Solano Community College District Project and RFP #18-010
February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01
Page 1 of 2
ADDENDUM TO RFP DOCUMENTS
ADDENDUM #01
Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #18‐010
Date: February 12, 2018
Addendum # 01 – The following clarifications are provided based on questions received and must be added/considered when completing your submittal: Acknowledgement of receipt of this ADDENDUM is required in the proposal’s cover letter of introduction. Please clearly note the addendum date and number.
ITEM:
ITEM NO. 1 – SECTION 00 11 16, Item 6 – Bid Date The bid date has been extended by two (2) weeks to Thursday, March 1, 2018 at 2:00 PM in order to be able to incorporate technical Mechanical, Electrical, Architectural and Structural specifications into the bid documents. These specifications will be included in the upcoming Addendum 2. The location and process for submission of bids remains unchanged.
ITEM NO. 2 – ARCHITECTURAL PLAN SHEETS A3.7 & A3.8 Replace ‘Plan Sheets A3.7 and A3.8’ with the attached “Addendum – 1 Plan Sheets A3.7 and A3.8’. Revisions include the clarification between demolition and replacement of existing ceilings. ITEM NO. 3 – STRUCTURAL DETAIL SK‐1 Add the attached Structural Detail ‘Addendum – 1 SK‐1’, which clarifies the extension of the parapet wall at the roof.
. ITEM NO. 4 – ANSWERS TO SUBMITTED QUESTIONS QUESTION –During the job walk, it was mentioned that the IT department for the college will remove the computers as needed in the classrooms and server room during construction. Please confirm that Solano College will be responsible for removing the computer equipment as needed. ANSWER – A preconstruction walk will be held with the IT department and the successful contractor to establish which computer equipment will need to be temporarily relocated during construction. All relocation and re‐installation work will be performed by the District’s IT department.
Solano Community College District Project and RFP #18-010
February 12, 2018 Vacaville Center HVAC Upgrade Project ‐ ADDENDUM # 01
Page 2 of 2
QUESTION –New Rooftop units will be provided with duct smoke detectors. Duct smoke detectors will need to be interconnected with the existing fire alarm. Please provide the contact information of the existing fire alarm service provider. ANSWER – The Fire Alarm Monitoring company is Sac. Valley Alarm. The contact is Brad Niblinc at (916)452‐1481. Repairs and technical information on the system are covered by Quality Sound. The contact is Matt Cooper at (209)948‐2104.
QUESTION –It was mentioned on the job walk that there will be no summer school. Please confirm there will be no summer school. ANSWER – Confirmed, although there will be summer school activity in the adjacent Biotech Building, which has a connecting lobby to the Vacaville Center. The existing MDF Room will need to remain in operation, with the required level of cooling maintained, throughout the project as it serves both facilities.
Pre-Bid-002
Request For Information
Bell Products, Inc. DELIVERIES: 722 Soscol Avenue MAILING: PO Box 396 Napa CA 94559-0396 Phone: (707) 255-1811 Fax: (707) 255-1908
Project: Solano College- Vacaville Center HVAC Upgrades Job #:
BPI RFI Number: Submitted By: Co-Author:
Pre-Bid-002 Rolando Roldan Casey Clark Specification Number: Drawing Number: Sent Date:
Sheet A3.3 02-08-18 Submitted To: Sent To: Date Required: Scott Glover ASAP Copies To: Potential Time Impact: Potential Cost Impact:
(yes if checked) (yes if checked) of: days of: ~ Subject: 2nd Floor South Reflected Ceiling Plan
Routing: - OWNER - PM - File - HVAC FO PIPING FO
Information Requested:
Sheet A4.3 has a hand written note to extend parapet wall to achieve min. 42”. Please provide a structural detail to extend the parapet wall that includes roofing and flashing.
Response:
Extend the existing parapet per the attached SK1.
Katy BriggsBASE DesignFebruary 10, 2018
Pre-Bid-001
Request For Information
Bell Products, Inc. DELIVERIES: 722 Soscol Avenue MAILING: PO Box 396 Napa CA 94559-0396 Phone: (707) 255-1811 Fax: (707) 255-1908
Project: Solano College- Vacaville Center HVAC Upgrades Job #:
BPI RFI Number: Submitted By: Co-Author:
Pre-Bid-001 Rolando Roldan Casey Clark Specification Number: Drawing Number: Sent Date:
Sheet A3.7 & A3.8 02-08-18 Submitted To: Sent To: Date Required: Scott Glover ASAP Copies To: Potential Time Impact: Potential Cost Impact:
(yes if checked) (yes if checked) of: days of: ~ Subject: New RCP for new work
Routing: - OWNER - PM - File - HVAC FO PIPING FO
Information Requested:
The second floor North and South reflected ceiling plans shown on A3.7 & A3.8 are identical to the second floor North reflected ceiling plans shown on A3.3 & A3.4 Please provide the corrected sheet showing the new work.
Response:
(E)22X16
(E)22x16
(E)20x14
(E)20x14
CLASSROOM212
COMPUTER LAB 211
SERVER ROOM210
IT SUPPORT209
COMPUTER LAB 208
CLASSROOM207
HALLWAY202
STAIR 1213
CLASSROOM214
CLASSROOM215
CLASSROOM218
MEN'S REST ROOM219
WOMEN'SREST ROOM
220
STUDY LOUNGE
206
POC
1
2
2
3
2 3
2
3
16x14L
14x14
(E) EA RISERTO REMAIN
(E)SA RISERTO REMAIN
4
(E)RESTROOMEXHAUSTSYSTEM TOREMAIN.
4
14x14L
(E)SA RISERTO REMAIN
(E) EA RISERTO REMAIN
(E)SA RISERTO REMAIN
(E)TRANSFER/RELIEF DUCT,CEILING GRILLE AND WALLLOUVER TO REMAIN (TYP).
1100 CFM6265 CFM(TYP 6)
5
180 CFM(TYP 6)
51 940 CFM6
1 810 CFM6200 CFM(TYP 6)
5
200 CFM(TYP 6)
5
1810 CFM 6
245 CFM(TYP 6)
5
11260 CFM 6
1740 CFM 6
200 CFM(TYP 6)
5
265 CFM(TYP 6)
5
11140 CFM 6
14"Ø
14"Ø
16"Ø
POC(E)16X12
14"Ø
(E)20X14
POC
16"Ø
120 CFM5
130 CFM5
8"Ø
8"Ø
(E)20x16
16"ØL
(E)22x14
14"Ø
14x14
4
4
4
4
4
7
7
14x14L16x14L
(E)22x16
7
16x14L
14x14L
16x16L
16x14L
(E)20x14
16x14L
16x16L
16x14L
16x14L
416x14L
7
500 CFM(TYP 6)
6
430 CFM(TYP 7)
6
1
C
1 2 3 4 5 6
A
B
D
J
E
K
L
H
F
G
1715900
SO
LA
NO
C
OM
MU
NIT
Y
VA
CA
VILLE
C
EN
TE
R
20
01
N
V
IL
LA
GE
P
KW
Y
DESCRIPTION
SCALE:
CHECKED:
REVISIONS
DRAWING
NUMBER:
PROJECT NUMBER:
DATE:
DRAWN:
NO DATE BY
CONSULTANT
CO
LLE
GE
D
IS
TR
IC
T
VA
CA
VIL
LE
, C
A 9
56
88
DSA BACK CHECK
NOTES:
1. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
2. ALL DIMENSIONS ARE TO BE FIELD VERIFIED.
3. PATCH AND REPAIR FINISHES TO MATCH ADJACENT FINISHES
AFFECTED BY DEMOLITION.
REFLECTED CEILING PLAN NOTES:
1. REFER TO MECHANICAL FOR ADDITIONAL EQUIPMENT INFORMATION.
REFLECTED
CEILING PLAN
SEE CONTINUATION MATCH LINE 1/A3.8
(E)24X16
HALLWAY222
ROOF DECK221
OFFICE 235
OFFICE 234
STAFF LOUNGE233
CONFERENCE232
DATA242
OFFICE 241
HALLWAY231
STAFF RESTROOM
243
JANITOR STORAGE
245
MACH247
HALLWAY246
OFFICE 240
STUDY/PHONE230
OFFICE 239
OFFICE 238
OFFICE 237
COPY/WORK ALCOVE244
STAIR 2
POC
POC
POC
FCU7
POC
POC FCU8
POC
POC
POC
FCU10
FCU9
POC
POC
1
1
1
1
POC
2
3
4
4
4
4
580 CFM(TYP 12)
5
POC
24X16
1245 CFM(TYP 2)
2 6
1245 CFM(TYP 2)
6
270 CFM(TYP 11)
5
(TYP 11)
(E)12"Ø
(E)12x1012x10
14" HIGH RAPLENUM
12"Ø
320 CFM 6(E)20x14
580 CFM(TYP 2) 6
300 CFM(TYP 4)
5(E)20x14
14x14L
16x14L
7
(E)14"Ø
7
14x14L
14"Ø
(E)6"Ø
8"Ø
180 CFM(TYP 3)
5
400 CFM(TYP 3)
5
1070 CFM6
200 CFM5160 CFM6
100 CFM 5
80 CFM 6270 CFM6
100 CFM(TYP 3)
5
(E)10"Ø
(E)8"Ø8"Ø
POC
(E)10"Ø
12"Ø10"Ø
(E)12x12 12"Ø
60 CFM 5150 CFM 5
150 CFM5
150 CFM 5
150 CFM5
130 CFM 6
130 CFM 6
130 CFM 6
130 CFM 6
100 CFM6
300 CFM5
280 CFM6280 CFM6
8"Ø
10x12
(E)10"Ø
(E)10"Ø
(E)12x8
N
P
Q
R
S
T
U
14
89
11
12
13
7
10
15
1715900
SO
LA
NO
C
OM
MU
NIT
Y
VA
CA
VILLE
C
EN
TE
R
20
01
N
V
IL
LA
GE
P
KW
Y
DESCRIPTION
SCALE:
CHECKED:
REVISIONS
DRAWING
NUMBER:
PROJECT NUMBER:
DATE:
DRAWN:
NO DATE BY
CONSULTANT
CO
LLE
GE
D
IS
TR
IC
T
VA
CA
VIL
LE
, C
A 9
56
88
DSA BACK CHECK
NOTES:
1. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
2. ALL DIMENSIONS ARE TO BE FIELD VERIFIED.
3. PATCH AND REPAIR FINISHES TO MATCH ADJACENT FINISHES
AFFECTED BY DEMOLITION.
REFLECTED CEILING PLAN NOTES:
1. REFER TO MECHANICAL FOR ADDITIONAL EQUIPMENT INFORMATION.
REFLECTED
CEILING PLAN
SEE CONTINUATION MATCH LINE 1/A3.7