All content in this presentation is protected – © 2008 American Power Conversion Corporation

Managementul infrastructurii fizice în centre de date este o

necesitate, nu un moft

Eduard BodorData Center BDM for Central EuropeMay 2011

Page 2: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Key market driversGlobal Market Trends

Data Center Specific Drivers

Digitalization driving demand

Business critical to “Life

Critical”

Cloud computing

Need to cut CO2 emissions to avoid

climate change

New economies driving demand

Flexibility & Modularity

Green data center

Match IT to business

needs

ManagementDensity

Page 3: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Is this a Data Center?

Page 4: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

No … THIS is a Data Center!

Page 5: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Environment Poses a Risk to Availability

●Racks were already hot in 2005● “10% of all racks are already too hot and fail

to meet industry standards for maximum IT reliability and performance.” (Uptime Institute)

●Virtualization is forcing more processing power out of a smaller space, causing hot spots (Forrester 2008)

• Need to monitor at rack level is more important because of variance within single rack.

●“For every 15 degrees over 75 degrees your equipment is subjected to, its lifetime is cut in half” (Uptime Institute)

●Technology exists for manufacturers to validate operating condition compliance

●Particle sensors, leak sensors

If you cannot verify you are running within operating If you cannot verify you are running within operating specifications you will shorten the life of your equipment.specifications you will shorten the life of your equipment.

Page 6: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Network Closets are Business Critical

●Power consumption has increased 10X over the past 10 years* (Cisco 2008)

●VOIP, Network Convergence, PoE

●97% of all IT spaces are network closets and server rooms

●Over 2.2 M in NAM alone (IDC 2006)

●VOIP is growing at 26% annually (IDC); $2.2B market in 2008

●Companies are realizing the criticality of IT spaces (Forrester 2008)

●42% percent of IT managers said business continuity and disaster recovery are very important, up from 33 percent from last year.

*in a 100 phone network closet

Business critical applications are running in Business critical applications are running in suboptimal environments.suboptimal environments.

Page 7: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Security is Increasing in Criticality●Security is a top issue with customers

● 76% of security decision makers expect to either maintain or increase their IT security budget for 2009 (Forrester 2008)

● Security makes up 10 percent of overall IT operating budgets in 2008, up from 8 percent last year.

● Over 60% of downtime is caused by human error (Uptime Institute)

● Cost of downtime increased 3X in last 10 years (Wall Street Journal 2008)

●Stringent Access control procedures are enforced in Data Centers

● Sisters of Mercy only allows IT personnel in Data Center when it is physically necessary

● Switch Communications enforces that only one of three redundant power distribution paths can be down for maintenance at any given time

●Regulatory Compliance forces a focus on security

Equipment Failure

Construction Design ExternalOperational

Consistent with surveys that attribute 60% or more of

failures to HUMAN ERROR

Knowing who accessed your Data Center or Knowing who accessed your Data Center or Network Closet is best practice.Network Closet is best practice.

Page 8: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Integration with Pelco IP Cameras

●Superior Image Quality ●Pelco IP cameras offer improved

image quality for specialized requirements where the traditional NetBotz Camera Pod is not sufficient.

●Low light capability●Pelco IP cameras offer greater

flexibility to customers in low light applications including Lights Out Network Closets and Data Centers.

●Absolute Remote Visibility●Pelco’s PTZ IP cameras allow you to

see every nook and cranny of your Network Closet.

See NetBotz Technical Specifications for specific Pelco IP camera integration compatibility.

Page 9: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Centralized Management

●Advanced alert customization capabilities:●Warning alerts, critical alerts, and alert

escalation●Multiple notification methods●Scheduling●Graphing ●Video attachments

●If deployment is bigger than 2 NetBotz appliances use InfraStruxure Central to optimize management efficiency

●NetBotz Surveillance nodes allow consolidated camera views through InfraStruxure Central

Site A

Site DSite C

Site B

Site EIP

Network

Page 10: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Data Center Manager Needs

D2-

L2

Collaborative System Architecture

Data Center Manager

Building

Security IT Room

Power

Needs access to all of the Interdependent systems that have effect on availability and efficiency

Page 11: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Data center

“Making the Connections”

Page 12: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

BuildingManagement

Security management

Powermanagement

IT Room management

“Making the Connections”

Page 13: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

●Minimize downtime

●Maximize power densities

●Enable fast decision-making

●Manage inventory for highest availability

●Manage inventory for highest efficiency

●Predictive simulation and modeling

Identify problems before they occur

What it means to you

Page 14: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Data collection

● Devices themselves with interface– UPS, RackMount PDU, CRAC● Meters to add communication – breakers, switchgear, transformers, generation

Page 15: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Cooling device monitoring

Schneider Continuum BMS Software

Page 16: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Power device monitoring

Schneider PowerLogic ION Enterprise Power Management Software

Page 17: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Security monitoring

Schneider InfraStruxure Central Data Center Management Software

Page 18: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

IT Room monitoring

Schneider InfraStruxure Central Data Center Management Software

Page 19: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011

Lifecycle and Workflow Management

Page 20: Apcbyschneider 27mai2011-110602085611-phpapp01

APC by Schneider Electric – Eduard Bodor – 27thh of May 2011