12
Magnet Controls Group LCLS Magnet Controls [email protected] .edu August 16, 2006 1 Status of the LCLS Magnet PS Controls Needed for First Injection Injector, Sector 21 and BC1 P Bellomo / A de Lira / K Luchini / D MacNair / Others

Magnet Controls Group LCLS Magnet Controls [email protected] August 16, 2006 1 Status of the LCLS Magnet PS Controls Needed for First Injection

Embed Size (px)

Citation preview

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20061

Status of the LCLS Magnet PS Controls

Needed for First Injection

Injector, Sector 21 and BC1

P Bellomo / A de Lira / K Luchini / D MacNair / Others

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20062

Background

Hardware Final Design Review March 30, 2006

Magnet list in the Hardware FDR

89 new magnet control systems

6 Intermediate (10kW or 20 kW)

83 Small (480W or 1.5kW)

1 modified existing QE system in Sector 21

Software Final Design Review in September

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20063

New Magnet Control Systems in B24

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20064

Sector 21 QE System Modification

Bulk PS

Boost PS

Q21201

Q21301

Q21401…

Q21901

SLC Mode

Bulk PS

Boost PS

Q21201

Q21301

Q21401…

Q21901

LCLS Mode

Isolation Switch

Reversing/Shorting Switch

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20065

New Systems – Hardware StatusMagnets

November installation

DC cables

Phase 1 installed, Phase 2 completed by mid-December

Racks, power supplies, PS controllers, terminal server, VME/PLC crates and modules for small PS

All in B24, except 200V, 50A SOL2 power supply due September 15, 2006. 15 new MCOR12/6s replace MCOR30s

PLC, 90% of VME modules here and installed, remainder October

Move all to Sector 20 on September 15

AC Power

Panel-boards exist, CBs and conduit installation Sep 25 – Oct 16

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20066

Modified S21 QE System – Hardware Status

Magnets, DC cables and racks

3 feet Bulk PS to new isolation and reversing/shorting switch chassis

Power supplies and controllers

QE21201/301 reversing/shorting switch chassis fabricated and bench tested.

Bulk PS isolation switch chassis – fabricated by 9/30

Install first week of October

CAMAC crates and modules exist

AC Control Power

Exists

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20067

New Systems – Design Documentation StatusDC Cables

EIs (Change some MCOR30s to MCOR12/6s), CAPTAR list, power supply spreadsheet

Racks, power supplies, PS controllers VME/PLC crates, modules and terminal server

Specifications, front views and manufacturer’s drawings/manuals, EPICS/VME integration documents

PLC wiring diagram undergoing some changes

CB hazard analysis completed – requested labels from CEF

Manuals, cable lists

AC Power

One lines, panel-board schedules

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20068

Modified S21 QE System – Design Documentation Status

DC cables

On modified EI diagram

Racks and accessories

Existing – one front view needs updating

Power supplies and controllers

Bulk PS Isolation chassis and QE201/301 magnet reversing / shorting switch chassis wiring diagrams

AC power

Existing 120VAC control

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 20069

New and Modified QE Systems – Software StatusSoftware

SLC 90% completeSLC Aware coding is complete and debugging 50% done

DisplaysSCP doneEDM

Test displays – doneMockups – 80% doneMain displays – 30% done

DatabasesSLC: All new units added to SLC database (MCOR30 to MCOR12)EPICS:

Templates and databases 90% doneSubstitution databases are 40% donePolynomials are 25% done

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 200610

New Systems - B24 Testing StatusPurpose – Verify wiring, basic operation as integrated systems

Controller-Power Supply-Local Mode (25% done)

BX01, 02 and BXH1,2,3,4 successfully tested

In process – testing PLC, 3 MCOR bulk power supplies, MCOR12/30s

Then test BXS, SOL1, SOL2, and BX11,12,13,14

Network/Controller Integration (25% done)

Network/EPICS integration with Intermediate PS Controllers

VME integration with MCOR12 and MCOR30 controllers

Remote Mode – Network/Power Supply Integration

Completion September 15, 2006

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 200611

New Systems - Field Test Plan

Three weeks needed in November-December timeframe

Hi pot DC cables

DC cable / magnet polarity checks B and V

Run Intermediates in Local Mode to verify transductor polarity

Run Intermediates and MCORs in Remote Mode

Addressing is correct

Voltage and current compliance

All readbacks are functional

Klixon, water flow, ground current interlocks function and display correct status

Tune response of each system

Magnet Controls GroupLCLS Magnet Controls [email protected]

August 16, 200612

Modified S21 QE System – Test Plan – Last SlideTest Plan

Initial tests – 1 week, 2nd week October. Check field wiring, isolating and reversing/shorting switch functionality,

Use 3 small (< 50V, less than 10J) power supplies

Force EMHP controller bit to SLC/LCLS modes – see table

Integrated tests – 1 week, Nov-Dec. Check SLC/LCLS modes from SCP – see table

Bit Bulk PS Q21201 Q21301

SLC + I + I + I

LCLS 0 -I 0