Who we are...

- Skateboarders & BMXers

- Professional Skatepark Designers

- Professional Skatepark Builders

PAGE 2v1.2 Skatepark Construction

Page 3: Presentation concreate layout

Design CrewShaun ScarfeTrevor JohnsonIain Young

31 years riding17 years skating27 years skating

PAGE 2v1.2 Skatepark Construction

Page 4: Presentation concreate layout

Design CrewIain is a skateboarder with 27 years of experience. Iain has worked in the construction industry for most of his working life.He has been building skateparks and obstacles since his passion in skateboarding began. With his experience and skill sets, Iain is able to operate and manage the on site construction to ensure that the end results are of the highest quality and meet the specification of the final design, with creative & innovative facilities as our hallmark.

Shaun Scarfe - Director / Designer

Iain Young - Director / Designer & Construction Manager

Shaun is a BMXer with 31 years experience. Shaun has been running Four One Four Skateparks Ltd 12 years building permanent indoor and outdoor skateparks. Four One Four have provided equipment for some of the most successful Events & Skatepark facilities in the UK & Europe.

These include The London 2012 Olympic Opening Ceremony, Adrenaline Alley Skatepark, Europe's first Resi Vert Ramp, NEC Cycle Show, Urban Games, NASS, Cologne Masters and the BMX Freestyle World Championships.

Trevor Johnson - DesignerTrevor has been skating for 17 years. In this time he has gained reputable sponsors and travelled the globe skating some of the best spots and parks in the world. Trevor has worked in the skatepark construction industry for over 10 years and with a keen eye for detail he has been able to apply his experience to design and build some of the most successful parks in the UK and Europe.

PAGE 2v1.2 Skatepark Construction

Page 5: Presentation concreate layout

Build Crew

PAGE 2v1.2 Skatepark Construction

Page 6: Presentation concreate layout

Our Skateparks

- Our passion translates into the parks we build

- It is in every step from the design to the finish

- We feel that this shows...

PAGE 2v1.2 Skatepark Construction

Page 7: Presentation concreate layout

Examples of Previous Works

PAGE 2v1.2 Skatepark Construction

Page 8: Presentation concreate layout

INVERNESS SKATEPARK - 3D Concept

Concept Images PAGE 4v1.2 Skatepark Construction

Page 9: Presentation concreate layout

INVERNESS SKATEPARK - 3D Concept

Concept Images PAGE 5v1.2 Skatepark Construction

Page 10: Presentation concreate layout

Projects managed by Iain Young

PAGE 9Project Images

Newtown Skatepark

INVERNESS SKATEPARK

v1.2 Skatepark Construction

Page 11: Presentation concreate layout

Example of previous work Projects managed by Iain Young

PAGE 9Project Images

Newport Skatepark Newport Skatepark

Newtown Skatepark Newtown Skatepark

v1.2 Skatepark Construction

Page 12: Presentation concreate layout

Shrewsbury Skatepark Shrewsbury Skatepark

Shrewsbury SkateparkShrewsbury Skatepark

Project Images PAGE 10

Example of previous work Projects managed by Iain Young

v1.2 Skatepark Construction

Page 13: Presentation concreate layout

Project Images PAGE 12

Bay 66 Nike LondonBay 66 Nike London

Bay 66 Nike London

Example of previous work Projects managed by Iain Young

v1.2 Skatepark Construction

Page 14: Presentation concreate layout

Project Images PAGE 11

Dudhope Skatepark

Dudhope Skatepark North Berwick Skatepark

Bay 66 Nike London

Example of previous work Projects managed by Iain Young

v1.2 Skatepark Construction

Page 15: Presentation concreate layout

Project Images PAGE 11

Example of previous work Projects managed by Iain Young

v1.2 Skatepark Construction

Page 16: Presentation concreate layout

Skatepark Concepts

PAGE 2v1.2 Skatepark Construction

Page 17: Presentation concreate layout

SKATEPARK CONCEPT - Transition Park

PAGE 2v1.2 Skatepark Construction

Page 18: Presentation concreate layout

PAGE 2

SKATEPARK CONCEPT - Transition Park

v1.2 Skatepark Construction

Page 19: Presentation concreate layout

Concept Images PAGE 6

SKATEPARK CONCEPT - Transition Park

v1.2 Skatepark Construction

Page 20: Presentation concreate layout

Concept Images PAGE 7

SKATEPARK CONCEPT - Plaza Park

v1.2 Skatepark Construction

Page 21: Presentation concreate layout

Concept Images PAGE 8

SKATEPARK CONCEPT - Plaza Park

v1.2 Skatepark Construction

Page 22: Presentation concreate layout

Concept Images PAGE 8

SKATEPARK CONCEPT - Extensions & Elevations

v1.2 Skatepark Construction

Page 23: Presentation concreate layout

Concept Images PAGE 8

SKATEPARK CONCEPT - Flow Street Section

v1.2 Skatepark Construction

Page 24: Presentation concreate layout

Concept Images PAGE 8

Design

- Identify the needs and requirements of the facility

- Understanding budget and achieving realistic goals

- We have an affinity to the clients & users vision

- Continual design development through user & client liaisons

- Design a facility to further user progression & skills development

v1.2 Skatepark Construction

Page 25: Presentation concreate layout

Concept Images PAGE 8

Consultation

- Continual design group involvement through every stage

- Actualisation of design groups visualisation

- Truly bespoke design process inline with user group feedback

v1.2 Skatepark Construction

Page 26: Presentation concreate layout

Concept Images PAGE 8

Integration of Facility

- Consideration of the surrounding areas and history of the site

- Integrated design space uses Topography for maximum use of materials & the available space

- Design & use of Landform & Architechture for improved Aesthetics

- Social benefits of completed facility

v1.2 Skatepark Construction

Page 27: Presentation concreate layout

Concept Images PAGE 8

Professionalism

- All staff have formal qualifications in their fields with continual development training programs within Concreate Skateparks

- Quality Management H&S Systems

- ISO 9001, ISO 18001, ISO 14001 Assured

- Full Liability and Design Indemnity insurance cover

- High level 3D render models & full construction drawings

v1.2 Skatepark Construction

Page 28: Presentation concreate layout

Concept Images PAGE 8

Company Structure- Management Management Tree

- Implementation How design vision is achieved with by intelligent management

- Protocol / Program of works Procedures in place to see the designers vision is maintained throughout, with clear communication channels & procedure.

- Timeline Realistic Program of works is crated then implemented to ensure timely delivery of the project.

v1.2 Skatepark Construction

Page 29: Presentation concreate layout

Concept Images PAGE 8

Construction- Methods, techniques & importance of H&S Bespoke Tools & Techniques - H&S compliance - COSSH & RAMS

- Groundworks Efficient Unit - Implemented to strict protocol and design standards

- Fabrication & Shuttering Techniques - Why is it so important to get right - Double checks

- Steel Installation Standards - Tie-ing of Steelwork - Correct Placement - Movement & Expansion

- Concreting Standards - intelligent planning of Concrete pours - How & why we lay our concrete

- Landscaping

v1.2 Skatepark Construction

Page 30: Presentation concreate layout

Concept Images PAGE 8

Shuttering

v1.2 Skatepark Construction

Page 31: Presentation concreate layout

Concept Images PAGE 8

Mesh & Rebar

v1.2 Skatepark Construction

Page 32: Presentation concreate layout

LONDON 2012 OLYMPICS Opening Ceremonies - LOCOG

BMX FREESTYLE WORLDS - Spielbetrieb

RELENTLESS NASS - Sports Vision

3 DEGREES - Red Bull

NEC CYCLE SHOW - Upper Street Events

NIKE 6.0 SNOW SHACK - Urb Orbis

NIKE 6.0 FASHION SHOW - Urb Orbis

GAMESTARS LIVE - London Event Co.

SPRITE URBAN GAMES - Board-X

SPRITE URBAN GAMES - Haymarket Exhibitions

KING of STREET - Board -X

NASS - ASE Ltd

WINDFEST & WIGHT AIR - Red Bull

TRIX MUSIC CHANNEL - BSKYB

GOLD COAST - Red Bull

RELENTLESS TV Commercial - Sports Vision

LINTON PARISH COUNCIL - Skatepark Maintenance

NEC BIKE SHOW - Haymarket Exhibitions

SPRITE PARKOUR COURSE - Urb Orbis

SHROPSHIRE COUNCIL - Shrewsbury Skate Ramp

DUNDEE CITY COUNCIL - Dudhope Skatepark Updates

Previous Clients & Events

ADRENALINE ALLEY SKATEPARK -

VODAFONE - First Chance

HTC ONE - Selfridges Skatepark

XSITE SKATEPARK - Gelder Group

FELT BICYCLES TM - Xtra Distribution

BRAUN SPINE RAMP - Kjerag / Spielbetrieb

V FESTIVAL - Kjerag / Spielbetrieb

BOARDMASTERS - Sports Vision

BMX MASTERS COLOGNE - Spielbetrieb

SPRITE SUMMER SESSIONS - Urb Orbis

CENTRAL SKATEARK - Two Distribution

TENT EXHIBITION - Farm Designs

CANON BOWL FREESTYLE CH -

MOUNT HAWKE SKATEPARK -

DIGITAL SWITCH OVER - BSKYB

NIA ATHLETICS HIGH JUMP - Fast Track

BUG JAM - Santa Pod Raceway

FIFE COUNCIL - Design & Consultation with 'Skint Skateparks'

BOTTESFORD COUNCIL - Skatepark Maintenance

BURN ENERGY / LOTUS F1 - Junk Yard project

BAY 66 Skatepark / NIKE SB - Urb-Orbis

Previous Clients PAGE 14v1.2 Skatepark Construction

Page 33: Presentation concreate layout

Concept Images PAGE 8

Concrete Works

v1.2 Skatepark Construction

Page 34: Presentation concreate layout

Concept Images PAGE 8

Concrete Finishing

v1.2 Skatepark Construction

Page 35: Presentation concreate layout

CONSTRUCTION PAGE 17

Grass Bunding 100mm Seeded Top Soil

Sub-Base 6F2 / 6F5or similar Recycled Fill

Teram Geo textile between Sub-

Base layers

Compacted MOT Type 1

or similar fill

Sub-Soil 6F2 / 6F5to engineer Spcification

150mm reinforced concreteHand Finished P380 - P450 grade

(specialist mix tested 60-70KNmm )

20mm Smooth Steel Bar600mm through join

A252 Reinforcing MeshTied at 200m centres

12mm Bent Rebar1200mm Long

150mm reinforced power floated concrete

Sealed Construction Joint to BS69120

Typical Construction

2

Concreate Skateparks - TYPICAL CONSTRUCTION - BS EN 14974:2006

v1.2 Skatepark Construction

Page 36: Presentation concreate layout

Concept Images PAGE 8

Assurances

- Warranty

- Indemnity on Design

- 15 Year on Concrete & Reinforcement

- Exclusions

- High level 3D render models & full construction drawings

v1.2 Skatepark Construction

Page 37: Presentation concreate layout

Concept Images PAGE 8

Assurances