13
GUILFORD COUNTY SCHOOLS BLUFORD STEM ACADEMY HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7, 2018 SKA Project 180052.0 NOTICE TO ALL BIDDERS The following items shall take precedence over the plans and specifications of the above named project and shall become part of the contract documents. Original items of the specifications and information indicated on the drawings not herein modified, amended, voided or suspended shall remain in effect. Number of Items and Pages included: 9 Items; 1 Page Attachments: 00 41 13 Bid Form; Invitation for Bids, Sheets S2.1, E1.1, E1.2, M1.1, M2.1, M2.2, M3.1 SPECIFICATIONS: ITEM 1: Section 00 41 13 - Replace Bid Form with attached. ITEM 2: Replace Invitation for Bids with attached. DRAWINGS: ITEM 3: Removed kitchen scope. Replace Sheet S2.1 with attached. ITEM 4: Removed kitchen scope. Replace Sheet E1.1 with attached. ITEM 5: Removed kitchen scope. Replace Sheet E1.2 with attached. ITEM 6: Removed kitchen scope. Replace Sheet M1.1 with attached. ITEM 7: Removed kitchen scope. Replace Sheet M2.1 with attached. ITEM 8: Removed kitchen scope. Replace Sheet M2.2 with attached. ITEM 9: Removed kitchen scope. Replace Sheet M3.1 with attached.

HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

GUILFORD COUNTY SCHOOLS

BLUFORD STEM ACADEMYHVAC Replacement Cafeteria/Kitchen Project

ADDENDUM NO. 4

May 7, 2018

SKA Project 180052.0

NOTICE TO ALL BIDDERS

The following items shall take precedence over the plans and specifications of the above named project and shall become part of the contract documents. Original items of the specifications and information indicated on the drawings not herein modified, amended, voided or suspended shall remain in effect.

Number of Items and Pages included: 9 Items; 1 Page

Attachments: 00 41 13 Bid Form; Invitation for Bids, Sheets S2.1, E1.1, E1.2, M1.1, M2.1, M2.2, M3.1

SPECIFICATIONS:

ITEM 1: Section 00 41 13 - Replace Bid Form with attached.

ITEM 2: Replace Invitation for Bids with attached.

DRAWINGS:

ITEM 3: Removed kitchen scope. Replace Sheet S2.1 with attached.

ITEM 4: Removed kitchen scope. Replace Sheet E1.1 with attached.

ITEM 5: Removed kitchen scope. Replace Sheet E1.2 with attached.

ITEM 6: Removed kitchen scope. Replace Sheet M1.1 with attached.

ITEM 7: Removed kitchen scope. Replace Sheet M2.1 with attached.

ITEM 8: Removed kitchen scope. Replace Sheet M2.2 with attached.

ITEM 9: Removed kitchen scope. Replace Sheet M3.1 with attached.

Page 2: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

BID FORM Section 00 41 13.02 Contractor Initials & Date ________

Section 00450Single Prime General Construction Bid Form

1

Contract: INFORMAL B TYPE CONTRACT

Project: CAFETERIA HVAC REPLACEMENT for BLUFORD STEM ACADEMYGuilford County Board of EducationGuilford County, NC

Bidder: _________________________________________________________________

Date: ________________________________________

The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as principal or principals is or are named herein and that no other person than herein mentioned has any interest in this proposal or in the contract to be entered into; that this proposal is made without connection with any other person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without collusion or fraud.

The Bidder further declares that he has examined the site of the work and the contract documents relative thereto, has read all special and supplemental provisions furnished prior to the opening of bids, has satisfied himself relative to the work to be performed, and thereby proposes and agrees if this proposal is accepted, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and labor necessary to complete the fabrication and delivery of the work, and other related work in full and complete accordance with the plans, specifications and contract documents, to the full and entire satisfaction of the Owner, with a definite understanding that no money will be allowed for extra work except as set forth in the General Conditions and other contract documents, on the Cafeteria and Kitchen HVAC Replacement Project at Bulford STEM Academy.

Bidders are advised that a notice to proceed may be issued upon approval by the Guilford County Board of Education, and in advance of the contract document.

The Bidder proposes and agrees, if this proposal is accepted, to execute a Contract within ten (10) days after notification of award, for the above work and for the below stated Compensation, in the form of AIA A107-2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum., for the sum of:

BASE BID: _____________________________________________________________________

____________________________________ Dollars ($______________________)

Mechanical Contractor:

_________________________________________ Bid Amount ($_____________________)

Page 3: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

BID FORM Section 00 41 13.02 Contractor Initials & Date ________

Section 00450Single Prime General Construction Bid Form

2

Electrical Subcontractor:

_________________________________________ Sub Bid Amount ($_____________________)

Controls Subcontractor:

_________________________________________ Sub Bid Amount ($_____________________)

ALTERNATES:

Not applicable

BID UNIT PRICES:

Not applicable

ADDENDA:

The following addenda were received and used in computing this bid:

Date Initial

Addendum #1 _________ __________

Addendum #2 _________ __________

Addendum #3 _________ __________

Addendum #4 _________ __________

The Bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order by the Owner or Designer on or before May 31, 2018, and shall substantially complete the work on or before 71 Days from the “Notice to Proceed” or the contract, whichever is dated first.

The undersigned further agrees that in the case of failure on his part to execute the said contract and the bond within ten (10) consecutive calendar days after written notice being given of the award of the contract, the certified check, cash or bid bond accompanying this bid shall be paid into the funds of the Owner’s account set aside for the project, as liquidated damages for such failure; otherwise the certified check, cash or bid bond accompanying this proposal shall be returned to the undersigned. Attach certified check, cash or bid bond to this proposal.

Page 4: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

BID FORM Section 00 41 13.02 Contractor Initials & Date ________

Section 00450Single Prime General Construction Bid Form

3

RESPECTFULLY SUBMITTED this ___________ day of ______________________, 200___.

___________________________________________________(Name of firm or corporation making bid)

By: _____________________________

Title: _____________________________ (Owner / Partner / President / Vice President)

License No. _______________________

Federal ID No. _____________________

WITNESS: (Proprietorship / Partnership)

By: __________________________________

ATTEST: (Corporation)

By: __________________________________ (CORPORATE SEAL)

Title: _________________________________(Corporate Secretary or Asst. Secretary Only)

Page 5: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

Guilford County SchoolsINVITATION FOR BIDS

Bluford STEM Academy – Cafeteria HVAC ReplacementMechanical Construction

1901 Tuscaloosa St, Greensboro, NC 27401

Sealed proposals will be received by the Guilford County School System until 3:00 pm on Thursday, May, 17, 2018 at 501 W. Washington Street, Greensboro, NC 27401, Room 100, and immediately thereafter publicly opened and read aloud, to furnish all materials and labor for the Bluford STEM Academy Cafeteria HVAC Replacement project. Upon arrival, please check-in at the front information desk for room location and sign-in. Please allow sufficient time for this, as late bids will not be accepted.

Plans, specifications, and contract documents will be available for inspection during business hours from 8:00 am – 5:00 pm from May 7, 2018 until bids are opened at the following locations: office of SKA Consulting Engineers, 300 Pomona Drive, Greensboro, NC 27407; North Carolina A&T State University Plan Room, Greensboro, NC; Associated General Contractors, Raleigh, NC; Minority Contractors Resource Center, Charlotte, NC; Reed Construction Data, Norcross, GA; Hispanic Contractors Association of the Carolinas, Winston-Salem, NC. A $100 deposit is required to obtain a complete set of plans and specifications. The full deposit is refundable to contractors submitting a Bona Fide bid and returning the plans and specifications in satisfactory condition within 10 days of the bid date.

Plan Deposits should be made payable to Guilford County Schools and delivered to the office of SKA Consulting Engineers, 300 Pomona Drive, Greensboro, NC 27407. Plans may also be viewed on the Guilford County Schools website. Contact Thomas Griffis at [email protected] for sign up and access to the plans room. Questions regarding the bid should be directed in writing to of SKA Consulting Engineers, 300 Pomona Drive, Greensboro, NC 27407, Attention: Stephen Moorefield PE LEED AP BD+C, [email protected].

A brief description of work in the project follows:Demolition of the existing rooftop units and outside ductwork for the cafeteria, re-enforcement of platform access ladder, install one new rooftop unit with outside ductwork, new unit DDC controls, and minor electrical.

A non-mandatory pre-bid conference will be held at the site at 3:00 pm, Wednesday, May 9, 2018. Attendees should park in the east parking lot and meet at the rear of the cafeteria. Attendance at this conference is strongly encouraged for all potential bidders to examine the existing conditions and to discuss particular details of the project. Bidders must be properly licensed for the work in accordance with Section 87 of the North Carolina General Statutes.

A 100% Performance and Labor and Material Payment Bonds are required for this project. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days.

E-Verify Requirements: This project requires the awarded vendor to comply with the requirements of E-Verify. (U.S. law requiring companies to employ only individuals who may legally work in the United States – either U.S. citizens, or foreign citizens who have the necessary authorization.)

Minority businesses are encouraged to submit bids for this project. The appropriate forms from the section entitled “Participation by Women and Minority Owned Businesses” must be submitted with each bid to show good faith efforts to obtain Minority and Women Owned Business Enterprise participation.

Page 6: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,

The Guilford County Board of Education awards public contracts without regard to race, religion, color, creed, national origin, sex, age or handicapped condition as defined by North Carolina General Statutes, Section 168A-3. The Board reserves the right to reject any or all bids presented and to waive any informalities and irregularities.

Guilford County SchoolsDonald ReidPurchasing Officer

Page 7: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,
Page 8: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,
Page 9: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,
Page 10: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,
Page 11: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,
Page 12: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,
Page 13: HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4purchasing.gcsnc.com/RFQAttachments/Q6036ADDENDUM4.pdf · HVAC Replacement Cafeteria/Kitchen Project ADDENDUM NO. 4 May 7,