26
YOUR CENTRAL SOURCE FOR DATA EXCHANGE Technical Road Blocks for a Model-Based Enterprise Doug Cheney Senior Consultant

Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

YOUR CENTRAL SOURCE FOR DATA EXCHANGE

Technical Road Blocks for a Model-Based Enterprise Doug Cheney Senior Consultant

Page 2: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Introductions

ITI TranscenData – Private company headquartered in Cincinnati since 1983 – Development offices in the United States, England, Israel and India – Engineering software and services

• PLM system migration solutions • CAD interoperability solutions

Doug Cheney – US and European upbringing – Engineering education (Caltech and BYU) – CAD validation specialist

• Algorithms • International standards • Process improvement consulting

2 Technical Road Blocks for a Model-Based Enterprise

Page 3: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

The Digital Product Model Evolution

Technical Road Blocks for a Model-Based Enterprise 3

2D CAD

2D Electronic Drawing

2D Paper Drawing 2D Paper

Drawing 2D Paper Drawing

3D CAD

3D CAD Model

2D Electronic Drawing

2D Paper Drawing 2D Paper

Drawing 2D Paper Drawing

1970 1980 1990 2010 2000

2D Drawing

2D Paper Drawing 2D Paper

Drawing 2D Paper Drawing

MBE

3D CAD Model & PMI

3D Lightweight Model plus 3D PMI, e.g. JT

No Paper No Drawings Less CAD Less Cost

2D Paper Drawing

3D Lightweight Geometry, e.g.

JT, 3D PDF

DMU

3D CAD Model

1781

Page 4: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Technical Incomplete CAx system functionality Lagging standards and regulations Digital data variation

Barriers to a Model-Based Enterprise (MBE)

4 Technical Road Blocks for a Model-Based Enterprise

Non-Technical Limited capital expense budgets Legacy product reuse rather than new product design Human resistance to change

Inertia

Page 5: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

NIST MBE PMI Validation and Conformance Testing Program

Develop test case definitions, test case models and software algorithms sufficient to measure conformance of CAD systems to American Society of Mechanical Engineers (ASME) standards for Product Manufacturing Information (PMI)

5 Technical Road Blocks for a Model-Based Enterprise

Page 6: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

NIST 3D MBE PMI Validation Data Process Flow

Technical Road Blocks for a Model-Based Enterprise 6

50 Test

Cases

50 CATIA V5 Models

50 Creo

Models

50 NX

Models

Verification Validation

50 SolidWorks

Models

200 STEP

Models

200 JT

Models

200 3D PDF Models

CAx (STEP) Impl. Forum

JT Impl. Forum

3D PDF Impl. Forum

Implementor Forum = Vendor partnership to resolve implementation issues

Page 7: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

NIST 3D MBE PMI Validation Test Case Example

Technical Road Blocks for a Model-Based Enterprise 7

Test Case CATIA Model

NX Model Creo Model

Page 8: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Lagging Standards and Regulations – Not for long!

International Data Modeling Standards – ISO 10303-242 STEP AP242 = AP203 x AP214 – ISO 14306 JT – ISO 14739-1 PDF with PRC

FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and Boeing 787 – Other aircraft programs pending

Department of Defense Regulations – MIL-STD-31000 Revision A – Technical Data Package (TDP)

can be 3D with PMI

8 Technical Road Blocks for a Model-Based Enterprise

Page 9: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Technical Incomplete CAx system functionality Lagging standards and regulations Digital data variation

Barriers to a Model-Based Enterprise (MBE)

9 Technical Road Blocks for a Model-Based Enterprise

Non-Technical Limited capital expense budgets Legacy product reuse rather than new product design Human resistance to change

Inertia

Page 10: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Types of Digital Data Variation

10 Technical Road Blocks for a Model-Based Enterprise

1. Master Design Interpretation – Confusing structure – Inconsistent data – Unrealistic features

2. Data Translation/Migration CAD A to CAD B or CAD A Rev 1 to Rev 2 – Data loss – Degradation – Unacceptable change

3. Engineering Revision – Unintentional change – Undocumented change

Can it be manufactured? Is it equivalent? Is it correct and clear?

Page 11: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Master Design Interpretation Divergence

Unrealistic (ambiguous) features in models must be interpreted by downstream users Different interpretations can affect part quality

11 Technical Road Blocks for a Model-Based Enterprise

Design Model

Prototyping Model

Analysis Model

Rework

Rework

Manufacturing Model

Page 12: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Master Design Interpretation Divergence Example

Simulation approved the design Manufacturing produced initial parts from native model All parts failed during final testing Caused last-minute schedule delay and retooling

12 Technical Road Blocks for a Model-Based Enterprise

Test Part Fatigue Failure

Page 13: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Testing failure (missing material)

Manufactured Part

Master Design Interpretation Divergence Example

Technical Road Blocks for a Model-Based Enterprise 13

Unrealistic feature (zero thickness)

Native Design Model

Page 14: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Master Design Geometry Defect Examples

Technical Road Blocks for a Model-Based Enterprise 14

Blocked Hole

Crack

Void Thin Volume

Page 15: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Master Design PMI Defect Examples

Technical Road Blocks for a Model-Based Enterprise 15

Page 16: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Geometry Translation Variation Example

Parametric design features preserved Different geometry solution in target system Fillet converted into a round which extends along top of flange

16 Technical Road Blocks for a Model-Based Enterprise

Fillet converted to a round

Legacy Model Translated Model

Page 17: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

PMI Remastering Variation Example

Different graphical presentation (expected, acceptable) Lost datum feature symbol Tolerance value change

17 Technical Road Blocks for a Model-Based Enterprise

Legacy Model Remastered Model

Page 18: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Geometry Migration Variation Example

The geometry created by these features was added when all features in the model were updated in the new version of the CAD system

18 Confidential

Current Model Updated Model

Page 19: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

PMI Migration Variation Example

Dimension display values changed when model were updated in the new version of the CAD system

19 Confidential

Current Model Updated Model

Page 20: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Unintentional Revision Change Example

Pocket depth on back side increased Hole break-out introduced Missed by drawing checker reviewing as-is drawing redline

20 Technical Road Blocks for a Model-Based Enterprise

As-Is Model To-Be Model

Page 21: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Intentional Revision Change Documentation

Side-by-side 3D PDF with synchronized graphics Each geometric and PMI change highlighted separately

21 Technical Road Blocks for a Model-Based Enterprise

Page 22: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Managing Variation in a Drawing-Based Enterprise

Simpler data: 2D geometry, GD&T and notes Drawing checking before release Human interpretation in all downstream processes – Tooling, process planning, inspection

Only graphical presentation must be translated and viewed Sufficient time for checking, release and consumption

22 Technical Road Blocks for a Model-Based Enterprise

Controlled with

Flexibility

Page 23: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Increasing Variation in a Model-Based Enterprise

Complex data: 3D geometry, design features and PMI Limited checking before release Automated system consumption Precise representation must be translated and interpreted Fewer iterations, less time to market

23 Technical Road Blocks for a Model-Based Enterprise

Uncontrolled yet

Highly-Constrained

Page 24: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Why Not Continue Manual Checking of MBE Models?

Complex Tedious Mind-numbing

24 Technical Road Blocks for a Model-Based Enterprise

Time-consuming Expensive

and Error-prone

Page 25: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

Managing Variation in a Model-Based Enterprise

1. Automated design checking and expert review before release – Consistent structure – Complete content – Realistic features

2. Automated translation validation before delivery – No data loss or degradation – Only negligible changes

3. Automated ECO validation before release – No unintentional changes – Clearly document intentional changes

25 Technical Road Blocks for a Model-Based Enterprise

Early warning systems

with Issue resolution

processes

Page 26: Technical Road Blocks for a Model-Based Enterprise - Cheney - Technical Road...– ISO 14739-1 PDF with PRC . FAA Aircraft Type Certification – MBD approved for Gulfstream G650 and

YOUR CENTRAL SOURCE FOR DATA EXCHANGE

Questions and Comments?