business activities

support you in engineering

prefabrication in our workshop

on-site assembly of the technological systems

industrial activities

nuclearenergy

construction

biotechnologyenvironmental protection

cosmetics chemistrypharmacy

fooddairybrewery

our business philosophy

quality safety

important figures

employment(people)

turnovers(mln PLN)

contribution of industrial activities

the standards and certificates

the standards and certificates

the standards and certificates

our workshop

gantry frames 2 x 12,5 T1 x 2,0 T

production hall area2.775 m2

height of the production hall

10,06 m

land area6.925 m2

what we manufacture in our workshop

tanks and reactors pipe fences and flow plates service skids – a pump system

elements of process pipelines with diameters from

DN 10 to DN 1200

pilot plants

complete process systems – SKIDs

special process piping(for a nuclear power

station)

piping systems, tunnels, ducts

heat exchangers, evaporators

storage and process tanks

what we manufacture in our workshop

platforms, steelworks

manifolds

ducts mobile process arrangements

what we manufacture in our workshop

SKIDs and manifolds

what we do at construction sites

pressure tanks complete process installations

process and media piping

pipe bridges

orbital welding supporting structures, platforms, stairs,

railings

heat and cold insulation

our main clients

awards and honours

our primary goal is to support the client in achieving success

selected projects in the years 2007-2015

selected projects in the years 2007-2015

GEA TBS / HEINEKEN Sevilla 2005-2007

GEA Tuchenhagen Brewery Systems and GEA HUPMANN AG

Assembly of complete process system and brewery plant. Assembly, welding and thermal insulation of process plants in fermentation cellars, CIP, fermentation and storage stations. Turnkey project. Moving of tanks, equipment into the hall, prefabrication of carrying structures under pipelines, laying and welding of pipelines. Trials, participation in commissioning. 105 000 hours.

Scope of work:

Buyer:

selected projects in the years 2007-2015

TOOTHPASTE FACTORY COLGATEŚwidnica 2006-2013

Building and installation work at the toothpaste site. Process plants and utility media. Construction and as-built documentation.Validation of toothpaste manufacturing plant.

Extension of the piping system.Supply of a complete CIP unit including automation and control systems.

Scope of work:

selected projects in the years 2007-2015

Colgate – Palmolive Mfg (Poland) Sp. z o.o.

Buyer:

UNILEVER POLSKA S.A.Poznań 2007

Unilever Polska S.A.

Process plant for soup manufacture in Unilever Polska S.A. Manufacturing Site in Poznań.

Delivery together with installation and commissioning of the process plant and preparation of thermal insulation on process lines.

Scope of work:

Buyer:

selected projects in the years 2007-2015

PROCESSING OF FRUIT AND VEGETABLES PLANT Mogielnica 2007

Manufacturing and installation of 6 tanks 1000m3

Scope of work:

selected projects in the years 2007-2015

Holvrieka Ido BV

Buyer:

PROCTER&GAMBLE POLSKA SP. Z O.O. Aleksandrów Łódzki 2007-2014

Procter & Gamble Polska Sp. z o.o.

Assembly, welding and installation of pipelines and hook up facilities, process plants and utility media.

CIPs and SKIDs

Scope of work:

Buyer:

selected projects in the years 2007-2015

LECH BROWAR WIELKOPOLSKI S.A.Poznań 2008

Holvrieka Ido BV

Assembly, welding, installation and insulation of 32 fermentation tanks V = 5500 hl

Scope of work:

Buyer:

selected projects in the years 2007-2015

MBEYA BREWERY (SAB MILLER)Tanzania 2009

Krones AG

Assembly, welding, CIP, filtration, fermentation, filling plants; Utility pipelines (steam, condensate, cooling water) thermal insulation. Turnkey project.

Scope of work:

Buyer:

selected projects in the years 2007-2015

MONDELEZ INTERNATIONALSkarbimierz 2009 - 2014

Cadbury WedelLine of: Crunchy, FCCW, Turkish, Double Decker, Picnic

Process hot water; design, manufacture, delivery, installation and commissioning of hot process water system 80°C on Crunchy line including fittings, placed on Skid frame, unloading and assembly of process equipment.

Design, manufacture, delivery, installation and commissioning of low temperature hot water exchangers (LTHW) including pipelines and fittings, supports for LTHW pipelines, access platforms and process media systems; unloading and assembly of process equipment.

Scope of work:

Buyer:

selected projects in the years 2007-2015

WATER TREATMENT STATION Bochnia 2009/2010

Veolia Water Systems Sp. z o.o.

Modernization, extension and installation works.

Scope of work:

Buyer:

selected projects in the years 2007-2015

WASTE WATER TREATMENT PLANT CZAJKAWarszawa 2009-2013

Veolia Water Systems Sp. z o.o.

Assembly of process plant. Prefabrication of the pipelines. Assembly of equipment, participation in commissioning.

STUOŚ-CZAJKA:Thermal Effluent Sediment Disposal Station: Documentation, prefabrication, delivery and assembly of ducts.Thermal protection insulation.

Scope of work:

Buyer:

selected projects in the years 2007-2015

FRUIT JUICES PRODUCTION PLANT WESERGOLD DODOWGermany 2010/2011

Manufacturing and installation of 8 tanks 1500m3

Scope of work:

selected projects in the years 2007-2015

Buyer:

Ziemann International GmbH

selected projects in the years 2007-2015

KASZTELAN BrewerySierpc 2013 - 2014

Buyer:

Krones Sp. z o.o.

Scope of work:

9 CCT Ø6800mm including walkway, ladder, connecting walkwayPremanufacture of elements of the tanksAssembly and welding of the tanksPressure testsDocumentation UDT / TUV

selected projects in the years 2007-2015

KASZTELAN Brewery - BrewhouseSierpc 2013 - 2014

Buyer:

Ziemann International GmbH

Scope of work:

Placing and installation of brewing vesselsAssembly of pumping systems, pipe bridges, piping,Assembly of ”dry part”Tests and start-up

UNILEVER BYDGOSZCZBydgoszcz 2013, 2014

GEA Polska S.A./ GEA PE United Kingdom

Process system for manufacturing and distribution of creams and gels:Skids and valve block prefabrication;Piping system;Prefabrication and assembly of CIP station with piping;Product transfer installation with recovery system (PIG stations).

Scope of work:

Buyer:

selected projects in the years 2007-2015

Catalysts factory BASFŚroda Śląska 2013-2015

MOSTOSTAL ZABRZE S.A.

Process installation for production of catalysts for a mobile NOx reduction systemTechnological and utilities installationsPremanufacture of the valve blocks;Premanufacture and assembly of the pipelinesBuilding and system worksConstruction and as-built documentation Start-up of the system

Project value:6.800.733,08 Euro

Scope of work:

Buyer:

selected projects in the years 2007-2015

Vreugdenhil Dairy Foods NederlandGörinchem 2014 - 2015

GEA Process Engineering Nederland BV & GEA Nu-Con Ltd

Process, technological and utilities installationsPremanufacture and TIG welding of the valve blocksPremanufacture of SKIDsPremanufacture and assembly of the pipelinesBuilding and system worksConstruction and as-built documentation Start-up of the system

Project value:2.488.771,02 Euro

Scope of work:

Buyer:

selected projects in the years 2007-2015

selected projects in the years 2007-2015

Royal Friesland CampinaBorculo 2014 - 2015

Buyer:

GEA Process Engineering Nederland BV, GEA Nu-Con LtdGEA France, GEA Denmark

Scope of work:

Process, technological and utilities installationsPremanufacture and welding of the valve blocksPremanufacture of SKIDsPremanufacture and assembly of the pipelines and service platformsConstruction and as-built documentation Start-up of the system

Project value:3.228.600,00 Euro

Paulaner GermanyMünich 2014 - 2015

KRONES AG

selected projects in the years 2007-2015

Buyer:

Scope of work:

Process, technological and utilities installationsPremanufacture and welding of the valve blocksPremanufacture of SKIDsPremanufacture and assembly of the pipelines and service platformsConstruction and as-built documentation Start-up of the system

Thank you for your attention