I N N O V AT I O N I N W AT E R N E T W O R K A N A LY S I S
I N N O V AT I O N I N W AT E R N E T W O R K A N A LY S I S
3.200k Inhabitants
39 Municipalities
TECHNOLOGY D I A LO G U E T O
W I T H E V E R Y O N E
Neighborhood Associations
Non-governmental Organizations
Basin Commitee
Municipal Authorities
Regulatory Agency
Automatic Pressure Optimization
GIS
Hydraulic Modeling
SCADA
Pump
Water Source
PRV Bulk Meter PRV
DMA/PMA DMA/PMA PMA
RTU Flow Logger Pressure Logger PRV Controller
P P P F RTU PRV PRV
Big Data: Data with 3 Vs (Volume, Velocity and Variety)
Unrivaled Visualization
Effective Communication
Improved water system performance
5x the production (30 scenarios/week)
Increased stakeholder engagement
Over 100 projects approved in 8 years
Hydraul ic Model O U TC O M E S K E Y
0,067 kwh/m³
Water Plant Juturnaiba Lagoon
Trunk Mains
0,010 kwh/m³
0,121 kwh/m³
Water Network
End Customer
4x Pump Stations: 78% of energy
consumption
Opex: 34% is spent in energy (29% HR)
F I G U R E O U T T H E
0,926 kwh/m³
S Y S T E M B O T T L E N E C K S
2007 2008 2009 2011 2014
Hydraulic Model D R O V E T H E W A T E R S Y S T E M
E V O L U T I O N
740 l/s 990 l/s 1.150 l/s 1.300 l/s 1.500 l/s
Start-up Trunk main recovery
Building New trunk
main Trimumu 1st stage
4 x tanks / new pumps/ Transient hydraulic
Protection
Building New trunk
main Trimumu 2st stage
WAT E R S Y S T E M
MODELED Singularities
2.050 km network
300 km trunk mains
70 km away from the spring 4x large pump stations
400 k inhabitants
2.000 k people (summer season)
Pipe: Headloss Gradient (m/km) <= 5 <= 10 <=15 1.500 L/s - 5.874 kW - 1,09 kWh/m³
CITY LOCATION Pump station
Tank
VIDEO - 2
Opportunity to raise revenue ( + 30% available volume);
Energy saving ( - 55% consumption – from 1,09 to 0,65 kwh/m³);
Savings in maintenance costs and enhancing system security.
P R O L A G O S W A T E R M A S T E R P L A N
RECORD TIME A P P R O V E D I N
Total investment in 5 years: 187 million BRL
-
100
200
300
400
500
600
700
2016 2017 2018 2019 2020
(MM - BRL)
Cumulative Return
Accumulated Investment
ROI
323% in 5 years
Apply advanced hydraulic modeling in other concessions
NEXT STEPS
Integrate the WaterGEMS with all platforms – real time decision
Loss rate on water distribution¹
Customer System
Network Register Failure database
GIS
32,90% 32,00% 31,90% 31,00% 32,00%
51,80% 51,40% 50,70% 55,70%
4Q13 1Q14 2Q14 3Q14 4Q14
Aegea (consolidated) Entrants
Water GEMs Database
*SNIS – National Information System on Sanitation
B R A Z I L - R E S E R V O I R S
S U P P LY & E N E R GY Water shortage
5/8 Regions: the security level was lower than 30%;
70,73
16,94
48,39
10,43
33,29
11,35
22,57
18,27
99,57
95,25 89,77
87,58 80,98
60,52
21,58
19,96
Jurumirim Furnas Nova Ponte
Sobradinho Passo Fundo
Passo Real
G.B. Munhoz
Tucuruí
70% 18% 6,9% 5,1%
Volume: 70% of the total with an average of 16% (in late 2014);
Measures: rationing of water supply and raising energy prices (+60%)