Cape Scott Wind Farm model validation exercise

Presentation to WECC REMTFNovember 18, 2014

Page 2: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

99 MW Cape Scott Wind Plant

• Located at the Northern tip of Vancouver Island• Very weak interconnection (SCR as low as 1.5 on

34.5 KV bus• Extensive PSCAD simulations done during

interconnection studies• Custom PSSE models developed by Vestas have

been successfully validated against PSCAD studies• BC Hydro has asked for generic models to satisfy

WECC requirements

Page 3: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014
Page 4: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

Original Parameters provided by Vestas, with turbines controlling voltage… Poor comparison with Generic Model, initial conditions suspect!

Page 5: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

Original Parameters provided by Vestas, with turbines controlling voltage… Poor comparison with Generic Model, initial conditions suspect!

Page 6: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

/9073 'USRMDL' 1 'REECAU1' 102 0 6 45 6 9 0 0 1 0 0 0.9 1.1 .01 -.01 .01 2 1 -1 1 -.11 .4 .4 .005 .5 -.5 1.1 .9 5 5 5 5 0 .01 1 0 1 0 1.2 .01 0 1 .5 1 .8 .36 .85 .25 .1 .45 .6 .45 .8 .45 1 1/

9073 'USRMDL' 1 'REGCAU1' 101 1 1 14 3 4 1 .005 .65 .9 .4 1.22 1.2 .2 .1 -1.3 0.02 1 49 -49 .5/

9073 'USRMDL' 1 'WTPTAU1' 104 0 0 10 3 14 .7 4 .7 .7 .3 17 0 10 -10/

9073 'USRMDL' 1 'WTARAU1' 105 0 0 2 0 1.007 0/

9073 'USRMDL' 1 'WTDTAU1' 103 0 0 5 4 34.7 0.0000 0.851 .5275 .5/

9073 'USRMDL' 1 'WTTQAU1' 505 0 1 15 3 3 010 10 .4 60 1.003 0 .2 .58 .4 .72 .6 .86 .8 1 28.8//

Most recent generic models provided by Vestas… controlling Q rather than voltage. Vestas says the model doesn’t work for voltage control. Note that if the voltage at terminals is initialized below 1.0 pu, initial condition suspect occur.

Page 7: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

The Vestas parameters were mainly taken from an EPRI model document. The parameters highlighted in yellow are parameters which don’t map perfectly to the PTI PSSE program, therefore Electranix guessed at them.

Page 8: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

Immediately after the fault, the power reference in the electrical model (REEC) goes above 1.0 pu, and begins oscillating sinusoidally. As long as it stays above 1, there is no problem, but if it dips below 1, problems occur as seen below…

Page 9: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014
Page 10: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

Vestas is still working!

• Some parameters provided by Vestas are not clear. We have guessed at these.

• Generic model performance doesn’t match custom model performance

• Inverse current limit characteristic seems to break PTI instructions for REECA

Page 11: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014
Page 12: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014
Page 13: Cape Scott Wind Farm model validation exercise Presentation to WECC REMTF November 18, 2014

Conclusion and Status• Vestas is reviewing the comparison between custom model and generic

model• Vestas is reviewing inverse characteristic violation of PTI data sheet• Vestas has been shown the steady state post fault disturbances. These are

not acceptable…• PTI has been informed that voltage control doesn’t work for the Vestas

model• Electranix will send the generic model to BC Hydro when the following

criteria are met:– No initial conditions suspect. (may be subject to voltage being over 1.0)– No steady state post fault disturbances– Model will be set up to control Q, and voltage control will be handled by STATCOM– Incorrect behaviour based on custom model validation will be acceptable,

provided the plant rides through faults– A strong recommendation will be made that the generic model not be used for

any studies near Cape Scott