1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development December 2, 2009

1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

Embed Size (px)

Citation preview

Page 1: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

1

AASHTO: SCOPT/MTAP Winter Meeting

METRO Update: Light Rail Operations and the Status of Future Corridors

Wulf Grote, P.E.Director, Project Development

December 2, 2009

Page 2: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

2

High Capacity Transit System

Page 3: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

3

High Capacity/Light Rail TransitFunding Sources

57-mile system funding: Tempe Sales Tax - 1996 (Prop 400) Phoenix Sales Tax - 2000 (Prop 2000) Mesa General Fund Glendale Sales Tax – 2001 (Prop 402) Regional Sales Tax 2004 (Prop 400) Federal Transit Administration (~40%)

Page 4: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

4

20-Mile Light Rail Line

Page 5: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

5

Why Did We Select This Corridor First?

Corridor has highest travel demand

High demonstrated bus ridership

Highest employment concentrations

Good residential base

High student population

Corridor contains most special event facilities

Page 6: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

6

Light Rail in Street Median

Page 7: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

7

Light Rail Vehicle

50 Vehicles Heat reflective paint Low E, solar reflective windows Insulated car bodies to reduce cooling loss Bicycle racks, wheelchair accessible

Page 8: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

8

“Cool Screen” Station

28 stations Louvers & tensile fabric maximize shade Benches, art & plants Chilled water fountains

Page 9: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

9

Unique Art at Each Station

19th Ave and Camelback44th Street and Washington

Roosevelt and Central Dorsey and Apache

1st Ave and Jefferson

Page 10: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

10

Park-and-Ride Locations

Page 11: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

11

Future Airport Connection via Sky TrainPhase 1 - 2013

Page 12: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

12

Operations

Frequency – Weekdays – 10 mins peak hours -20 mins off peak Saturday - 15 mins peak hours – 20 mins off peak Sunday and Holiday -20 mins all hours of day

Operations Monday thru Thursday 4 a.m. – midnight Friday 4:40 a.m. to 3 a.m. (Sat) Saturday 4:30 a.m. to 3 a.m. (Sun) Sunday 4:30 a.m. to midnight

Page 13: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

13

Total Average Daily Boardings

Page 14: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

14

Average Daily Boardings

Page 15: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

15

Intercept Survey ResultsApril 2009

35% never used transit the year before 40% used transit on a weekly basis

45% walked to a METRO station 29% drive and 26% transfer from a bus

40% utilize METRO to/from home for needs other than work or ASU 27% use METRO for work and 12% for ASU

68% of those surveyed had at least 1 car available for their trip

Page 16: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

16

Development along 20-mile Route2004 to Present

$7.4 billion total investment along alignment (planned, under construction, or completed)

$5.9 billion private investment

$1.5 billion public investment

17,000+ residential units

9+ million square ft. commercial

3,200+ hotel rooms

$1.4 billion$1.4 billion

$7.4 billion$7.4 billion

Light rail investment Non-rail investments

Page 17: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

17

High Capacity Transit System

Page 18: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

18

Northwest LRT Extension

Page 19: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

19

NW LRT Extension Overview

Project Length = 3.2 Miles Stations = 3 Park-and-Ride = 500 spaces Construction Cost = $250 million (YOE)

Doesn’t include ROW or design Funding – City of Phoenix and Regional PTF

No federal funds

Page 20: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

20

Northwest LRT Extension Status

Design Completed – April 2009 Real Estate Acquisition – Spring 2010 Construction – Delayed

Construction team under contract Small street project next summer

Evaluating various funding alternatives, including federal funds

Page 21: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

21

Central Mesa LRT Extension

Page 22: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

22

Central Mesa Project Highlights

Project Length = 3.1 miles

Cost Estimate = $227M (YOE$)

Funding Sources:

5309 Small Starts = 33%

CMAQ = 15%

Regional PTF = 52%

November 2009 – submitted request to FTA to enter Project Development

Page 23: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

23

Tempe South Study Area

Tempe South Corridor Study Area

Page 24: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

24

Tempe South Corridor Rural Road

Bus Rapid Transit

Page 25: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

25

Tempe South CorridorMill Avenue

Modern Streetcar

Page 26: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

26

Phoenix West Extension

High Capacity Transit Alignment in the I-10 median west of I-17

MAG adopted – July 2008

Page 27: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

27

Phoenix West Extension

50’ median for future mass transit preserved as part of I-10 completion

Page 28: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

28

I-10 Freeway HCT Transition

Page 29: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

29

LRT Alternative: I-17 – Jefferson – Washington/Jefferson

Page 30: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

30

Bus Rapid Transit

BRT: Los Angeles Metro Orange LineBRT: Los Angeles Metro Orange Line

Page 31: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

31

Bus Rapid Transit Alternative

Page 32: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

32

High Capacity Transit System

Page 33: 1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development

33