Doc No: 254625-300-DB-GEN-006 Rev: A Page 1 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
PROJECT DESIGN BASIS
Mott MacDonald Consultants (India) Pvt. Ltd.
Kothari House, CTS No. 185
Off Andheri - Kurla Road
Andheri (East)
Mumbai 400 059
Hindustan Petroleum Corporation Ltd
Krishna Shree, 2nd Floor, Gandhi Nagar
1st Main Road - Adyar
Chennai 600 020
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 3 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
List of Content Page No
1 Purpose 4
2 Scope 4
3 Responsibilities 4
4 Definitions 4
5 Introduction 4
6 Units of Measurement 5
7 Site Information 8
7.1 Site Data 8
7.2 Site Access 8
8 Codes & Standards 8
9 Statutory Approvals 8
10 Contractual Schedule 8
11 Scope of work 8
12 Local conditions and utility battery limits 8
13 Reference documents 8
14 Software to be used 9
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 4 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
1 Purpose
The purpose of this document is to detail all the basic information required to form the basis of
basic & detailed engineering. This document also references other documents which allow a
more detailed insight into the design basis.
2 Scope
This document describes the Project Design Basis for the Visakh Marketing Installation
Resitement Project – Black Oil Terminal.
3 Responsibilities
The data enclosed in this document is applicable to all disciplines in MMCI & any third party
vendors / suppliers. In case of conflict between the document and other project specific
standards / specifications, reference should be made to the MMCI project manager for
resolution.
The order of precedence of documents to be used on this project is as follows:
1. The Indian Government rules and regulations,
2. Local state regulations (Andhra Pradesh),
3. HPCL company procedures,
4. International codes and standards
4 Definitions
HFHSD High Flash High Speed Diesel
FO Furnace Oil
LSHS Low Sulphur Heavy Stock
JBO Jute Batching Oil
LDO Light Diesel Oil
MMCI Mott MacDonald Consultants India Private Limited
HPCL Hindustan Corporation Petroleum Limited
5 Introduction
HPCL proposes to construct a Greenfield Oil Terminal Adjacent to Visakha refinery on land
leased from VPT as resitement of the existing Oil Installation at Malkapuram, Visakhapatnam.
The proposed site is in Plot near AK Steel for black Oil the same are approx.2 Kms away from
Visakhapatnam Refinery. The Andhra Steel Plot is admeasuring 40 acres Approximate.
The installations shall be planned and designed as per Hanover’s Principles of sustainability and
the Administrative buildings shall be certified for Green Buildings.
Black Oil Terminal will consist of major Black Oil tankages and receipt & delivery facility for
the same.
The mode of receipt and delivery in the Black Oil Terminal shall be as follows:
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 5 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
The product shall be received from the refinery through pipelines, Provision shall also be
provided to receive product from Jetties. The delivery of product shall be through Rail wagon,
Bunkering and Road tank trucks. Facility shall be provided for delivery of product through
pipeline for bunkering.
The products to be handled at Black Oil Terminal are:
1. HFHSD.
2. FO.
3. LSHS.
4. JBO.
5. LDO.
6. Bitumen.
7. Lube Oil.
6 Units of Measurement
The Metric system of units will be used for all documentation. In general the units to be
used on this project are tabulated below. Use of units not listed is to be kept to a
minimum and must get prior approval from MMCI Project Engineering Manager.
Quantity Units
SPACE AND TIME
Length m , mm
Area m2, mm2
Volume m3, l (litre), ml, mm
3
Section modulus mm3
Second moment of area mm4
Time s, min, h, d
Velocity m/s, mm/s, km/h
Acceleration m/s2
Volume Flow m3/s, m
3/h, m
3/d
Plane angle degrees /minutes / seconds
Solid angle sr
Angular Velocity rad/s
PERIODICITY
Frequency MHz kHz Hz
Rational frequency rev/s rpm
MECHANICS
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 6 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
Mass t (tonne) kg
Mass Flow t/d t/h kg/h kg/s
Molar Flow kgmol/h kgmol/s
Volumetric Flow m 3/h
Normal Volumetric Gas Flow Nm3/h (0°c and 1.33 kg/cm
2a)
Standard Volumetric Liquid Flow std,m3/h (15°C)
Density kg/m3
Liquid Absoulute Density kg/m3 (15°C)
Momentum kgm/s
Moment of inertia kgm2
Force N
Moment of force Nm
Loading (super) kN/m2 (structural design)
Loading (Linear) kN/m
Stress N/m2
Pressure ( Absolute) kg/cm2a
Pressure (Gauge) kg/cm2g
Pressure (Vacuum) mm Hg
Energy, Work MJ, kJ
Power MW, kW, W
Dynamic Viscosity cP(centipoises)
Kinematic Viscosity cSt (centistokes)
Surface Tension mN/m
Level % , mm
Vibration µm
HEAT
Absolute temperature K
Customary Temperature °C
Heat Quantity kcal
Heat Flow rate kcal/hr
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 7 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
Notes:
The inch-pound units shall be used for all piping system sizing & rating.
Density of heat flow rate kcal /m2hr
Thermal conductivity kcal/m°Chr
Coefficient of heat transfer kcal/hr m2°C
Specific heat capacity kcal/kg K
Specific entropy kcal/kg
Calorific value (mass basis) kcal/kg
Specific energy, specific enthalpy, specific
latent heat Kcal/kg
Calorific value (volume basis) kcal/m3
ELECRICITY AND MAGNETISM
Electric current kA A mA
Electric potential and electromotive force kV V mV µV
Electric field strength V/m
Current Density A/mm2 A/m
2
Resistance, impedance, reactance MΩ kΩ Ω mΩ µΩ
Resistivity Ωm µΩ m
Active power MW kW W
Reactive power MVAr kVAr VAr
Apparent Power MVA kVA VA
Electric energy MWh Wh MJ kJ J
Analysis %,ppm,ppb
Conductivity µS/cm
ILLUMINATION
Luminous flux lm
Illumination Lx (lux)
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 8 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
7 Site Information
7.1 Site Data
The Site is located at latitude 17o
41’ N, longitude 83o 15’ E at Visakhapatnam District
in Andhra Pradesh. The nearest airport is Jawaharlal Nehru Airport at Visakhapatnam
and the nearest harbour is Visakha Port Trust.
7.2 Site Access
HPCL, BLACK OIL TERMINAL
Behind NSRDC, Sindia Junction (Behind ESI Hospital), Visakhapatnam – 530005
(2 Kms from HPCL Visakhapatnam Refinery)
8 Codes & Standards
Refer respective disciplines design basis for list of codes and standards.
9 Statutory Approvals
The following statutory approvals are envisaged for implementation of the project:
• Chief Controller of Explosive (CCOE) / Petroleum and Explosives Safety Organization
(PESO)
• Oil Industry Safety Directorate (OISD)
• Director General of Civil Aviation
• State Pollution Control Board
• State Electricity Board
• IBR
• Local Authorities
• Factory Inspectorate
10 Contractual Schedule
• Project Start date : January 22, 2009
• Project completion : July 21, 2010
11 Scope of work
Refer “Section 5 - Scope of Work” of tender documents no. 8000005-HD-10147 for detailed
scope of work.
12 Local conditions and utility battery limits
Refer Document No. 254625-300-SP-GEN-001 for local conditions and utility battery limits.
13 Reference documents
• Process Design Basis : 254625-300-DB-PRO-001
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT - BLACK OIL TERMINAL
Doc No: 254625-300-DB-GEN-006 Rev: A Page 9 of 9
P:\Andheri\Projects\254625 HPCL- Black Oil Terminal\07 Project Management\Procedures\Project Design Basis\BO - Project
Design Basis - Latest.doc
• Civil Design Basis : 254625-300-DB-CIV-001
• Piping Design Basis : 254625-300-DB-PIP-001
• Electrical Design Basis : 254625-300-DB-ELE-001
• Instrumentation Design Basis : 254625-300-DB-INT-001
• Mechanical Design Basis : 254625-300-DB-MEC-001
• Pipeline Design Basis : 254625-300-DB-PPL-001
• Local conditions : 254625-300-SP-GEN-001
14 Software to be used
Software For Hysis Simulation
In House Spread Sheets Pressure drop calculations
HTFS Heat Exchanger design
AutoCAD 2007 Drawings
Ceasar II – ver 5.0 Stress Analysis
MS Word 2003 Specifications / manuals/ etc.
MS Excel 2003 Work sheets / data sheets / lists etc.
Instru Calc 1.20e Control valve sizing
PVElite Pressure vessel design
STADD PRO 2007 Civil/Structural design
Tank API storage tank
Instrument Calculator Calculation
In Tools Instrument Engg
Primavera Project Planning
MS Project Project Planning
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – BLACK OIL TERMINAL
Doc No: 254625-300-SP-GEN- 001 Rev: C Page 1 of 3
P:\Andheri\IndiaProject\254625 HPCL- Black Oil Terminal\07 Project Management\Local Conditions\BO-Local Conditions,
Rev.C.doc
LOCAL CONDITIONS
Hindustan Petroleum Corporation Ltd
Visakha Dispatch Station
VR-ATP Area, Naval Base Post
Visakhapatnam - 530 014
Andhra Pradesh
Mott MacDonald Consultants (India) Pvt. Ltd.
Kothari House, CTS No. 185
Off Andheri - Kurla Road
Andheri (East)
Mumbai 400 059
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – BLACK OIL TERMINAL
Doc No: 254625-300-SP-GEN- 001 Rev: C Page 2 of 3
P:\Andheri\IndiaProject\254625 HPCL- Black Oil Terminal\07 Project Management\Local Conditions\BO-Local Conditions,
Rev.C.doc
LOCAL CONDITIONS
Client HINDUSTAN PETROLEUM CORPORATION LTD.
MMCI Project No. 254625IN01
Issue and Revision Record:
Rev Date Originator Checked Approved Description
A 16/03/09 VV SG RB Issued for Comments
B 05/05/09 VV SG AVM Issued for Information
C 07/09/09 SVS VK SG Issued for Information
Group Disclaimer
"This document has been prepared for the titled project or named part thereof and should not be relied upon or
used for any other project without an independent check being carried out as to its suitability and prior written
authority of Mott MacDonald being obtained. Mott MacDonald accepts no responsibility or liability for the
consequences of this document being used for a purpose other than the purposes for which it was commissioned.
Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be
taken to confirm his agreement, to indemnify Mott MacDonald for all loss or damage resulting therefrom. Mott
MacDonald accepts no responsibility or liability for this document to any party other than the person by whom it
was commissioned.”
C
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – BLACK OIL TERMINAL
Doc No: 254625-300-SP-GEN- 001 Rev: C Page 3 of 3
P:\Andheri\IndiaProject\254625 HPCL- Black Oil Terminal\07 Project Management\Local Conditions\BO-Local Conditions,
Rev.C.doc
LOCAL CODITIONS PROJECT DESCRIPTION : HPCL Black Oil LOCATION : Visakhapatnam, India
LOCAL CONDITIONS:
ELEVATION : 3.0 m ABOVE MEAN SEA LEVEL CLIMATE : Highly Corrosive
DESIGN OF COOLING TOWER: WBT 29.5 0C WIND DIRECTION: South-West to North-East
DESIGN OF HVAC WIND VELOCITY : Basic wind speed 50 m/sec AT 10 m EL (IS 875 Part(3) )
SUMMER : 37 0C DBT, 26.5 OC WBT
50 % RH
SEISMIC DESIGN FACTOR : Zone II (IS 1893 Part 1 : 2002)
TOPOGRAPHY FACTOR, K3 : 1.22
WINTER : 15.4 0C DBT, 14.9 OC WBT
65 % RH
RAINFALL MAX / MIN (MM / DA): Max * mm & Design * mm
MONSOOON : 33.8 0C DBT , 29.2 0C WBT 80 % RH
DESIGN RAINFALL INTENSITY: 75mm/hr
MIN. DESIGN WIND LOAD FOR STRUCTURES: As Per IS-875 part III
DRY BULB TEMPERATURE:
Outdoor Indoor Control Room
Temp. (0C) RH Temp. (0C) RH Temp. (0C) RH
Site Rated (Max/Min) 40.7 50% * * 25 55%
Max./Min. (Mech. Design) 45 50% NA NA 50 55
Design Wet Bulb 29.2 NA NA NA NA
TROPICALISATION REQUIRED: - NO
WINTERIZATION REQUIRED : - NO
UTILITY BATTERY LIMITS :
ELECTRICIAL
UNITS PRIMARY
DISTBN. (HV) MV(415V) VOLTAGE
DG FED EMERGENCY POWER
AC UPS DC SYSTEM
VOLTAGE , kV 33kV + 10% 415 V + 10% 415 V+ 10% 230V+ 1% 110V DC
FREQUENCY, Hz 50 + 5% 50+ 5% 50+ 5% 50+ 1% -
COMBINED VOLTAGE
FREQUENCY
% + 10 + 10 + 10 - -
PHASE 3 Ph 3 Ph 3 Ph 1 Ph -
DESIGN TEMP FOR ELEC.
EQPT.
o C 50
LIQUIDS
UNITS COOLING WATER CHILLED
WATER
CHILLED
BRINE
HOT
WATER
HOT
OIL
TG UTILITY
SUPPLY PRESSURE kg/cm2g
DESIGN PRESSURE kg/cm2g
SUPPLY TEMPERATURE 0C
DESIGN TEMPERATURE 0C NA NA NA NA NA NA
TEMPERATURE RISE / DROP
0C
PRESSURE DROP
MAXIMUM
kg/cm2
FOULING FACTOR m2h0C/kcal
GASES
UNITS PLANT AIR INSTR. AIR NITROGEN STEAM
HP MP LP LPE LLP
PRESSURE :
NORMAL
kg/cm2g 11 3.0
: DESIGN
kg/cm2g 13 3.45
TEMPERATURE :
NORMAL
0C NA NA NA NA 187 145 NA NA
:
DESIGN
0C 217 180
Rev Description Originator Checker Approver Date
A Issued for Client comments / Approval VK GS RB 16.03.2009
B Issued for Information VK GS AVM 05.05.2009
C Issued for Information SVS VK GS 07.09.2009