81
[email protected] William Berg 6.17.0 8 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics Group

[email protected] William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

LCLS Undulator SystemsBeam Loss Monitor

Status Report, FAC 6.17.08

William Berg ANL/APS Diagnostics Group

Page 2: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Introduction

• Purpose & Requirements

• Project Scope Update

• Global System Status & Schedule– Detector– Interface Module– Link Node Front End

• Girder Integration

• Test Devices & Status

• Concluding Remarks

Page 3: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Purpose h-dn

The BLM will be used for Two Purposes:

A: Inhibit bunches following an “above-threshold” radiation event.

B: Keep track of the accumulated exposure of the magnets in each undulator.

Purpose A is of highest priority. BLM will be integrated into the Machine Protection System (MPS) and requires only limited dynamic range from the detectors.

Purpose B is also desirable for understanding long-term magnet damage in combination with the undulator exchange program but requires a large dynamic range for the radiation detector (order of 106 ) and much more sophisticated diagnostics hard and software.

Page 4: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Requirements pk

• Primary function of the BLM is to indicate to the MPS if losses exceed preset thresholds.

• MPS processor will rate limit the beam according to which threshold was exceeded and what the current beam rate is.*Beam Current threshold determination?

• The thresholds will be empirically determined by inserting a thin obstruction upstream of the undulator.

• Simulation of losses and damage in the undulator will proceed in parallel with the present effort.

Page 5: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Project Updates• Design review held 1-24-08.

• Descope March 2008 – Management Directive: no fundamental design modifications

(lowest effort costs).

– 2008 m&s costs reduced 400k to 75k.

– FY 2008 BLM Project defined as R&D (not construction).

– 33 installed units decreased to 5 for mps function only.

– FY 2009 funding for remaining detectors pending.

– Proceeding with Simulations and Empirical Testing to verify dosimeter function.

Page 6: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Project Status

• BLM Engineering Specification Document

– Broken into 3 ESD’s.• Beam Line Detector (ANL, in progress).• Interface Module (ANL, completed).• Link Node Front End (SLAC, in progress).

• Global electronic review complete (ready for fabrication pending testing, eric norum 4/16).

• Global Schematic diagrams, block diagram, and parameter list (archived, Josh Stein, designer assignment?).

Page 7: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Detector Schedule BLM Schedule FY 2008 march april may june july aug sept oct

detector assemblyproduction

detector design lock x

assembly draw ing set x x

procurements x x x

detector fabrication x x x x

detector assembly x x

ship to slac x

installation x

testing

detector design prototype x

prototype assembly draw ings x

prototype fabrication x x x

prototype testing (beam) x x

Page 8: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Status - Detector

• Beam Line Detector:

– Detail and Assembly Drawings:(engineering review and tolerancing).

• Detector Head.

• Detector BFW Mounting Bracket.

• Undulator Motion Tracking Adapter.

Page 9: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Status - Detector

• All material and components identified.

• Vendor list compiled.

• Stock procurements underway.

• Long lead procurements (5/08).

• Fabrication quotes and awards (6/08).

Page 10: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Rendering of Detector

Page 11: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Cross Section of BLM Detector

Page 12: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Undulator Inserted Position

Page 13: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Pin Function

Page 14: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Interface Module Schedule

BLM Schedule FY 2008 march april may june july aug sept oct

interface moduleproduction

design lock x

enclosure assembly draw ing x

procurements x

module fabrication x x x

module assembly x

ship to slac x

installation x

testing

prototype board x x

bench testing x x x

beam based testing (aps) x x

Page 15: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Status – Interface Module (IM)

• Prototype design complete.

• Prototype board and enclosures fabricated.

• Final enclosure design in process (stenciling?)

• Bench and beam based testing plan.

Page 16: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Interface Module Board

Page 17: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Interface Module Enclosure

Page 18: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Status – Link Node Front End (slac)

• Design in progress.

• Procurements started.

• Prototype boards in fabrication.

• Bench and beam based test plan.

Page 19: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Beam Loss Monitor - Undulator Hardware (m. brown)

In Undulator Hall

Long Haul Cables

Power

ControlSystem

MPSNetwork

HV

PS

CO

NT

RO

LLE

D P

ULS

ER

AM

PL.

( IP

DA

C )

HV

PS

RE

AD

BA

CK

( IP

AD

C )

CU

ST

OM

GA

TE

D IN

TE

GR

AT

OR

( IP

)

LED PULSER BOARD

HV POWER SUPPLY

PMT&

BASE

LE

D

FIBER

ColdFire

FPGA

I/O

TRIGGER

119MHz + FIDUCIAL

*

LINK NODE CHASSIS

AC POWER

UndulatorBeam Loss

Detector(8)

888

Timing Fanout

Timing Distribution

*

MPSLINK

*Fiber

Page 20: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Integration

• Interface Module Girder Location.• BLM Detector Girder Identification (which five?).

• Estop/IM Bracket Design (in progress).

• Cable Plant details (z drops).

• Power Supply from local control rack (cable length).

• Installation Procedure.

• Long haul cables defined and in process.

• Link Node channels and rack distribution defined.

Page 21: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Interface Module Girder Location

Page 22: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Page 23: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Tunnel Cable Drops

Page 24: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Detector Test Devices

• Thru-put and beam test module

– Design Complete– Cerenkov radiator in fabrication– Housing out for quote (qnty 3).– Procurements underway

• APS Beam Pipe Detector (not tied to FY08 production)

– Design Complete.– Detailed and assembly drawing (eng. review/tol.).

Page 25: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Test Module Rendering

Page 26: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Test Module Drawing

Page 27: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Cerenkov Radiator Fabrication

Page 28: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Radiator Blocks (actual uv grade material)

Page 29: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Radiator Blocks (actual uv grade material)

Page 30: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Concluding Comments

• Overall blm program budget is thin.

• Timetable is very aggressive.

• On Schedule for October.

• Calibration hardware needs to be solidified.

• Simulation, test, calibration, operation plan.

• BLM MOU scope FY2009?

Page 31: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Status

End of Presentation

Page 32: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Introduction

• Physics Requirements Document: Heinz-Dieter Nuhn 9-28-07 (prd: 1.4-005-r0 undulator beam loss monitor).

• Scope Reduction: diagnostic to mps detector.

• Purpose and Requirements.

• ANL Budget: M&S (325k detector, ctls interface box 100k).

• Detector Schedule: (design: nov-dec,drawings: dec-feb,pro/fab/assy: feb-jun,del: july, inst: aug-sep).

• Organization: 4 groups, Group Definition: (controls, detector, simulation, test & calibration).

• Design Highlights and System Overview (detectors: dynamic 33, static: 2, r&d fiber:1).

• Detector design details and focus topics.

• Funds are limited and efforts need to be focused to minimize costs (h-dn).

• Simulation of losses and damage in the undulator will proceed in parallel with the present effort (pk).

Page 33: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

ANL Draft BLM Budget

• 425k M&S Total:

• 325k Detector Development

• detectors

• mounting and slide systems

• cables and fiber

• 100k Controls Interface Box

Page 34: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Draft schedule

Detector nov dec jan feb march april may june july aug sept

design x x

component drawings x x

assembly drawing x x

procurements x x

design lock x

fabrication x x x

assembly x x

ship to slac x

installation x x

Page 35: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

LCLS MPS Beam Loss Monitor

System Engineer: W. Berg

Cost Account Manager: G. Pile Technical Manager: D. Walters

Scientific advisor: P. Krejcik * FEL Physics: H. Nuhn * Scientific advisor: B. Yang FEL Physics: P. Emma *

Controls/MPS Group Lead (ctls) : J. Stein Lead (mps): A. Alacron *

Detector Group

Lead: W. Berg

Simulations and analysis Group

Lead: J. Dooling

Testing and Calibration Group

Lead: B. Yang

M. Brown *R. Diviero J. Dusatko *S. Norum *A. Pietryla

A. BrillL. ErwinR. KeithleyJ. Morgan

L. EmeryM. Santana *J. Vollaire *B. Yang

W. BergJ. Bailey J. DoolingL. Moog

* Slac employee

Page 36: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

MPS Beam Loss Monitor Group Functions

• Controls Group: J Stein, A. Alacron

• Develop BLM control and mps system:• Interface Box and Control.

• PMT Signal Conditioning.

• Control and MPS Integration and User Displays.

• Detector Group: W. Berg• Develop Detector and Machine Integration.

• Simulations and Analysis Group: J. Dooling• Provide collaborative blm simulation support and test analysis.

• Test and Calibration Group: B. Yang• Provide beam based hardware testing programs and calibration plan.

Page 37: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

System Design Highlights

• 33 distributed detectors (one preceding each undulator segment), two static units (up and downstream of undulator hall). One additional channel reserved for r&d fiber based system.

• MPS threshold detection and beam rate limiting.

• Single pulse detection and mps action up to max 120Hz beam rep rate via dedicated mps link.

• Monitoring of real time shot to shot signal levels and record integrated values up to one second.

• Heart beat led pulser for system validation before each pulse up to full rep rate (pseudo calibration).

• Remote sensitivity adjust (dynamic range) by epics controlled PMT dc power supply (600-1200V).

• Calibrated using upstream reference foil (initial use cal will be determined from simulation studies).

Page 38: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Detector Design Highlights

• Cerenkov Radiation Based (x-ray beam noise immunity).

• Employs PMT for high sensitivity to beam losses.

• Dynamic detector (tracks with undulator) 100mm stroke. Undulator position (in/out) detection will be used to set the corresponding mps threshold levels.

• Manual static insertion option via detachable arm for special calibration and monitoring.

• Large area sensor (coverage of the full horizontal width of the top and bottom magnet blocks).

• Fiber Out for low gain upgrade (full integration and dyn range diagnostic), control system expandable to 80 channels.

• Radiation hard components (materials and electronics).

Page 39: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Interconnect Diagram m. brown

Page 40: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Interface Box Location

Page 41: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Plan View of Short Drift

Page 42: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BFW Pump Out Port Relocation

Page 43: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Removable Pin for Manual Insertion

Page 44: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Undulator Inserted Position

Page 45: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Undulator Retracted Position

Page 46: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Detector Pin Detail

Page 47: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Cerenkov Radiator

Page 48: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Magnet Block Sensor Coverage

Page 49: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Proposed PMT Device -04 (420nm)

Page 50: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Vendor List

Radiator Substrate water jet and final polish (lap and flame) (quartz)- VA Optical

Radiator AlSi coating – Eddy Company

Radiator Material - Corning

PMT and Magnetic Shield - Hamamatsu

Connectors: SMA Fiber Feed through) -Thor Labs

High Voltage Feed through - Kings

SMB Signal Fed through - AMP

Fiber Optic Cable (heartbeat) Fiber (fused silica) - Stocker Yale

Fiber Optics Cable, UV Grade – Coastal Connections

Signal Cable – Belden

Body Fabrication- M1, High Tech, AJR Industries

Miscellaneous Hardware (fasteners, o-rings, flex coupling, spanner wrench) – McMaster-Carr

Linear Bearing Assembly – IKO International

Spherical Bearing – Aurora Bearing

Page 51: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

UV Grade Fiber

Page 52: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Fused Silica Radiator

Page 53: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM System Support Focus Topics

• Funding of beam based prototyping and test program.

• Implementation of upstream calibration foil (alt. profile monitor/halo).

• BFW prototype tolerance verification (system tolerance in LTT)

Page 54: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Summary• Undulator magnets protection is critical for machine commissioning period.

• BLM system is now defined as a component of the mps (descope) with an upgrade path to a diagnostic (low gain detector).

• Calibration plan and hardware is vital to proper system operation (threshold detection will use empirically derived levels).

• Schedule for development of the blm program is very aggressive and funding is limited.

Page 55: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Detector Summary• Building a detector based on cerenkov radiation and PMT detection.

• 36 distributed channels (2 static devices) capable of single pulse detection (up to full rep rate) with rate limiting reaction.

• Detectors dynamically track with undulator position with manual detach option to remain in a fully inserted static position.

• Adjustable PMT sensitivity with remotely controlled high voltage power supply.

• Keep alive system test (led pulser) before each beam pulse.

• All Vendors have been identified, Quotes in progress, Drawing set being reviewed.

• Installation does not require access into the vacuum system or removal of other components.

Page 56: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

End of Presentation

Page 57: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Page 58: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Parts Animation

Page 59: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Undulator System

Page 60: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM System Support Focus Topics1. Assignment of Eric Norum to controls design oversight and testing.

2. *Funding of beam based prototyping and test program.

3. Group Leaders to significantly step up direct involvement in system oversight, program implementation, and schedule tracking (controls: n. arnold, diag: g. decker, lcls: g. pile, ops/analysis: m. borland).

4. Active participation in simulations and simulation priority from slac.

5. *Implementation of upstream profile monitor (halo or at min. cal foil).

6. Adequate analysis and shielding of upstream beam dump.

7. Develop long term collaboration plan for the pursuit of determining magnet damage mechanisms and thresholds via empirical methods.

8. Determine need and priority of BLM signal integration (diagnostic).9. BFW prototype verification (system tolerance LTT)

Page 61: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Summary Undulator magnets protection is critical for machine commissioning period. Schedule for development of the blm program is very aggressive and funding is limited. System design and fabrication must go in parallel with simulation and testing program. Consider Minimum requirements for first level implementation. Taking advantage of

existing mps infrastructure. BLM system is now defined as a component of the mps with an upgrade path to a

diagnostic (low gain detector). 36 distributed channels (2 static devices) capable of single pulse detection and rate

limiting reaction. Detectors track with undulator position with detach option for manual operation. Calibration plan and hardware is vital to proper system operation (threshold detection will

use empirically derived levels). Quotes in progress Drawing set being reviewed

Page 62: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Controls Architecture pk

The BLM PMT interfaces to the MPS link node chassis.

The IO board of the MPS link node chassis provides the ADC & DAC for the PMT.

A detector interface box (pmt, led pulser, sig con?) is the treaty point between the MPS and the undulator BLM.

There are 5 link node chasses serving up to 8 BLMs along the undulator (expandable from 8 to16 channels).

Page 63: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Undulator Hardware

LINKNODE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

LINKNODE

LINKNODE

LINKNODE

LINKNODE

SparesSpares

Page 64: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Beam Loss Monitors with Link Nodes

Use Link Node tosupport analog I/O IndustryPack modules

provide analog readouts to control system

set threshold levels

control HV power supplies

control LED Pulser

Page 65: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Segment Design Layout m. brown

MPS Link

Node

Page 66: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Locking Pin Detail (moves with undulator)

Spherical Bearing

Flex Joint

Page 67: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Beam Loss Monitors using Link Nodes

Page 68: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Proposed PIC / BLM Timing

PIC TIMINGFIDUCIAL

or Trigger near Fiducial time

INTEGRATIONWINDOW = 2.5 mSec

2.5 mSec

BLM TIMING

FIDUCIAL FIDUCIAL

INTEGRATIONWINDOW = 20uSec

1020 uSecDELAY = 1020 uSec

DELAY = 0

The proposed trigger timing for the BLM and PIC Systems will be derived from 119MHz with Fiducial ( i.e.nomial Fido signal )

FIDUCIAL119 MHz

The MPS Link chassis will receive this signal on a trigger input and will output a trigger for the BLM or PIC IP Modules.

FIDUCIALor Trigger near Fiducial time

Page 69: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Link Node Block Diagram

ColdfireComputer

(RTEMS/EPICS)

FPGAVitrex-4

XC4VFX20

Interface Transceivers

MPS Fiber Link

SFP

Gereral-Purpose TTL I/O

Output Ifc Bd(Opto-Isolators)

MPS Link Node – Functional Block Diagram

Ethernet

MPS Devices

Fault Inputs(96)

Mitigation Device Outputs

(8)

Industry PackInterface

Industry PackModule 1

SignalCond Board

Industry PackModule 2

SignalCond Board

GPIO for status, ctrl, etc.(Unused Trigger I/O signals)

Industry PackModule 3

SignalCond Board

Industry PackModule 4

SignalCond Board

Input Ifc Bd 6(Opto-Isolators)

Input Ifc Bd 1(Opto-Isolators)

Trigger I/O

USB Ifc

4

4

Trigger I/O can be configured as

needed

From EVR

To other devices

PC Laptop

Local Debug Port

Node Address Switches

Page 70: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Page 71: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Page 72: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Undulator Protection Requirements

Inputs to inhibit the e-beamPrimary protection from a number of Beam Loss Monitors (BLMs) along the undulatorSecondary protection from control system monitoring of

BPM orbitMagnet power supply statusMagnet mover status

Long-term monitoring of the radiation doseDosimeters attached to the magnets

Page 73: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Rolls Out with Undulator Magnet

The BLM is mounted to tightly surround the vacuum pipe near the beam finder wire

It is on a linear slide so that it can be moved off the beam when the undulator magnet is rolled out

An detachable arm makes the BLM and magnet roll out together

The BLM will automatically be less sensitive to beam loss when the undulator is in the out position

The BLM can be manually inserted on the beam pipe for special calibration procedures

Page 74: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Specification

A single BLM will be placed in each of the gaps between undulator modules.Design is to maximize the sensitivity of the monitor

Located as close as possible to the beam axis as the vacuum chamber allowsChoose a sensitive Cerenkov medium coupled to a high gain photomultiplier tubeThe detector will not be segmented to provide transverse position information of the losses

Page 75: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM reliability and self test

Each loss monitor is equipped with a LED that flashes between beam pulses.

Provides a pre-beam test of the BLM system before beam is sent through the undulator

Provides a stay-alive signal for the control system to monitor the BLM system during operation

Page 76: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM dynamic range

For simplicity and cost the BLM will be optimized for maximum sensitivity And allowed to saturate the signal if a large loss occurs

The trip threshold is still exceeded if the device saturates so the MPS will still trip and protect the undulatorMonitoring of the loss signal to integrate the dose received by the undulator will not be valid if the device saturatesHowever, if large losses are anticipated such as when the beam finder wires are inserted, the gain of the PMT will be reduced to prevent saturation.

Page 77: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Signal Monitoring

The BLM has a fast, dedicated link to the MPS to shutoff the beam within 1 pulseThe local MPS link node chassis also has a ‘slow’ network connection to the control system via channel access

Allows monitoring of the BLM level at any timeReads back and controls the PMT voltageControls the LED test pulseControls the threshold set point for MPS trips

Page 78: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

BLM Controls Architecture

The BLM PMT interfaces to the MPS link node chassisThe IO board of the MPS link node chassis provides the ADC & DAC for the PMTA cable interface box is the treaty point between the MPS and the undulator BLMThere are 5 (? verify this number) link node chasses serving up to 8 BLMs along the undulator (a diagram would help here)

Page 79: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

Future expansion

The link node chassis can handle more than the present number of installed BLMs

During commissioning a long fiber BLM will also be tested

It is compatible with the link node chassis controls

Page 80: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

MPS Overview (m. brown)

Page 81: Berg@aps.anl.gov William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics

[email protected]

William Berg6.17.08

Beam Loss Monitor

1

1122

cos

sinsin

A

rr

System Roll