Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Undulator System Tests

Marion M. White

ANL-ASD-LCLS

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Outline

Testing Scope and Deliverables Single-Undulator

Multi-Undulator

Measurement Plans and Requirements

Schedule

Summary

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Two Tests to be Carried Out

Single Undulator Module Test

Multiple Undulator Module Test

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Single

Single Undulator Integrated System Test @ ANL

Prototype undulator [can’t wait for 1st article; no need to]

Prototype support/mover system: Cradle, CAM movers, Rollaway system, controls software and hardware

“Quadrupole” with fiducialization surfaces

“BPM” with fiducialization surfaces

“Vacuum Chamber”

“WPM, HLS, BLM” sensors

“Fixed Support” or actual prototype

Earthquake protection bracing

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Goals of the Single Undulator Test

Provide critical input to the S/M system design reviews.

Help to determine whether the support/mover system design is ready for final production.

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Deliverables – Single Test

Measurement of cradle and rollaway motions

Determine precision and reproducibility of motions, including start and stop

Check for interference

Measure vibration damping or (hopefully not) amplification.

Measure position stability and temperature dependence of components and subcomponents.

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Single

Single Undulator Integrated System Test

At ANLPrototype undulator [no time for 1st article and no need]

Prototype support/mover system: Cradle, CAM movers, Rollaway system, controls software and hardware

“Quadrupole” with fiducialization surfaces

“BPM” with fiducialization surfaces

“Vacuum Chamber”

“Fixed Support” or actual prototype

WPM, HLS, BLM” sensors

Earthquake bracing

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Preparation @ ANL

Test to be done in APS Magnet Measurement AreaTemperature regulated

May need to construct a temporary plastic tent if present thermal regulation is inadequate.

Clean area

Adequate space

Experienced People

Deliverables of the test are critical to our scope and schedule

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Single

Single Undulator Integrated System Test At ANL

Use the prototype undulator - no time and no need to wait for the 1st article;Prototype support/mover system: Cradle, CAM movers, Rollaway system, controls software and hardware

“Quadrupole” with fiducialization surfaces

“BPM” with fiducialization surfaces

“Vacuum Chamber”

“Fixed Support” or actual prototype

WPM, HLS, BLM” sensors

Earthquake bracing

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Prototype Undulator at ANL

Vacuum Chamber

Goes in Here

Vacuum Chamber

Goes in Here

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Single

Single Undulator Integrated System Test At ANL

Prototype undulator [no time for 1st article and no need]

Prototype support/mover system:“Quadrupole” with fiducialization surfaces

“BPM” with fiducialization surfaces

“Vacuum Chamber”

“Fixed Support” or actual prototype

WPM, HLS, BLM” sensors

Earthquake bracing

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

S/M Prototype: under construction

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Support/Mover Prototype includes

Cradle

CAM movers and motors

Rollaway system

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Support/Mover Prototype includes

Cradle,

CAM movers,

Rollaway system,

Controls hardware & softwareTemperature monitoring

Position settability and monitoring

Verification of motion

Verification of limits

Reproducibility and smoothness of start and stop

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Scope: LayoutWire-Flag or

BPM ?Quad BPM

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Single

Single Undulator Integrated System Test At ANLPrototype undulator [no time for 1st article and no need]Prototype support/mover system: Cradle, CAM movers, Rollaway system, controls software and hardware

“Quadrupole” with fiducialization surfaces“BPM” with fiducialization surfaces“Vacuum Chamber” + pumps & tees…“WPM, HLS, BLM” sensors & Wire ScannerEarthquake bracingFixed Support” or actual prototype

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Use of Substitute Units

The quadrupole, BPM, and vacuum chamber will be same-size and same-weight fiducialized substitute units when prototypes or first articles are not yet available.

Pumping crosses and pumps will be used

Cabling will be incorporated

Magnet water piping will be incorporated

“WPM, HLS, BLM sensors” will be incorporated

Some kind of Earthquake bracing will be determined in collaboration with the SLAC safety committee, and will be incorporated; it will probably not be the final system

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Single

Single Undulator Integrated System Test At ANL

Prototype undulator [no time for 1st article and no need]

Prototype support/mover system: Cradle, CAM movers, Rollaway system, controls software and hardware

“Quadrupole” with fiducialization surfaces

“BPM” with fiducialization surfaces

“Vacuum Chamber”

“Fixed Support” or actual prototype

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Fixed Support

ANL assumes the Fixed Support scope: we are working toward having a prototype ready and instrumented for the Fall 2005 tests.

Availability of FS prototype permits monitoring its behaviour as well.

If unavailable for the single test, a solid backup support will be used

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Schedule: Single Undulator Module

Design/procure vacuum/diagnostic components: starts next weekDevelop detailed plan and fixed-base design. Start June 05 - engineering specs well in hand then. Prepare controls HW/SW Jun-Aug 05; debugPrepare test area – Jun-Aug 05; monitorPrepare/fabricate test stand and components August thru November 2005; Assemble Components latest December 2005Short term test complete by mid-January 2006; leads to FDR; 2-month test continues after that.

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Prototype Undulator scheduling

Design, instrument, and verify shipping container

Ship prototype undulator to SLAC in the June 05 timeframe for setup and integration of MMF instrumentation and systems.

SLAC ships prototype back to ANL for assembly into single-module test.

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

The Two Tests: Multi

Two (or three) undulators with long and short breaks will be mounted on fixed supports

Ideally, includes wire position monitor segment and hydrostatic level – at least the mountings and sensors.

Contains production first articles.

verify form and fit of all subcomponents,

Refine assembly procedures Assist in development of maintenance procedures

Refine alignment and realignment procedures

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Multi-Undulator Test

Can be done at ANL or SLACFirst article undulators and subcomponents will be available at ANL after acceptance verification.

Stable area @APS

Initial assembly and testing will take place at ANL; then ship to SLAC for long-duration testing at MMF.

SLAC personnel would participate in the testing and analysis, and would learn first from experienced ANL personnel.

Schedule is dependent on preparing the area and on first article delivery schedules; follow-on to the Single-module test. First 2 undulators available by 3/06.

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Deliverables

Everything from the single-module test plus:validate relative motion and alignment between two modules and stability

Additional software - development and debugging

verify no constraints from final cabling and earthquake bracing

Marion M. White

Undulator System Tests [email protected]

07 April 2005

LLCCLLSS

Summary

A test of a single-undulator-module assembly will be carried out at ANL in Fall/Winter 05 using prototype and substitute components to provide critical data for the support/mover system final design review prior to RFP.An integrated multi-undulator-module assembly will be done when first articles are available, testing component fits, verifying assembly and installation procedures, verifying relative motion and motion limits, and monitoring thermal and vibration stability.