Yves MUYANGEManaging DirectorRECO - RWANDA RECO
The pulse of the Nation
2
� Institutional framework
� Electricity subsector overview
� Evolution of national offer
� Distribution system
� Customer and Billing evolution
� Demand forecast by 2017
� Generation and transmission projects
� Supply management
� Investment environment and directory
Presentation Outline
3
� Electricity Law, National Energy Policy and National Energy Strategy
� Electricity Master Plan 2009-2025
� Investment Prospectus 2009-2013 (for Electricity Access Roll Out Programme)
� Electricity strategic plan for the energy sector 2011 – 2017
� Regulatory body (RURA)
Institutional framework
4
Electricity sub sector overview
� Installed and the imported capacity are 82.77MW(45% thermal) and 16MWrespectively.
� Peak demand 67MW
� The HV transmission lines are 110 kV, 70kV and have in total 391.387km.
� The network has 18 substations.
� 200,000 customers on prepaid and electronic metering
5
Projects Current status (2011) Targets (2017)
Supply
Access
• 105MW
• 4900 Km MV & LV
• 13% access
• 90% Health
Centers
• 26% Schools
• 90% Admin
Centers
• 1000MW
• Plus 1400Km
• 50% access
• 100% Health
Centers
• 100% Schools
• 100% Admin
Centers
Overview Cont’d
6
EVOLUTION OF NATIONAL OFFER IN KWH FROM 2000 TO 2010
7
DISTRIBUTION SYSTEM
• Distribution system is composed of 30kV, 15kV, 11kV and 6.6kV lines
• Low voltage distribution is composed of 0.4kV lines
Year 2006 2007 2008 2009 2010
Overall losses
22 18 18 20 19
8
CUSTOMER EVOLUTION
Year 2006 2007 2008 2009 2010
Customers 77,181 86,537 109,502 142,497 186,487
Year 2001 2002 2003 2004 2005
Customers 48,581 57,679 67,008 68,314 70,187
9
BILLING EVOLUTION
YEAR 2009 2010 Increase BILLING(RWF) 38,282,956,140 44,286,253,018 6,003,296,878
10
POWER DEMAND IN MW
11
PLANTS UNDER CONSTRUCTION
Plant name Type Installed
Capacity
Year of
operation
Rugezi Hydro 2.2 2011
Mukungwa 2 Hydro 2.5 2011
Keya Hydro 2.2 2011
Kivu Watt M. Gas 25 2012
Kivu Watt M. Gas 75 2014
Nyabarongo I Hydro 27.5 2013
Rukarara II Hydro 2 2013
Rukarara V Hydro 5 2013
Giciye Hydro 4.5 2013
Total 143.7
12
POWER PLANTS UNDER STUDIES
Plant Name Plant
Type
Capacity Year of
operation
Mukungwa TPP
IPP
Thermal 20 2011
Rusumo Falls Hydro 60 2016
Rusizi III Hydro 145 2015
Upgrading of
KP 1
M.Gas 50 2013
Nyabarongo II Hydro 25 -
Rusizi IV Hydro 287 -
Total 537
13
Generation Mix 2010-2017
14
TRANSMISSION LINE PROJECTS BY 2015Transmission line
Name with 110kV
Length in km Cost in USD
NYABARONGO HPP-
KILINDA
23 -
KIGOMA-BUTARE 30 3,990,000
BIREMBO-
RWINKWAVU
67 445,550
RUKARARA-KILINDA 36 9,391,305
TOTAL 149 13,826,855
Note: The cost for line Nyabarongo HPP- Kilinda is included in Nyabarongo Power plant construction.
15
TRANSMISSION LINE PROJECTS
Transmission line 220kV Length
in km
Estimated
Cost in USDGOMA (DRC) – RUBAVU 10 1,163,750KIBUYE – RUBAVU, 1 circuit 64 14,896,000KAMANYOLA-KARONGI 84 19,085,500RUBAVU – KIGALI 110 25,602,500
KIGALI AIRPORT – BIREMBO 32 7,448,000
KIGALI AIRPORT – RUSUMO FALLS
77 17,921,750
BIREMBO – MIRAMA (OUGANDA)
116 26,999,000
BUGARAMA-CIMERWA 8 1,064,000TOTAL 501 114,170,500
16
SUPPLY MANAGEMENT (SCADA)
17
Investment environment and directory
� Stable political environment
� Rwanda: Top reformer in 2009 & 2010
(WB – Doing Business reports)
� 8th position in fast connecting to electricity in 2010 (Doing business report 2011)
� Regional integration (EAC, CEPGL, EAPP...)
� www.mininfra.gov.rw
� www.rdb.rw
� www.minecofin.gov.rw
� www.electrogaz.co.rw
18
THANKS / Q&A