Plate Mill Housings Erection and Settlement Transdata Movimentação de Cargas Complexas

2015 CRW - Transdata Rigging Job of the Year

Embed Size (px)

Citation preview

Page 1: 2015 CRW - Transdata Rigging Job of the Year

Plate Mill Housings Erection and Settlement

Transdata Movimentaçãode Cargas Complexas

Page 2: 2015 CRW - Transdata Rigging Job of the Year

02 pieces of 14.63 long x 05.60 high x 02.21 meters wide - 325 tonnes

47’99’’ x 18’37’’ x 07’25’’ - 358 T (short tons)

Housing

Page 3: 2015 CRW - Transdata Rigging Job of the Year

Site

Page 4: 2015 CRW - Transdata Rigging Job of the Year

Settlement onto Base

Starting date: November 20, 2014

Ending date: December 30, 2014

12 axle SPMT’s

500-tonne Hydraulic Gantry System

1,000-tonne Hydraulic Gantry System

Housing

Team:

01 Mechanical Engineer;

01 Lift Supervisor;

02 Gantry Operators;

01 SPMT Operator;

03 Riggers;

02 Topografer.

Page 5: 2015 CRW - Transdata Rigging Job of the Year

Advantages

No Additional Civil Works Required

• Use existing civil structures;

• Performance in Facility built;

• Hydraulic gantries system setting-up.

Before

Fast Track - No interference in the project’s dynamics.

Page 6: 2015 CRW - Transdata Rigging Job of the Year

Advantages

Reduction of time frame and costs

comparing with other methods

Crawler Cranes

02 Cranes of 1,350 and 400 tonnes capacity;

Impossible to perform completely indoor;

Area required;

USD 1,5 million;

Time.

Overhead Cranes

340-tonne overhead crane / 25 to 30 meters;

Cost USD 4 million – Equipment + Extra costs

(Assembly + beams bearing structure);

Time;

Operational risks.

Page 7: 2015 CRW - Transdata Rigging Job of the Year

Critical Points

Accuracy in synchronized

movement of 6 legs

Scaling the main lift beam considering

interferences in the runway track assembly

Transfer of the load to the system

* Motor base limiting the pieces entrance

Accuracy on the settlement less than

5mm

Page 8: 2015 CRW - Transdata Rigging Job of the Year

Critical Points

Devices dynamic efforts (sizing and

positioning on the piece)

Page 9: 2015 CRW - Transdata Rigging Job of the Year

Critical Points

System scaling to enable lift about 14

meters high and special slings.

2,400 mm (7´10``)

3,560 mm (11`8``)

3,560 mm (11`8``)

12

,21

4 m

m (

47

`)

13

,96

5 m

m (

45

`9``

)

4,9

60

mm

(16

`3``

)

3,9

90

mm

(13

`1``

)

Page 10: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 0 - Preparation

Internal haulage;

Jobsite;

System setting-up;

Placing devices.

Page 11: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 1 – Transferring Load to Gantry

Page 12: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 2 – Traveling Load

Page 13: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 3 – Erection

Page 14: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 4 – Settlement

Page 15: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 5 – Hydraulic Gantries positions

replacement

Page 16: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 6 – Transferring Second Load

Step 7 – Traveling Second Load

Page 17: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 8 – Second Load Erection

Page 18: 2015 CRW - Transdata Rigging Job of the Year

Operation

Step 9 – Second Load Settlement

Page 19: 2015 CRW - Transdata Rigging Job of the Year

Achievement

Innovation – worldwide;

Safety – 0 accident;

Cost effective;

Short time.

Page 20: 2015 CRW - Transdata Rigging Job of the Year

Credits

Successful Team

Transdata recognizes that the success of its operations is based on all

employees dedication. In this operation the performance of its Engineering

Team is highlighted, in special Mr. Jefferson Paula, Project Leader and Mr.

Wilson Reis, the Engineer Coordinator.

Transdata also thanks the Client’s contribution, in special from UTC

Engenharia – Matheus Conterno, Carlos David, Vinícius Amaral e Reni

Peixoto.