June 2010, tests were conducted using a 3D simulator in order to analyse and optimise navigation around the bridge. This research was conducted for the benefit of all those who sail on the Garonne, allowing us to predict the navigation conditions created by the new bridge.

    Each base consists of 20 foundation stakes of 1600 mm diameter poured directly into metal casing. The middle pillar on the right bank sits on 25 steel stakes. The left bank pillar is based on a shallow foundation which sits atop a bed of marl mudstone. The abutments on the right and left banks are founded on stakes housed in metal casing. The left bank abutment is founded on 30 foundation stakes, each 800 mm in diameter and cased in metal. The right bank abutment is founded on 13 foundation stakes, also 800 mm in diameter and cased in metal.

    B B

    C

    C

    Platform

    Spiral staircase

    Lift shaftDisabled access

    Guard rail

    Glass casing

    1500

    1200

    1000

    C

    C

    A A

    Lift shaft

    Pulley for the suspension cable whichlifts the central section

    Disabled access

    2200

    4400

    6280

    1830

    Spiral staircase

    Glass casing

    Height 82m

    2200

    50

    50

    150

    R1500

    1000

    0.000Z:

    -11.100Z:

    -27.000Z:

    Top of the base +5,8 m

    Height -5,2 m

    Mechanism housing

    Right bank -BrazzaLeft bank - Bacalan

    1690

    0

    Bedding thickness 0.60 m34.00 m x 114.00 m

    3700

    200

    1500

    2000

    5800

    4700

    500

    2500

    2300

    600

    150

    350

  • The mechanism and the base

    17 / 06 / 10 Arrival of the first pillar base, right bank

    Winch drum - NFM Factory, Creusot

    The lifting section of the Chaban-Delmas bridge is an impressive structure: 2750 tons of metal fitting together flawlessly!Achieving this feat requires an elaborate elevator system, designed to use as little energy as possible. In each of the four pylons of the bridge, a cable system (connected one side to the span and the other side to a heavy counterweight) winds on enormous pulleys located in the upper reaches of the pylons. This mechanism is operated from the control station on the right bank, driven by two 132 KW motors and winch systems housed in the base of the bridge.The total weight of the counterweight is 2694 tons: 56 tons less than the weight of the mobile section!Thus, in the down position, the lifting section is held in place by this extra weight known as the imbalance, by simple effect of gravity.

    motor + winch

    pulleys

    counterweights

    cables

    Lifting section

    A giant elevator

    Project leaders

    Commissioning authority

    Communaut urbaine de Bordeaux

    direction des Grands travaux et des Investissements de dplacement

    direction de la Voirie service des Ouvrages dart

    Design and construction consortiumVinci construction (GTM Sud Ouest TP GC)

    Technical Design EGIS-Jean Muller International

    Architecture and structures: Lavigne et Cheron Michel Virlogeux

    Glass Coveris

    Concrete supplier Garandeau

    Concrete reinforcement Cepaba

    Lift design Hardesty & Hanover

    Construction and installation of steel framework Cimola, Sarens

    Technical inspections Socotec

    Topographical supervision Pedezert-Labeille

    Diving (foundations) S. Romoeuf

    Power supply Vinci Energie

    Energy and information technology GTM Santerne

    Automated systems Actemium

    Telecom systems Axens

    Underwater cables Cepeca

    Health and safety GM Qualit

    External checks SNCF - Dpartement des Ouvrages dArt

    Lighting design Y. Kersal

    Lighting Citeos

    Lifting system operator Eiffage Construction Mtallique

    Communaut urbaine de Bordeaux

    05 56 99 84 84

    Graphic Design Le Big, in partnership

    with the Cubs Communications Department

    TextCub

    technical data sheet for the Chaban-Delmas Bridge

    Drum

    Downstream column

    Upstream column

    Base P3

    Right bank Bastide

    Secondary reducer

    Motors and primary reducer

    Secondary reducer

    Drum

    River Garonne

    Further informationwww.pontchabandelmas.lacub.fr

    Cap Sciences observation kioskHangar 20 - Quai de Bacalan 33300 Bordeaux tl. +335 56 01 07 07 www.cap-sciences.net