Solano Community College District Project and RFP #18-010 February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 1 of 2 ADDENDUM TO RFP DOCUMENTS ADDENDUM #01 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #18‐010 Date: February 12, 2018 Addendum # 01 – The following clarifications are provided based on questions received and must be added/considered when completing your submittal: Acknowledgement of receipt of this ADDENDUM is required in the proposal’s cover letter of introduction. Please clearly note the addendum date and number. ITEM: ITEM NO. 1 – SECTION 00 11 16, Item 6 – Bid Date The bid date has been extended by two (2) weeks to Thursday, March 1, 2018 at 2:00 PM in order to be able to incorporate technical Mechanical, Electrical, Architectural and Structural specifications into the bid documents. These specifications will be included in the upcoming Addendum 2. The location and process for submission of bids remains unchanged. ITEM NO. 2 – ARCHITECTURAL PLAN SHEETS A3.7 & A3.8 Replace ‘Plan Sheets A3.7 and A3.8’ with the attached “Addendum – 1 Plan Sheets A3.7 and A3.8’. Revisions include the clarification between demolition and replacement of existing ceilings. ITEM NO. 3 – STRUCTURAL DETAIL SK‐1 Add the attached Structural Detail ‘Addendum – 1 SK‐1’, which clarifies the extension of the parapet wall at the roof. . ITEM NO. 4 – ANSWERS TO SUBMITTED QUESTIONS QUESTION –During the job walk, it was mentioned that the IT department for the college will remove the computers as needed in the classrooms and server room during construction. Please confirm that Solano College will be responsible for removing the computer equipment as needed. ANSWER – A preconstruction walk will be held with the IT department and the successful contractor to establish which computer equipment will need to be temporarily relocated during construction. All relocation and re‐installation work will be performed by the District’s IT department.

ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

  • Upload
    hacong

  • View
    220

  • Download
    5

Embed Size (px)

Citation preview

Page 1: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

Solano Community College District Project and RFP #18-010

   February 12, 2018            Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 

Page 1 of 2 

ADDENDUM TO RFP DOCUMENTS  

 

ADDENDUM #01  

Project:  Solano Community College District Vacaville Center HVAC Upgrade Project Project #18‐010  

Date: February 12, 2018 

  

Addendum # 01 – The following clarifications are provided based on questions received and must be  added/considered  when  completing  your  submittal:  Acknowledgement  of  receipt  of  this ADDENDUM  is  required  in  the  proposal’s  cover  letter  of  introduction.    Please  clearly  note  the addendum date and number. 

ITEM:  

  ITEM NO. 1 – SECTION 00 11 16, Item 6 – Bid Date The bid date has been extended by two (2) weeks to Thursday, March 1, 2018 at 2:00 PM in order to be able to incorporate technical Mechanical, Electrical, Architectural and Structural specifications into the bid documents.  These specifications will be included in the upcoming Addendum 2.  The location and process for submission of bids remains unchanged. 

   ITEM NO. 2 – ARCHITECTURAL PLAN SHEETS A3.7 & A3.8 Replace ‘Plan Sheets A3.7 and A3.8’ with the attached “Addendum – 1 Plan Sheets A3.7 and A3.8’.  Revisions include the clarification between demolition and replacement of existing ceilings.  ITEM NO. 3 – STRUCTURAL DETAIL SK‐1 Add the attached Structural Detail ‘Addendum – 1 SK‐1’, which clarifies the extension of the parapet wall at the roof. 

.  ITEM NO. 4 – ANSWERS TO SUBMITTED QUESTIONS  QUESTION –During the job walk, it was mentioned that the IT department for the college will remove the computers as needed in the classrooms and server room during construction.  Please confirm that Solano College will be responsible for removing the computer equipment as needed.  ANSWER – A preconstruction walk will be held with the IT department and the successful contractor to establish which computer equipment will need to be temporarily relocated during construction.  All relocation and re‐installation work will be performed by the District’s IT department. 

 

Page 2: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

Solano Community College District Project and RFP #18-010

   February 12, 2018            Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 

Page 2 of 2 

QUESTION –New Rooftop units will be provided with duct smoke detectors.  Duct smoke detectors will need to be interconnected with the existing fire alarm.  Please provide the contact information of the existing fire alarm service provider.  ANSWER – The Fire Alarm Monitoring company is Sac. Valley Alarm.  The contact is Brad Niblinc at (916)452‐1481.  Repairs and technical information on the system are covered by Quality Sound.  The contact is Matt Cooper at (209)948‐2104. 

  

QUESTION –It was mentioned on the job walk that there will be no summer school.  Please confirm there will be no summer school.  ANSWER – Confirmed, although there will be summer school activity in the adjacent Biotech Building, which has a connecting lobby  to the Vacaville Center.  The existing MDF Room will need to remain in operation, with the required level of cooling maintained, throughout the project as it serves both facilities. 

 

Page 3: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

Pre-Bid-002

Request For Information

Bell Products, Inc. DELIVERIES: 722 Soscol Avenue MAILING: PO Box 396 Napa CA 94559-0396 Phone: (707) 255-1811 Fax: (707) 255-1908

Project: Solano College- Vacaville Center HVAC Upgrades Job #:

BPI RFI Number: Submitted By: Co-Author:

Pre-Bid-002 Rolando Roldan Casey Clark Specification Number: Drawing Number: Sent Date:

Sheet A3.3 02-08-18 Submitted To: Sent To: Date Required: Scott Glover ASAP Copies To: Potential Time Impact: Potential Cost Impact:

(yes if checked) (yes if checked) of: days of: ~ Subject: 2nd Floor South Reflected Ceiling Plan

Routing: - OWNER - PM - File - HVAC FO PIPING FO

Information Requested:

Sheet A4.3 has a hand written note to extend parapet wall to achieve min. 42”. Please provide a structural detail to extend the parapet wall that includes roofing and flashing.

Response:

Extend the existing parapet per the attached SK­1.

Katy BriggsBASE DesignFebruary 10, 2018

Page 4: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO
Page 5: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

Pre-Bid-001

Request For Information

Bell Products, Inc. DELIVERIES: 722 Soscol Avenue MAILING: PO Box 396 Napa CA 94559-0396 Phone: (707) 255-1811 Fax: (707) 255-1908

Project: Solano College- Vacaville Center HVAC Upgrades Job #:

BPI RFI Number: Submitted By: Co-Author:

Pre-Bid-001 Rolando Roldan Casey Clark Specification Number: Drawing Number: Sent Date:

Sheet A3.7 & A3.8 02-08-18 Submitted To: Sent To: Date Required: Scott Glover ASAP Copies To: Potential Time Impact: Potential Cost Impact:

(yes if checked) (yes if checked) of: days of: ~ Subject: New RCP for new work

Routing: - OWNER - PM - File - HVAC FO PIPING FO

Information Requested:

The second floor North and South reflected ceiling plans shown on A3.7 & A3.8 are identical to the second floor North reflected ceiling plans shown on A3.3 & A3.4 Please provide the corrected sheet showing the new work.

Response:

ebueno
Submittal Stamp
ebueno
Text Box
see attached PDF
ebueno
Line
ebueno
Line
ebueno
Text Box
2-9-2018
Page 6: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

(E)22X16

(E)22x16

(E)20x14

(E)20x14

CLASSROOM212

COMPUTER LAB 211

SERVER ROOM210

IT SUPPORT209

COMPUTER LAB 208

CLASSROOM207

HALLWAY202

STAIR 1213

CLASSROOM214

CLASSROOM215

CLASSROOM218

MEN'S REST ROOM219

WOMEN'SREST ROOM

220

STUDY LOUNGE

206

POC

1

2

2

3

2 3

2

3

16x14L

14x14

(E) EA RISERTO REMAIN

(E)SA RISERTO REMAIN

4

(E)RESTROOMEXHAUSTSYSTEM TOREMAIN.

4

14x14L

(E)SA RISERTO REMAIN

(E) EA RISERTO REMAIN

(E)SA RISERTO REMAIN

(E)TRANSFER/RELIEF DUCT,CEILING GRILLE AND WALLLOUVER TO REMAIN (TYP).

1100 CFM6265 CFM(TYP 6)

5

180 CFM(TYP 6)

51 940 CFM6

1 810 CFM6200 CFM(TYP 6)

5

200 CFM(TYP 6)

5

1810 CFM 6

245 CFM(TYP 6)

5

11260 CFM 6

1740 CFM 6

200 CFM(TYP 6)

5

265 CFM(TYP 6)

5

11140 CFM 6

14"Ø

14"Ø

16"Ø

POC(E)16X12

14"Ø

(E)20X14

POC

16"Ø

120 CFM5

130 CFM5

8"Ø

8"Ø

(E)20x16

16"ØL

(E)22x14

14"Ø

14x14

4

4

4

4

4

7

7

14x14L16x14L

(E)22x16

7

16x14L

14x14L

16x16L

16x14L

(E)20x14

16x14L

16x16L

16x14L

16x14L

416x14L

7

500 CFM(TYP 6)

6

430 CFM(TYP 7)

6

1

C

1 2 3 4 5 6

A

B

D

J

E

K

L

H

F

G

1715900

SO

LA

NO

C

OM

MU

NIT

Y

VA

CA

VILLE

C

EN

TE

R

20

01

N

V

IL

LA

GE

P

KW

Y

DESCRIPTION

SCALE:

CHECKED:

REVISIONS

DRAWING

NUMBER:

PROJECT NUMBER:

DATE:

DRAWN:

NO DATE BY

CONSULTANT

CO

LLE

GE

D

IS

TR

IC

T

VA

CA

VIL

LE

, C

A 9

56

88

DSA BACK CHECK

NOTES:

1. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

2. ALL DIMENSIONS ARE TO BE FIELD VERIFIED.

3. PATCH AND REPAIR FINISHES TO MATCH ADJACENT FINISHES

AFFECTED BY DEMOLITION.

REFLECTED CEILING PLAN NOTES:

1. REFER TO MECHANICAL FOR ADDITIONAL EQUIPMENT INFORMATION.

REFLECTED

CEILING PLAN

SEE CONTINUATION MATCH LINE 1/A3.8

Page 7: ADDENDUM TO RFP DOCUMENTS - solano.edu 1 Vacaville Center HVAC... · February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01 Page 2 of 2 ... PM - File - HVAC FO

(E)24X16

HALLWAY222

ROOF DECK221

OFFICE 235

OFFICE 234

STAFF LOUNGE233

CONFERENCE232

DATA242

OFFICE 241

HALLWAY231

STAFF RESTROOM

243

JANITOR STORAGE

245

MACH247

HALLWAY246

OFFICE 240

STUDY/PHONE230

OFFICE 239

OFFICE 238

OFFICE 237

COPY/WORK ALCOVE244

STAIR 2

POC

POC

POC

FCU7

POC

POC FCU8

POC

POC

POC

FCU10

FCU9

POC

POC

1

1

1

1

POC

2

3

4

4

4

4

580 CFM(TYP 12)

5

POC

24X16

1245 CFM(TYP 2)

2 6

1245 CFM(TYP 2)

6

270 CFM(TYP 11)

5

(TYP 11)

(E)12"Ø

(E)12x1012x10

14" HIGH RAPLENUM

12"Ø

320 CFM 6(E)20x14

580 CFM(TYP 2) 6

300 CFM(TYP 4)

5(E)20x14

14x14L

16x14L

7

(E)14"Ø

7

14x14L

14"Ø

(E)6"Ø

8"Ø

180 CFM(TYP 3)

5

400 CFM(TYP 3)

5

1070 CFM6

200 CFM5160 CFM6

100 CFM 5

80 CFM 6270 CFM6

100 CFM(TYP 3)

5

(E)10"Ø

(E)8"Ø8"Ø

POC

(E)10"Ø

12"Ø10"Ø

(E)12x12 12"Ø

60 CFM 5150 CFM 5

150 CFM5

150 CFM 5

150 CFM5

130 CFM 6

130 CFM 6

130 CFM 6

130 CFM 6

100 CFM6

300 CFM5

280 CFM6280 CFM6

8"Ø

10x12

(E)10"Ø

(E)10"Ø

(E)12x8

N

P

Q

R

S

T

U

14

89

11

12

13

7

10

15

1715900

SO

LA

NO

C

OM

MU

NIT

Y

VA

CA

VILLE

C

EN

TE

R

20

01

N

V

IL

LA

GE

P

KW

Y

DESCRIPTION

SCALE:

CHECKED:

REVISIONS

DRAWING

NUMBER:

PROJECT NUMBER:

DATE:

DRAWN:

NO DATE BY

CONSULTANT

CO

LLE

GE

D

IS

TR

IC

T

VA

CA

VIL

LE

, C

A 9

56

88

DSA BACK CHECK

NOTES:

1. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

2. ALL DIMENSIONS ARE TO BE FIELD VERIFIED.

3. PATCH AND REPAIR FINISHES TO MATCH ADJACENT FINISHES

AFFECTED BY DEMOLITION.

REFLECTED CEILING PLAN NOTES:

1. REFER TO MECHANICAL FOR ADDITIONAL EQUIPMENT INFORMATION.

REFLECTED

CEILING PLAN

SEE CONTINUATION MATCH LINE 1/A3.7