26
PROJECTS MINING Ecuador is a country that has a great growth potential in the exploration and development of Deposits and minerals. The objective of this sector is to generate a sustainable development with public policies that facilitate, norm and promote investments in extractive activities for Ecuador. The mining sector represents an important source of resources for the development of the nation, as a leveraging factor for the generation of employment, and a factor for a balanced local and regional development.

Catalogodeinversion2012 ingles parte2

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Catalogodeinversion2012 ingles parte2

P R O J E C T SMINING

Ecuador is a country that has a great growth potential in the exploration and development of Deposits and minerals. The objective of this sector is to generate a sustainable development with public policies that facilitate, norm and promote investments in extractive activities for Ecuador. The mining sector represents an important source of resources for the development of the nation, as a leveraging factor for the generation of employment, and a factor for a balanced local and regional development.

Page 2: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Cañar Province

LEVEL OF STUDIES Prospecting Studies. Determination of anomalous zones

Name of the Project | PILZHUM

Technical Data

DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility Studies.The mineralization that exists is an argentiferous galena, gold, lead and zinc. There exist mining works with approximately 600 m of galleries; geologic resources 500.000 ounces of silver.

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

MIN

ING

PR

OJE

CT

S47

Page 3: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Azuay Province

LEVEL OF STUDIES Prospecting Studies. Determination de anomalous zones

CONTRACTING METHOD Strategic Alliances.

Name of the Project | ANGAS

Technical Data

DESCRIPTION:Geologic exploration, Pre-feasibility studies and Feasibility.Prospect located within three areas of approximately 4.500 hectares each, a high sulfur content system with a potential for gold and silver. Geological Resources of 300.000 ounces of gold.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

MIN

ING

PR

OJE

CT

S

48

Page 4: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Bolivar Province

LEVEL OF STUDIES Basic exploration studies in anomalous zones.

Name of the Project| SAN MIGUEL

Technical Data

DESCRIPTION:Geologic exploration, Pre-feasibility studies and Feasibility.Sub-divided into six anomalous zones and within six areas of approximately 5.000 hectares each, mineralization and alteration related to porphyries of copper– molybdenum with a geologic potential of 500 MT/0,6% of copper.

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

MIN

ING

PR

OJE

CT

S49

Page 5: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Zamora Chinchipe Province

LEVEL OF STUDIES Basic exploration studies in anomalous zones.

Name of the Project | NANGUIPA MOUNTAIN RANGE (MINA REAL)

Technical Data

DESCRIPTION:Advanced Geologic Exploration, Pre-feasibility and Feasibility.Prospect and explore for copper, molybdenum and gold in the mining concession in the Zamora Chinchipe Province located in the southeast of the national territory.

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

MIN

ING

PR

OJE

CT

S

50

Page 6: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Bolívar Province

LEVEL OF STUDIES Basic exploration studies in anomalous zones.

CONTRACTING METHOD Strategic Alliances.

Name of the Project | TELIMBELA

Technical Data

DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility studies.Prospect and explore for copper, molybdenum in the mining concession of the Telimbela project located in the Bolivar Province.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

MIN

ING

PR

OJE

CT

S51

Page 7: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Esmeraldas Province

LEVEL OF STUDIES Basic exploration studies in anomalous zones.

Name of the Project | LA TOLA NORTE

Technical Data

DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility studies.Evaluate and certify the level of proven and probable reserves in the ferrous sand deposits (titanium – magnetiferous) existing in the coastal zone of the Esmeraldas Province, in order to reach the level of Pre-feasibility, mining conceptual designs for exploitation and the design of the iron and steel plant designs.

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

MIN

ING

PR

OJE

CT

S

52

Page 8: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY National Mining Company EPSCOPE AND LOCATION Bolívar and Los Ríos Provinces

Name of the Project | EL TORNEADO

LEVEL OF STUDIES Basic exploration studies in anomalous zones.

CONTRACTING METHOD Strategic Alliances.

Technical Data

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

DESCRIPTION:Geologic exploration, Pre-feasibility and Feasibility studies.Prospect and explore for copper, molybdenum and gold in the mining area of El Torneado located in the provinces of Bolívar and Los Ríos which are in the central eastern part of the national territory.

MIN

ING

PR

OJE

CT

S53

Page 9: Catalogodeinversion2012 ingles parte2

Project Summary

NAME LOCATION - PROVINCE DEPOSIT

BEGINNING OF OPERATIONS(Estimated)

AMOUNT OF INVESTMENT

Pilzhum Cañar 2012 UNDETERMINED

Angas Azuay 2012 UNDETERMINED

San Miguel Bolívar 2012 UNDETERMINED

Cordillera de Nanguipa Zamora Chinchipe 2012 UNDETERMINED

Telimbela Bolívar 2012 UNDETERMINED

La Tola Norte Esmeraldas 2012 UNDETERMINED

El Torneado Bolívar and Los Ríos

Gold, silver, plomo and zinc

Gold and silver

Copper

Gold, copper and molybdenum

Copper and molybdenum

Arenas Ferrosas

Gold, copper and molybdenum 2012 UNDETERMINED

TOTAL UNDETERMINED

54

Page 10: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY Mining ViceministryFINANCING REQUIRED UNDETERMINED.

Name of the Project | FIRST MINING TENDER

NAME LOCATION -PROVINCE

POTENCIAL G_M

FGM INTRUSIVE

FGM VOLCANIC

FGMMETAMORPHIC

ALLUVIAL ENVIRONMENTMETALIC

N° EVIDENCES (OCCUR)MM

LEVEL OFSTUDIES

La Sofía Province of Sucumbíos Medium Medium - High Medium Medium - Low Partially Favorable

Partially Favorable

6 Prospection

Magdalena Province of Imbabura High Medium Medium - High Medium - Low 0 Prospection

Río Jalligua Province of Cotopaxi High Medium - Low High Medium - Low Partially Favorable 0 Prospection

Balzapamba Province of Bolívar High Medium - High Medium Medium - Low Not Favorable 10 Prospection

Alao Provincia of Chimborazo Medium - High Medium - Low Medium Medium Partially Favorable 7 Prospection

Purubin Province of Cañar High Medium - High Medium Medium - Low Not Favorable 10 Prospection

San Miguelde Cuyes

Provinces of Morona Santiago and Azuay

Medium - High Medium Medium Medium - High Totally Favorable 5 Prospection

Paccha Province ofEl Oro High Medium - High Medium Medium - Low Partially Favorable 6 Prospection

YacuambiProvince of Zamora Chinchipe

High Medium - Low Medium - High Medium - Low Partially Favorable 1 Prospection

Namirez AltoProvince of Zamora Chinchipe

High High Medium - Low Medium - Low Not Favorable 2 Prospection

Note: All existing minig rights inside de mining tender will be entirely respected.

MIN

ING

PR

OJE

CT

S55

Page 11: Catalogodeinversion2012 ingles parte2

Name of the Project | FIRST MINING TENDER Projects Location

La Sofía

Magdalena

Río Jalligua

Balzapamba

Alao

Purubin

San Miguel de Cuyes

Paccha

Yacuambi

Namirez Alto

MIN

ING

PR

OJE

CT

S

56

Page 12: Catalogodeinversion2012 ingles parte2

P R O J E C T SOIL

Ecuador strives to e�ciently exploit its energy resources by promoting the exploration of new oil and gas �elds, as well as investment in the re�ning of crudes, with the objective of guaranteeing autonomy in the consumption of derivates.

Page 13: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Certi�cation of Reserves (Ryder Scott) Basic Engineering studies (Mustang Engineering International)

Technical Data

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED USD 500´000.000

Financial Indicators

GOVERNING ENTITY Petroamazonas EPSCOPE AND LOCATION Francisco de Orellana Province

Name of the Project | EXPLORATION AND PRODUCTION OF HYDROCARBONS IN THE APAIKA AND NENKE FIELDS OF BLOCK 31

DESCRIPTION:Produce approximately 30,000 BOPD, of 15 to 17 °API, incorporating 60 MMbls.

OIL

PR

OJE

CT

S

58

Page 14: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, and calculation of reserves in the Charapa �eld.

Technical Data

CONTRACTING METHOD Direct Investment. Contracting with international public companies.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

GOVERNING ENTITY Secretariat for HydrocarbonsSCOPE AND LOCATION Sucumbios Province.

Name of the Project | EXPLORATION AND PRODUCTION OF THE CHARAPA BLOCK

DESCRIPTION:Exploration and development of non-drilled structures in the northern sector of the Eastern Basin of Ecuador. In this area there are wells in production and prospects to be developed.

OIL

PR

OJE

CT

S59

Page 15: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, and calculation of reserves.

Technical Data

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Sucumbíos Province

Name of the Project | EXPLORATION AND PRODUCTION OF THE LAGO AGRIO BLOCK

DESCRIPTION:Exploration and development of the Lago Agrio �eld, with the possibility of increasing by 40 MMbls the hydrocarbon reserves.

OIL

PR

OJE

CT

S

60

Page 16: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, drilling of wells.

Technical Data

CONTRACTING METHOD Direct Investment. International Tenders. Contracting with international public companies.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

GOVERNING ENTITY Secretariat for HydrocarbonsSCOPE AND LOCATION South-East of Ecuador (Morona Santiago, Pastaza and part of Napo Provinces).

Name of the Project | EXPLORATION AND PRODUCTION IN THE SOUTH-EAST OF ECUADOR

DESCRIPTION:Exploration and development of 21 blocks. Possibility of �nding 690 MMbls of OOIP, 5 blocks have seismic 2D data, and only one block has wells.

OIL

PR

OJE

CT

S61

Page 17: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Studies: geological, geophysical, seismic 2D, and calculation of reserves of the Pacoa Field. Seismic interpretations of the block inland as well as o�-shore.

Technical Data

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Santa Elena Province

Name of the Project | EXPLORATION AND PRODUCTION OF BLOCK 01 – PACOA FIELD

DESCRIPTION:Exploration in Block 1 has a total area of 400,000 Hectares (onshore and o�-shore).

OIL

PR

OJE

CT

S

62

Page 18: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES There are 1.593,87 km of seismic 3D, an evaluation has been made of reservoirs, correlations with existing wells, AVO studies, seismic stratigraphy and the identi�cation of approximately 72 prospects.

Technical Data

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Guayas Province

Name of the Project | EXPLORATION AND PRODUCTION OF BLOCK 05 – CUENCA PROGRESO

DESCRIPTION:Exploration of Block 05, Progreso basin, located on the Ecuadorian Coast, the OOIP in 4 structures is of 221 MMbls.

OIL

PR

OJE

CT

S63

Page 19: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Seismic 2D studies, de�nition of potential areas for the accumulation of methane hydrates.

Technical Data

CONTRACTING METHOD Strategic Alliances.

FINANCING REQUIRED UNDETERMINED.

Financial Indicators

GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION O�-Shore

Name of the Project | OFF COAST EXPLORATION: METHANE HYDRATES

DESCRIPTION:Investigation to ratify the existence of methane hydrates. A preliminary evaluation carried out based on seismic information determines an area of 5.381 km with methane hydrates, calculating the following resources:Optimistic scenario: 779,11Tcf (trillion cubic feet), and a conservative scenario: 112,19Tcf.In the event of ratifying the existence of these resources of gas hydrates, it will be convenient to develop the adequate technology for exploitation and development in the generation of energy.

OIL

PR

OJE

CT

S

64

Page 20: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Feasibility Basic Engineering

Technical Data

CONTRACTING METHOD Tenders with �nancing International Tenders Contracting with international public companies.

FINANCING REQUIRED USD 280´000.000

Financial Indicators

GOVERNING ENTITY EP PetroecuadorSCOPE AND LOCATION Guayas and Azuay Provinces

Name of the Project | PIPELINE PASCUALES - CUENCA

DESCRIPTION:Construction of a multiple-product pipeline of 210 km, from the Pascuales terminal in the province of Guayas to the Chaullabamba terminal in Cuenca, Azuay Province. Pumping stations in Pascuales, El Chorrillo, La Troncal and the necessary intermediate stations to be determined in the hydraulic design of the pipeline.

OIL

PR

OJE

CT

S65

Page 21: Catalogodeinversion2012 ingles parte2

LEVEL OF STUDIES Basic Engineering (April 2012)

Technical Data

CONTRACTING METHOD Strategic Alliances. Tenders with �nancing. Contracting with international public companies.

FINANCING REQUIRED USD 12.800’000.000

Financial Indicators

GOVERNING ENTITY Re�nería del Pací�co Eloy AlfaroSCOPE AND LOCATION Manabí Province

Name of the Project| REFINERÍA DEL PACÍFICO

DESCRIPTION:The project contemplates the design and construction of a re�nery with a processing capacity of 300 thousand barrels of crude oil per day, with a deep conversion technology, required for the production of gasoline, diesel, LPG and petrochemical currents. Additionally, it contemplates facilities for the supply of electric energy, water, crude oil and the transport of products and marine installations. Furthermore, the re�nery must generate all of the electric power it needs, and will contribute with approximately 115 MW of electricity to the electric network connected to the National Interconnected System.

OIL

PR

OJE

CT

S

66

Page 22: Catalogodeinversion2012 ingles parte2

Project Summary

NAME LOCATION - PROVINCE TYPE OF PROJECT STARTING DATE OF

CONSTRUCTION (Estimated)AMOUNT OFINVESTMENT

Exploration and production of hydrocarbons of the Apaika and Nenke �elds of Block 31

Orellana Exploitation of crude oil 2012 $ 500’000.000

Exploration and production of the Charapa Block

Sucumbíos Exploitation of crude oil 2012

Exploration and production of the Lago Agrio Block

Sucumbíos Exploitation of crude oil 2012

Exploration and productionin the Southeast of Ecuador

Southeast Ecuador Exploitation of crude oil 2012

Exploration and productionof Block 01 - Pacoa Field

Santa Elena Exploitation of crude oil 2012

Exploration and productionof Block 05 - Cuenca Progreso

Guayas Exploitation of crude oil 2012

O�-shore Exploration:Methane Hydrates

Ecuadorian Coast Exploration 2012

UNDETERMINED

UNDETERMINED

UNDETERMINED

UNDETERMINED

UNDETERMINED

UNDETERMINED

Pipeline Pascuales - Cuenca Guayas and AzuayDistillates petroleumproducts transport 2012 $ 280’000.000

Re�nería del Pací�co Manabí Re�ning 2012 $ 12.800’000.000

TOTAL $ 13.580’000.000

67

Page 23: Catalogodeinversion2012 ingles parte2

P R O J E C T STELECOMMUNICATIONS

By means of the creation of the Ministry of Telecommunications and of the Information Society, on August 13, 2009, the State recognized the need of guaranteeing to all Ecuadorians, an equal access to the Technologies of Information and Communication, taking over the responsibility of assuring the creation of a solid base for the transition of our country towards the information society.

Page 24: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY Ministry of Telecommunications and the Society of Information SCOPE AND LOCATION Everywhere in Ecuador

Name of the Project | DIGITAL TELEVISION (DTV)

DESCRIPTION:Implementation of the national network RTVECUADOR public TV station with the standard of terrestrial

LEVEL OF STUDIES Feasibility Studies

Technical Data

FINANCING REQUIRED USD 23´000.000

Financial Indicators

CONTRACTING METHOD Tenders with �nancing. Contracting with international public companies.

TE

LE

CO

MM

UN

ICA

TIO

NS

PR

OJE

CT

S69

Page 25: Catalogodeinversion2012 ingles parte2

GOVERNING ENTITY Ministry of Telecommunications and the Society of Information SCOPE AND LOCATION City of Quito

Name of the Project | NATIONAL CENTER FOR PUBLIC DATA

DESCRIPTION:Implementation of the National Center for Public Data, principal and alternate, that includes civil and technological infrastructure, that will permit the Ecuadorian State to have available a National Center for Public Data, that will provide technological information and communication services in a standardized manner, guaranteeing their e�ciency, con�dentiality, integrity, availability, compliance and reliability; optimizing the technological investment of the State and facilitating the implementation of electronic government.

LEVEL OF STUDIES Pre-feasibility Study.Technical Data

CONTRACTING METHOD Direct Investment

FINANCING REQUIRED USD 70´000.000

Financial Indicators

TE

LE

CO

MM

UN

ICA

TIO

NS

PR

OJE

CT

S

70

Page 26: Catalogodeinversion2012 ingles parte2

Project Summary

NAME LOCATION - PROVINCE DESCRIPTION

START DATE OFCONSTRUCTION

(Estimated)AMOUNT OF INVESTMENT

Digital Television Quito, Guayaquil and Cuenca

RTVECUADOR NationalNetwork

July 2012 $ 23’000.000

National Center forPublic Data Quito National Center

for Public Data March 2012 $ 70’000.000

TOTAL $ 93‘ 000.000

71