SMAP final workshop Alexandria February Overview SMAP III partners in ICZM projects Key to symbols: © Coordinating Partner Partner Type of partner Nador (Mo) El Kala Moulouya (Al/Mo) AMIS (Al) K&M &Sfax (Tu) ALAMIM (Eg) Port Said (Eg) Gokova (Tur) IMAC (Le) PAP/RAC METAP- BP TOT National Authorities 5 Public sector institutions © 7 Universities/ Institutes © © © © 9 NGOs © © © 5 International organizations (UNDP etc.) © 5 32
Citation preview
Overview of SMAP III (09/2005 – 06/2009)
Horizontal and vertical integration in ICZM
Marseilles, 29-30 Juin 2009
E. Baijot
Team Leader SMAP III TA
SMAP final workshop Alexandria February 2009 2
Awareness and Communication
ICZM SD
SMAP III
SMAP III key objectives
SMAP final workshop Alexandria February 2009 3
Overview SMAP III partners in ICZM projects
Key to symbols: © Coordinating Partner Partner
Type of partner
Nador(Mo)
El Kala Moulouya (Al/Mo)
AMIS(Al)
K&M&Sfax (Tu)
ALAMIM (Eg)
Port Said (Eg)
Gokova (Tur)
IMAC (Le)
PAP/RACMETAP-BP
TOT
National Authorities
5
Public sector institutions
© 7
Universities/ Institutes
© © © © 9
NGOs © © © 5
International organizations (UNDP etc.)
© 5
32
SMAP final workshop Alexandria February 2009 4
Location and characteristics of the 8 SMAP III ICZM Projects
Developing ICZM plan in 3 pilot areas: Nador lagoon, Cap des trois fourches, Boudinar commune
Wetlands management associated with an ICZM process – CEL, Tourism investment
ICZM in Algiers ‘s bay – urban sprawling, multiple rejects, water resources, coastal erosion.
Address LM many challenges; set up monitoring unit, propose sustainable development model for LM CEL in national
inhabited park closed to border (immigration, econ. Activities)
Lake Manzalla challenges; pollution, irrigation –water managt., fishery, others; propose SD model for LMan
1. Establish a protected area as a tool for SD NRM 2. a new dev. planning Sfax south, an industrial city facing many challenges
ICZM within Gokova special protected area. Key actors: SPA, Mugla governorate, Akyaka
ICZM in northern Lebanon, with large participation from various actors including municipalities
SMAP final workshop Alexandria February 2009 5
Horizontal and vertical integration • Definition
– Refer to the institutional context – Horizontal; inter-sector, inter-department at local level ;
excellent if strong local leadership, development of a vision for their territory (municipality, province, governorate) with strong ownership; good communication between the various stakeholders;
– Vertical: bottom up and top down between local and national and between national and regional level ;
• Bottom up: lessons learned get wider audience and integrated in appropriate national policy
• Top down: real implementation of national policy, appropriate planning thus avoid sense of dispossession, tradition rules and modern legal framework mutually reinforce
SMAP final workshop Alexandria February 2009 6
8 ICZM Projects ICZM managt plan (training, studies,
scenarios, etc)
Consolidation of ICZM process and principles
Participation Planning tool Local specificities
SMAP III TATA support, tools & Capacity Building Coordination & cross-fertilizationCommunication
Promoting Awareness(PAP/RAC, METAP, Blue Plan) /RMSU
Awareness for decision makersPolicy briefsDev and impl. awar str.
Political supportPolitical support Regional awarenessRegional awareness
Regional coordination National ownership ICZM & Management tools
SMAP III ICZM approach
REGNAT
LOCAL
Projects Activities
Horizontal and vertical /Regional Integration
SMAP final workshop Alexandria February 2009 7
Cases studies
• Morocco: Mr Fouad Zyadi, Secrétariat d’ Etat auprès du Ministère de l’ Energie, des mines de l’ eau et de l’ Environnement, chargee de l’ eau et de l’ Environnement Cellule du Littoral, - project El Kala Moulouya and Nador
• Turkey: Dr Yucel Atilla, Mugla University, project manager SMAP III Gokova project
SMAP final workshop Alexandria February 2009 8
Observations and Comments on Horizontal Integration • ICZM is not yet well defined in many countries by legal and
institutional framework, and is more closely linked to governance where horizontality is predominant with actors /stakeholders developing together a territory project with a strong ownership and commitment
• Within governance, development of tools like voluntary agreement (boat traffic in Turley) and/or charter ( Moulouya, El Kala)
• Influence and role of NGOs and civil society through the development of participatory tools like focus groups, stakeholders forums, etc.
• Strong personality with high commitment (Sfax, Berkane, Mugla) reinforced by appropriate organizations (universit)
SMAP final workshop Alexandria February 2009 9
Observations and Comments on Vertical Integration• Need to improve top down integration
• Need to solve overlapping mandates at central level (ex; water in Egypt- numerous institutions)
• Address improper competition between institutions at national and local level on the same space like DPM
• Better communication with local level to be in touch with reality (budget, human resources, traditional law, etc.)
• Design and enforce a proper decentralization with appropriate communication between the various administration level
SMAP final workshop Alexandria February 2009 10
Contact
SMAP III TA, Zamalek, Cairo, +20 2 27362232
Leader/ICZM: Etienne Baijot, [email protected], +20 100 790 330
Comms: Tiny McKinney, [email protected], +20 16 4920560
Regional/SD: Charbel Rizk, [email protected], +961 3466615
www.smap.eu