23
Quality analysis of Machine Shop (HMC) Presenting: GROUP # 01 Abu Bakar Siddique ME123009 Shahid Hussain ME123019 Muhammad Ifraheem ME123022 Fahad Akhter ME123082

Quality analysis of hmc

Embed Size (px)

Citation preview

Page 1: Quality analysis of hmc

Quality analysis of Machine Shop (HMC)

Presenting:

GROUP # 01

Abu Bakar Siddique ME123009

Shahid Hussain ME123019

Muhammad Ifraheem ME123022

Fahad Akhter ME123082

Page 2: Quality analysis of hmc

Introduction of HMC

• Leading enterprise in a country.

• Two main Production unit

• Mechanical works

• Foundry & Forge works

• Mechanical works starts 1971

Page 3: Quality analysis of hmc

Machine Shop

• Most Important Shop

• Contributes major part in income of industry

• Divided in three categories

• Small Bay

• Medium Bay

• Heavy Bay

• Batch Production

Page 4: Quality analysis of hmc

TurningDrawing Reading

Dimension Correct

Facing

Dimension CorrectMilling

Dimension CorrectDrilling

Store

Dimension Correct

If YES

If YES

• If NO

If YES

If NO

If NO

If NO

If NO If NO

If YES

Flow Chart

Page 5: Quality analysis of hmc

Turning Data

Turning 1 2 3 4 Avg Dia Range

1 420.2 419.6 419.8 420.1 419.925 0.6

2 419.9 420.3 420.1 419.9 420.05 0.4

3 420.8 420.2 420.5 420.3 420.45 0.6

4 420 419.9 419.8 420 419.925 0.2

5 420.4 420 420.3 420.1 420.2 0.4

6 419.5 420.2 419.9 420.1 419.925 0.7

7 420.4 419.8 420.2 419.9 420.075 0.6

8 420.2 419.9 420 420.1 420.05 0.3

9 420.3 419.9 420.2 419.9 420.075 0.4

10 420.2 419.6 420.1 419.7 419.9 0.6

Page 6: Quality analysis of hmc

Charts and Capability

Cp= 0.574 Cpk=

1 2 3 4 5 6 7 8 9 10419419.2419.4419.6419.8

420420.2420.4420.6

X- Bar Chart

Avg. Diameter MeanUCL LCL

Dia

met

er (

mm

)

1 2 3 4 5 6 7 8 9 100

0.2

0.4

0.6

0.8

1

1.2

R-Chart

Range R UCL(R) LCL(R)

Rang

e

Page 7: Quality analysis of hmc

Facing Data

Facing 1 2 3 4 Avg. Width Range

1 36.4 35.8 36.2 35.9 36.075 0.6

2 35.8 36.2 36 36.1 36.025 0.4

3 36.5 35.5 36.2 35.3 35.875 1.2

4 36.3 35.9 36.1 35.8 36.025 0.5

5 35.7 36.2 35.9 36 35.95 0.5

6 35 36.5 36.4 36.1 36 1.5

7 35.8 36.4 36.2 35.9 36.075 0.6

8 36.2 35.7 35.9 36.2 36 0.5

9 36.8 36.4 35.9 36 36.275 0.9

10 35.6 36.3 36.3 35.8 36 0.7

Page 8: Quality analysis of hmc

Charts and Capability

Cp= 1.66 Cpk=

1 2 3 4 5 6 7 8 9 1034.8

35.2

35.6

36

36.4

36.8

X- Bar Chart

Avg, Width MeanUCL LCL

Wid

th (

mm

)

1 2 3 4 5 6 7 8 9 1000.20.40.60.8

11.21.41.61.8

R-Chart

Range R UCL(R) LCL(R)

Rang

e

Page 9: Quality analysis of hmc

Milling DataMilling 1 2 3 4 Avg Depth Range

1 24.4 23.8 24.2 23.7 24.025 0.7

2 24.6 24.2 24.3 24.6 24.425 0.4

3 23.7 24.2 24.1 23.9 23.975 0.5

4 24.4 23.6 23.9 24.2 24.025 0.8

5 24.2 23.9 23.9 24.1 24.025 0.3

6 23.9 24.7 24.5 23.9 24.25 0.8

7 24.2 23.7 23.9 24 23.95 0.5

8 24.3 23.7 23.9 24.1 24 0.6

9 23.8 24.1 24 23.9 23.95 0.3

10 24.5 23.6 23.7 24.4 24.05 0.9

Page 10: Quality analysis of hmc

Charts and Capability

Cp= 1.15 Cpk=

1 2 3 4 5 6 7 8 9 1023.223.423.623.8

2424.224.424.6

X- Bar Chart

Avg. Depth MeanUCL LCL

Dep

ht (

mm

)

1 2 3 4 5 6 7 8 9 1000.20.40.60.8

11.21.4

R-Chart

Range R UCL(R) LCL(R)

Rang

e

Page 11: Quality analysis of hmc

Drilling Data

Drilling 1 2 3 4 Avg. Depth Range

1 15.8 16 15.9 15.8 15.875 0.2

2 16.4 16.5 16.1 16.2 16.3 0.4

3 15.9 16 16 16 15.975 0.1

4 16.5 16.2 16.3 16.4 16.35 0.3

5 15.8 15.9 16 15.9 15.9 0.2

6 15.8 15.9 15.9 15.9 15.875 0.1

7 16.1 15.8 15.9 16.1 15.975 0.3

8 16.3 16.1 16.2 16.1 16.175 0.2

9 16 16 15.9 15.9 15.95 0.1

10 16.4 16.1 16.3 16.4 16.3 0.3

Page 12: Quality analysis of hmc

Charts and Capability

Cp= 0.877 Cpk=

1 2 3 4 5 6 7 8 9 101515.215.415.615.8

1616.216.416.6

X-Chart

Avg. Dia UCL LCL Mean

Dia

met

er

1 2 3 4 5 6 7 8 9 1000.10.20.30.40.50.6

R-Chart

Range UCL(R) LCL(R) R

Rang

e

Page 13: Quality analysis of hmc

Cause and effect diagram

Page 14: Quality analysis of hmc

Flow Process ChartProcesses Time ⃝� → □ D ∇

Drawing Reading 05 min √        

Transfer to Turning machine 02 min   √      

Machine checking 02 min     √    

Turning 12 min √        

Transfer to Grinding machine 02 min   √      

Tool Grinding 01 min √        

Check dimensions 02 min     √    

Transfer to another machine for facing 03 min   √      

Facing 10 min √        

Check dimensions 02 min     √    

Transfer to Grinding machine 01 min   √      

Tool Grinding 01 min √        

Supervisor inspection 05 min     √    

Transfer to Milling 02 min   √      

Wait for completing job 14 min       √  

Milling 40 min √        

Check dimensions 05 min     √    

Supervisor inspection 05 min     √    

Transfer to Drilling 02 min   √      

Drilling 10 min √        

Check dimensions 02 min     √    

Transfer to QC Department 05 min   √      

Quality Inspection 07min     √    

Transfer to store 05 min   √      

Store ----         √

Page 15: Quality analysis of hmc

Calculations

Total Time= 143 min

Operation Time= 79 min, Transport Time=22 min, Inspection Time= 30 min,

Delay Time =14 min

Efficiency % = =%

Page 16: Quality analysis of hmc

Questionnaire

Questions SA A N D SD

Material quality of HMC products is good enough. 1 5 2 2 1

Dimensional accuracy is within specified limits. 2 4 3 1 1

HMC is able to ship out products in a given time period. 2 4 1 3 1

Are all design reviewed tested and verified? 1 3 5 2 0

HMC products are reliable. 3 5 3 0 0

HMC manufacture products are low cost as compared to other firms. 4 2 2 2 1

latest technology is being used in HMC. 0 3 4 4 0

HMC has a good benchmark for other relevant firms. 1 4 5 0 1

HMC is meeting all customer requirements. 3 5 3 0 0

Is HMC fulfilling ISO standards? 2 2 1 4 2

19 37 29 18 7

Page 17: Quality analysis of hmc

Importance Performance Matrix

IMPORTANCE

HIGHHMC 

LOW

   

 LOW HIGH

PERFORMANCE

Total Value=

11x (1+2+3+4+5+6+7+8+9+10)x5=3025

Total obtained=2071

Our Target Value =3

On scale 5=

Page 18: Quality analysis of hmc

Cost per Month

Labor cost 104,000 Rs 36.62%

Electricity 150,000 Rs 89.70%

Maintenance 20,000 Rs 96.57%

Others 10,000 Rs 100.00%

Total 284,000 Rsele

ctricit

y

labor

cost

mainten

ance

others

020000400006000080000

100000120000140000160000

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Cost per Month

Page 19: Quality analysis of hmc

Cost of Quality

Years External Cost

Internal Cost

Prevention Cost

Appraisal Cost

Total Quality Cost

1 4.5 2 1 0.55 8.05

2 4.5 2.5 1.2 0.55 8.75

3 4.25 3 1.2 0.54 8.99

4 3.75 3.5 1.3 0.53 9.08

5 2.75 3 1.6 0.52 7.87

6 2.5 2.7 1.5 0.51 7.21

7 2 2.5 1.25 0.5 6.25

Note: Each cost * 100,000 Rs

0 1 2 3 4 5 6 7 802468

10

Cost Of QualityExternal Cost Internal CostPrevention Cost Apperasial CostTotal Quality Cost

Years

Cost

Page 20: Quality analysis of hmc

Current Sigma Level

Number of units Nu 5,000Number of opportunities No 04

Number of defects Nd 85

Number of defective units Ndu 53

• 4250 defects per million opportunities.• This corresponds to the 3.2 sigma level.

Page 21: Quality analysis of hmc

ISO Standard

• ISO 9001 certified

• Authorized to use 4 ASME stamps U, U2, S & PP for equipment manufacturing

Page 22: Quality analysis of hmc

Conclusion

HMC management has to take some decisions.

• Buy new machinery

• Shift machines from manual to Computer Numerical Control

• Hire highly skilled people

• Follow Six sigma principles

Page 23: Quality analysis of hmc

Questions???