HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 1

         

PART – 2 - TECHNICAL   

Page 2: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 2

         

2.1 Specification for Supply of LPG Pumps at various locations

         

CONTENTS A. SPECIFICATIONS FOR API PUMPS

B. DRAWING & DATA REQUIREMENTS C. SPECIFICATIONS FOR 3 PHASE MV MOTORS D. MOTOR DATA SHEET (ATTACHED SEPERATELY)

E. PUMP DATA SHEET (ATTACHED SEPERATELY) F. MATERIAL OF CONSTRUCTION

Page 3: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 3

A. SPECIFICATIONS FOR API PUMPS 1.0 GENERAL 1.1 Scope This specification together with the design data sheets covers the requirements for Centrifugal

Pumps & Drivers. The LPG Pumps shall conform to API 610 (10th Edition). The vendor shall separately indicate the deviations from the code, if any.

The provisions of API 610 (10th Edition), shall supersede the specifications given below. In case of any conflict, deviation or discrepancy, the same shall be brought out by the bidder clearly in their ‘Unpriced Bid’ Where ever there is a conflict/mismatch in interpretation of various terms the following sequence of prioty order shall be considered with No 1 having the max weightage and No 5 the Minimum. 1. BOQ & Item Description in Tender Line 2. Data Sheets provided by Consultant M/s Worley parsons, Mumbai 3. Special terms & Conditions 4. Technical Specifications 5. General Terms & Conditions The Scope shall include but not limited to

• Inspection and Testing as specified.

• Submission of documents as specified.

• Painting as specified.

• Preparation of shipment and delivery to site.

• Spares for two years normal operation.

• Start-up spares and commissioning spares.

• Vendor recommended special tools as included in offer

• Any other items, required to make system complete.

1.2 Engineering Services

The Vendor shall provide engineering services, which shall include, but not necessarily be limited to, the following:

• Providing/coordinating detailed design of all equipment and components within the scope of supply.

• Resolving engineering queries related to the equipment and components within the scope of supply.

Page 4: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 4

• Performing all relevant calculations pertaining to the equipment and components within the scope of supply. Providing all Performance Curves related to the Equipments

• Providing progress reports etc.

• Providing expediting services for all sub-vendors.

• Providing quality assurance, including all sub-vendors with respect to ISO 9000 or equivalent.

• Quality Assurance.

• Supervision of Installation/erection and commissioning.

• Training of client’s personnel at site / Vendor’s shop.

1.3 Exclusions

• Installation/Erection, Testing & Commissioning.

• Power & Control Cables and associated cable glands & lugs.

1.4 Modifications Any exceptions or additions to this specification shall be mentioned on the design data sheet. 1.5 Duty The pump shall be suitable for continuous duty. 2.0 DESIGN 2.1 General Design pressure shall be defined as the sum of the maximum suction pressure plus the peak

differential pressure developed with maximum diameter impeller. Pumps shall preferably operate at standard electric motor speeds for the maximum rated output. 2.2 Drivers Motor drivers shall be selected with the following margins over the absorbed HP of the pump at

the design duty point. ---------------------------------------------------------------------------------------------------------

Motor Ratings (% of Absorbed HP) Range of absorbed HP of the pump Motors with Motors with

unity service 1.15 service

Page 5: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 5

factor factor --------------------------------------------------------------------------------------------------------- Upto 25 HP 125 115 Above 25 upto 100 HP 115 105 Above 100 HP 110 100 ---------------------------------------------------------------------------------------------------------

However, the motor shall not be less than the maximum absorbed HP for the selected impeller. 2.3 Vibration & Balance All rotating parts shall be statically balanced. Impellers shall be dynamically balanced if the pump is to be operated at any of the following

conditions:

i) At speeds over 1,800 rpm if rated capacity exceeds 70 Cu.M./hr. and impeller diameter is more than 150 mm.

ii) At speeds over 1,800 rpm for two or more stages. iii) At speeds over 3,800 rpm. During operation at maximum continuous speed or at any other specified operating speed, the

double amplitude of vibration in any plane measured on the shaft adjacent to the bearing housing shall not exceed the values given below :

--------------------------------------------------------------------------------- Rated speed RPM Double amplitude Centimeters --------------------------------------------------------------------------------- Through 1000 RPM 0.00752 Over 1000 through 4000 0.00635 Over 4000 through 6000 0.00508 Over 6000 0.00381 --------------------------------------------------------------------------------- Where it is not possible to measure vibrations on the shaft, the total amplitude of vibration shall

be measured at both bearings or bearing housing and shall not exceed 50 percent of the foregoing values.

Critical speeds shall be at least 20 percent above or below the normal operating speeds for pumps

with flexible shafts and at least 20 percent above the maximum operating speed for pumps with stiff shafts.

Page 6: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 6

2.4 Flanges Suction and discharge connections shall be flanged in accordance with ANSI B 16.5 300#

Welded Neck Raised Flanges, standards and the suction flanges should be designed for the same pressures as the discharge flanges to permit testing under the required full test pressure.

2.5 Castings No carbon steel bolting shall be used in steel pumps, ASTM-A 193, Grade B7 or equivalent shall

be used, except as noted for special services. Pumps in vacuum service shall be provided with vents consisting of extra heavy seamless nipples

and forged steel valves. All casings shall be provided with 20 mm minimum plugged drain connections. The casing

drains of pumps handling corrosive fluids containing erosive solids shall have bar stock plugs, ground flush with the inside of the casing.

All tapped holes shall be plugged with solid plugs. This shall include cooling water

connections, stuffing box connections and seal gland plate connections as well as vent and drain connections. Carbon steel plugs shall be used in tapped holes in cast iron parts. For other than cast iron parts, the plugs shall be of the same metal as the parts containing the tapped holes. Plugs shall have shanks at least 40 mm in length to permit the use of a pipe wrench.

2.6 Impellers Impellers shall have the characteristics of generally decreasing head with increasing capacity

from shut off to normal capacity. In boiler feed service, shut off head shall be approximately 20 percent higher than the design point head.

Pump shall have an impeller of size which is mid way between the maximum and minimum sizes

or near the minimum size. Where more than one pump is specified, they shall have identical characteristics for running

successfully in parallel. The tenderer shall state the minimum permissible capacity at rated speed without excessive

temperature rise and radial thrust. Where necessary, an automatic by pass connection shall be provided to prevent excessive temp. rise at zero flow. Automatic recirculation valve of Key stone/ Schroedahl make shall be supplied along with each set of pumps.

Page 7: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 7

Suitable thrust balancing arrangement should be incorporated in the design. 2.7 Shaft and shaft sleeves Shafts shall be of ample size to transmit the maximum driver horse power and designed to

withstand operation for the entire head capacity range. Shafts shall be provided with sleeves securely locked to the shaft. When the size of the pump

makes the use of shafts sleeve impracticable, the shaft shall be made of a wear resistant material for packed pumps and of a corrosion resistant material for pumps with mechanical seals.

Shaft sleeves shall be sealed at one end. The end of the shaft sleeve assembly (or nut) shall

extend beyond the outer face of the packing gland. 2.8 Bearings The bearings and bearing lubrication system shall be selected for the service conditions and shall

be capable of operating continuously with a lubricant outlet temperature not exceeding 75_ C at any bearing when the ambient temperature is 35 degree C. Thrust bearings shall require no water cooling.

Bearings shall have minimum rated life of 25,000 working hours (B-10 rating). Bearing housing shall be designed to prevent entry of gland leakage, water or dust. Oil lubricated bearings shall be equipped with constant level oilers. The bearing shall be anti

friction type with rotation independent automatic lubrication by internal oil circulation. Grease lubricated bearings shall not be used. Pump design shall be capable of withstanding reverse rotation for a short duration. Difference between NPSHR – NPSHA shall be 1.0 M (min) 2.10 Piping System Gland seal piping and flushing oil manifolds at the pumps shall include dial type thermometer

and pressure gauges with steel bourbon tubes having welded connections. When the pump suction pressure is below atmospheric, combination vacuum pressure gauges shall be furnished.

Page 8: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 8

Cooling water manifolds for closed system shall include sight flow indicators and inlet and

outlet shut off valves. Balancing lines for multi-stage pumps shall be made up with flanged joints; screwed unions

are not acceptable. Cooling water, gland oil and recirculating piping systems, including all accessories such as

gauges, valves, etc. shall be furnished fully assembled and installed on the pump. The piping shall be arranged to follow the pump contour as closely as possible and shall be adequately supported.

When mechanical seals with pumping rings are specified, a cooling water system complete and

cooler shall be provided. 2.11 LPG Tandem Double Mechanical Shaft Seals with flushing plan 52 Double mechanical seal arrangement is required as a preventive measure to avoid leakage of

product in case of failure of the primary seal. Flushing arrangement will give the indication about the failure of the primary seal.

The total assembly for independent operation of the pump shall be supplied by the vendor. The

arrangement consists of the following major components. 1. The total mechanical seal arrangement. 2. Flushing arrangement

Flushing pot :

Capacity : As required ( vendor to specify) Design Pressure : 46 Kg / Sq. Cm g Design code for the flushing tank pot : ASME SEC VIII Div. 2

Flushing pot is to be provided with cooling coils to cool down the barrier liquid flowing through the pot. Flow rate as required to be maintained through the cooling coil.

Level indicator.

As level indicator along the Level switch to give alarm at the low fluid level in the Flushing pot and a press switch to indicate failure of the primary seal.

Page 9: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 9

All the pipe fittings, valves, flow indicator, press indicator, manifold, flanges etc. required for the

flushing arrangement are in the scope of supply of the vendor.

Drawings to be submitted at the offer stage along with the other drawing :

1. Double mechanical seal arrangement. 2. Flushing system layout.

MATERIAL OF CONSTRUCTION All the equipment & pipe fittings for flushing unit are to be of SS 304.

2.12 Coupling Spacer type couplings shall be used on vertical shaft pumps equipped with mechanical seals

to permit seal replacement without disturbing the prime mover. Where motor half couplings are fitted by the pump supplier, he shall take full responsibility for

correct fitting or alignment. Threaded couplings shall preferably be used only with hollow-shaft motors which have a non

reverse rachet. If threaded couplings are used on vertical pumps, they shall be secured against reverse rotation without the use of set screws.

When gear type couplings are specified, they shall be heavy duty, forged steel, flexible spacer and

lubricated type. When disc type couplings are specified, the flexible discs shall be stainless steel.

Page 10: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 10

B. VENDOR DRAWING & DATA REQUIREMENTS

ROTATING EQUIPMENT - ASSOCIATED AUXILIARY EQUIPMENT 1.0 GENERAL 1.1 This specification, together with appropriate Vendor Data Requirement forms, defines

requirement for vendor drawings and data on rotating equipment. 1.2 BIDDERS UNABLE TO COMPLY WITH THESE REQUIREMENTS MUST DETAIL

ALL EXCEPTIONS IN THEIR PROPOSAL. The timely delivery of quality drawings and data is as crucial to an Engineering schedule as

delivery of the equipment itself is to a construction schedule. 1.3 FAILURE TO PROVIDE ADEQUATE PRELIMINARY DRAWINGS AND DATA MAY

RENDER A PROPOSAL "NON-RESPONSIVE". 1.4 AFTER COMMITMENT, FAILURE TO PROVIDE TIMELY AND QUALITY "ADVANCE

CERTIFIED" DRAWINGS AND DATA MAY DELAY PROGRESS, PAYMENTS AND MAY ADVERSELY AFFECT FUTURE INVITATION TO BID.

2.0 PRELIMINARY DRAWINGS AND DATA 2.1 SCHEMATICS OR FLOW DIAGRAMS Shall include reasonably accurate gas or fluid flows, lube, seal oil and control oil, all

instrumentation, valves, safety devices and control schemes. 2.2 DIMENSIONED OUTLINE DRAWINGS For all equipment whether base plate mounted or not, the outline drawings shall include

approximate weights, overall dimensions, size, rating and approximate locations of main nozzles, centerline height and shaft extension details, approximate dismantling clearances and approximate handling weights. They shall also include the approximate location of main electrical connections.

2.3 CROSS SECTION & DETAIL DRAWINGS

Page 11: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 11

Shall include main construction features, details of seals, bearings and other mechanical details such as the governor of the driver.

2.4 PREDICTED PERFORMANCE CURVES These curves shall include the specified duties and design conditions as required on the enquiry

data sheets. 3.0 CERTIFIED DRAWINGS AND DATA 3.1 After commitment/placement of P.O. and after preliminary drawings and data are submitted, the

vendor shall provide certified drawings and data as specified below. DIMENSIONED OUTLINE DRAWINGS The vendor supplying the driven equipment shall submit a combined dimensioned outline

drawing of pump and driver. This drawing(s) shall include :

a) Dimensions of base plates complete with diameter, number and location of bolt holes and thickness of metal through which bolt must pass.

b) Locating or tie-in dimensions of the equipment relative to the base plate. c) Identification, size, rating and location of every terminal connections. The terminal

connections referred to above shall include main suction and discharge nozzles, cooling water, lube seal and control oil, ventilating and instrument air, casing vents and drains, instrument and electrical connections.

d) All horizontal and vertical clearances necessary for dismantling purposes with location of

lifting lugs. e) Maintenance weights and name of part. f) Direction of rotation of each component part of main train. g) Magnitude and direction of the expansion movement of main nozzles and the permitted

piping forces and moments on the nozzles.

Page 12: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 12

Dimensioned outline drawings shall also be provided for Auxiliary Equipment. This covers equipment whether or not mounted on the main base plate and includes lube and seal oil system, overhead tanks and seal oil traps.

FOUNDATION LOADING DIAGRAMS These drawings shall include : a) Maximum operating weight with loading diagram. b) Size and location of foundation cut-outs, if required, for downward nozzles and drains.

c) The location and magnitude of out-of-balance forces and moments transmitted to the foundation for reciprocating compressors and/or drivers.

SCHEMATIC WIRING AND/OR FLOW DIAGRAMS These drawings shall include :

a) The final definition of the gas or fluid flows, lube, seal oil and control oil, all instrumentation valves, safety devices and control schemes.

b) Components and Instrument Lists : These are lists of all components and instruments

show on the schematics identifying the manufacturer and type, with operating and design conditions and settings. The same symbol shall be used on outline drawings and schematics for consistent identification of each terminal connection.

DETAIL DRAWINGS Cross sectional drawings and detail drawings. GA Drgs shall be submitted to HPCL within 02 weeks of placement of PO ERECTION/ASSEMBLY DRAWINGS In accordance with the standard practice of the manufacturer. CALCULATIONS Torsional and lateral critical speed analysis of the complete rotating assembly. The documents

shall include :

Page 13: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 13

a) Description of system analysed. b) Component details such as shaft stiffness, masses, inertias. c) Calculation method. d) Calculated natural frequencies and maximum stresses. e) Conclusions including comments on possible exciting forces and frequencies. PREDICTED PERFORMANCE CURVES These curves shall include the specified duties and design conditions as required on the data

sheet. MANUFACTURER'S DATA REPORTS a) Mill and material test certificates. b) Hydrostatic test certificates for pressure containing parts. c) Rotor Balance Report. d) Over speed Test Report. PERFORMANCE TEST REPORTS Performance test reports submitted must be certified and reflect the test requirements specified

and agreed. Performance test shall be witnessed by TPI or HPCL Engineer at the manufacturers shop.

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS In accordance with the standard practice of the manufacturer. THIRD PARTY REQUIREMENTS All the materials shall be inspected by third party agencies. Test Certificates/Inspection

Certificates/Test Reports and third party inspection report shall be submitted at the time of delivery. Approved third party inspection agencies are:

1. M/s. Lloyds 2. M/s. Bureau Veritas

Page 14: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 14

3. M/s. Indian Register of Shipping 4. M/s EIL 5. M/s PDIL 6. M/s DNV 7. M/s TUV RECOMMENDED SPARE PARTS LIST The vendor shall supply complete spares part list within 02 weeks of Placement of PO. The list of

minimum required spares is mentioned under NOTES OF SOQ in the tender enquiry. Vendor to quote their rates of Recommended Spares of 02 Years operation based on the 02 items mentioned under NOTES of SOQ only

C. SPECIFICATIONS FOR 3 PHASE MEDIUM VOLTAGE INDUCTION MOTORS 1.0 SCOPE 1.1 This specification covers the general requirements for 3 phase medium voltage induction motors.

The motor to be supplied shall be suitable for operation through a Variable ( 0 – 100%) Frequency Drive for optimum energy utilization. Supply of the VFD is not included in the scope of this tender.

2.0 DELETED 3.0 Standards

All motors shall comply, wherever applicable with the latest issues of the following standards: IS : 325 - Three phase induction motors. IS : 1231 - Dimensions of three phase foot mounted motors. IS : 2148 - Flame proof enclosures of electrical apparatus. IS:2223 Dimensions of flange mounted A.C. induction motors. IS:2253 Designations for types of construction and mounting arrangements of rotating

electrical machinery. IS : 2254 - Dimensions of vertical shaft motors for pumps.

Page 15: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 15

IS : 2968 - Dimensions of slide rails for electric motors. IS : 4029 - Guide for testing three phase induction motors. IS : 4691 Degrees of protection provided by enclosures for rotating electrical machinery. IS : 4722 - Rotating electrical machines. IS : 4728 - Terminal marking and direction of rotation for rotating electrical machinery. IS : 4729 - Measurement and evaluation of vibration of rotating electrical machines. IS : 4889 - Methods of determination of efficiency of rotating electrical machines. IS : 6362 - Designation of methods of cooling for rotating electrical machines. 4.0 General Description

4.1 The motors shall be liberally designed as regards its pull-out torque, pull-out voltage and its ability to ride through voltage dips during system disturbances.

4.2 Motor frame sizes shall be in accordance with I.E.C. Recommendation in the absence of Indian Standards.

4.3 Motors for hazardous areas shall be of a design for which approval has been obtained from the Central Mining & Research Station, Dhanbad, for use in the divisions of areas specified.

4.4 All motors approved as per clause 4.3 above shall have a separate name plate carrying the details of such approval an d fixed adjacent to the main plate.

4.5 The motors shall have additional accessories like space heaters, embedded temperature detectors etc. if specified in the data sheet.

5.0 Weather Proofing / Explosion proof

5.1 Motors specified with weather proof / explosion proof enclosures, shall be suitable for out-door operation subjected to direct sun and rain without further protection (like canopy, hood etc.) from the weather.

6.0 Insulation

Page 16: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 16

6.1 The windings shall be insulated with the class of insulation specified in the data sheet.

6.2 The windings shall be given protective coatings to withstand service in the environment

specified.

6.3 The windings shall be provided with moisture protective coating to prevent absorption of moisture.

7.0 Terminal Boxes

7.1 All the six ends of the winding shall be brought out to the terminal block and marked.

7.3 Terminal box shall be on the right hand side of the motor when viewed from the shaft end unless specified otherwise in the data sheet.

7.4 Double compression type cable glands of CCOE approved make suitable for cable sizes given in the motor data sheet shall be provided for the terminal boxes.

7.5 If space heaters, embedded temperature detectors etc. are specified in the data sheet, separate

terminal boxes with compression type cable glands shall be provided for the same. If the motor is flame proof, these terminal boxes and cable glands shall also be flame proof, double compression type approved by CMRS, Dhanbad.

7.6 In case capacitors are envisaged to be connected to the motor terminals (as indicated in the data sheet) the terminal box shall be of a special design by which sufficient creepage space between terminals is available and also the terminal box shall be provided with two sets of cable glands.

7.7 Terminal box covers and cable gland entries shall be effectively sealed against the entry of moisture and dirt, before the motor leaves the factory.

8.0 Name Plate

8.1 All nameplates shall be of stainless steel.

8.2 Ambient temperature for which the motor is designed, type and name of lubricant and bearing members, shall be indicated in the name plate.

9.0 Lifting Facility

Page 17: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 17

Suitable lifting facility shall be provided for the motors. 10.0 Lubrication

Grease migration shall be prevented.

11.0 Special Requirements

11.1 Where any special requirement such as degree of protection to enclosures, thermal cut-outs,

special cable boxes, extra starting torque or supply of half coupling etc. are specified in the order, these details shall be clearly recorded in the test certificates or in an attached supplement.

11.2 Details of bearings shall be given in the test certificates to facilitate ordering or spares. 12.0 Standby Duty

All motors shall be capable of standing idle for long periods without damage to be bearings. 13.0 Motors ordered with driven machines Where a motor is supplied with a driven machine, the driven machine supplier shall be

responsible for the suitability of the motor for the equipment, correctness of the motor test certificates and for the arrangements of couplings and for all damage and defects arising from faulty alignment or vibration etc. and shall guarantee reasonable defect liability period. The guarantee period for motor shall be at least the same as that for the driven equipment.

14.0 Methods of starting All motors are envisaged to be started direct on line, unless otherwise specified in the data sheet. 15.0 Number of Starts. All motors shall be suitable for 3 cold and 2 hot consecutive starts unless specified otherwise in

the data sheet. 16.0 Direction of Rotation All motors shall be suitable for operation in both directions. 17.0 Final Colour

Page 18: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 18

Final color of all motors and pump shall be Aircraft blue - Shade No. 356-as per IS : 5. Bass frame shall be of Jet black.

NOTES: 1. Schedule of technical particulars of motors should be filled in and submitted with the offer . 2. Items marked * in the MV Induction Motor Data Sheet should be filled in by the vendor. 3. Motors located out door shall be protected by a 1.5-mm thick mild steel canopy. 4. The motor rating shall be chosen as given below: Range of absorbed KW Motor Rating Upto 18.5 KW Not less than 125% of absorbed KW 18.5 KW - 75 KW Not less than 115% of absorbed KW

Above 75 KW Not less than 110% of absorbed KW 5. The motor shall be so chosen that the start-up time at 80% of the voltage of the motor when

driving the specified load is less than the starting current withstand time (hot) of the motor. 6. If indigenous motors are offered the motors shall be of Siemens, NGEF, Kirloskar, Crompton

Greaves or Bharat Bijlee make only. No other indigenous make of Motor will be accepted.

VENDOR’S SCOPE OF SUPPLY

Pumps Drive Common Base Plate Coupling Guard Coupling Match Flanges Automatic Recirculation Valve (1 no. per pump )

Mechanical Seal Lubricator Foundation Bolts Air Relief Valve Motor Stool Differential Pr. switch

Material of Construction: S-5 / S-6 as per API 610 (8th & 10th edition). No deviation with respect to the Material of Construction for the Pump shall be accepted.

Page 19: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 19

SCHEDULE OF TECHNICAL PARTICULARS OF MOTORS 1. Make of motors : 2. Equipment No. : 3. Motor Rating : 4. Speed in RPM (Syn) : 5. Frame size : 6. No load current(Amps) : 7. No load power input : 8. Full load current(Amps) : 9. Starting current(% FLC) : 10. Full load torque(Nm) : 11. Starting torque (% FLT) :

12. Pull up torque (% FLT) : 13. Pull out torque : 14. Slip (percentage) : 15. Efficiency (%) and power factor : 15.1 At full load : 15.2 At 3/4 load : 15.3 At 1/2 load :

Page 20: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 20

16. No load power factor : 17. Power factor starting : 18. Stator resistance : 19. Total resistance : (with respect to stator) 20. Total leakage reactance : (with respect to stator) 21. Short circuit impedance : 22. Locked rotor withstand time: 22.1 Hot (seconds) : 22.2 Cold (seconds) : 23. Starting time of motor on : DOL with driven equipment coupled. 24. Minimum voltage required for: starting with the equipment and corresponding starting time. 25. Pull out volume at full load : 26. Allowable number of succ- : essive starts with driven equipment. 26.1 From cold condition : 26.2 From hot condition : 27. Time interval required :

Page 21: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 21

for restarting the motor after the permissible successive starts. 28. Guaranteed temperature : rise under worst condi- tions of voltage and frequency. 29. Maximum allowable sustained :

voltage drop and the time in seconds the motor can be kept running with full load without exceeding the permissible temperature rise. 30. Design class of rotor as per : NEMA standards. 31. GD square value of rotor in : KG sq. M. 32. Speed Vs. torque curve : 33. Current Vs. time curve : 34. Current Vs. speed curve : 35. Thermal withstand : characteristics (hot & cold) 36. Start withstand time : 36.1 Hot (seconds) : 36.2 Cold (seconds) : 37. Time constants (seconds) : 37.1 Stator time constant :

Page 22: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 22

37.2 Rotor time constant : 38. CCOE Certificate (for : Flame-proof motors) 40. Bearings 40.1 Drive end bearing no. : 40.2 Non-drive end bearing no. : 40.3 Make of bearings : SKF / FAG 41. Lubricant : 41.1 Make : 41.2 Type : 41.3 Lubrication schedule of motor : 42. Percentage residual voltage re- :

connection allowed. 43. Slip ring motors : 43.1 Rotor open circuit voltage : 43.2 Rotor current : 43.3 Make of brush : 43.4 Grade of brush : 43.5 Details of starting resistance : 44. Nett weight of motor : 45. Shipping weight of motor : 46. Shipping volume of motor :

Page 23: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 23

GENERAL SPECIFICATION FOR 3 PHASE MV INDUCTION MOTORS

(FOR MOTORS SUPPLIED ALONGWITH DRIVEN EQUIPMENTS) 1. Vendor Data Requirements ________________________________________________________________________

With Within Before quotation 1 month dispatch of P.O. ________________________________________________________________________ 1. Data Sheet SP SP SP (Initial) ( final) 2. Schedule of technical SP SP particulars (final) 3. Dimensioned General Arrangement drawing SP 4. Speed-torque curve of motor and drive eqpt. SP 5. Current VS time curve SP 6. Current VS speed curve SP 7. Thermal withstand chara- cteristics (hot & cold) SP 8. Terminal box drawing SP 9. Itemwise acceptance or

Page 24: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 24

deviations, if an, from the specifications SP 10. Spare parts list SP 11. Erection, operation and Maintenance Manual SP NOTE: 1. 'SP' stands for prints. 2. Where requirements as indicated here conflict with those given in other

documents, the former shall prevail. SPECIFICATIONS FOR CENTRIFUGAL PUMPS OPERATING CONDITIONS FLUID : LPG ANALYSIS : C3 AND C4 HYDRO CARBONS SPECIFIC GRAVITY : 0.5033 VAPOUR PRESSURE : 9.54KG./SQ CM AT 38 DEGREE C VISCOSITY : 0.209 CST TEMPERATURE AMBIENT : 38 DEG C & above CAPACITY MAXIMUM : * : * NORMAL : AS DETAILED IN CHART BELOW LOCATION HAZIRA CAPACITY 240 CUM/Hr PURPOSE Product Transfer from ONGC Complex to

Hazira HPCL LPG plant Qty in Nos 2 Diff Head MLC 138 Suction Pressure AS PER ENCLOSED DATA SHEET Discharge Pressure AS PER ENCLOSED DATA SHEET

Page 25: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 25

SPECIFICATION MAKER'S NO. * PERFORMANCE CURVE NO. * OUTLINE DRAWING NO. * FOUNDATION DRAWING NO. * MOTOR SPECIFICATION NO. * SAFE MIN. FLOW * PUMP TYPE HORIZONTAL CENTRIFUGAL MULTISTAGE LPG PUMP NPSH (REQD.) * NPSH (AV) : PUMP SHUT OFF HEAD ROTATION (FACING PUMP COUPLING) * IMPELLER TYPE * IMPELLER DIA * MIN. MAX. DESIGN SPEED RPM CASING SPLIT * SHAFT SEAL TYPE MECH. SEAL Double seal Tandem type of Burgmann

/ sealol ( EPIL ) / Dura metallic SUCTION NOM BORE * SUCTION FLANGE STD ANSI * B 16.5 300# WNRF DELIVERY NOM BORE *

Page 26: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 26

DELIVERY FLANGE STD ANSI * B 16.5 300# HYDRAULIC TEST PRESSURE * BASE PLATE TYPE * PERFORMANCE TEST AT SITE * AT SHOP * ABSORBED SHAFT HP AT NORMAL FLOW * EFFICIENCY * ABSORBED SHAFT HP AT MAX. FLOW * RECOMMENDED MOTOR HP * MOTOR SPEED MOTOR TORQUE REQD. AT START * MOTOR TORQUE REQD. AT FULL LOAD * WR VALUE OR DRIVEN MACHINE * COUPLING TYPE METALLIC * COUPLING GUARD NON SPARKING * ALUMINIUM DRIVE DIRECT * LUBRICATION OF PUMP BEARINGS * OIL GEARS LIQUID * STUFFING BOX/MECH. SEAL SEALANT * SEALANT INJECTION PRESSURE * WATER COOLED PARTS* i) BEARINGS CU. M./HR. *

Page 27: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

HINDUSTAN PETROLEUM CORPORATION LIMITEDLPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,

MUMBAI-400001

Signature and Seal of the Bidder Page | 27

ii) STUFFING BOX CU.M./HR. * iii) MECHANICAL SEAL CU.M./HR * iv) GEAR BOX CU.M./HR. * MOTOR SUPPLIED * COUPLING SUPPLIED * FOUNDATION BOLTS SUPPLIED * MOTOR HALF COUPLING FITTED * COMPLETE DRIVE UNIT ALIGNED * NETT SHIPPING WEIGHT PUMP * NETT SHIPPING WEIGHT MOTOR * SHIPPING VOLUME * MAKE OF ARC VALVE * SIZE OF ARC VALVE *

F. MATERIAL OF CONSTRUCTION Material of Construction shall be strictly S-5 / S-6 as per API 610 (10th edition)   

Page 28: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 29: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 30: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 31: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 32: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

Equipment Data Sheet for Centrifugal Pump (BB)Tag No. : Client: Hindustan Petroleum Corporation LimitedService: Transfer of LPG Plant Location: ONGC, HaziraP & ID No. : 435-JH0911-10-PR-PID-1001 Supplier:Calculation Ref. : Purchase Order No.:No. of Units:Service Description: LPG

1 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER2 DATA SHEETS (6.1.1)

3 NO.4 PUMP5 MOTOR6 GEAR7 TURBINE8 APPLICABLE OVERLAY STANDARD(S): API 610 10TH EDITION (HOLD) NUMBER OF STAGES:9 OPERATING CONDITIONS (5.1.3) LIQUID (5.1.3)

10 FLOW, NORMAL (m3/h) RATED (m³/h) LIQUID TYPE OR NAME Refer service description & process data (Sheet 2 of 5)11 OTHER Refer Sheet 2 of 5 HAZARDOUS FLAMMABLE (5.1.5)1213 SUCTION PRESSURE MAX./RATED 1109.3 / (kpaA) (Refer process data S14 DISCHARGE PRESSURE (kpaA) PUMPING TEMP (°C)15 DIFFERENTIAL PRESSURE (kpaA) VAPOR PRESS. (kpaA)16 DIFF. HEAD (mlc) NPSHA (m) RELATIVE DENSITY (SG):17 PROCESS VARIATIONS (5.1.4) Note 15 (For tripping of the pump) VISCOSITY (cP)18 STARTING CONDITIONS (5.1.4) SPECIFIC HEAT, Cp (kJ/kg °C)19 SERVICE: CONT. INTERMITTENT (STARTS/DAY) CHLORIDE CONCENTRATION (PPM)20 PARALLEL OPERATION REQ'D (5.1.13) H2S CONCENTRATION (6.5.2.4) (PPM) WET (5.2.1.12c)

21 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT (5.12.1.9)2223 LOCATION: (5.1.30) MATERIALS (5.12.1.1)

24 INDOOR (covered location) HEATED OUTDOOR UNHEATED ANNEX H CLASS (5.12.1.1) S625 ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) MIN DESIGN METAL TEMP (5.12.4.1) 0 (°C)26 CL 1 ZONE 1 GR IIA, IIB DIV T3 REDUCED HARDNESS MATERIALS REQ'D. (5.12.1.11) Yes27 WINTERIZATION REQ'D TROPICALIZATION REQ'D. BARREL/CASE IMPELLER28 SITE DATA (5.1.30) CASE/IMPELLER WEAR RINGS

138

P-10-001 A/B

1786

P-10-001 A/BM-10-001 A/B

0.5 @ 35 DEG.C

240 240

MAX.35.00

MIN.

NORMAL

Two (2); (1 working + 1 standby)

Centrifugal Pump Data Sheet to API 610, 10th Edition

REVISIONS

ITEM NO. BYATTACHED ITEM NO. ATTACHED ITEM NO.

1092.83676.56

ATTACHED DATE

0.097413.35

( )29 ALTITUDE (m) BAROMETER (bara) SHAFT30 RANGE OF AMBIENT TEMPS: MIN/MAX. / (°C) DIFFUSERS31 RELATIVE HUMIDITY: MIN / MAX / (%) BOLTING PTFE coated A193 Gr. B732 UNUSUAL CONDITIONS: (5.1.30) DUST FUMES PERFORMANCE:

33 OTHER PROPOSAL CURVE NO. RPM34 IMPELLER DIA. RATED MAX. MIN. (mm)35 IMPELLER TYPE36 DRIVER TYPE RATED POWER (kW) EFFICIENCY (%)37 INDUCTION MOTOR STEAM TURBINE GEAR MINIMUM CONTINUOUS FLOW:38 OTHER THERMAL (m3/h) STABLE (m3/h)39 PREFERRED OPER. REGION TO (m3/h)40 MOTOR DRIVER (6.1.1 / 6.1.4) ALLOWABLE OPER. REGION TO (m3/h)41 MANUFACTURER MAX HEAD @ RATED IMPELLER (m)42 (kW) (RPM) MAX POWER @ RATED IMPELLER (kW)43 FRAME ENCLOSURE NPSHR AT RATED CAPACITY (m) (5.1.10)44 HORIZONTAL VERTICAL SERVICE FACTOR MAX SUCTION SPECIFIC SPEED: (5.1.11)45 VOLTS/PHASE/HERTZ MAX. SOUND PRESS. LEVEL REQ'D (dBA) (5.1.16)46 TYPE EST MAX SOUND PRESS. LEVEL (dBA) (5.1.16)47 MINIMUM STARTING VOLTAGE (6.1.5) EST MAX SOUND POWER LEVEL (dBA) (5.1.16)48 INSULATION TEMP. RISE UTILITY CONDITIONS (5.1.3)49 FULL LOAD AMPS ELECTRICITY50 LOCKED ROTOR AMPS DRIVERS51 STARTING METHOD CONTROL52 LUBE SYSTEM VOLTAGE DIP OTHER (6.1.5)5354 BEARINGS (TYPE/NUMBER): STEAM MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.55 RADIAL / DRIVERS56 THRUST / HEATING57 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE58 UP (N) DOWN (N) SUPPLY TEMP. (°C) MAX. RETURN TEMP. (°C)59 NORM. PRESS. (barg) DESIGN PRESS. (barg)60 REFER MOTOR DATA SHEET MIN. RET. PRESS. (barg) MAX. ALLOW. D.P. (barg)61 CHLORIDE CONCENTRATION: (PPM)6263646566

ARev.

Hindustan Petroleum Corporation LimitedCLIENTHPCL

Project No: 435/JH0911 SHEETDatasheet No: 435-JH0911-10-ME-DAS-0005-001 1 of 4

VTS

N/A

VTS

VTS

415 V240 V

ClientApprovedKMNP

501 ph 50

VOLTAGE

80%

N/A

3 ph

HERTZ

12,800 SI Units85 @ 1.0 m

PHASE

Date Issue Description Originated CheckedSCW SH

90

14-May-10 Issued for Review

YESVTSVTSVTS

5005

Page 33: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

Equipment Data Sheet for Centrifugal Pump (BB)Tag No. : P-10-001 A/B Client: Hindustan Petroleum Corporation LimitedService: Transfer of LPG Plant Location: ONGC, HaziraP & ID No. : 435-JH0911-10-PR-PID-1001 Supplier:Calculation Ref. : Purchase Order No.:No. of Units:Service Description: LPG

1 CONSTRUCTION SURFACE PREPARATION AND PAINT

2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)3 PUMP TYPE: (4.1) Vendor shall furinsh manufacturer painting standard with the bid.4 BB1 BB2 BB3 BB5 Other PUMP:5 CASING MOUNTING: PUMP SURFACE PREPARARTION6 CENTERLINE NEAR CENTERLINE PRIMER7 FOOT FINISH COAT8 CASING SPLIT BASEPLATE: (6.3.17)9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION

10 CASING TYPE: PRIMER11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT12 BETWEEN BEARINGS BARREL DETAILS OF LIFTING DEVICES(6.3.20)13 CASE PRESSURE RATING: SHIPMENT: (7.4.1)14 MAX ALLOWABLE WORKING PRESSURE (barg) DOMESTIC EXPORT EXPORT BOXING REQUIRED15 @ (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS16 HYDROTEST PRESSURE (barg) SPARE ROTOR ASSEMBLY PACKAGED FOR:17 SUCTION PRESSURE REGIONS MUST BE DESIGNED SHIPPING CONTAINER (8.2.8.3) VERTICAL STORAGE (8.2.8.2)18 FOR MAWP (5.3.6) TYPE OF SHIPPING PREPARATION N2 PURGE (8.2.8.4)19 NOZZLE CONNECTIONS: (5.4.2) HEATING AND COOLING

20 SIZE FLANGE FAC'G HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D.21 RATING COOLING WATER (C.W.) PIPING PLAN (6.5.4.1)22 SUCTION C.W. PIPING:23 DISCHARGE PIPE TUBING; FITTINGS24 BAL. DRUM C.W. PIPING MATERIALS: 25 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) S. STEEL C. STEEL GALVANIZED26 NO. SIZE (NPS) COOLING WATER REQUIREMENTS:TYPE

POSITION

300# 300#

Two (2); (1 working + 1 standby)

Centrifugal Pump Data Sheet to API 610, 10th Edition

27 DRAIN BEARING HOUSING (m3/h) @ (bar)

28 VENT HEAT EXCHANGER (m3/h) @ (bar)

29 PRESSURE GAUGE30 TEMP. GAUGE STEAM PIPING: TUBING PIPE31 WARM-UP BEARINGS AND LUBRICATION

32 BALANCE/LEAK-OFF BEARING (TYPE/NUMBER) (5.10.1):33 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) RADIAL /34 CYLINDRICAL THREADS REQUIRED (5.4.3.3) THRUST /35 ROTOR: LUBRICATION (5.11.3, 5.11.4):36 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) RING OIL HYDRODYNAMIC PURGE OIL PURE OIL MIST37 SHRINK FIT - LIMITED MOVEMENT IMPELLERS (8.2.2.3) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):38 COUPLINGS:(6.2.2) PRESSURE LUBE SYS. ISO 10438-3 ISO 10438-2 (8.2.6.1 / 8.2.6.5)39 MANUFACTURER MODEL OIL VISC. ISO GRADE40 RATING (kW/100 RPM) OIL PRESS. TO BE GREATER THAN COOLANT PRESSURE41 SPACER LENGTH (mm) SERVICE FACT. 1.5 REVIEW AND APPROVE THRUST BEARING SIZE (8.2.5.2.4)42 DRIVER HALF COUPLING MOUNTED BY: OIL HEATER REQUIRED: STEAM ELECTRIC43 PUMP MFR. DRIVER MFR. PURCHASER INSTRUMENTATION (6.4.2)44 COUPLING WITH HYDRAULIC FIT (6.2.10) SEE ATTACHED API 670 DATA SHEET45 COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) ACCELEROMETER (S) (6.4.2.1)46 COUPLING PER ISO 14691 (6.2.4) PROVISION FOR VIBRATION PROBES (6.4.2.2)47 COUPLING PER ISO 10441 (6.2.4) RADIAL PER BRG AXIAL PER BRG48 COUPLING PER API 671 (6.2.4) PROVISION FOR MOUNTING ONLY (5.10.2.11)49 NON SPARK COUPLING GUARD (6.2.14c) FLAT SURFACE REQUIRED (5.10.2.12)50 COUPLING GUARD STANDARD PER (6.2.14a) RADIAL BEARING METAL TEMP. THRUST BEARING METAL TEMP.51 BASEPLATES: TEMP. GAUGES (WITH THERMOWELLS)52 API BASEPLATE NUMBER (ANNEX D) MONITORS AND CABLES SUPPLIED BY (6.4.2.4)53 NON-GROUT CONSTRUCTION (6.3.13) REMARKS:54 OTHER SKID BASE PLATE MOUNTED ON CONCRETE FOUNDATION55 MECHANICAL SEAL:(5.8.1)56 SEE ATTACHED ISO 21049/API 682 DATA SHEET Remark-4 & 557 VENDOR SHALL FURNISH DULY FILLED IN API682 DATA SHEET WITH BID58 MASSES (kg)59 PUMP BASEPLATE60 DRIVER COUPLING61 GEAR TOTAL6263646566

Hindustan Petroleum Corporation LimitedCLIENTHPCL

Project No: 435/JH0911 SHEETDatasheet No: 435-JH0911-10-ME-DAS-0005-001 2 of 4

Page 34: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

Equipment Data Sheet for Centrifugal Pump (BB)Tag No. : P-10-001 A/B Client: Hindustan Petroleum Corporation LimitedService: Transfer of LPG Plant Location: ONGC, HaziraP & ID No. : 435-JH0911-10-PR-PID-1001 Supplier:Calculation Ref. : Purchase Order No.:No. of Units:Service Description: LPG

1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.) Remark-72 START-UP NORMAL MAINTENANCE TEST NON-WIT WIT OBSERVE3 SPECIFY HYDROSTATIC (7.3.2)4 PERFORMANCE (7.3.3)5 OTHER PURCHASER REQUIREMENTS NPSH (7.3.4.2)6 COORDINATION MEETING REQUIRED (9.1.3) RETEST ON SEAL L'KGE (7.3.3.2d)7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) RETEST REQUIRED AFTER FINAL8 MAX RELATIVE DENSITY (REMARK 1) HEAD ADJUSTMENT (7.3.3.5b)9 MAX DIA. IMPELLERS AND/OR NO OF STAGES COMPLETE UNIT TEST (7.3.4.3)

10 OPERATION TO TRIP SPEED SOUND LEVEL TEST (7.3.4.4)11 CONNECTION DESIGN APPROVAL (5.12.3.4 / 8.2.1.4) CLEANLINESS PRIOR TO12 INERT GAS INHIBITED STORAGE-SPARE CARTRIDGE (8.2.8.4) FINAL ASSEMBLY (7.2.2.2)13 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) NOZZLE LOAD TEST (6.3.6)14 TORSIONAL ANALYSIS REPORT (5.9.2.6) CHECK FOR CO-PLANAR 15 PROGRESS REPORTS (9.3.3) MOUNTING PAD SURFACES (6.3.3)16 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) MECHANICAL RUN UNTIL OIL17 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) TEMP. STABLE (7.3.4.7.1)18 LATERAL ANALYSIS REQUIRED (8.2.4.1 / 8.2.4.1.3) 4 HR. MECHANICAL RUN AFTER19 DYNAMIC BALANCE ROTOR (8.2.4.2) OIL TEMP. STABLE (7.3.4.7.3)20 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) 4 HR. MECH RUN TEST(7.3.4.7.2)21 VENT DRAIN COOLING WATER TRUE PEAK VELOCITY DATA22 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) (7.3.3.4d)23 FLANGES REQD IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) BRG HSG RESONANCE24 CONNECTION BOLTING TEST (7.3.4.6)25 PTFE COATING ASTM A153 GALVANISED REMOVE / INSPECT26 PAINTED SS HYDRODYNAMIC BEARINGS

Two (2); (1 working + 1 standby)

Centrifugal Pump Data Sheet to API 610, 10th Edition

Start-Up and 2 Years of Operation Spare Parts

6 SS O C GS27 INSTALLATION LIST IN PROPOSAL (9.2.3L) AFTER TEST (8.2.7.5)28 AUXILIARY EQUIPMENT29 SHOP INSPECTION (7.1.4) TEST (7.3.4.5)30 PERFORMANCE CURVE APPR. CHARPY TEST (EN 13445 / ASME VII)31 TEST WITH SUBSTITUTE SEAL (7.3.3.2) SITE ACCEPTANCE TEST Remark-1432 MATERIAL CERTIFICATION REQUIRED (5.12.1.8)33 CASING IMPELLER SHAFT34 OTHER Diffuser, Sleeve, bearing housing and other pressure parts on package VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c) (copy provided to Purchaser)35 CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)36 INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)37 MAG PARTICLE LIQUID PENETRANT INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)38 RADIOGRAPHIC ULTRASONIC RECORD FINAL ASSEMBLY RUNNING CLEARANCES39 INSPECTION REQUIRED FOR CASTINGS (7.2.1.3) (5.12.1.5) COMPLETION OF INSPECTION CHECK LIST (7.1.6)40 MAG PARTICLE LIQUID PENETRANT41 RADIOGRAPHIC ULTRASONIC42 HARDNESS TEST REQUIRED: (7.2.2.3)43 ADDITIONAL SUBSURFACE EXAMINATION FOR 7.2.1.344 FOR Shaft45 METHOD Ultrasonic464748495051525354555556575859606162636465

Hindustan Petroleum Corporation LimitedCLIENTHPCL

Project No: 435/JH0911 SHEETDatasheet No: 435-JH0911-10-ME-DAS-0005-001 3 of 4

REMARKS

QA INSPECTION AND TESTING

Page 35: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets

Equipment Data Sheet for Centrifugal Pump (BB)Tag No. : P-10-001 A/B Client: Hindustan Petroleum Corporation LimitedService: Transfer of LPG Plant Location: ONGC, HaziraP & ID No. : 435-JH0911-10-PR-PID-1001 Supplier:Calculation Ref. : Purchase Order No.:No. of Units:Service Description: LPG

1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT 2 FOR HPCL UNIT ONGC, Hazira3 SITE Hazira, Surat, India SERVICE LPG45 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER67 PRESSURE VESSEL DESIGN CODE REFERENCES.

8 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER9

10 CASTING FACTORS USED IN DESIGN( 5.3.4)(TABLE 3) 11 SOURCE OF MATERIAL PROPERTIES1213 WELDING AND REPAIRS (5.12.3.1)

14 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED) 15 ALTERNATE WELDING CODES AND STANDARDS (5.12.3.1)16 Welding Requirement (Applicable Code or Standard) Purchaser defined Default per Table 10 17 Welder/operator qualification18 Welding procedure qualification19 Non-pressure retaining structural welding such as baseplates or supports20 Magnetic particle or liquid penetrant examination of the plate edges21 Postweld heat treatment22 Postweld heat treatment of casing fabrication welds2324 MATERIAL INSPECTION (7.2.2.1)(7.2.1.3)

25 THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 13 IF NO PURCHASER PREFERENCE IS STATED)26 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)

Two (2); (1 working + 1 standby)

Centrifugal Pump Data Sheet to API 610, 10th Edition

27 Type of inspection Methods For fabrications Castings28 Radiography29 Ultrasonic inspection30 Magnetic particle inspection31 Liquid penetrant inspection3233 1. The rated differential pressure specified for the pump has been arrived at based on the highest product density.34 2. Pump shall be suitably selected for all operating conditions and fluids properties specified. Any short comings shall be highlighted in the Bid. Characteristic curves35 for various operating speeds indicating operating points shall be provided with Bid for Purchaser review during bid evaluation.36 3. Pumps shall be direct driven.37 4. Vendor shall furnish duly filled-in API 682 data sheet for proposed sealing system with Bid. Mechanical seal shall be cartridge type. Seal plan sketches shall be submitted 38 indicating all accessories and instrumentation and connection details. Vendor shall provide complete information for the sealing systems offered along with the bid.39 5. Double mechanical seal shall be offered and shall be as per API 682. The seal plans shall be selected and approved by seal vendor for the present application. Vendor to 40 consider plan 52 for secondary seal. Vendor to provide the emmission data from the seal/seal-pot that needs to be vented, and provide recommendations on the same. 41 6. Inspection and testing requirement shall be firmed up during vendor bid evaluation stage. Vendor shall furnish preliminary Inspection and Test Plan with the bid.42 7. The trip speed should be limited to 105% 43 of the rated speed.44 8. Vendor to consider Automatic Minimum Recirculation Valve for each pump, as a free issue, to installed by others. Vendor to select the valve suitable for stable45 minimum continuous recirculation flow of his pumps and shall provide the selection basis and valve vendor data sheet along with the bid. 46 The Automatic Minimum Recirculation Valve shall be complete and shall be from a reputed manufacturer such as Schroedahl / Yarway / equivalent, and shall be selected 47 such that there is minimum possible pressure drop across the main flow direction for the pump rated flow. Vendor to add this pressure drop to the specified differential 48 head of the pump to arrive at the final pump differential head to be offered -- vendor to clearly identify the same in their bid.49 The valve shall be rated for the pump discharge flange rating. Vendor to also indicate the maximum distance the valve can be located from the pump discharge.50 9. Vendor to note that there is no cooling water vailable in the plant. Hence any cooling requirement shall be met by air cooling. (Hold)51 10. Deleted525354 11. Deleted555657 12. Deleted5859 13. Deleted6061 14. Site Acceptance Testing (SAT) of each pump along with its motor,and other auxillaries shall be carried out by vendor at site for final acceptance by Purchaser. 62 Vendor to provide a typical test plan for same along with the bid for Purchaser's evaluation, however should include 48 hours run test at rated point (or guarantee point) 63 The entire pump, motor and auxillaries shall perform satisfactorily during the test and 64 meet all the guarantee parameters. Any additional testng instrumentation, etc required shall be adviced by vendor in the bid.6566

Hindustan Petroleum Corporation LimitedCLIENTHPCL

Project No: 435/JH0911 SHEETDatasheet No: 435-JH0911-10-ME-DAS-0005-001 4 of 4

15. For trip signal: refer note 8 of process data sheet

REMARKS

Page 36: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 37: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 38: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets
Page 39: PART – 2 - TECHNICAL - HPCLtenders.hpcl.co.in/tenders/tender_prog/tenderfiles/3081/Tender/... · PART – 2 - TECHNICAL . HINDUSTAN PETROLEUM CORPORATION LIMITED ... Data Sheets