    Piping Layout Engineering -

    Basic Concepts

  • 8/20/2019 Piping Layout Presentation.ppt

    2/56

    Piping Layout Considerations:

    OperationMaintenance

    Constuctability

    Economics

    Safety

    Aesthetics

  • 8/20/2019 Piping Layout Presentation.ppt

    3/56

    Design for Constructibility Ten Commandments:

    K eep I t Straight and Simple K eep I ts Structures Simple K eep I ts S pecification Simple K eep I t Shop Standard K eep I ts Standard Simple K eep I t Same Size

    K eep I t S uare and S uatty K eep I ts Support Simple K eep I ts Schedule Sacred K eep I ts Site Suitable

  • 8/20/2019 Piping Layout Presentation.ppt

    4/56

    Ma!or steps before Piping Layout "esign:

    #"e$elopment of Plot Plan

    #E uipment layout design

    #Conceptual Piping layout design

  • 8/20/2019 Piping Layout Presentation.ppt

    5/56

  • 8/20/2019 Piping Layout Presentation.ppt

    6/56

  • 8/20/2019 Piping Layout Presentation.ppt

    7/56

  • 8/20/2019 Piping Layout Presentation.ppt

    8/56

  • 8/20/2019 Piping Layout Presentation.ppt

    9/56

  • 8/20/2019 Piping Layout Presentation.ppt

    10/56

  • 8/20/2019 Piping Layout Presentation.ppt

    11/56

  • 8/20/2019 Piping Layout Presentation.ppt

    12/56

  • 8/20/2019 Piping Layout Presentation.ppt

    13/56

  • 8/20/2019 Piping Layout Presentation.ppt

    14/56

    EQUIPMEN L!"#U $UNI PL# PL!ND%!&IN' 'UIDE LINES

    The follo%ing are the guidelines generally follo%ed %hile ma&ing an E uipment layout'unit plotplan dra%ing(

    a) E uipment layout shall be dra%n in *:+, or *:*,,

    scale(

    b) A, size dra%ing sheet should generally be used for

    e uipment layout( -f the area to be co$ered is small. A*

    size can be used(

    c) Place north arro% at the top right hand corner of the

    sheet to indicate plant north(

    d) The area abo$e title bloc& to be &ept free for general

    notes and reference dra%ings(

  • 8/20/2019 Piping Layout Presentation.ppt

    15/56

    e) All e uipments are mar&ed %ith its e uipment no( as appearing in E uipment list / dimensions

    0diameter. height'length etc()f) All e uipments center line are located in plant

    building %(r(t( the column grid( 1or layout ofoutdoor plant ' offsite facility. the e uipment shall be located by co2ordinates(

    g) Conceptual layout. P / -". $endor'fabricatede uipment dra%ings are to be used as basicdocument for preparing e uipment layout

    dra%ing(h) 3al&%ays. cutouts. piperac&s. floor drains. gutter.

    trenches. ramp etc( if applicable should be clearly mar&ed in the dra%ing (

  • 8/20/2019 Piping Layout Presentation.ppt

    16/56

    i) 1or in house plant layout. the location of staircases. lift /

    other utility areas should be clearly sho%n(

    !) -n e uipment layout sectional dra%ing. for each e uipment

    its top most or bottom most ele$ations should be mar&ed(

    &) Orientation of e uipment shall be clearly mar&ed for all

    the

    e uipments by orienting one of the ma!or nozzles(

    l) -n case of reactors ' tan&s. the location of manhole '

    handhole.

    S4'L4.L- etc( shall be at accessible position(

    m) E uipment lifting cutout shall be mar&ed clearly in the

  • 8/20/2019 Piping Layout Presentation.ppt

    17/56

    n) E uipment planned to be installed in future shall be

    sho%n dotted(

    o) 1or heat e5changers. tube remo$al ' cleaning space

    shall be mar&ed(

    p) 3hile locating the pumps care shall be ta&en to ensure

    that the 6PS7 re uirement is met(

    ) 4eneral notes are %ritten on one of the dra%ings 0first)

    and shall not be repeated on all layouts but reference

    shall be gi$en( r) "irection of north shall be maintained same for all the

    plans for the same plant ' pro!ect(

  • 8/20/2019 Piping Layout Presentation.ppt

    18/56

    s) -f more than one dra%ing is re uired to co$er a

    specified area. then the match line shall be indicated clearly%ith the reference dra%ings(

    t) One of the general notes should specify the

    absolute le$el of the area co$ered %ith respect to the plot(

    u) The e uipment load. operating or test load

    %hiche$er is ma5imum shall be considered for design and the

    layout should indicate this along %ith the dynamic factor

    %here$er applicable( This could also be co$ered in table as

    %ell(

  • 8/20/2019 Piping Layout Presentation.ppt

    19/56

    $) 1or reactors %ith agitators. lifting beam shall be pro$ided for

    agitator remo$al(

    %) 1or $endor e uipments maintenance space as recommended by

    them for maintenance shall be pro$ided(

    5) E uipment layout shall also indicated the positions of utility

    stations. safety sho%er and eye %ash(

    y) E uipment ele$ation shall be so arranged to ensure gra$ity

    flo%

    %here specified(

  • 8/20/2019 Piping Layout Presentation.ppt

    20/56

    -rrespecti$e of the type of arrangement. there are certain basic principles to be follo%ed %hile locating the e uipment(

    # Economic piping# Process re uirements

    # Common Operation

    # 8nderground facilities# Climatic conditions

  • 8/20/2019 Piping Layout Presentation.ppt

    21/56

    !CCESS PL! )#%MS

    The follo%ing guidelines shall be follo%ed for pro$iding access platforms in the layout(

    a) 1or all Manholes %ith centre line ele$ation abo$e 9+,,

    mm( b) 1or instrument $ision( The L4 should be $ie%ed %hile

    operating the bypass of the control $al$e(c) At ,, mm 2 *+,, mm belo% the Manhole(

    d) A minimum height of ;(+ m to be considered bet%een platforms to ta&e care of the headroom(

    e) The platform at the top of the to%er shall be at ;+, to 9,,mm abo$e the top dish(

  • 8/20/2019 Piping Layout Presentation.ppt

    22/56

    P*IL#S#P*" #) IN-PL!N PIPIN'

    o

    o

  • 8/20/2019 Piping Layout Presentation.ppt

    23/56

    =A>" P-P-64

    P / - diagram. e uipment layout. piping specifications.e uipment dra%ing and the $endor re uirement for proprietarye uipment form the basis of a piping layout( -n areas %here

    piping is critical. the e uipment locations are fi5ed only after a?piping study@ is made(

    The first step in the de$elopment of pipe rac& is the generationof a line routing diagram( A line routing diagram is aschematic representation of all process and utility piping systems

    dra%n on a copy of plot plan or it could be planometricrepresentation of the utility and process line diagrams( Althoughit disregards the e5act locations. ele$ations or interferences. itlocates the most congested area(

  • 8/20/2019 Piping Layout Presentation.ppt

    24/56

  • 8/20/2019 Piping Layout Presentation.ppt

    25/56

    )ig( +(,(

  • 8/20/2019 Piping Layout Presentation.ppt

    26/56

  • 8/20/2019 Piping Layout Presentation.ppt

    27/56

  • 8/20/2019 Piping Layout Presentation.ppt

    28/56

    )ig( +(,(.

    1.5 TO 2M

    TYPE 1

    5 TO 6M 1TO 1.2M

    TYPE 2

  • 8/20/2019 Piping Layout Presentation.ppt

    29/56

    5 TO 6M

    TYPE 3

    / * 0 1 1 ll 2i0 0 i b l 3(

  • 8/20/2019 Piping Layout Presentation.ppt

    30/56

    /e *ea0roo1 nor1ally pro2i0e0 is as belo3(Sr( "escription 7eadroom

    6o( 0mm)*( Clear head room under ;;,,

    Structures'pipe linesinside operating area(

    ;( 7ead room o$er rail B,,,0from top of rails)

    9( Clear headroom abo$e B,,,crest of road for cranemo$ement(

    ( Clear headroom abo$e D,,,crest of road for truc& mo$ement(

    +( Clear headroom abo$e +,,crest of road bet%een

    process units(

  • 8/20/2019 Piping Layout Presentation.ppt

    31/56

    )ig( +(,(4a

  • 8/20/2019 Piping Layout Presentation.ppt

    32/56

  • 8/20/2019 Piping Layout Presentation.ppt

    33/56

    )ig( +(,(56

  • 8/20/2019 Piping Layout Presentation.ppt

    34/56

    )ig( +(,(55

  • 8/20/2019 Piping Layout Presentation.ppt

    35/56

  • 8/20/2019 Piping Layout Presentation.ppt

    36/56

    )ig( +(,(5,

  • 8/20/2019 Piping Layout Presentation.ppt

    37/56

    )ig( +(,(57

  • 8/20/2019 Piping Layout Presentation.ppt

    38/56

    8al2e !ccessibility

  • 8/20/2019 Piping Layout Presentation.ppt

    39/56

    )ig +(,(54

  • 8/20/2019 Piping Layout Presentation.ppt

    40/56

    )ig +(,(+6

  • 8/20/2019 Piping Layout Presentation.ppt

    41/56

    )ig +(,(+5b

  • 8/20/2019 Piping Layout Presentation.ppt

    42/56

    )ig +(,(++

  • 8/20/2019 Piping Layout Presentation.ppt

    43/56

    +(,(9 PIPIN' )#% INS %UMEN S

    -nstruments.%hen located on piping .%ill need certainspecific re uirement for it to perform the duty for %hich it is pro$ided( Piping Engineer should be a%are of thesere uirements and should ta&e care of the same %hile routingthese pipe lines(a) 1lo% measurement instrument need certain straight lengthupstream and do%nstream of the instrument(This is normally*+" on the upstream and +" on the do%nstream(

    b) The pipe lines in %hich flo% meters such as magneticflo%meters .$orte5 meters .turbinemeters etc are located should

    be routed in such a %ay that the line %ill be full %ith li uid allthe time(The pipe line should be supported on both sides ofmeter(

  • 8/20/2019 Piping Layout Presentation.ppt

    44/56

    c) Control $al$es are located at grade. at about +,,mm height to pro$ide con$enient access for operation and maintenance( loc&and bypass $al$e also form the same criteria( The standard

    arrangements follo%ed are as per 1ig ;(9(;9 ( -f poc&eting the process line is unacceptable. then a permanent or mobile platformshould be planned. as access is $ery important( Locating control$alues on the $ertical line should be a$oided(-f is una$oidableF theshould actuator should be supported properly(The bypass should

    be selected for easy operation(

    d) -solation $al$es for le$el gauges and pressure gauges shall bemade accessible( Access and space for the remo$al of le$elcontrollers temperature probes .conducti$ity probes.bottom flagsof the control $alues etc shall be pro$ided( All primary andsecondary indicators of pressure. temperature. flo%. le$el.

    positioners etc( should be $isible from the operating area(

  • 8/20/2019 Piping Layout Presentation.ppt

    45/56

    e) >otameters shall be placed on $ertical line and the inletshould be from the bottom of the instrument(

    f) Thermo%ell shall be located on the pipe line of re uiredsize(-nstrument hoo& up shall be reffered for the re uirement(

    g) Enough operating and maintance access shall be considered%hile locating any instrument(

  • 8/20/2019 Piping Layout Presentation.ppt

    46/56

    )ig( +(,(+,

  • 8/20/2019 Piping Layout Presentation.ppt

    47/56

    )ig( +(,(+:

  • 8/20/2019 Piping Layout Presentation.ppt

    48/56

    The Considerations to arri$e at an economical rac& desgingare

    *(

  • 8/20/2019 Piping Layout Presentation.ppt

    49/56

    /e re;uire1ent as per t/e follo3ing s/all bea0/ere0 to

    a) The 1actories Act * G(

    b) The Petroleum Act * 9 / The Petroleumrules * BD(

    c) The Static and Mobile Pressure ules * G*(

    d) The 4as Cylinders >ules * G*(

    e) The -ndian oiler >egulations * +*( f) "e$elopment control rules by the State

    -ndustrial "e$elopment Corporation (

  • 8/20/2019 Piping Layout Presentation.ppt

    50/56

    B F W

    TA N K

    E C O N O M IS E R

    B F W

    H P D O S IN G

    B O IL E R F E E DW A TE R P U M P

    D O S IN G TA N K D O S IN G P U M P

    P I

    M A N I F O L D

    C O N S U M E R

    S T

    Y

    S T

    TO A TM O S .( T Y P )

    L G L G L G L G

    B L O W D O W ND R A I N

    B LO W D O W N TA N

    N O TE :

    P IP E L IN E S T H E P U R ! I E W O F IB R S H O W N W ITH T H IC H L IN E S .

    IB R S C O P E

    IB R S C O P E

  • 8/20/2019 Piping Layout Presentation.ppt

    51/56

    +(,(. C%I IC!L E

    The uality of the e uipment and piping layout can beestablished by the Critical E5amination Techni ue %here youensure that all the follo%ing parameters are %ell addresseda) -t is process ade uateH

    b) -t is operator friendlyHc)-t is construction clearHd)7as ade uate maintenance access pro$idedHe)7o% to e$acuate in case of emergencyHf)7as safe fire fighting access pro$idedH

    g)Standard practices %here applicable has been adoptedHh)-s the piping arrangement aesthetic Hi)-s supporting arrangement ade uate and aesthetic H

    !) -s piping ade uately fle5ible H

  • 8/20/2019 Piping Layout Presentation.ppt

    52/56

    EQUIPMEN !ND PIPIN' L!"#U - PUMPS

    Pumps rarely influences the plant layout e5cept %here a

    common standby for t%o ser$ices or multiple duty pumps

    might dictate the process e uipment arrangement( ut the

    pumps can ne$er be treated as an independent entity. but to be

    treated as part of the piping system %hich affects the

    performance e$en if the basic selection is faultless(

  • 8/20/2019 Piping Layout Presentation.ppt

    53/56

    The design of e uipment and piping configuration

    affect the energy used and capital cost of pumps( 7ence.

    economy of piping and structures along %ith ease of

    operation and maintenance are the principal aim %hile

    arranging the pumps (

  • 8/20/2019 Piping Layout Presentation.ppt

    54/56

    The primary goal in locating the pump is to minimize the

    piping configuration %hile satisfying the performance and

    fle5ibility re uirements as %ell as allo%able loads that may

    be sub!ected to the nozzles(

    Mechanical or Chemical Engineers can no longer

    consider the pump as an independent entity. but to be treatedas a part of the Piping System(

  • 8/20/2019 Piping Layout Presentation.ppt

    55/56

  • 8/20/2019 Piping Layout Presentation.ppt

    56/56

    )ig( ,(5(5b