Kennedy Space Center Center Operations Directorate Construction of Facilities Division
LEED Lessons Learned
Presented To: PM Challenge 2011
By: Traci Robinson / NASA KSCFrank Kline / NASA KSC
February 9, 2011Long Beach, CA
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Agenda
♦ Introductions
♦ NASA and LEED
♦ Teamwork Lessons Learned
♦ Technical Lessons Learned
♦ Contractual Lessons Learned
♦ Q&A
2February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
3
NASA AND LEED
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
4
Blue Marble
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Joint Mission / Vision?
To pioneer the future in space exploration, scientific discovery and
aeronautics research.
February 9, 2011 5
Buildings and communities will generate and sustain the
health and vitality of all lifewithin a generation
To transform the way buildingsand communities are designed,built and operated, enabling anenvironmentally and sociallyresponsible, healthy and prosperous environment thatimproves the quality of life.
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
What is LEED
6February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
What is LEED
Sustainable Sites
Water Efficiency
Energy & Atmosphere
Materials & Resources
Indoor Environmental Quality
Locations & Linkages
Awareness & Education
Innovation in Design
Regional Priority
LEED Credit Categories
7February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
What is LEED
8February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Highest Level of Certification
9February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
10
NASA and LEED?
NASA Manages:
♦ 40,000+ people at 10 Centers and 3 additional major component facilities
♦ 2500+ buildings, 2300+ other constructed assets valued conservatively at over $25B
♦ 360,000+ acres (562 mi2)
Most of NASA’s facilities are over 40 years old (at or beyond their design life)
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
♦ Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management Ensure that all new facilities and renovation projects implement
design, construction, and maintenance and operation practices in support of the sustainable design/high-performance buildings goals of the E.O. and statutory requirements and existing facilities’ maintenance and operation practices in support of the goals of the E.O.
♦ Energy Policy Act of 2005 Where lifecycle cost-effective, buildings shall be designed to
achieve energy consumption levels at least 30% below ASHRAE 90.1-2004
Cost effective sustainable design principles shall be applied to the siting, design, and construction of all new and replacement buildings
Federal - because I told you so
11February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
♦ Energy Independence & Security Act of 2007 Renewable Energy
30% hot water building demand from Solar Thermal Energy Efficiency Equipment Standards
new standards for lighting commercial appliance equipment
♦ Federal Leadership in High Performance and Sustainable Buildings MOU Reduce environmental impact of materials:
Recycled Content Biobased Content Construction Waste Ozone Depleting Compounds
Federal - because I told you so
12February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
♦ The American Recovery and Reinvestment Act of 2009 Economic Stimulus Act to Result in Greener Federal Buildings
and Fleets — The U.S. General Services Administration (GSA) will receive $4.5 billion under the American Recovery and Reinvestment Act of 2009 to convert existing federal buildings into high-performance green buildings. The GSA will also garner $300 million to purchase greener vehicles for federal fleets.
Reduce Federal Energy Consumption. Currently, the federal government is the world’s largest single consumer of energy in the world, spending approximately $14.5 billion on energy consumption in FY 2008. Barack Obama and Joe Biden believe in the importance of leading by example. They will make the federal government a leader in the green building market, achieving a 40 percent increase in efficiency in all new federal buildings within five years and ensuring that all new federal buildings are zero emissions by 2025. They will invest in cost effective retrofits to achieve a 25 percent increase in efficiency of existing federal buildings within 5 years. The Obama Biden plan will put forward the resources necessary to achieve a 15 percent reduction in federal energy consumption by 2015.
Presidential - because I told you so
13February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
♦ NPD 8820.2C Design and Construction of Facilities (d) Industry-best practices of sustainable design, maintainable
design, building commissioning, and safety and security shall be incorporated, to the maximum extent possible, into the planning and execution of facility projects. The use of these practices ensures that facility projects are delivered with the most economical life-cycle cost, least environmental impact, and maximum benefits in occupant's health, safety, security and productivity.
Facilities Engineering and Real Property Division (FERPD) Policy Letter of 9/5/2003 LEED™ Silver certification for major New Construction and repair projects starting in FY06
♦ NPR 8820.2E, Facilities Project Implementation Guide
♦ NPR 8831.2D, Facilities Maintenance Management
NASA - because I told you so
14February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
♦ Environmental NPD 8500.1, NASA Environmental Management NPR 8570.1, Energy Efficiency & Water Conservation
Technologies & Practices NPR 8820.3, Pollution Prevention
♦ Safety NPR 8715.3, NASA Safety Manual
♦ Security NPR 1620.1A, Security Procedures & Guidelines
♦ Procurement NPR 8830.1, Affirmative Procurement Plan for
Environmentally Preferable Products
NASA - because I told you so
15February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Why?
16February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Highest Level of Certification
17February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
All of the Above
18February 9, 2011
♦ Pick your own reason – JUST DO IT! LEED plaque Saves money Right thing to do Significantly reduces or eliminates negative impacts of
buildings on environment & occupants Want to impress the “Green” crowd Just want to keep your job
♦ NASA and LEED pulling the planet in the same direction?
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
19
TEAMWORK
“Light is the task where many share the toil.” -- Homer
Source: JesterArtsIllustrations.com
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Teamwork
♦ LEED projects require many team members
20
NASAWater Mgmt
EnergyModeler
Consultants
Subs
Engineers
UtilityCompany
LandscapeArchitect
Regulators
Cx Agent
Contractor
LEED Admin
Architect
EPA
O&M
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Teamwork
♦ LEED projects require many team members within NASA
21
Procurement
LegalEnvironmental
Management
Public
Engineers
Construction Mgmt
Architect
O&M
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #1
♦ Include all the right people to fill all the necessary roles and understand what motivates them to perform to their highest potential in an innovative and non-traditional LEED environment.
22February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Team Dynamics
23
Forming
Storming
Performing
Norming
Every team goes through these stages.
The only difference is the speed at which they go through them.
Source: Bruce Tuckman, “Tuckman’s Stages”
Every team member brings:• Needs• Wants• Preconceived Ideas• Biases
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Team Dynamics
24
Resistance(Conflict)
Commitment(Motivation)
Compliance(Have to)
“Coming together is a beginning. Keeping together is progress. Working together is success.”
-- Henry Ford
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Team Motivation for LEED
♦ Not everyone is motivated by the same ideology (e.g. global climate change, green living)
♦ Not everyone is motivated by money (either first cost or life cycle costs)
♦ Everyone generally wants to be associated with success
♦ Everyone generally wants to be associated with healthy, efficient, attractive spaces
♦ Everyone is generally motivated by mandates and contractual requirements
25February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Individual Motivations
♦ Purpose
Alignment with personal desires & needs
♦ Leadership
♦ Responsibility
To NASA, the environment, future
generations, or the bottom line
♦ Challenge / Growth
♦ Camaraderie / Socialization
26
Source: Maslow’s Hierarchy of Needs
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Team Culture
♦ Some are ready for giant leaps
(e.g. photovoltaics, rainwater
collection, net zero, etc.)
♦ Some need small steps (e.g. business cases, ROI)
♦ Not every idea / motivation
will work on everyone A la carte is needed
27
“Great teamwork is the only way we create the breakthroughs that define our careers.” -- Pat Riley
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #2
♦ Everyone is not motivated by the same things, even on LEED projects, but everyone is motivated by something.
The good PM will seek to understand their team members and strive to meet their needs while moving the project forward to success.
28February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
How to achieve commitment
♦ Personalized approach Find out what motivates the team
member
♦ Challenge some team members
♦ Explain the mandatory requirements & benefits e.g. Recycling
♦ Compromise 1 year trial period for waterless
urinals
29
“Kites rise highest against the wind – not with it.”
-- Sir Winston Churchill
Source: www.istockphoto.com
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
What if someone is adverse?
♦ Use a personalized approach
♦ Bring in others to help convince where there is doubt
♦ Explain the mandates / Executive Orders
♦ Find a replacement or an alternate
30
“You get the best out of others when you give the best of yourself.” Harry Firestone
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #3
♦ A “difficult” team member may not have any issue with the project or other team members. They may be going through a difficult time outside of work that is impacting their performance or attitude at work.
31February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
How to keep commitment high
♦ Kudos, compliments and recognition During and after the project Individually and as a team In front of peers and management Document it Acknowledge the team and its efforts
during ribbon cuttings and other public
opportunities Make posters Life Savers ® award Three Musketeers ® award
32February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #4
♦ Everyone appreciates a sincere ‘thank you’ for a job well done, especially in front of their peers and management.
33February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
34
TECHNICAL LESSONS LEARNED
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
35
Issue: Concrete Sandwich Tilt-up panels - Designed as Final Interior Finish
Problem: Lack of Experience / High Expectations
Impacts: Project Schedule LEED Impacts – Coatings / Polished ConcreteFinding Alternatives during constructionChange Order – Related Costs
Building Envelope
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
36
Building Envelope
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #5
♦ Don’t be the “first” unless you’ve done your homework.
37February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
38
Issue: Raised FlooringProblem: Sealing Plenum Space / Selection of Covering
Impacts: CostsLEED Certification RamificationsFinding AlternativesNew Design – Related Change Orders
Under Floor Air Distribution
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
39
Under Floor Air Distribution
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #6
♦ The devil is in the details. Complex systems require extra attention.
40February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
41
Building Integrated Photovoltaic
Issue: Roof Material Change(KSC Policy Changed During Construction)
Problem: Designed for Flexible PV Panels
Impacts: CostsLEED Certification RamificationsElectrical ServiceWiring / Conduit InstalledNew Panel / Inverter SizingFinding AlternativesNew Design – related change orders
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
42
Building Integrated Photovoltaics
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lesson Learned #7
♦ Even the best laid plans…..
♦ Design, design, design….. but always be ready with an alternative to keep the project goals within reach.
43February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
THE LYNCH PIN FOR LEED SUCCESS
44
CONTRACTS
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Contracts
♦ Lynch pin: n. A central cohesive source of support and stability.Source: www.thefreedictionary.com
45February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Contracts
LEED services that require or could benefit from contracts or contract changes
♦ LEED Administration
♦ Commissioning
♦ Waste management / reclamation
♦ O&M
♦ Green Power Purchases
♦ Pest Control
♦ Recycling
♦ Janitorial
♦ Grounds maintenance
♦ Food Service
♦ Measurement & Verification
46February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lessons Learned #8 and 9
♦ Understand the implications of LEED credits to new and existing contracts and change existing contracts as necessary.
♦ Use existing contracts to purchase Green Power (note: those contracts don’t have to exist at your center or even within NASA).
47February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Government contracts
♦ Government contracts are set up to protect taxpayer dollars and to ensure fair competition
♦ This can sometimes make innovation, collaboration and integration difficult – all of which are needed on LEED projects
♦ Remember – the Contracting Officer is an integral member of the team and not the enemy
48February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
How we’ve done it or tried to do it
♦ The Good LEED Admin – FFP
(design & construction)
Waste management / reclamation - FFP to Construction contract
Green Power Purchases – FFP
O&M / Pest Control / Janitorial / Grounds – Cost Plus Award Fee
Recycling - FFP (EO 13101)
♦ The Bad Commissioning –
FFP (design & construction)
49
♦ The Ugly LEED registration /
certification fees – government credit card
Measurement & Verification – change order to FFP contract during construction
February 9, 2011
FFP: Firm Fixed Price
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Lessons Learned #10, 11 and 12
♦ Include contract language to cover delays outside of the government’s control (e.g. a delay in commissioning because the GC wasn’t ready)
50
♦ Include contract language requiring the GC to certify they are ready for commissioning and other milestones requiring integration of multiple parties or activities.
♦ Don’t count on being able to use a government credit card for LEED registration or other fees.
February 9, 2011
Kennedy Space Center Center Operations Directorate Construction of Facilities Division
Questions?