REVIEW OF OPERATIONS ULASAN OPERASI The main road and drainage system at Putrajaya The Prime Minister’s Office interchange at Putrajaya CIVIL ENGINEERING CIVIL ENGINEERING CIVIL ENGINEERING CIVIL ENGINEERING CIVIL ENGINEERING AND B AND B AND B AND B AND BUILDING CONSTR UILDING CONSTR UILDING CONSTR UILDING CONSTR UILDING CONSTRUCTION UCTION UCTION UCTION UCTION At the forefront of the Group’s business activities is the civil engineering and building construction division, specialises in the development and construction of in- frastructure and building projects. Leading the activity is its flagship company Lankhorst Pancabumi Contractors Sdn Bhd, a Class A Bumiputra building and engineering contractor and a Grade G7 contractor registered with the Malaysian Construction Industry Development Board (CIDB). The division has completed the 2.8 km elevated high- way with several interchanges linking the West Port with the North/South Port at Jalan Kem, Port Klang in 1999. During the year under review, the Division concentrated mainly on the final construction of several ongoing projects, which include: the main road and drainage system for the new Government Precinct at Putrajaya, phase 1A - Package R1 the Prime Minister’s Office interchange for the new Government Precinct at Putrajaya, phase 1A -Parcel A the design and build of one of the country’s longest in-situ bridge accross Sg. Dinding at Lumut, Perak. The division secured fewer contracts during the eco- nomic slowdown. Nonetheless, the near future looks promising as the growth in the construction sector is expected to pick-up in the year 2000. KEJUR KEJUR KEJUR KEJUR KEJURUTERAAN UTERAAN UTERAAN UTERAAN UTERAAN AWAM AM AM AM AM DAN PEMBIN AN PEMBIN AN PEMBIN AN PEMBIN AN PEMBINAAN B AAN B AAN B AAN B AAN BANGUN ANGUN ANGUN ANGUN ANGUNAN AN AN AN AN Bahagian kejuruteraan awam dan pembinaan bangunan merupakan tunggak aktiviti perniagaan dalam Kumpulan, yang mempunyai kepakaran dalam projek pembangunan dan pembinaan instruktur dan binaan bangunan. Peneraju aktiviti ini adalah syarikat utamanya Lankhorst Pancabumi Contractors Sdn Bhd, kontraktor bangunan dan kejuruteraan Bumiputra Kelas A dan kontraktor Gred G7 yang berdaftar dengan Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB). Bahagian ini telah berjaya menyiapkan pembinaan 2.8 km lebuhraya bertingkat dengan beberapa persimpangan yang menghubungkan Pelabuhan Barat dengan Utara/ Selatan di Jalan Kem, Pelabuhan Klang dalam tahun 1999. Pada tahun dalam ulasan, penumpuan utama Bahagian ini adalah kepada persiapan akhir kepada beberapa projek yang sedang dijalankan, ini termasuklah: jalan utama dan perparitan utama untuk pusat pentadbiran baru kerajaan persekutuan di Putrajaya, fasa 1A - pakej R1 persimpangan bertingkat Pejabat Perdana Menteri untuk pusat pentadbiran baru kerajaan persekutuan di Putrajaya, fasa 1A-Parcel A rekabentuk dan pembinaan salah satu jambatan in-situ terpanjang di dalam negara menyeberangi Sg. Dinding di Lumut, Perak. Bahagian ini kurang memperolehi kontrak semasa kelembapan ekonomi. Walaubagaimanapun, memandangkan pertumbuhan dalam sektor pembinaan dijangka beransur pulih pada tahun 2000, jangkamasa terdekat adalah lebih memberangsangkan. 20

REVIEW OF OPERATIONS - National University of Singaporelibapps2.nus.edu.sg/nus_hl/lankhorst21999.pdf · KEJURUTERAAN MEKANIKAL & ELEKTRIKAL Sebagai peneraju dan pakar dalam kejuruteraan

  • Upload
    voquynh

  • View
    225

  • Download
    0

Embed Size (px)

Citation preview

REVIEW OF OPERATIONSULASAN OPERASI

The main road and drainage system at Putrajaya The Prime Minister’s Office interchange at Putrajaya

CIVIL ENGINEERINGCIVIL ENGINEERINGCIVIL ENGINEERINGCIVIL ENGINEERINGCIVIL ENGINEERINGAND BAND BAND BAND BAND BUILDING CONSTRUILDING CONSTRUILDING CONSTRUILDING CONSTRUILDING CONSTRUCTIONUCTIONUCTIONUCTIONUCTION

At the forefront of the Group’s business activities is thecivil engineering and building construction division,specialises in the development and construction of in-frastructure and building projects.

Leading the activity is its flagship company LankhorstPancabumi Contractors Sdn Bhd, a Class A Bumiputrabuilding and engineering contractor and a Grade G7contractor registered with the Malaysian ConstructionIndustry Development Board (CIDB).

The division has completed the 2.8 km elevated high-way with several interchanges linking the West Port withthe North/South Port at Jalan Kem, Port Klang in 1999.

During the year under review, the Division concentratedmainly on the final construction of several ongoingprojects, which include:• the main road and drainage system for the new

Government Precinct at Putrajaya, phase 1A -Package R1

• the Prime Minister’s Office interchange for thenew Government Precinct at Putrajaya, phase 1A-Parcel A

• the design and build of one of the country’slongest in-situ bridge accross Sg. Dinding atLumut, Perak.

The division secured fewer contracts during the eco-nomic slowdown. Nonetheless, the near future lookspromising as the growth in the construction sector isexpected to pick-up in the year 2000.

KEJURKEJURKEJURKEJURKEJURUTERAAN UTERAAN UTERAAN UTERAAN UTERAAN AAAAAWWWWWAMAMAMAMAMDDDDDAN PEMBINAN PEMBINAN PEMBINAN PEMBINAN PEMBINAAN BAAN BAAN BAAN BAAN BANGUNANGUNANGUNANGUNANGUNANANANANAN

Bahagian kejuruteraan awam dan pembinaan bangunanmerupakan tunggak aktiviti perniagaan dalamKumpulan, yang mempunyai kepakaran dalam projekpembangunan dan pembinaan instruktur dan binaanbangunan.

Peneraju aktiviti ini adalah syarikat utamanya LankhorstPancabumi Contractors Sdn Bhd, kontraktor bangunandan kejuruteraan Bumiputra Kelas A dan kontraktorGred G7 yang berdaftar dengan Lembaga PembangunanIndustri Pembinaan Malaysia (CIDB).

Bahagian ini telah berjaya menyiapkan pembinaan 2.8km lebuhraya bertingkat dengan beberapa persimpanganyang menghubungkan Pelabuhan Barat dengan Utara/Selatan di Jalan Kem, Pelabuhan Klang dalam tahun1999.

Pada tahun dalam ulasan, penumpuan utama Bahagianini adalah kepada persiapan akhir kepada beberapaprojek yang sedang dijalankan, ini termasuklah:• jalan utama dan perparitan utama untuk pusat

pentadbiran baru kerajaan persekutuan diPutrajaya, fasa 1A - pakej R1

• persimpangan bertingkat Pejabat PerdanaMenteri untuk pusat pentadbiran baru kerajaanpersekutuan di Putrajaya, fasa 1A-Parcel A

• rekabentuk dan pembinaan salah satu jambatanin-situ terpanjang di dalam negara menyeberangiSg. Dinding di Lumut, Perak.

Bahagian ini kurang memperolehi kontrak semasakelembapan ekonomi. Walaubagaimanapun,memandangkan pertumbuhan dalam sektor pembinaandijangka beransur pulih pada tahun 2000, jangkamasaterdekat adalah lebih memberangsangkan.

20

The contracts successfully secured by the division in1999 include:• the construction of main Infrastucture work of 6

storey low cost apartment at Bandar Baru Bangi,Selangor for Perbadanan Kemajuan NegeriSelangor (PKNS)

• proposed development of 600 units low- cost housesat Sabak Bernam, Selangor.

• construction of 416 units of residential houses inAmpang Pecah, Kuala Kubu Bharu, Selangor.

• sub-structure works for the Great Hall,Universiti Teknologi Petronas, Tronoh, Perak.

The year 1999 saw the completion of building works oflandside Firestation at Kuala Lumpur International Air-port (KLIA), Sepang and the Computer and LanguageCenter of the International Islamic University, Gombak.

Ongoing projects which are in the finishing stages in-clude; the 26-storey Selbourne Tower in Shah Alam,PKNS factories, Rawang, Mosque in Bandar SultanSuleiman, Port Klang and Prolink mixed developmentin Gelang Patah, Johor.

For the coming year, the Division apart from placinggreater emphasis on civil engineering projects, will looktowards strategic joint-ventures in procuring moreprojects to improve future earnings.

RAILRAILRAILRAILRAILWWWWWAAAAAY Y Y Y Y TRATRATRATRATRACK ENGINEERINGCK ENGINEERINGCK ENGINEERINGCK ENGINEERINGCK ENGINEERING

Lankhorst Track Construction Sdn Bhd (LTC) was in-corporated in 1996 as the Group’s railway track con-struction specialist. LTC specialises in the contruction,strengthening and maintenance of railway tracks.

Through successful completion of 4-km railway trackconstruction in Kedah linking the Gurun railway sta-tion to the Petronas Fertilizer plant in Kg. Chempedak,LTC has built for itself a solid reputation for delivering

Kontrak yang berjaya diperolehi oleh Bahagian ini padatahun 1999 termasuklah:• pembinaan kerja infrastruktur utama untuk

pembinaan 6 tingkat rumah pangsa kos rendahdi Bandar Baru Bangi, Selangor untukPerbadanan Kemajuan Negeri Selangor (PKNS)

• cadangan pembangunan 600 unit rumah rakyatdi Sabak Bernam, Selangor.

• pembinaan 416 unit rumah di Ampang Pecah,Kuala Kubu Bharu, Selangor.

• kerja sub-struktur untuk Dewan Besar,Universiti Teknologi Petronas, Tronoh, Perak.

Pada tahun 1999 menyaksikan beberapa kerja binaanbangunan yang telah siap dilaksanakan iaitu BalaiBomba sebelah darat di Lapangan Terbang AntarabangsaKuala Lumpur (KLIA), Sepang dan Pusat Komputerdan Bahasa Universiti Islam Antarabangsa, Gombak.

Projek yang dalam peringkat akhir pembinaantermasuklah Menara Selbourne setinggi 26-tingkat diShah Alam, Kilang untuk PKNS, Rawang, Masjid diBandar Sultan Suleiman, Pelabuhan Klang danpembangunan perumahan bercampur Prolink di GelangPatah, Johor.

Pada tahun akan datang ini, selain dari mengutamakanprojek kejuruteraan awam Bahagian ini akan meninjaukepada rancangan usaha-sama yang strategik untukmemperoleh lebih kerja seterusnya meningkatkanpendapatan masa hadapan.

KEJURKEJURKEJURKEJURKEJURUTERAAN LANDUTERAAN LANDUTERAAN LANDUTERAAN LANDUTERAAN LANDASAN KERETASAN KERETASAN KERETASAN KERETASAN KERETAPIAPIAPIAPIAPI

Lankhorst Track Construction Sdn Bhd (LTC)diperbadankan pada tahun 1996 sebagai pakarpembinaan landasan keretapi. Kepakaran LTCtermasuklah dalam kerja pembinaan, pengukuhan danpenyelenggaraan landasan keretapi.

Elevated highway with several interchanges linking the West Portwith the North/South Port at Jalan Kem, Port Klang.

infrastructure projects; at Balik Pulau, Pulau Pinang. Strengthening of track between Bukit Mertajam to Padang Besar

Piling and substructure works at Universiti Teknologi Petronas,Tronoh, Perak

high quality products and services on time. Since itsinception LTC has contributed earnings and securedseveral projects for the Group.

During the year under review the contracts secured in-clude:• Segamat - Inland Port for Lembaga Pelabuhan

Klang

REVIEW OF OPERATIONS (continuation)

ULASAN OPERASI (sambungan)

Dengan kejayaannya menyiapkan landasan keretapisepanjang 4 km di Kedah yang menghubungkan stesenGurun ke loji Urea Petronas di Kg. Chempedak, LTCtelah menunjukkan reputasi yang mantap dalammenyediakan produk dan perkhidmatan yang berkualitiserta menepati masa. Sejak penubuhannya LTC telahmenyumbang pendapatan dan memperoleh beberapaprojek untuk Kumpulan.

23

Kontrak kerja yang diperoleh pada tahun dalam tinjauantermasuklah:• Segamat - Inland Port untuk Lembaga Pelabuhan

Klang• kerja pengukuhan landasan keretapi dari stesen

Bukit Merah ke Butterworth (fasa II)• kerja pengukuhan landasan keretapi dari stesen

Bukit Mertajam ke Padang Besar.

LTC, dilengkapi dengan pengalaman, kepakaran sertarekod kerja yang baik yakin akan peluang perniagaanyang dijangka dari pertumbuhan aktiviti pembinaanlandasan keretapi di dalam negara.

PERKHIDMAPERKHIDMAPERKHIDMAPERKHIDMAPERKHIDMATTTTTAN KEJURAN KEJURAN KEJURAN KEJURAN KEJURUTERAAN KHUSUSUTERAAN KHUSUSUTERAAN KHUSUSUTERAAN KHUSUSUTERAAN KHUSUSKEJURKEJURKEJURKEJURKEJURUTERAAN GEOUTERAAN GEOUTERAAN GEOUTERAAN GEOUTERAAN GEOTEKNIKALTEKNIKALTEKNIKALTEKNIKALTEKNIKAL

Cardon (M) Sdn Bhd (dahulu dikenali sebagai CardonGeobabrics (M) Sdn Bhd) adalah pakar dalam kerjamembaik pulih tanah, kerja menanam cerucuk, kerjapenstabilan cerun, pembinaan tebingan, kolam dankawasan penimbunan tanah.

Dalam tahun tinjauan, Cardon telah berjayamemperolehi dua projek kerja tanah dan infrastrukturyang terletak di:• Mukim Petaling, Sungai Besi, Kuala Lumpur• Balik Pulau, Pulau Pinang

Di Sungai Besi, Kuala Lumpur Cardon menjalankankerja pembersihan tanah, mengendali sistem membaikpulih tanah untuk penimbusan bekas lombong danperkhidmatan serta kerja akhir infrastruktur. Projekini dijangka siap pada tahun 2001.

Sementara itu di Balik Pulau, Pulau Pinang, projek inidijangka siap pada akhir tahun ini.

Dilengkapi dengan pengalaman yang luas dalam bidangkejuruteraan geoteknikal, rekod kerja yang baik sertapengurusan yang bijak, Cardon yakin akansumbangandan penglibatannya yang lebih luas dalamindustri pembinaan dalam tahun akan datang ini.

bridge over Sg. Sitiawan (653m); one of the 3 bridges build accrossSg. Sitiawan at Lumut, Perak

bridge over Sg. Dinding

• strengthening of railway track between Bukit Merahto Butterworth (phase II) stations

• strengthening of railway track between BukitMertajam to Padang Besar stations.

LTC, equipped with its experience, expertise and proventrack record is confident to capitalise from the antici-pated increase in the railway tracks construction activi-ties in the country.

SPECIALISED ENGINEERING SERSPECIALISED ENGINEERING SERSPECIALISED ENGINEERING SERSPECIALISED ENGINEERING SERSPECIALISED ENGINEERING SERVICESVICESVICESVICESVICESGEOGEOGEOGEOGEOTECHNICAL ENGINEERINGTECHNICAL ENGINEERINGTECHNICAL ENGINEERINGTECHNICAL ENGINEERINGTECHNICAL ENGINEERING

Cardon (M) Sdn Bhd (formerly known as CardonGeofabrics (M) Sdn Bhd) specialised in soil improve-ment works, piling and micropiling works, slope

stabilisation and construction of embankments, pondsand landfill.

During the year under review, Cardon successfully se-cured two earthworks and infrastructure projects locatedat:• Mukim Petaling, Sungai Besi, Kuala Lumpur• Balik Pulau, Pulau Pinang.

At Sungai Besi, Kuala Lumpur, Cardon undertakes theland clearing, conducting soil improvement system forthe filling of the ex-mining pond and the infrastructureand services work. The project is scheduled for comple-tion in 2001.

Whilst at Balik Pulau, Pulau Pinang, the project is ex-pected to be completed by the year end.

Equipped with years of hands-on experience ingeotechnical engineering, with a proven track record andgood management practice, Cardon is confident of itsgreater involvement and contribution in constructionindustry for years ahead.

Landside Firestation at Kuala Lumpur International Airport(KLIA), Sepang

26-storey Selbourne Tower,Shah Alam, Selangor

MECHANICAL & ELECTRICAL ENGINEERINGMECHANICAL & ELECTRICAL ENGINEERINGMECHANICAL & ELECTRICAL ENGINEERINGMECHANICAL & ELECTRICAL ENGINEERINGMECHANICAL & ELECTRICAL ENGINEERING

As the Group’s leading Mechanical and Electrical Engi-neering specialist, Lankhorst M & E Sdn Bhd (LME)continues to contribute earnings for the Group. Forthe year under review, LME has achieved the highestturnover of RM33.8 million compare to RM18.6 mil-lion in the previous year.

LME is mainly involves in the supply, installation andcommissioning of air-conditioning and ventilation, fireprotection, electrical systems and maintenance services.

The ongoing contracts for the year are contributed by:• Prolink Housing project, Johor Bahru• University Sains Malaysia - Phase 2 & 3

Nibong Tebal, Pulau Pinang• Maintenance Services for buildings• Air-conditioning piping for Universiti Sabah.

Having a good track record and financial stability, LMEis confident to secure more contracts once the construc-tion industry start to pick-up in the immediate term.

ENVIRENVIRENVIRENVIRENVIRONMENTONMENTONMENTONMENTONMENTAL ENGINEERINGAL ENGINEERINGAL ENGINEERINGAL ENGINEERINGAL ENGINEERING

Lankhorst Wastewater Technology Sdn Bhd (LWWT)is involved in the design and implementation of waterengineering, specialises in wastewater treatment,consultancy services, supply and install the mechanicalsystem and equipment for the water treatment process.

KEJURKEJURKEJURKEJURKEJURUTERAAN MEKANIKAL & ELEKTRIKALUTERAAN MEKANIKAL & ELEKTRIKALUTERAAN MEKANIKAL & ELEKTRIKALUTERAAN MEKANIKAL & ELEKTRIKALUTERAAN MEKANIKAL & ELEKTRIKAL

Sebagai peneraju dan pakar dalam kejuruteraanMekanikal dan Elektrikal Kumpulan, Lankhorst M &E Sdn Bhd (LME) terus menjadi penyumbang kepadapendapatan Kumpulan. Untuk tahun dalam tinjauan,LME telah mencapai perolehan yang tertinggi iaitusebanyak RM33.8 juta berbanding RM18.6 juta pada

tahun sebelumnya.

LME menumpukan kepada membekal, memasang danmula kerja kepada sistem penghawa dingin danpengaliran udara, sistem pembenteras api dan elektrikaldan perkhidmatan penyelenggaraan

Kontrak dalam pelaksanaan yang disumbang pada tahunini termasuklah:• projek perumahan Prolink, Johor Bahru• Univeriti Sains Malaysia - Fasa 2 & 3

Nibong Tebal, Pulau Pinang• Perkhidmatan penyelenggaraan untuk bangunan• Penyaluran penghawa dingin di Universiti Sabah.

Dengan rekod kerja yang baik dan kewangan yang stabil,LME yakin untuk memperolehi lebih banyak kontrakkerja apabila industri pembinaan mula bergerak dalamtempoh terdekat ini.

KEJURKEJURKEJURKEJURKEJURUTERAAN UTERAAN UTERAAN UTERAAN UTERAAN ALAM SEKITALAM SEKITALAM SEKITALAM SEKITALAM SEKITARARARARAR

Lankhorst Wastewater Technology Sdn Bhd (LWWT)terlibat dalam kerja-kerja merekabentuk dan pelaksanaankejuruteraan air khususnya bidang rawatan airkumbahan, perkhidmatan jururunding, membekal sertamemasang sistem mekanikal dan peralatan prosesrawatan air.

REVIEW OF OPERATIONS (continuation)

ULASAN OPERASI (sambungan)

24

Sewage Treatment Plant at Bandar Baru Bangi, Selangor Masjid Bandar Baru Sultan Suleiman, Port Klang, Selangor

Computer and Language Centre, International Islamic University,Gombak, Selangor

Projects undertaken in the year under review include:• wastewater treatment plants at Bandar Baru

Bangi, Selangor• wastewater treatment plants for factories at

Rawang, Selangor for PKNS.

The economic slowdown has adversely affected theLWWT activities, which resulted in fewer jobs beingsecured from the authorities and property developers.However new opportunities for the coming year is ex-pected to be encouraging in tandem with the economicgrowth.

Projek yang dilaksanakan pada tahun dalam tinjauanialah:• loji rawatan sisa kumbahan untuk Bandar Baru

Bangi, Bangi, Selangor• loji rawatan sisa kumbahan bagi kilang untuk

PKNS di Rawang, Selangor

Kelembapan ekonomi telah memberi kesan ketarakepada aktiviti LWWT, menyebabkan kurangnya kerja-kerja baru yang diperolehi daripada pihak berkuasa danpemaju hartanah. Walaubagaimanapun peluang-peluang baru untuk tahun hadapan dijangka bertambahbaik selaras dengan pertumbuhan ekonomi.

AKTIVITI BERSEPAKTIVITI BERSEPAKTIVITI BERSEPAKTIVITI BERSEPAKTIVITI BERSEPADUADUADUADUADUPEMBPEMBPEMBPEMBPEMBANGUNANGUNANGUNANGUNANGUNAN HARAN HARAN HARAN HARAN HARTTTTTANANANANANAHAHAHAHAHDDDDDAN PENGURAN PENGURAN PENGURAN PENGURAN PENGURUSAN PRUSAN PRUSAN PRUSAN PRUSAN PROJEKOJEKOJEKOJEKOJEK

Bahagian pembangunan hartanah dijalankan olehLankhorst Hartanah Sdn Bhd sebagai Pengurus Projekdan Rampai Budi-Jaya Sdn Bhd sebagai turnkeykontraktor untuk projek Desa Bukit Bujang. Aktivitibahagian ini tertumpu kepada pembangunan 166-ekarDesa Bukit Bujang di Kuala Kubu Bharu, projekperumahan campuran yang dikendalikan oleh RampaiBudi-Jaya Sdn Bhd sebagai turnkey kontraktor.

Projek Desa Bukit Bujang, yang dilancarkan pada tahun1998 telah menerima sambutan baik dari para pembeli.Sehingga kini, 94% daripada rumah yang ditawarkanberjumlah 274 unit dibawah sub-fasa 1A,1B dan 1Cyang merangkumi rumah berkembar satu-tingkat(Meranti dan Cengal) dan Banglo Dua-tingkat(Cendana 1) pada harga yang berpatutan dariRM53,000 ke RM200,000 telah ditempah. Kerjapembinaan telah bermula pada September 1999.

Pihak pengurusan percaya apabila keadaan ekonomisemakin pulih dalam jangkamasa terdekat ini, sub-fasa1D dan 1E yang mengandungi 138 unitrumahberkembar jenis Cengal akan dilancarkan padasuku terakhir tahun 2000 dan fasa 2 akan dibuka untukjualan pada tahun 2001.

Model unit - Cengal, Desa Bukit Bujang ,Kuala Kubu Bharu, Selangor

INTERINTERINTERINTERINTERGRAGRAGRAGRAGRATED TED TED TED TED AAAAACTIVITIESCTIVITIESCTIVITIESCTIVITIESCTIVITIESPRPRPRPRPROPEROPEROPEROPEROPERTY DEVELTY DEVELTY DEVELTY DEVELTY DEVELOPMENTOPMENTOPMENTOPMENTOPMENTAND PRAND PRAND PRAND PRAND PROJECT MANOJECT MANOJECT MANOJECT MANOJECT MANAAAAAGEMENTGEMENTGEMENTGEMENTGEMENT

The property development division is undertaken byLankhorst Hartanah Sdn Bhd as the Project Managerand Rampai Budi-Jaya Sdn Bhd as the turnkey contrac-tor for the Desa Bukit Bujang project. The divisionactivity is concentrated mainly on the developmentof166-acre Desa Bukit Bujang in Kuala Kubu Bharu, amixed residential project undertaken by the RampaiBudi-Jaya Sdn Bhd as the turnkey contractor.

Desa Bukit Bujang project, which was launched in 1998received good response from purchasers. To date, 94%of the houses totalling 274 units offered under sub-phases 1A, 1B and 1C comprises of single-storey semi-detached houses (Meranti and Cengal) and double -storey bungalows (Cendana 1) at affordable prices rang-ing from RM53,000 to RM200,000 were taken up. Theconstruction commenced in September 1999.

The management believes as the economic conditionimproves in the near future, sub phases 1D and 1E con-sisting of 138 units of semi detached houses will belaunched in the final quarter of 2000. Phase 2 will beopened for sales in 2001.

REVIEW OF OPERATIONS (continuation)

ULASAN OPERASI (sambungan)

27

QQQQQUUUUUARRARRARRARRARRYINGYINGYINGYINGYING

Port Dickson Sepang Quarry Sdn Bhd (formerly knownas Jimah Quarry Sdn Bhd) undertakes the Group’s quar-rying activities. Situated in the vicinity of Bukit Sia-mang, Kampung Jimah Lama, District of Port Dickson,Negeri Sembilan, the quarry plant was fully installed inmid 1997. However, due to unforeseen difficultiesencountered in removing the overburden the commer-cial production only commenced in April 1998.

The management believes the quarry will start to con-tribute to the Group’s profitability once the construc-tion industry improves.

KUKUKUKUKUARIARIARIARIARI

Port Dickson Sepang Quarry Sdn Bhd (dahulu dikenalisebagai Jimah Quarry Sdn Bhd) adalah pengendaliaktiviti kuari Kumpulan. Terletak berhampiran BukitSiamang, Kampung Jimah Lama, Daerah Port Dickson,Negeri Sembilan, kilang kuari telah siap dibina padapertengahan tahun 1997. Walaubagaimanapun,disebabkan dari kesukaran luar jangka untukmengeluarkan bebanan tanah pengeluaran komersilhanya bermula pada bulan April 1998.

Pihak pengurusan percaya bidang kuari akan memberisumbangan yang menguntungkan kepada Kumpulanapabila industri pembinaan pulih.

Quarry site of Port Dickson Sepang Quarry Sdn Bhd

28

LLLLLOCAOCAOCAOCAOCATIONTIONTIONTIONTION

LLLLLOKASIOKASIOKASIOKASIOKASI

Lot No. 8049,P.T. 3868, H.S.(D) No. 17165,District ofPetaling,Selangor DarulEhsanNo. 55, Jalan SS15/4B,Subang JayaSelangor

Lot No. Precinct2.8,Pusat Bandar,District of ShahAlam,Selangor

P.T. No. 1847,H.S.(D) No.12277,Mukim of Jimah,District of PortDickson,Negeri SembilanDarul Khusus, inthe vicinity ofBukit Siamang,Jimah Lama,Jimah, NegeriSembilanapproximately23km to thesouthwest ofSeremban

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION

KETERANGANKETERANGANKETERANGANKETERANGANKETERANGAN

Three-storeyterrace shopoffice buildingrented toCardon M) SdnBhd

Bangunankedai pejabatteres tiga-tingkatdisewakankepadaCardon(M) Sdn Bhd

Vacant Land

Tanah Kosong

QuarryOperations

Operasi Kuari

TENURETENURETENURETENURETENURE

(EXPIR(EXPIR(EXPIR(EXPIR(EXPIRY DY DY DY DY DAAAAATE)TE)TE)TE)TE)

HAKMILIKHAKMILIKHAKMILIKHAKMILIKHAKMILIK

(T(T(T(T(TARIKHARIKHARIKHARIKHARIKH

TTTTTAMAAMAAMAAMAAMAT)T)T)T)T)

Freehold

HakmilikBebas

Leasehold99 years(2096)

HakmilikPajakan99 tahun(2096)

Leasehold29 years(1.7.2023)

HakmilikPajakan29 tahun(1.7.2023)

AREAAREAAREAAREAAREA

KELKELKELKELKELUUUUUASANASANASANASANASAN

3,095 sq ft

3,095 k.p

54,753 sq ft

54,753 k.p

14,164hectares

14,164hektar

GRGRGRGRGROSS BOSS BOSS BOSS BOSS BUILUILUILUILUILT-T-T-T-T-

UP AREAUP AREAUP AREAUP AREAUP AREA

KELKELKELKELKELUUUUUASANASANASANASANASAN

BINBINBINBINBINAANAANAANAANAAN

KASARKASARKASARKASARKASAR

5,904 sq ft

5,904 k.p

-

-

-

-

NET BOOKNET BOOKNET BOOKNET BOOKNET BOOK

VVVVVALALALALALUEUEUEUEUE

(RM’000)(RM’000)(RM’000)(RM’000)(RM’000)

AS AS AS AS AS AAAAATTTTT

31 Dec 199931 Dec 199931 Dec 199931 Dec 199931 Dec 1999

NILAI BNILAI BNILAI BNILAI BNILAI BUKUUKUUKUUKUUKU

BERSIHBERSIHBERSIHBERSIHBERSIH

(RM’000)(RM’000)(RM’000)(RM’000)(RM’000)

padapadapadapadapada

31 Dis 199931 Dis 199931 Dis 199931 Dis 199931 Dis 1999

293

293

5,717

5,717

2,300

2,300

LANKHORST PANCABUMI CONTRACTORS SDN BHD

LANKHORST HARTANAH SDN BHD

PORT DICKSON SEPANG QUARRY SDN BHD (formerly known as Jimah Quarry Sdn Bhd)

PROPERTIES HELD BY THE GROUPHARTANAH YANG DIMILIKI KUMPULAN

APPRAPPRAPPRAPPRAPPROOOOOXXXXX

AAAAAGEGEGEGEGE

(YEARS)(YEARS)(YEARS)(YEARS)(YEARS)

ANGGARANANGGARANANGGARANANGGARANANGGARAN

USIAUSIAUSIAUSIAUSIA

(T(T(T(T(TAHUN)AHUN)AHUN)AHUN)AHUN)

10 years

10 tahun

3 years

3 tahun

5 years

5 tahun

29

SHAREHOLDERS’ INFORMATIONMAKLUMAT PEMEGANG SAHAM

ANALYSIS OF SHAREHOLDERS BY RANGE OF GROUP AS 28 APRIL 2000ANALISA PEMEGANG SAHAM DARI BERBAGAI KUMPULAN PADA 28 APRIL 2000

SUBSTANTIAL SHAREHOLDERS AS AT 28 APRIL 2000PEMEGANG SAHAM TERBESAR PADA 28 APRIL 2000

CATEGORYKATEGORI

NO. OF SHARESBILANGAN SAHAM

% OVER TOTALSHARES

% DARI JUMLAHSAHAM

NO. OFSHAREHOLDERS

BILANGANPEMEGANG SAHAM

% OVER TOTALSHAREHOLDERS% DARI JUMLAH

PEMEGANG SAHAM

1 - 1,0001,001 - 5,0005,001 - 10,00010,001 & above/keatas

634,3551,122,000

439,00037,803,645

39,999,000

1.592.811.10

94.50

100.00

6354065760

1,158

54.8435.064.925.18

100.00

STATEMENT OF DIRECTOR’S SHAREHOLDINGSAS AT 21 JANUARY 2000PENYATA PEGANGAN SAHAM PARA PENGARAHPADA 21 JANUARI 2000

NAME OF DIRECTORSNAMA PARA PENGARAH

DIRECT INTERESTSKEPENTINGAN

SECARA LANGSUNG

INDIRECT INTERESTSKEPENTINGAN

SECARA TIDAK LANGSUNG

NO.BIL.

1.

2.

3.

4.

5.

6.

7.

IR. TUAN HAJI AZLAN BIN AWANG

TUAN HAJI ABDUL AZIZ BIN BAKRI

YB. SENATOR DATUK NOR AZAH AWIN

TUAN HAJI MAT HASSAN ESA

YBHG. DATO’ SARI @ SHAARI MAJIHIN @ MAT JIHIN

TUAN HAJI HASSAN TAN SRI IBRAHIM

YBHG. DATO’ MOHD. NOR ABDUL WAHID

611,145

355

-

-

-

-

-

NOTES:

Indirectly held via HSK Corporate Advisory and Consultancy Services Sdn. Bhd. as Stakeholder pursuant to the Securities Commission’s profitguarantee requirement.Indirectly held via Ufuk Bestari Sdn. Bhd. which is 55% held by Azlan Bin Awang and 45% held by Abdul Aziz Bin Bakri (Shares pledged withCimsec Nominees (Tempatan) Sdn. Bhd.).Shares pledged with Arab-Malaysian Nominees (Tempatan) Sdn. Bhd.+

*

#

NOTA:

Pegangan Tidak Langsung melalui HSK Corporate Advisory and Consultancy Services. Sdn. Bhd. sebagai Pemegang Amanah Harta mengikutkehendak Suruhanjaya Sekuriti untuk mengadakan jaminan keuntungan.Pegangan Tidak Langsung melalui Ufuk Bestari Sdn. Bhd. dimana 55% ekuiti dipegang oleh Azlan Bin Awang dan 45% dipegang oleh AbdulAziz Bin Bakri (Saham dicagar dengan Cimsec Nominees (Tempatan) Sdn. Bhd.).Saham dicagar dengan Arab-Malaysian Nominees (Tempatan) Sdn. Bhd.+

*

#

NAME OF SHAREHOLDERSNAMA PEMEGANG SAHAM

SHAREHOLDING(DIRECT)

PEGANGAN SAHAM(LANGSUNG)

TOTALJUMLAH

SHAREHOLDING(INDIRECT)

PEGANGAN SAHAM(TIDAK LANGSUNG)

%NO.BIL.

1.

2.

3.

4.

IR. TUAN HAJI AZLAN BIN AWANG

TUAN HAJI ABDUL AZIZ BIN BAKRI

PERBADANAN NASIONAL BERHAD

PRB NOMINEES (TEMPATAN) SDN BHDA/C RISDA

611,145

355

10,112,000

1,352,000

2,388,30518,000,000

20,388,305

1,117,5001,611,695

18,000,000

20,729,195

*#

+*#

-

-

20,999,450

20,729,550

10,112,000

1,352,000

52.50

51.83

25.28

3.38

20,388,305

20,729,550

-

-

-

-

-

○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

%

1.52

-

-

-

-

-

-

%

50.98

51.83

-

-

-

-

-

SHAREHOLDERS’ INFORMATIONMAKLUMAT PEMEGANG SAHAM

TWENTY LARGEST SHAREHOLDERS AS AT 28 APRIL 2000DUA PULUH PEMEGANG SAHAM TERBESAR PADA 28 APRIL 2000

NAME OF SHAREHOLDERSNAMA PEMEGANG SAHAM

CIMSEC NOMINEES (TEMPATAN) SDN BHDPENGURUSAN DANAHARTA NASIONAL BERHAD FOR UFUK BESTARI SENDIRIAN BERHADPERBADANAN NASIONAL BERHAD

MAYBAN SECURITIES NOMINEES (TEMPATAN) SDN BHDA/C HSK CORPORATE ADVISORY AND CONSULTANCY SDN BHD FOR AZLAN B. AWANGMAYBAN SECURITIES NOMINEES (TEMPATAN) SDN BHDA/C HSK CORPORATE ADVISORY AND CONSULTANCY SDN BHD FOR ABDUL AZIZ B. BAKRIPRB NOMINEES (TEMPATAN) SDN BHDRUBBER INDUSTRY SMALLHOLDERS DEVELOPMENT AUTHORITYARAB-MALAYSIAN NOMINEES (TEMPATAN) SDN BHDA/C ARAB-MALAYSIAN BANK BHD FOR ABDUL AZIZ B. BAKRIAZLAN BIN AWANG

MALAYSIA NOMINEES (TEMPATAN) SENDIRIAN BERHADPLEDGED SECURITIES ACCOUNT FOR MGI SECURITIES SDN BHDMAYBAN TRUSTEES BERHADAMANAH SAHAM BANK ISLAM TABUNG PERTAMAAMANAH RAYA BERHADBBMB PRIME FUNDBIMSEC NOMINEES (TEMPATAN) SDN BHDPLEDGED SECURITIES ACCOUNT FOR TG. ABDULLAH IBNI SULTAN HJ. AHMAD SHAHAMANAH RAYA BERHADBBMB UNIT TRUST FUNDHASNIZA BT MOHD ZAFERI

MAYBAN FINANCE BERHADPLEDGED SECURITIES ACCOUNT FOR ESA BIN MOHAMEDMULTI-PURPOSE BANK NOMINEES (TEMPATAN) SDN BHDPLEDGED SECURITIES ACCOUNT FOR MGI SECURITIES SDN BHDMOHD JUNID BIN ITAM SULIMAN

AMANAH SAHAM MARA BERHAD

AMANAH RAYA BERHADDANA PUTRA BBMBVANGUARD NOMINEES (TEMPATAN) SDN BHD

MOHAMAD RIAZZUDDIN BIN ALI

TOTAL/JUMLAH

%

45.00

25.28

5.97

4.03

3.38

2.79

1.53

1.08

0.60

0.45

0.39

0.33

0.32

0.25

0.25

0.25

0.25

0.23

0.20

0.11

92.69

NO.BIL.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

SHAREHOLDINGPEGANGAN SAHAM

18,000,000

10,112,000

2,388,305

1,611,695

1,352,000

1,117,500

611,145

433,000

239,000

180,000

155,000

130,000

129,000

100,000

100,000

100,000

100,000

90,000

80,000

45,000

37,073,645

SHAREHOLDERS BY CATEGORY AS AT 28 APRIL 2000KATEGORI PEMEGANG SAHAM PADA 28 APRIL 2000

HELD BY MALAYSIANPEGANGAN WARGA MALAYSIA

HELD BY FOREIGNERSPEGANGAN WARGA ASING

NO. OF SHAREHOLDERSBILANGAN PEMEGANG SAHAM

NO. OF SHARESBILANGAN SAHAM

PERCENTAGEPERATUSAN

PERCENTAGEPERATUSAN

BUMIPUTRA NOMINEES COMPANIESNON-BUMIPUTRA NOMINEES COMPANIESBUMIPUTRA COMPANIESNON-BUMIPUTRA COMPANIESINDIVIDUALS

MALAYS AND NATIVESCHINESEINDIANSOTHERS

907721

9

20671923

5

1,150

7.776.651.810.78

17.7962.091.990.43

99.31

24,997,500797,000

10,984,00094,000

1,302,5001,681,000

74,00011,000

39,941,000

62.501.99

27.460.23

3.264.200.180.03

99.85

NOMINEES COMPANIESINDIVIDUALS

TOTAL/JUMLAH

268

1,158

0.170.520.69

100.00

15,00043,00058,000

39,999,000

0.040.110.15

100.00

30