65
Phase 1 Geotechnical Engineering Services Totem Lake Connector NE 124 th Street/124 th Avenue NE Kirkland, Washington for City of Kirkland c/o COWI North America, Inc. July 14, 2017 8410 154 th Avenue NE Redmond, Washington 98052 425.861.6000

Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

Embed Size (px)

Citation preview

Page 1: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

Phase 1 Geotechnical Engineering Services

Totem Lake Connector NE 124th Street/124th Avenue NE Kirkland, Washington

for City of Kirkland c/o COWI North America, Inc.

July 14, 2017

8410 154th Avenue NE Redmond, Washington 98052 425.861.6000

 

 

 

Page 2: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

Phase 1 Geotechnical Engineering Services

Totem Lake Connector NE 124th Street/124th Avenue NE

Kirkland, Washington File No. 0231-090-00

July 14, 2017

Prepared for:

City of Kirkland c/o COWI North America, Inc. 1191 2nd Avenue, Suite 1110 Seattle, Washington 98101

Attention: Schaun Valdovinos, MS, PE, P.Eng.

Prepared by:

GeoEngineers, Inc. 8410 154th Avenue NE Redmond, Washington 98052 425.861.6000

Michael A. Gray, PE Herbert R. Pschunder, PE Staff Geotechnical Engineer Senior Geotechnical Engineer

Debra C. Overbay, PE Associate

MAG:HRP:DCO:nld

Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record.

 

 

 

Page 3: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page i File No. 0231-090-00

Table of Contents INTRODUCTION AND PROJECT DESCRIPTION ......................................................................................................... 1 FIELD EXPLORATIONS AND LABORATORY TESTING ............................................................................................... 2

Field Explorations ............................................................................................................................................... 2 Laboratory Testing ............................................................................................................................................... 2 Previous Site Explorations ................................................................................................................................... 2

SITE CONDITIONS ....................................................................................................................................................... 2

Geology……………… ............................................................................................................................................... 2 Surface Conditions............................................................................................................................................... 2

South Alignment ............................................................................................................................................ 3 Central Alignment .......................................................................................................................................... 3 North Alignment ............................................................................................................................................ 3

Subsurface Conditions ........................................................................................................................................ 4 South Bridge Abutment and South Approach Ramp .................................................................................. 4 Bridge Touchdown in Traffic Island .............................................................................................................. 4 Spiral Ramp and Transition to Existing Trail ................................................................................................ 4

Groundwater Conditions ...................................................................................................................................... 5

CONCLUSIONS AND RECOMMENDATIONS .............................................................................................................. 6

Earthquake Engineering ...................................................................................................................................... 7 Ground Motion Parameters .......................................................................................................................... 7 Liquefaction Potential ................................................................................................................................... 7 Liquefaction-Induced Ground Settlement ................................................................................................... 8 Ground Rupture ............................................................................................................................................. 9

Bridge Foundation ............................................................................................................................................... 9 Drilled Shafts ................................................................................................................................................. 9

Bridge Approach….. ........................................................................................................................................... 11 MSE or Structural Earth Walls ................................................................................................................... 11 Drainage ..................................................................................................................................................... 11

Earthwork……………… ........................................................................................................................................ 12 Excavation Considerations ........................................................................................................................ 12 Clearing and Grubbing ............................................................................................................................... 12 Subgrade Preparation ................................................................................................................................ 12 Structural Fill Materials ............................................................................................................................. 12 Erosion and Sedimentation Control .......................................................................................................... 14 Temporary Cut Slopes ................................................................................................................................ 14

Construction Vibrations and Pre-Construction Surveys of Adjacent Buildings .............................................. 15

RECOMMENDATIONS FOR FUTURE SERVICES ..................................................................................................... 15 LIMITATIONS ............................................................................................................................................................. 16 REFERENCES ............................................................................................................................................................ 16

 

 

 

Page 4: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page ii File No. 0231-090-00

LIST OF TABLES

Table 7. Preliminary LPILE Parameters

LIST OF FIGURES

Figure 1. Vicinity Map Figure 2. Site Plan Figures 3 through 11. Axial Resistance Plots

APPENDICES

Appendix A. Field Explorations Figure A-1 – Key to Exploration Logs Figures A-2 through A-8 – Log of Borings

Appendix B. Laboratory Testing Figure B-1– Sieve Analysis Results Figure B-2 – Atterberg Limits Test Results

Appendix C. Previous Explorations Appendix D. Report Limitations and Guidelines for Use

 

 

 

Page 5: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 1 File No. 0231-090-00

INTRODUCTION AND PROJECT DESCRIPTION

This report presents the results of our preliminary geotechnical engineering services in support of Phase 1 design of the proposed Totem Lake Connector project located at NE 124th Street and 124th Avenue NE in Kirkland, Washington. The location of the project site is shown on the Vicinity Map, Figure 1.

The Totem Lake Connector will consist of a non-motorized bridge conforming to AASHTO Shared-Use Path Guidelines, spanning the intersection of NE 124th Street/124th Avenue NE and Totem Lake Boulevard. The preliminary bridge alignment and site features are shown in the Site Plan, Figure 2. The bridge will provide an elevated connection between segments of the existing Cross Kirkland Corridor (CKC) trail. The CKC is an approximately 5¾ mile long multipurpose trail on a former BNSF railroad grade that extends north from 108th Avenue NE near State Route 520 to Slater Avenue NE.

The initial concept for the bridge includes:

■ an embankment for the south approach ramp flanked by retaining walls;

■ the bridge spanning over NE 124th Street and Totem Lake Boulevard with a “touchdown” support in the triangular property bounded by these roadways; and

■ a spiral ramp located just northeast of Totem Lake Boulevard extending over the park and wetland associated with Totem Lake, transitioning back to the trail alignment.

Our services were completed in general accordance with a Subconsultant Agreement between COWI North America, Inc. and GeoEngineers dated January 2017.

Our scope of services includes:

■ reviewing existing geologic and geotechnical information available for the site and surrounding areas;

■ completing explorations at the site to characterize the subsurface soil and groundwater conditions;

■ completing geotechnical laboratory testing on selected soil samples obtained from the explorations;

■ providing recommendations for seismic design in accordance with the 2014 AASHTO LRFD Bridge Design Specifications, 7th Edition;

■ completing analysis to evaluate the axial and lateral capacity for deep foundations supporting the proposed bridge structure;

■ evaluating settlement of ramp fills and bridge foundations;

■ developing options for retaining walls for bridge abutment and ramp fills;

■ providing recommendations for site preparation, earthwork, pavements, and underground utility construction; and

■ preparing draft and final versions of this preliminary geotechnical design report.

 

 

 

Page 6: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 2 File No. 0231-090-00

FIELD EXPLORATIONS AND LABORATORY TESTING

Field Explorations

Preliminary subsurface conditions were evaluated along the project alignment by drilling seven borings (B-1 through B-7) to depths ranging from 21½ to 71½ feet below the existing ground surface. The locations of the subsurface explorations completed for this project are shown on Figure 2. Details of the field exploration program and logs of the borings are presented in Appendix A, Field Explorations.

Laboratory Testing

Soil samples were obtained during drilling and taken to GeoEngineers’ laboratory for further evaluation. Selected samples were tested for the determination of moisture content, fines content (particles passing the U.S. No. 200 sieve), grain size distribution, and plasticity characteristics. A description of the laboratory testing and the test results are presented in Appendix B.

Previous Site Explorations

In addition to the explorations completed as part of this evaluation, we reviewed logs of available explorations from previous studies along and near the project alignment. The logs of explorations from previous projects referenced for this study are presented in Appendix C, Previous Explorations.

SITE CONDITIONS

Geology

Published geologic information for the project area includes a United States Geological Survey (USGS) map for the Kirkland, Washington quadrangle (Minard 1983). The mapped surface geologic units in the project area include recessional outwash (Qvr), glacial till (Qvt) and transitional beds (Qtb). The recessional outwash is mapped north of NE 124th Street and consists primarily of stratified sand and gravel with varying percentages of silt and clay. These deposits are related to a glacial meltwater channel that extends west to east in the Totem Lake area, and are generally in a loose to medium dense condition.

Glacial till and the transitional beds are mapped south of NE 124th Street. Glacial till generally consists of a non-sorted, non-stratified mixture of clay, silt, sand and gravel with larger constituents up to the size of boulders. The till is very dense and relatively impermeable, but can contain minor amounts of interbedded stratified sand and gravel. The transitional deposits consist of massive to bedded silt, clay and sand with minor amounts of peat and gravel. The transitional bed deposits are generally in a very stiff to hard condition due to being overridden by glaciers.

Surface Conditions

The project alignment extends in a southwest-to-northeast direction and is parallel to the Cross Kirkland Connector (CKC) multi-purpose trail along most of its length. The south approach will begin about 500 feet southwest of NE 124th Street on the existing trail grade, and extend up through the slope cut to the proposed bridge alignment. The proposed bridge alignment is located roughly 15 to 30 feet away and parallel to the existing trail alignment.

 

 

 

Page 7: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 3 File No. 0231-090-00

Numerous underground utilities exist along and across the alignment, the most notable of which are a fiber optic line on the east side of the CKC trail and a deep sanitary sewer line that crosses the western part of the spiral ramp area.

For the purposes of discussion, we have divided the site into three general areas below.

South Alignment

The southern part of the alignment and CKC trail is located within a through cut made for the former Eastside Rail Corridor (ERC) that was first developed in 1904 as part of the Lake Washington Belt Line. The line was initially used for hauling coal and lumber, and eventually for agricultural and industrial use. The Spirit of Washington Dinner Train also used the tracks from 1993 to 2007. In late 2009, BNSF sold the line to the Port of Seattle and the CKC came into public ownership.

Most of the trail is surfaced with fine gravel; however, a short asphalt paved section is present where the trail approaches the existing streets. Elevations along the south portion of the trail segment range from about Elevation 150 feet to about Elevation 146 feet. (Elevations in the report refer to NAVD 88 datum). Drainage ditches with depths up to about 3 feet are present on both sides of the existing CKC trail.

The existing through-cut within the south portion of the alignment contains cut slopes ranging from a few feet high to as high as 15 feet. The cut slope inclination is typically 1½H:1V (horizontal to vertical) and is vegetated with low brush.

Adjacent development includes a gas station and roadway to various commercial properties (Office Max, motel and fitness club) on the northwest, and a public storage facility on the southeast.

Central Alignment

NE 124th Street is a four-lane, high-volume arterial street that crosses the central alignment in a west to east direction. A triangular-shaped traffic island is located on the north side of NE 124th Street and south side of Totem Lake Boulevard NE, also a high-volume arterial. A retail store (Rite Aid) is located west of the island and turn lane from Totem Lake Boulevard NE to 124th Street.

The traffic island is nearly level with ground surfaces at approximately Elevation 145 feet. A small metal signal building remaining from the railroad era is located within the western part of the island and grass covers the remaining area.

North Alignment

North of Totem Lake Boulevard NE, the bridge will transition to a spiral ramp connecting to the existing CKC trail. The trail in this area is supported on a fill embankment placed for the former railroad. A short asphalt paved section of trail transitions to a gravel surfaced segment that continues northeast to 128th Place NE. A retail tire store (Discount Tire) is present on the southeast side of the existing trail and a wetland bordering Totem Lake is present to the northwest below the trail embankment. High voltage power lines cross over the trail in a south to north direction.

The existing ground surface ranges from about Elevation 141 feet on the trail surface to about Elevation 125 feet at the toe of the slope near the edge of a large wetlands. Slope inclinations range from about 2H:1V for the railroad embankment to about 4H:1V near the toe of the slope. Vegetation in the spiral ramp

 

 

 

Page 8: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 4 File No. 0231-090-00

area includes heavy underbrush and deciduous trees of varying diameters. Some of the brush and smaller trees were cleared to provide access for the drill rig used to complete the borings. Clearing and boring locations were limited to outside the wetlands for Phase I explorations.

Subsurface Conditions

We evaluated subsurface soil and groundwater conditions along the project alignment by drilling seven borings (B-1 through B-7) to depths ranging from 21½ to 71½ feet below the existing ground surface, and by reviewing the logs of selected previous explorations completed near the alignment.

The following sections describe subsurface soil conditions for: (1) the south approach ramp and bridge abutment near NE 124th Street, (2) the bridge touchdown location within the traffic island, and (3) the spiral ramp area and transition to the existing trail grade.

South Bridge Abutment and South Approach Ramp

Explorations located south of NE 124th Street include borings B-5 through B-7 drilled for the current study and boring B-93 drilled in 1987 by Converse Consultants.

Boring B-5 was located near the proposed south abutment and encountered 6 inches of gravel trail surfacing over medium dense silty sand to a depth of 7 feet. Stiff to hard silt and clay and dense silty and clayey sand with varying amounts of gravel was encountered below the surficial silty sand. Subsurface soils were similar in the 1987 boring, B-93.

Boring B-6 was drilled along the existing CKC trail near the end of the south approach ramp and boring B-7 was drilled near the future NE 120th Street crossing. Both borings encountered about 6 inches of gravel trail surfacing over either native silt soils (B-6) or silty sand fill (B-7) that could be related to utility installation. The fill is in a dense condition and extends to a depth of about 4½ feet in boring B-7. The fill is underlain by native stiff to hard silt containing thin lenses of peat. A layer of dense silty sand was encountered between the silt layers in boring B-6 at a depth of 13 to 18 feet.

Bridge Touchdown in Traffic Island

Boring B-4 was drilled within the traffic island and encountered 6 inches of topsoil over loose to medium dense silty sand with gravel fill. The fill extends to a depth of about 7 feet and is underlain by loose to medium dense silty sand. Below this depth, the boring encountered variable soil conditions consisting of alternating layers of medium dense to dense silty and clayey gravel with cobbles, and stiff to very stiff silt and clay.

At a depth of 53 feet, the boring encountered very dense clayey gravel with cobbles. This unit is underlain by very dense silty sand with gravel that extends to the bottom of the boring at 66½ feet.

Spiral Ramp and Transition to Existing Trail

Borings B-1 through B-3 were drilled in the proposed spiral ramp area outside the wetland area. Borings B-87 and B-89 drilled in 1987 by Converse Consultants were located east of the former railroad grade.

Boring B-1 encountered about 4½ feet of loose silty sand fill associated with the embankment that supports Totem Lake Boulevard to the west. Boring B-3 encountered approximately 17½ feet of very loose to medium

 

 

 

Page 9: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 5 File No. 0231-090-00

dense sand and silty sand fill with varying amounts of gravel associated with the railroad embankment. Borings B-87 and B-89 also encountered loose silty sand fill to depths of 9 and 2 feet, respectively. The loose surficial sand with silt encountered in boring B-2 may also be fill associated with the railroad embankment.

Peat was encountered below the fill in boring B-87 and extends to a depth of about 19 feet below the ground surface at the time the boring was drilled. No peat was encountered in borings B-1 through B-3 and in boring B-89. It is possible the peat was removed during construction of the railroad embankment.

Loose to medium dense sand with varying amounts of silt, gravel and cobbles underlies the fill and peat, where present. This soil unit extends to depths of about 26 to 43 feet in the recent and previous borings. We interpret these soils to be recessional outwash deposits.

Very stiff to hard silt and clay and medium dense to very dense sand and gravel with varying amounts of silt and cobbles underlie the loose to medium dense sand unit, and extend to the bottom of the borings. These soils could represent glacial till or transitional deposits.

Groundwater Conditions

Groundwater was observed during drilling at depths ranging from approximately 6 to 17½ feet below the existing ground surface. The groundwater conditions observed during drilling are presented on the boring logs.

Groundwater conditions observed while completing the explorations represent a short-term condition and may or may not be representative of the long-term groundwater conditions at the site. In lower permeability soils the depth at which the groundwater is initially encountered may be many feet below the long-term groundwater level measure in monitoring wells over an extended time.

Monitoring wells were installed in two of the borings, B-2 and B-4, to depths of 20 and 25 feet, respectively. 1 Alliance Geomatics surveyed the tops of the wells in February 2017.

Table 1 provides a summary of groundwater measurements completed on February 16 and May 3, 2017.

TABLE 1. SUMMARY OF GROUNDWATER MEASUREMENTS

Well ID Ground Surface Elevation (feet)

Top of Casing Elevation

(feet)

Measured Groundwater Elevation (feet) / Depth Below Ground Surface (feet)

2/16/2017 5/3/2017

B-2 129.92 129.69 126.58/0.23 125.79/4.13

B-4 144.48 144.61 130.51/13.97 127.69/16.79

Additional groundwater measurements will be taken during the design phase of the project to further assess variations in groundwater elevations. Groundwater levels are anticipated to fluctuate as a function of precipitation and season.

The monitoring wells are the property of the City of Kirkland. The wells should be decommissioned by a licensed well driller in accordance with Chapter 173-160 of the Washington Administrative Code (WAC)

 

 

 

Page 10: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 6 File No. 0231-090-00

when they are no longer needed for data collection. Alternatively, the wells could be kept intact for use during project bidding and then be decommissioned under the construction contract.

CONCLUSIONS AND RECOMMENDATIONS

A summary of primary geotechnical considerations for the project is provided below. The summary is presented for introductory purposes only and should be used in conjunction with the complete recommendations presented in this report.

■ Based on the borings completed to date, the site is designated as seismic Site Class D per the Washington State Department of Transportation (WSDOT) Geotechnical Design Manual (GDM) and AASHTO LRFD. However, borings were not completed within the wetland area such that Site Class E or F may be appropriate within this portion of the site. Additional explorations will be completed during final design, and a site-specific seismic response analysis may be appropriate depending on the subsurface conditions encountered.

■ Effective stress liquefaction analysis was completed to better characterize the liquefaction susceptibility of the site soils and the anticipated settlement resulting from liquefaction. As summarized in a subsequent section, estimated ground settlements resulting from liquefaction of the subsurface soils during the design earthquake range from 0 in the southwest, to 6 to 9 inches in the northeast.

■ We understand the “Skipping Stone” design alternative has been selected which includes 10 individual piers and a western and eastern abutment. Based on the preliminary subsurface soil conditions encountered and the bridge demands, large diameter drilled shaft foundations will provide suitable support for the bridge. The west abutment will require two shafts and the east abutment near the end of the spiral ramp will likely require three shafts. The remaining foundations will be single shafts to support the Y-piers. Recommendations for axial, compression and lateral capacities are discussed in subsequent sections

■ The approach embankment from the west will extend from the existing trail and up the adjacent slope to connect with the bridge alignment. MSE walls are planned to support the approach in this area. A shorter embankment is required at the north abutment, extending from the spiral terminus to the existing trail. Lightweight fill may be utilized in this area to mitigate settlement, depending on the subsurface findings in the final borings.

■ Green stormwater Infiltration may be feasible in the granular soils encountered above the wetland, depending on the location of the facility, long-term groundwater monitoring results, and other regulatory requirements. A lower infiltration rate is available in the south and central site areas based on the fines content encountered in the preliminary borings. Additional evaluation will be completed during final design to support drainage design.

These and other geotechnical considerations are discussed further, and recommendations pertaining to the geotechnical aspects of the project are presented in the following sections of this report.

 

 

 

Page 11: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 7 File No. 0231-090-00

Earthquake Engineering

Ground Motion Parameters

The seismic design of the bridge should be completed using the design criteria presented in the 7th Edition of the AASHTO LRFD Bridge Design Specifications (2014). This document references the 2008 USGS National Seismic Hazards Mapping project for determining spectral acceleration coefficients (bedrock) for design. The acceleration coefficients for design are based on the expected ground motion at the project site that has a 7 percent probability of exceedance in a 75-year period (approximate 975-year return period).

Based on the calculated Vs30 from the borings completed, the site is classified as Site Class D. However, it is likely that a greater thickness of soft/loose soils are present in the wetland area resulting in Site Class E. Additional borings will be completed during final design to confirm the site class in this area. Recommended seismic parameters are provided in Table 2.

TABLE 2. AASHTO SEISMIC PARAMETERS

AASHTO Seismic Parameter Recommended Value

Site Class D E

Ss 1.25

S1 0.48

Zero-period Site Factor, Fpga 1.13 0.98

Short Period Site Factor, Fa 1.00 0.90

Long-period Site Factor, Fv 1.52 2.40

Liquefaction Potential

Liquefaction is a phenomenon where soils experience a rapid loss of internal strength as a consequence of strong ground shaking. Ground settlement, lateral spreading and/or sand boils may result from liquefaction. In general, structures supported on liquefied soils could suffer foundation settlement, downdrag loads, or lateral movement that could be severely damaging to the structures.

Conditions favorable to liquefaction typically occur in loose to medium dense, clean to moderately silty sand that is below the groundwater level. Based on our evaluation of the subsurface conditions at the site, we conclude that portions of the subsurface soils exhibit characteristics of liquefiable soils and will likely undergo some level of strength loss during the design-level earthquake event (peak ground acceleration [PGA] value and mean earthquake Magnitude as presented in Table 3 below). The PGA value was determined using the PGA from the 2008 USGS probabilistic seismic hazard deaggregation at 975-year return period multiplied by the site amplification factor presented in AASHTO LRFD Bridge Design Specifications (2014). For the design magnitude, we selected the mean magnitude based on the results of the 2008 USGS probabilistic seismic hazard deaggregation.

 

 

 

Page 12: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 8 File No. 0231-090-00

TABLE 3. EARTHQUAKE DESIGN PARAMETERS FOR LIQUEFACTION ANALYSIS

Return Period Mean Magnitude

PGA (g)

Site Class D Site Class E

975 Years 6.76 0.37 0.42

Liquefaction triggering is typically evaluated using semi-empirical methods (i.e. simplified methods) based on in situ field tests such as standard penetration test (SPT), cone penetration test (CPT), or shear wave velocity measurements. The simplified methods of liquefaction evaluation are based on comparing the earthquake induced loading to the soil resistance to triggering liquefaction. The earthquake induced loading is called the cyclic stress ratio (CSR) and the soil resistance is the cyclic resistance ratio (CRR). The borings (B-1 to B-5) completed at the site with SPT measurements were evaluated using the simplified triggering criteria proposed by Youd and Idriss (2001) based on a mean magnitude 6.76 design earthquake event (975 years) with a PGA of 0.42g and 0.37g.

Table 4 summarizes the depth ranges of liquefiable soil across project site based on the simplified liquefaction evaluation method used in this study for Site Classes D and E.

TABLE 4. POTENTIAL LIQUEFIABLE ZONES

Boring Depth Range (feet)

(Site Class D) Depth Range (feet)

(Site Class E)

B-1 0 to 22.5 0 to 17.5

B-2 0 to 27.5 0 to 27.5

B-3 12.5 to 28 and 42.5 to 47.5 12.5 to 28

B-4 22.5 to 27.5 22.5 to 27.5

B-5 No Liquefiable Soils No Liquefiable Soils

Liquefaction-Induced Ground Settlement

The magnitude of liquefaction-induced ground settlement was computed using the Youd and Idriss (2001) simplified approach described previously. Reconsolidation settlement (volumetric strain) is estimated as a function of the factor of safety of liquefaction triggering (serving as a proxy for the maximum accumulated shear strain).

Table 5 below summarizes the range of estimated settlement across the project site for the analysis methods used in this study. The settlement ranges represent estimated ground settlement from the soils encountered from the ground surface to the depth of boring.

TABLE 5. LIQUEFACTION-INDUCED GROUND SETTLEMENT

Boring No. Depth of Boring

(feet) Estimated Settlement

(inches)

B-1 71.5 6-9

B-2 71.0 5-8

 

 

 

Page 13: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 9 File No. 0231-090-00

Boring No. Depth of Boring

(feet) Estimated Settlement

(inches)

B-3 61.5 3-6

B-4 66.5 1-2

B-5 31.5 0

Ground Rupture

The closest mapped fault in the vicinity is located roughly 1 mile north, and is designated as a “Class B” fault by Washington Department of Natural Resources. Class B faults or fault systems are those which Quaternary-age deformation is suspected, but insufficient evidence has been gathered to support this determination. The uncertain traces mapped are part of the Southern Whidbey Island fault zone. Based on the available data, the risk of adverse impacts resulting from seismically induced slope instability, differential settlement, or surface displacement due to faulting is considered to be low.

Bridge Foundation

Based on the subsurface soil conditions encountered and bridge demands, large diameter shaft foundations will provide suitable support for the bridge. The west abutment will require two shafts and the east abutment near the end of the spiral ramp will likely require three shafts. The remaining foundations will be single shafts to support the Y-piers. Mechanically stabilized earth (MSE) walls will be constructed to retain the west approach ramp, and smaller walls may also be necessary at the east ramp between the east abutment and the existing trail. Foundation recommendations are discussed in detail below.

Drilled Shafts

Axial Capacity We understand the bridge will be supported on 14 or 15 large diameter drilled shafts. Interior piers will be supported on single shafts and the abutments will be supported on two or three shafts. We evaluated axial shaft capacity using the methods presented in the 7th Edition of the AASHTO LRFD Bridge Design Specifications (2014 with the 2016 Interim Revisions). For Phase 1 evaluation, we developed a single, simplified soil profile using specific soil information at borings B-1, B-4, and B-5 to represent the north, central, and south portions of the bridge. Three diameters (4, 5, and 6 feet) were included for analyzing preliminary capacities.

The compressive and uplift axial shaft capacities for Service, Strength and Extreme Limit loading states are provided in Figures 3 through 11, Axial Resistance Plots. The capacity values presented in this report assume that 8 feet of permanent steel casing will be installed in the upper portion of the shaft. The axial and lateral soil strengths used to evaluate the capacity of the drilled shafts assume the range of soil liquefaction estimated from the simplified liquefaction analysis using Site Class D PGA. Axial reduction factors for group effects should be considered if multiple shafts are spaced closer than three shaft diameters on center.

We have incorporated the resistance factors presented in Table 6 into our drilled shaft foundation capacity charts. The capacity charts also assume that single drilled shafts (i.e. no redundant shafts) are present at each bent by applying 20 percent reduction in capacity. The service limit state condition assumes 1 inch of settlement at the top of the drilled shaft.

 

 

 

Page 14: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 10 File No. 0231-090-00

TABLE 6. LRFD DRILLED SHAFT FOUNDATION RESISTANCE FACTORS

Limit State Resistance Factor φ

Skin Friction End Bearing

Strength 0.55 0.50

Service 1.00 1.00

Extreme 0.8 1.00

Uplift 0.45 - Lateral Capacity We understand that lateral capacity analyses of drilled shafts will be evaluated using the p-y curve method (LPile). Geotechnical design parameters for use in the evaluation of the lateral capacity of drilled shafts are presented in Table 7, which is located at the end of the report text. Additional parameters will be developed during final design when additional borings are completed. Preliminary LPile analyses runs were also provided to the structural engineer.

Shafts spaced closer than five shaft diameters (as measured center-to-center) apart will experience lateral group effects that will result in a lower lateral load capacity for trailing rows of shafts with respect to leading rows of shafts for an equivalent deflection. We recommend that the lateral load capacity for trailing shafts in a shaft group spaced less than five pile diameters apart be reduced in accordance with the factors in Table 8.

TABLE 8. SHAFT P-MULTIPLIERS, PM, FOR MULTIPLE ROW SHADING

Shaft Spacing1 (in terms of shaft diameter)

P-Multipliers, Pm2, 3

Row 1 (leading row)

Row 2 (1st trailing row)

Row 3 and higher (2nd trailing row)

3D 0.85 0.65 0.55

5D 1.0 0.85 0.80

Notes: 1 The P-multipliers in the table above are a function of the center to center spacing of shafts in the group in the direction of loading expressed in multiples of the shaft diameter, D. 2 The values of Pm were developed for vertical shafts only. 3 The P-multipliers are dependent on the shaft spacing and the row number in the direction of the loading to establish values of Pm for other shaft spacing values, interpolation between values should be conducted.

Construction Considerations Based on our understanding of the preliminary bridge demand loading, drilled shafts will likely extend to a depth of 60 to 70 feet below existing site grade within the spiral ramp area, and 40 to 50 feet along the remaining alignment. The drilled shafts will extend well below the static groundwater elevation. Based on the depth below grade, location of the static groundwater elevation, and proximity to utilities, we recommend that shafts be installed with temporary casing that extends to the dense silty sand or very stiff to hard silts and clay excavated using oscillator or rotator methods. This technology incorporates high torque casing oscillators and rotators to advance heavy wall steel casing into the ground concurrent with the excavation without any vibration or ground loss. A temporary work platform founded on a geogrid reinforced mat, or reaction piles may be necessary to support the oscillator rig and associated drilling equipment.

 

 

 

Page 15: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 11 File No. 0231-090-00

Drilled shafts should be excavated with equipment that reduces the amount of loose cuttings or slough at the bottom of the drilled hole. Slough and loose cuttings should be removed from the hole prior to placing the concrete. We recommend the drilled shafts be constructed using the tremie methods for concrete placement. Nondestructive testing of shafts using Cross-Hole Sonic Logging (CSL) and/or Thermal Integrity Profiling (TIP) is recommended for all drilled shafts completed for the project.

Though not encountered in our recent explorations, cobbles, boulders, and debris could be encountered within the soil profile. The contractor should be prepared to advance through and/or remove cobbles, boulders, and debris if encountered during drilled shaft construction.

Bridge Approach

Based on the preliminary plan, the south approach will begin about 500 feet southwest of NE 124th Street on the existing trail grade, and extend up through the slope cut to the existing bridge alignment. The bridge alignment is located roughly 15 to 30 feet away and parallel to the existing trail. A variable height MSE wall is planned to retain the ramp up the slope and to the south abutment. Maximum embankment height is anticipated to be about 15 feet.

The north approach will likely include low-height MSE walls to retain the embankment between the existing trail and the abutment within the spiral ramp. These walls are estimated to be less than 4 feet high and extend about 50 to 75 feet.

Based on the subsurface conditions encountered in our preliminary borings, conventional fill and construction methods are likely feasible for design and construction of the walls. Additional borings will be completed within the spiral ramp area to confirm soft compressible peat is not present. Lightweight fill or EPS geofoam may be considered for the north approach if necessary. Additional description of the MSE wall construction is provided below and additional design parameters will be provided during final design.

MSE or Structural Earth Walls

MSE (mechanically-stabilized earth) or structural earth (SE) walls are planned to retain the approach fill embankments. Global and internal stability of the wall should be evaluated during final design using the procedures outlined in section 15.5.3 of the 2015 WSDOT GDM and Section 11.10 of the 2012 AASHTO LRFD Bridge Design Specifications. We recommend a horizontal seismic force, kh, equal to 0.5 times the PGA be considered when evaluating the wall components for seismic design.

Minimum embedment of MSE walls will be governed by the wall height, slope in front of the wall, retained soil and loading condition. The required embedment depth will be evaluated during final design. MSE walls should be designed for reinforcement pullout, reinforcement capacity, connection strength, sliding resistance, bearing resistance and over-turning using the various load and resistance factors consistent with the criteria presented in AASHTO LRFD Specifications. Minimum reinforcing length should be 0.7 times the wall height (top of wall to top of leveling pad) or 6 feet, whichever is greater. Pullout, over-turning, or other internal stability requirements will dictate longer reinforcement lengths for the variable loading and wall configuration.

Drainage

Wall drainage consisting of a minimum 6-inch-diameter perforated drain pipe embedded in drainage material should be incorporated into design of the walls. The drainage material and drain pipe should be

 

 

 

Page 16: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 12 File No. 0231-090-00

wrapped with a geotextile conforming to WSDOT 9-33 to reduce the potential for fines migration. The drain should be installed at the back of the reinforcement zone and be sloped to direct water into a storm drain system or other suitable discharge.

Earthwork

Excavation Considerations

Fill soils are present along the alignment associated with construction of the railroad embankment and adjacent streets. We anticipate that these soils can be excavated with conventional excavation equipment. The contractor should be prepared to deal with debris, cobbles and boulders, which are frequently encountered in uncontrolled fill soils.

Clearing and Grubbing

The existing ground surface along the project corridor is typically vegetated or paved as discussed in the “Surface Conditions” section of this report. Embankment areas covered with vegetation should be cleared and grubbed in accordance with Section 2-01 of the WSDOT Standard Specifications.

Subgrade Preparation

Following clearing and grubbing, we recommend the existing slope in the south approach area be cut into a series of horizontal benches to key in new fill and provide a horizontal stable surface for the foundation of new walls. Additional details and site preparation recommendations will be evaluated during final design when the final configuration of the alignment and walls are available.

Subgrade stabilization will be required to access the north site and wetland area to complete final explorations and to install drilled shafts. This may include the use of high-strength geotextiles and geogrids, light weight fill, or a stabilized platform with reaction piles. Detailed recommendations for site preparation and access road considerations will be provided during final design.

Structural Fill Materials

Materials used to construct the south access ramp and placed behind retaining structures is classified as structural fill for the purpose of this report. Structural fill material quality varies depending upon its use, as described below:

1. As a minimum, structural fill placed to construct embankments and the trail, to backfill utility trenchesand to support foundations should meet the criteria for common borrow, WSDOT 9-03.14(3). Commonborrow will be suitable for use as structural fill during dry weather conditions only. If structural fill isplaced during wet weather, the structural fill should consist of gravel borrow, WSDOT 9-03.14(1).

2. Structural backfill for walls should meet the criteria for gravel borrow or gravel backfill for walls, WSDOT 9-03.12(2).

3. Structural fill placed to surround collector pipe (drain rock) should meet the criteria for gravel backfillfor drains, WSDOT 9-03.12(4).

On-site Soils The soils observed in the explorations generally contain a high percentage of fines (silt and clay) and are moisture-sensitive. Some of the on-site soils may meet the criteria for common borrow and may be suitable for use during dry weather construction only, provided the soil has a moisture content near optimum.

 

Page 17: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 13 File No. 0231-090-00

However, the fine-grained soils (silt and clay), or existing fill with wood or other debris do not meet the criteria for common borrow and should not be used. Peat and organic silt soils are unsuitable for use as structural fill.

Fill Placement and Compaction Criteria Structural fill should be mechanically compacted to a firm, non-yielding condition. Structural fill should be placed in loose lifts not exceeding 1 foot in thickness. Each lift should be conditioned to the proper moisture content and compacted to the specified density before placing subsequent lifts. We recommend structural fill placed for the approach ramps be compacted to 95 percent of the maximum dry density (MDD) (ASTM D 1557).

We recommend that a representative of GeoEngineers be present during proof-rolling and/or probing of the exposed subgrade, and during placement of structural fill. GeoEngineers will evaluate the adequacy of the subgrade soils and identify areas needing further work, perform in-place moisture-density tests in the fill to evaluate whether the work is being done in accordance with the compaction specifications, and advise on any modifications to procedure that may be appropriate for the prevailing conditions.

Weather Considerations The on-site soils generally contain a high percentage of fines (silt and clay) and are moisture-sensitive. When the moisture content of these soils is more than a few percent above the optimum moisture content, these soils become muddy and unstable, operation of equipment on these soils will be difficult, and it will be difficult or impossible to meet the required compaction criteria. Additionally, disturbance of near-surface soils should be expected if earthwork is completed during periods of wet weather. The contractor will need to take precautions to protect the subgrade during periods of wet weather.

The wet weather season in western Washington generally begins in October and continues through May; however, periods of wet weather may occur during any month of the year. The optimum earthwork period for these types of soils is typically June through September. If wet weather earthwork is unavoidable, we recommend that:

■ the ground surface in and around the work area should be sloped so that surface water is directed away from the work area. The ground surface should be graded such that areas of ponded water do not develop. The contractor should take measures to prevent surface water from collecting in excavations and trenches. Measures should be implemented to remove surface water from the work area;

■ erosion control techniques should be implemented to prevent sediment from leaving the site;

■ earthwork activities should not take place during periods of heavy precipitation;

■ slopes with exposed soils should be covered with plastic sheeting;

■ the contractor should take necessary measures to prevent on-site soils and soils to be used as fill from becoming wet or unstable. These measures may include the use of plastic sheeting, sumps with pumps, and grading. The site soils should not be left uncompacted and exposed to moisture. Sealing the surficial soils by rolling with a smooth-drum roller prior to periods of precipitation will help reduce the extent that these soils become wet or unstable; and

■ construction activities should be scheduled so that the length of time that soils are left exposed to moisture is reduced to the extent practical.

 

 

 

Page 18: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 14 File No. 0231-090-00

Erosion and Sedimentation Control

Potential sources or causes of erosion and sedimentation depend upon construction methods, slope length and gradient, amount of soil exposed and/or disturbed, soil type, construction sequencing and weather. Implementing an erosion and sedimentation control plan will reduce the project impact on erosion-prone areas. The plan should be designed in accordance with applicable regulatory standards. The plan should incorporate basic planning principles including:

■ scheduling grading and construction to reduce soil exposure;

■ retaining existing vegetation whenever feasible;

■ revegetating or mulching denuded areas;

■ directing runoff away from denuded areas;

■ reducing the length and steepness of slopes with exposed soils;

■ decreasing runoff velocities;

■ preparing drainage ways and outlets to handle concentrated or increased runoff;

■ confining sediment to the project site; and

■ inspecting and maintaining control measures frequently.

In addition, we recommend that slope surfaces in exposed or disturbed soil be restored so that surface runoff does not become channeled. Some sloughing and raveling of slopes with exposed or disturbed soil should be expected.

Temporary erosion protection should be used and maintained in areas with exposed or disturbed soils to help reduce erosion and reduce transport of sediment to adjacent areas and receiving waters. Permanent erosion protection should be provided by re-establishing vegetation using hydroseeding or landscape planting.

Temporary Cut Slopes

Temporary shallow cut slopes may be utilized around the site during construction. We recommend that temporary cut slopes be inclined no steeper than 1½H:1V. Flatter slopes may be necessary if seepage is present on the cut face or if localized sloughing occurs. The above cut slope recommendation applies to fully dewatered conditions and is not appropriate for deep excavations in the spiral ramp area. If excavations are required in the spiral ramp area, we should be contacted for site specific shoring or appropriate excavation configurations. In other areas, additional recommendations for open cuts include:

■ no traffic, construction equipment, stockpiles or building supplies be allowed at the top of the cut slopes within a distance of at least 10 feet from the top of the cut;

■ exposed soil along the slope be protected from surface erosion during periods of wet weather using waterproof tarps, visqueen or flashcoating with shotcrete;

■ construction activities be scheduled so that the length of time the temporary cut is left open is reduced to the extent practical;

 

 

 

Page 19: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 15 File No. 0231-090-00

■ erosion control measures be implemented as appropriate such that runoff from the site is reduced to the extent practical;

■ surface water is diverted away from the excavation; and

■ the general condition of the slopes be observed periodically by a geotechnical engineer to confirm adequate stability.

Since the contractor has control of the construction operations, the contractor should be made responsible for the stability of cut slopes, as well as the safety of the excavations.

Construction Vibrations and Pre-Construction Surveys of Adjacent Buildings

We recommend that a detailed pre-construction condition damage survey of nearby structures be completed to document structural and cosmetic building conditions. This should include photographs, videotaping and other means to establish existing conditions and actual vibration induced damages. We also recommend taking base line vibration measurements prior to any construction or rerouting of traffic to determine what average vibrations typical traffic patterns, including rail road traffic, create in the project area.

Survey reference points should be established on nearby buildings and surveys should be completed before and during construction to determine if any settlement of the structures has occurred. We also recommend performing vibration monitoring at or immediately outside these buildings to document actual vibrations experienced during the work.

Addition details regarding vibration monitoring and pre-construction surveys will be provided during final design.

RECOMMENDATIONS FOR FUTURE SERVICES

Throughout this report we have made recommendations for additional field explorations, analyses, and recommendations that should be completed in support of the final design. Generally, these items are listed below:

■ Drill final geotechnical borings for the drilled shaft bridge foundation locations. AASHTO and the GDM require that borings be located at each foundation element and that they extend at least 20 feet beneath the final shaft tip.

■ Provide drilled shaft axial and lateral capacity charts that are developed for each foundation element based on the new and existing boring and laboratory information.

■ Prepare lateral earth pressure diagrams for site walls, and provide wall design parameters for the approach ramps.

■ Prepare supporting information and requirements for the development of a plan to monitor vibrations during construction. This includes setting peak particle velocity thresholds for various existing features in the project vicinity.

 

 

 

Page 20: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 16 File No. 0231-090-00

■ Perform additional evaluations in association with the proposed geotechnical borings in order to further evaluate the potential for green stormwater infiltration potential and to support final design of such elements if necessary.

LIMITATIONS

We have prepared this report for the exclusive use of the City of Kirkland, COWI North America, Inc., and their authorized agents in the preliminary design of the Totem Lake Connector project in Kirkland, Washington. The data and report should be provided to prospective contractors for their bidding or estimating purposes, but our report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions.

Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of geotechnical engineering in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood.

Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record.

Please refer to Appendix D titled “Report Limitations and Guidelines for Use” for additional information pertaining to use of this report.

REFERENCES

American Association of State Highway and Transportation Officials, 2014, “LFRD Bridge Design Specifications, 7th Edition.” 2016 Interim Revisions.

Converse Consultants NW, 1988, “Report of Geotechnical Exploration, Redmond Connection Project, King County, Washington.”

Minard, J.P. 1983. Geologic Map of the Kirkland Quadrangle, Washington. U. S. Geological Survey Miscellaneous Field Studies Map MF-1543.

Troost, Kathy Goetz; Booth, Derek, et al, 2005, The Geologic Map of Seattle – A Progress Report. United States Geological Survey, Open File Report 2005-1252.

Tokimatsu K., Seed H.B., 1987. “Evaluation of Settlements in Sands Due to Earthquake Shaking,” Journal of Geotechnical Engineering, 1987, vol. 113, pp. 861-878.

United States Geological Survey. 2008. 2008 Interactive Deaggregations, U.S. Geological Survey Earthquake Hazards Program, at http://geohazards.usgs.gov/deaggint/2008/

Washington State Department of Natural Resources. Subsurface Geology Information System Mapping Application, at https://fortress.wa.gov/dnr/protectiongis/geology/?Theme=subsurf

Washington State Department of Transportation, Geotechnical Design Manual, M 46-03.11, May 2015.

 

 

 

Page 21: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page 17 File No. 0231-090-00

Washington State Department of Transportation, Standard Specifications for Road, Bridge and Municipal Construction, 2016.

Wiss, J. F., February 1981, “Construction Vibrations: State-of-the-Art”, Journal of the Geotechnical Engineering Division, Vol. 107, No. 2, pp. 167–181.

Youd, T. L. and Idriss, I. M. 2001. “Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils,” Journal of Geotechnical and Geoenvironmental Engineering, Vol. 127, No. 4, April 2001, pp. 298-313.

 

 

 

Page 22: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

Preliminary LPILE Parameters

Totem Lake Connector

Kirkland, Washington

Top of Soil

Layer

Bottom of

Soil Layer

0 5 5 SM Fill Sand (Reese) 120 120 30 20 - - -

5 12 7 SP-SM Sand (Reese) 115 53 28 10 - - 0.05

12 26 14 SP-SM/SM Sand (Reese) 120 58 32 40 - - 0.30

26 53 27 ML/CL Stiff Clay 115 53 - - 2000 0.005 0.80

53 80 27 SP Sand (Reese) 120 58 40 125 - - -

0 13 13 SM Fill Sand (Reese) 120 120 30 50 - - -

13 23 10 GC Sand (Reese) 120 58 35 80 - - 0.50

23 28 5 ML/SM Sand (Reese) 115 53 30 35 0.30

28 33 5 GM Sand (Reese) 120 58 36 90 - - -

33 38 5 CL Stiff Clay 115 53 - - 1000 0.007 0.70

38 43 5 GC Sand (Reese) 120 58 36 90 - - -

43 53 10 ML Stiff Clay 115 53 - - 2000 0.005 0.80

53 80 27 GC/SM Sand (Reese) 120 58 40 150 - - -

Table 7

B-4

p-Multiplier

(For

Liquefaction)

B-1

Total Unit

Weight (pcf)

Effective

Unit Weight

(pcf)

Friction

Angle

(degrees)

Modulus of

Subgrade

Reaction

(pci)

Cohesion

(psf)

Strain at

50% Max

StressLocation

Approximate Depth Below

Ground Surface (feet) Layer

Thickness

(feet) Soil Type Soil Model

File No. 0129-149-00 Table 7 Page 1 of 1

 

 

 

Page 23: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

µ

SITE

Vicinity Map

Figure 1

Totem Lake Pedestrian BridgeKirkland, Washington

2,000 2,0000

Feet

Data Source: Mapbox Open Street Map, 2016

Notes:1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intended to

assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and contentof electronic files. The master file is stored by GeoEngineers,Inc. and will serve as the official record of this communication.

Projection: NAD 1983 UTM Zone 10N

P:\0\

0231

090\

GIS\

MXD\

0023

1090

00_T

0300

_F01

_Vici

nityM

ap.m

xd D

ate Ex

porte

d: 02

/08/

17 b

y gloh

rmey

er 

 

 

Page 24: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

X

22"18"18"

12"

22"

14"8"

6"

16"

6"

12"

10"22"

28"18"

24"

40" CLUSTER

15"

15"

12"

20"

42"

10"15"

6"SPLIT 6" & 3"

12"12" 8"

9"

12"

10"

7"

10"

8"8"

8" 8"SPLIT 12" & 8"

8"

SPLIT 8" & 8"

14"

SPLIT 30" & 30"6"

8" DEAD

SPLIT 30" & 14"14"

6"12" CLUSTER

24" DEADCLUSTER 1-16"/2-3"

12"

8"8" DEAD12"8" DEAD

12" CLUSTER

10"16"

6"

6"

20"8" DEAD

10" DEAD

10" CLUSTER

22" DEAD

8"

10" DEAD16" CLUSTER

6" DEAD6"30"

"A4"

"A5""A6"

"A7"

"A3" "A2""A1"

6"

SPLI T 2-24"

26"

6"

SPLI T 10"/12"

6"30"

8"20"8"

8"

6"

30"

30"

16" DEAD

10"

20"

10"6" DEAD

10" DEAD14" DEAD

20"

12" DEAD28" DEAD

12"6"

26" DEAD14" CLUSTER

14" CLUSTER

12"

6"30" CLUSTER

13"

12"

13" DEAD

8"

10" DEAD

8" DEAD

8"

10" DEAD

6" DEAD

8"

8"

8"

ICV

E

12"

6"

6"

6"

12"

SPLIT 20"/28"

14"8"

SD

20"

20" 24"

16"

CLUMP

CLUMP

24" DEAD

SSSS

UGE

F0

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

F0

F0

F0

F0

F0

UGE

UGE

UGE

UGE

UGE

SS

SS

SS

SS

SS

SSBH-7

BH-6

BH-5

BH-4

BH-1BH-2

BH-3

SS

SS

SS

SSSS

OHE

OHE

OHE OH

EOH

EOH

EOH

E

157

155

151

15015015516

0

162

150

157148

149

147

150

151

152

150148

147

145 147

146

145

142

144

145

169

166

165

160

155

150

146

142

145

144

145

146

144

135

140

143

130

125

135

140

135

125

123

140

142

138

134

136

137

131

130

130

135

140

139

138

135

135

132

135

JB

JB

TCTEL

T

JB

JB

JB

WM

WMWM ICB

WM

WMWM

JBJBJB

TTT

JB

JB

TC

WMWM

W

JB

JB

5.0%3.7%

NE 124th Street

Totem Lake Blvd NE

B-1B-3

B-5

B-6

B-7

B-2

B-4

B-87

B-89

B-93

Proposed Alignment (Ring-Girder)

Existing Right-Of-Way

Figure 2

Totem Lake Pedestrian BridgeKirkland, Washington

Site Plan

W E

N

S

P:\0

\023

1090

\CAD

\00\

Geo

tech

\023

1090

00_T

0300

_F02

_Site

Pla

n.dw

g TA

B:F0

2 D

ate

Expo

rted:

05/

22/1

7 - 1

3:56

by

kcoo

k

Feet

0100 100

Notes:1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intended to assist in

showing features discussed in an attached document. GeoEngineers,Inc. cannot guarantee the accuracy and content of electronic files. Themaster file is stored by GeoEngineers, Inc. and will serve as the officialrecord of this communication.

Data Source: Background from COWI North America, Inc. dated 02/22/17.

Vertical Datum: MLLW (NAVD 88).

Projection: NAD83 (HARN) Washington State Planes, North Zone, US Foot.

LegendBoring by GeoEngineers, 2017 (Current Study)

Boring with Monitoring Well by GeoEngineers, 2017(Current Study)

Boring by Converse Consultants NW, 1987

B-1

B-2

B-87

 

 

 

Page 25: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

Axial Resistance Plots

4-ft Diameter, Eastern Pier (B-1)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 40 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 128.5 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 3

Totem Lake Pedestrain Bridge Kirkland, Washington

SM (Fill)

SP-SM

SP-SM

SM

ML

CL

SP

SP

SP-SM

SP57

67

77

87

97

107

117

127

Elev

atio

n (

ft)

Subsurface Profile

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 500 1,000 1,500 2,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

Side Resistance - 1.inEnd Bearing - 1.inTotal Resistance - 1.inSide Resistance - 2.inEnd Bearing - 2.inTotal Resistance - 2.in

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 500 1000 1500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

Side Resistance

End Bearing

Total Resistance

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 500 1,000 1,500 2,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 26: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

Axial Resistance Plots

5-ft Diameter, Eastern Pier (B-1)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 50 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 128.5 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 4

SM (Fill)

SP-SM

SP-SM

SM

ML

CL

SP

SP

SP-SM

SP57

67

77

87

97

107

117

127

Elev

atio

n (

ft)

Subsurface Profile

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 500 1,000 1,500 2,000 2,500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

Side Resistance - 1.inEnd Bearing - 1.inTotal Resistance - 1.inSide Resistance - 2.inEnd Bearing - 2.inTotal Resistance - 2.in

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 500 1000 1500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

Side Resistance

End Bearing

Total Resistance

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 1,000 2,000 3,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 27: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

Axial Resistance Plots

6-ft Diameter, Eastern Pier (B-1)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 60 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 128.5 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 5

SM (Fill)

SP-SM

SP-SM

SM

ML

CL

SP

SP

SP-SM

SP57

67

77

87

97

107

117

127

Elev

atio

n (

ft)

Subsurface Profile

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 1,000 2,000 3,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

Side Resistance - 1.inEnd Bearing - 1.inTotal Resistance - 1.inSide Resistance - 2.inEnd Bearing - 2.inTotal Resistance - 2.in

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 500 1000 1500 2000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

Side Resistance

End Bearing

Total Resistance

57.5

67.5

77.5

87.5

97.5

107.5

117.5

127.5

0 1,000 2,000 3,000 4,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 28: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 144.8 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 6

Axial Resistance Plots

4-ft Diameter, Central Pier (B-4)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 317 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

SM

GC

ML

GM

CL

GC

ML

GC

SM

78

88

98

108

118

128

138

Elev

atio

n (

ft)

Subsurface Profile

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 500 1,000 1,500 2,000 2,500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

Side Resistance - 1.inEnd Bearing - 1.inTotal Resistance - 1.inSide Resistance - 2.inEnd Bearing - 2.inTotal Resistance - 2.in

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 500 1000 1500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

Side Resistance

End Bearing

Total Resistance

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 500 1,000 1,500 2,000 2,500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 29: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 144.8 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 7

Axial Resistance Plots

5-ft Diameter, Central Pier (B-4)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 396 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

SM

GC

ML

GM

CL

GC

ML

GC

SM

78

88

98

108

118

128

138

Elev

atio

n (

ft)

Subsurface Profile

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 1,000 2,000 3,000 4,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

Side Resistance - 1.inEnd Bearing - 1.inTotal Resistance - 1.inSide Resistance - 2.inEnd Bearing - 2.inTotal Resistance - 2.in

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 500 1000 1500 2000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

Side Resistance

End Bearing

Total Resistance

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 1,000 2,000 3,000 4,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 30: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

Axial Resistance Plots

6-ft Diameter, Central Pier (B-4)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 475 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 144.8 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 8

SM

GC

ML

GM

CL

GC

ML

GC

SM

78

88

98

108

118

128

138

Elev

atio

n (

ft)

Subsurface Profile

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 1,000 2,000 3,000 4,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

Side Resistance - 1.inEnd Bearing - 1.inTotal Resistance - 1.inSide Resistance - 2.inEnd Bearing - 2.inTotal Resistance - 2.in

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 500 1000 1500 2000 2500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

Side Resistance

End Bearing

Total Resistance

78.8

88.8

98.8

108.8

118.8

128.8

138.8

0 1,000 2,000 3,000 4,000 5,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 31: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 146.7 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 9

Axial Resistance Plots

4-ft Diameter, Western Pier (B-5)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 0 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

SM

CL

ML

SC

ML

CL

CL

115

120

125

130

135

140

145

Elev

atio

n (

ft)

Subsurface Profile

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 200 400 600 800 1,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

SideResistance -1.inEndBearing -1.inTotalResistance -1.inSideResistance -2.inEndBearing -2.inTotalResistance -2.in

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 100 200 300 400 500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

SideResistance

End Bearing

TotalResistance

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 200 400 600 800 1,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 32: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 146.7 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 10

Axial Resistance Plots

5-ft Diameter, Western Pier (B-5)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 0 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

SM

CL

ML

SC

ML

CL

CL

115

120

125

130

135

140

145

Elev

atio

n (

ft)

Subsurface Profile

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 500 1,000 1,500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

SideResistance -1.inEndBearing -1.inTotalResistance -1.inSideResistance -2.inEndBearing -2.inTotalResistance -2.in

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 200 400 600

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

SideResistance

End Bearing

TotalResistance

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 500 1,000 1,500

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 33: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

1.2.

3.4.5.

Side Uplift End Comp. Uplift

6. Sand 0.55 0.45 0.5Clay 0.45 0.35 0.4

Rock 0.55 0.4 0.5

General Notes

The plots are based on a single shaft and do not consider group effects of closely spaced shafts.

The axial resistance plots assume a top of shaft Elevation of 146.7 feet and permanent steel casing to a depth of 8 below the ground surface. The geotechnical engineer should re-evaluate axial shaft resistance if permanent steel casing length or top of shaft Elevation changes.

1

Strength

Soil Type Service

Extreme

Resistance Factors

10.8

Axial shaft resistance was developed in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual and the 2015 WSDOT Geotechnical Design Manual (GDM).

Figure 11

Axial Resistance Plots

6-ft Diameter, Western Pier (B-5)

The service case assumes 1-inch and 2-inch of shaft settlement.

The plots include resistance factors shown on the adjacent table for Strength, Extreme, and Service Limit States. Resistance factors for Strength Limit State do not include a 20 percent reduction for non-redundant shafts.

Unfactored downdrag load for the Extreme Limit State is estimated to be 0 kips. A load factor of 1.0 is recommended to be applied with post-earthquake loading conditions in accordance with the 2014-2015 AASHTO LRFD Bridge Design Manual.

SM

CL

ML

SC

ML

CL

CL

115

120

125

130

135

140

145

Elev

atio

n (

ft)

Subsurface Profile

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 500 1,000 1,500 2,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Service Limit State

SideResistance -1.inEndBearing -1.inTotalResistance -1.inSideResistance -2.inEndBearing -2.inTotalResistance -2.in

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 200 400 600 800 1000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Strength Limit State

SideResistance

End Bearing

TotalResistance

115.7

120.7

125.7

130.7

135.7

140.7

145.7

0 500 1,000 1,500 2,000

Elev

atio

n (

ft)

Factored Axial Resistance (kips)

Extreme Limit State

Side Resistance

End Bearing

Total Resistance

Totem Lake Pedestrain Bridge Kirkland, Washington

0231

-090

-00

Exp

orte

d on

7/1

4/17

 

 

 

Page 34: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

APPENDIX A Field Explorations

 

 

 

Page 35: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page A-1 File N0. 0231-090-00

APPENDIX A FIELD EXPLORATIONS

We evaluated subsurface soil and groundwater conditions along the Totem Lake Connector project alignment by drilling seven borings (B-1 through B-7) at the approximate locations shown on the Site Plan, Figure 2.

Geologic Drill Exploration, Inc. completed the drilling on January 30 through February 2, 2017 under subcontract to GeoEngineers. The borings were drilled to depths ranging from about 21½ to 71½ feet below the existing ground surface.

Exploration locations, ground surface elevations and monitoring well elevations were surveyed by 1 Alliance Geomatics following drilling. Exploration locations and elevations should be considered accurate to the degree implied by the methods used.

The explorations were continuously observed by a geotechnical engineer who evaluated and classified the soils encountered, obtained representative soil samples, and observed groundwater conditions. Our representative maintained a detailed log of each exploration.

Disturbed samples of the representative soil types were obtained from the borings using standard penetration test (SPT) sampling procedures. SPT sampling was performed using a 2-inch outside diameter split-spoon sampler driven with a standard 140-pound hammer in accordance with ASTM D 1586. The soils encountered in the borings were typically sampled at 2½- to 5-foot vertical intervals with the SPT split spoon sampler.

Samples were obtained by driving the sampler into the soil with the hammer free-falling 30 inches. The number of blows required to drive the sampler the for each 6 inches of penetration was recorded. The blow count (“N-value”) of the soil was calculated as the number of blows required for the final 12 inches of penetration. Where very dense or hard soils conditions precluded driving the full 18 inches, the number of blows for the partial penetration was noted on the logs.

Soils encountered in the borings were visually classified in the field using ASTM D 2488, which is summarized in Figure A-1. Logs of the borings are provided in Figures A-2 through A-8.

The logs reflect our interpretation of the field conditions and the results of geotechnical laboratory evaluation and testing of samples. They also indicate the depths at which the soil types or their characteristics change, although the change may be gradual. If the change occurred between samples, it was interpreted. The densities noted on the boring logs are inferred from the blow count data and judgment based on the conditions encountered.

The soil samples were logged, sealed in plastic bags and transported to our Redmond geotechnical laboratory. Field soil classifications were further evaluated in our laboratory.

Observations of groundwater conditions were made during drilling and are included on the boring logs. These observations represent a short-term condition and may or may not be representative of the long-term groundwater conditions at the site. Groundwater conditions observed during drilling should be considered approximate.

 

 

 

Page 36: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page A-2 File No. 0231-090-00

Monitoring wells (2-inch diameter) were installed in borings B-2 and B-4 to allow measurement of groundwater levels following drilling. We measured groundwater levels in the wells on February 16, 2017. The groundwater level measurements are indicated on the boring logs.

The monitoring wells are the property of the City of Kirkland. The wells should be decommissioned by a licensed well driller in accordance with Chapter 173-160 of the Washington Administrative Code (WAC) when they are no longer needed for data collection. Alternatively, the wells could be kept intact for use during project bidding and then be decommissioned under the construction contract.

Soil cuttings generated from drilling were transported for eventual disposal at an off-site facility.

 

 

 

Page 37: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

Measured groundwater level in exploration,well, or piezometer

Measured free product in well or piezometer

Distinct contact between soil strata

Approximate contact between soil strata

Contact between geologic units

SYMBOLS TYPICALDESCRIPTIONS

GW

GP

SW

SP

SM

FINEGRAINED

SOILS

SILTS ANDCLAYS

NOTE: Multiple symbols are used to indicate borderline or dual soil classifications

MORE THAN 50%RETAINED ONNO. 200 SIEVE

MORE THAN 50%PASSING

NO. 200 SIEVE

GRAVELAND

GRAVELLYSOILS

SC

LIQUID LIMITLESS THAN 50

(APPRECIABLE AMOUNTOF FINES)

(APPRECIABLE AMOUNTOF FINES)

COARSEGRAINED

SOILS

MAJOR DIVISIONSGRAPH LETTER

GM

GC

ML

CL

OL

SILTS ANDCLAYS

SANDS WITHFINES

SANDAND

SANDYSOILS

MH

CH

OH

PT

(LITTLE OR NO FINES)

CLEAN SANDS

GRAVELS WITHFINES

CLEAN GRAVELS

(LITTLE OR NO FINES)

WELL-GRADED GRAVELS, GRAVEL -SAND MIXTURES

CLAYEY GRAVELS, GRAVEL - SAND -CLAY MIXTURES

WELL-GRADED SANDS, GRAVELLYSANDS

POORLY-GRADED SANDS, GRAVELLYSAND

SILTY SANDS, SAND - SILT MIXTURES

CLAYEY SANDS, SAND - CLAYMIXTURES

INORGANIC SILTS, ROCK FLOUR,CLAYEY SILTS WITH SLIGHTPLASTICITY

INORGANIC CLAYS OF LOW TOMEDIUM PLASTICITY, GRAVELLYCLAYS, SANDY CLAYS, SILTY CLAYS,LEAN CLAYS

ORGANIC SILTS AND ORGANIC SILTYCLAYS OF LOW PLASTICITY

INORGANIC SILTS, MICACEOUS ORDIATOMACEOUS SILTY SOILS

INORGANIC CLAYS OF HIGHPLASTICITY

ORGANIC CLAYS AND SILTS OFMEDIUM TO HIGH PLASTICITY

PEAT, HUMUS, SWAMP SOILS WITHHIGH ORGANIC CONTENTSHIGHLY ORGANIC SOILS

SOIL CLASSIFICATION CHART

MORE THAN 50%OF COARSE

FRACTION RETAINEDON NO. 4 SIEVE

MORE THAN 50%OF COARSE

FRACTION PASSINGON NO. 4 SIEVE

SILTY GRAVELS, GRAVEL - SAND -SILT MIXTURES

POORLY-GRADED GRAVELS,GRAVEL - SAND MIXTURES

LIQUID LIMIT GREATERTHAN 50

Figure A-1

Continuous Coring

Bulk or grab

Direct-Push

Piston

Shelby tube

Standard Penetration Test (SPT)

2.4-inch I.D. split barrel

Contact between soil of the same geologicunit

Material Description Contact

Graphic Log Contact

NOTE: The reader must refer to the discussion in the report text and the logs of explorations for a proper understanding of subsurface conditions.Descriptions on the logs apply only at the specific exploration locations and at the time the explorations were made; they are not warranted to berepresentative of subsurface conditions at other locations or times.

Groundwater Contact

Key to Exploration Logs

Sampler Symbol Descriptions

ADDITIONAL MATERIAL SYMBOLS

NSSSMSHS

No Visible SheenSlight SheenModerate SheenHeavy Sheen

Sheen Classification

SYMBOLS

Asphalt Concrete

Cement Concrete

Crushed Rock/Quarry Spalls

Topsoil

GRAPH LETTER

AC

CC

SOD Sod/Forest Duff

CR

DESCRIPTIONSTYPICAL

TS

Laboratory / Field Tests%F%GALCACPCSDDDSHAMCMDMohsOCPMPIPPSATXUCVS

Percent finesPercent gravelAtterberg limitsChemical analysisLaboratory compaction testConsolidation testDry densityDirect shearHydrometer analysisMoisture contentMoisture contentMohs hardness scaleOrganic contentPermeability or hydraulic conductivityPlasticity indexPocket penetrometerSieve analysisTriaxial compressionUnconfined compressionVane shear

Blowcount is recorded for driven samplers as the number ofblows required to advance sampler 12 inches (or distance noted).See exploration log for hammer weight and drop.

"P" indicates sampler pushed using the weight of the drill rig.

"WOH" indicates sampler pushed using the weight of thehammer.

Rev 02/2017

 

 

 

Page 38: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

7

24

25

20

Added drilling mud to borehole

Driller noted gravel at 22 feet

Driller noted easier drilling at 27 feet

1

2MC

3

4SA

5

6MC

7

8

TS

SM

SP-SM

SM

ML

CL

6 inches topsoilBrown silty fine to medium sand with gravel and

organic matter (loose, wet) (fill?)

Grayish brown fine to medium sand with silt (very looseto medium dense, wet)

Grades to with occasional gravel

Grayish brown silty fine to coarse sand with gravel(dense, wet)

Brown silt with sand (very stiff to hard, wet)

Orange-brown lean clay with sand and gravel (hard,wet)

10

8

8

8

7

10

18

18

7

2

P

P

9

18

43

27

Notes:

1/30/2017 1/30/2017 71.5EF

HRP Geologic Drill Exploration, Inc. Hollow-stem Auger

D-50 Track RigDrillingEquipment

Automatic140 (lbs) / 30 (in) Drop

WA State Plane NorthNAD83 (feet)

1309793261723.8

128.51NAVD88

Easting (X)Northing (Y)

Surface Elevation (ft)Vertical Datum

DrilledStart End Total

Depth (ft)Logged ByChecked By

HammerData

SystemDatum

Driller DrillingMethod

Groundwater observed at 6 feet at time ofexploration

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Sheet 1 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-1Totem Lake Pedestrian Bridge

Figure A-2

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKS

Elev

atio

n (f

eet)

125

120

115

110

105

100

95

Dep

th (f

eet)

0

5

10

15

20

25

30

35

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 39: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

4

24

26

15

AL (LL = 33; PI = 10)

Auger refusal at 42½ feet; moved 3 feet to thenorth and drilled to 45 feet

1 foot of heave

9AL

10

11MC

12

13SA

14

15

16

CL

SP

SP-SM

SP

Gray lean clay with sand, gravel and cobbles (very stiffto hard, wet)

Gray fine to coarse sand with gravel and cobbles(dense to very dense, wet)

Gray fine sand with silt and gravel (very dense, wet)

Gray fine to medium sand with gravel (very dense, wet)

12

10

18

18

12

10

12

10

41

31

48

21

39

86/11"

60

70

Sheet 2 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-1 (continued)Totem Lake Pedestrian Bridge

Figure A-2

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKSEl

evat

ion

(fee

t)

90

85

80

75

70

65

60

Dep

th (f

eet)

35

40

45

50

55

60

65

70

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 40: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

8

10

12

10

10

10

12

6

5

5

4

13

8

13

8

23

1MC

2

1

4%F

5

6

7MC

8

SP-SM

SP-SM

SP

SM/ML

GM

Brown fine to medium sand with occasional gravel(loose, wet)

Brown fine to medium sand with silt (mediumdense, wet)

Brown fine to medium sand with occasional gravel(loose to medium dense, wet)

(1 foot of heave, added drilling mud to borehole)

Gray silty fine to coarse sand and brown silt withsand, gravel and organic matter (loose/mediumstiff, wet)

(Driller noted gravel at 23 feet)

Orange-brown silty fine to coarse gravel with sandand cobbles (medium dense, wet)

20

26

25

9

2.0

7.0

10.0

20.020.321.0

Concrete surfaceseal

3/8-inch bentoniteseal

2-inch Schedule 40PVC well casing

Colorado silica sandbackfill

2-inch Schedule 40PVC screen,0.020-inch slotwidth

2-inch Schedule 40PVC end cap

StartDrilled 1/31/2017

HammerData

Date MeasuredHorizontalDatum

Vertical Datum

DOE Well I.D.: BIK 733A 2 (in) well was installed on 1/31/2017 to a depth of 20(ft).

2/16/2017Easting (X)Northing (Y)

DrillingEquipment

Top of CasingElevation (ft) 129.69

Groundwater seepage encountered at 6½ feet during drilling.

D-50 Track Rig

Elevation (ft)

Groundwater Depth toWater (ft)

Notes:

Surface Elevation (ft)

Automatic140 (lbs) / 30 (in) Drop

126.58

129.92NAVD88

1309863261727.9

WA State Plane NorthNAD83 (feet) 3.34

Logged ByHRP

DrillingMethod1/31/2017

EndChecked By Driller

EFTotalDepth (ft) Hollow-stem Auger

Geologic Drill Exploration,Inc.71

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Steel surfacemonument

Elev

atio

n (f

eet)

125

120

115

110

105

100

95

Dep

th (f

eet)

0

5

10

15

20

25

30

35

Inte

rval

Wat

er L

evel

Gra

phic

Log

FIELD DATA

Rec

over

ed (

in)

Blo

ws/

foot

Col

lect

ed S

ampl

e

Sam

ple

Nam

eT

estin

g

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Moi

stur

eC

onte

nt (%

)

Fine

sC

onte

nt (%

)

WELL LOG

Sheet 1 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring with Monitoring Well B-2Totem Lake Pedestrian Bridge

Figure A-3

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_W

ELL_

%F

 

 

 

Page 41: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

18

10

18

12

18

12

11

10

19

22

24

32

88/11"

50/6"

50/5"

50/4"

9AL

10

11

12MC

13MC

14

15

16

ML

GM

ML

GM

SP

Orange-brown silt with sand and gravel (very stiff,wet)

(AL [LL = 30; PI = 7])(Driller noted easier drilling at 36½ feet)

Orange-brown silty fine to coarse gravel with sandand cobbles (medium dense, wet)

Gray silt with sand and occasional gravel (very stiff,wet)

Gray silty fine to coarse gravel with sand andcobbles (dense, wet)

(Driller noted cobbles at 46 feet)

Gray fine to medium sand with gravel (very dense,wet)

(Driller noted easier drilling at 54 feet)

(1-foot heave)

Monitoring well installed in separate boring drilled5 feet to the southwest.

22

15

12

71.0

3/8-inch bentoniteseal

Elev

atio

n (f

eet)

90

85

80

75

70

65

60

Dep

th (f

eet)

35

40

45

50

55

60

65

70

Inte

rval

Wat

er L

evel

Gra

phic

Log

FIELD DATA

Rec

over

ed (

in)

Blo

ws/

foot

Col

lect

ed S

ampl

e

Sam

ple

Nam

eT

estin

g

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Moi

stur

eC

onte

nt (%

)

Fine

sC

onte

nt (%

)

WELL LOG

Sheet 2 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring with Monitoring Well B-2 (continued)Totem Lake Pedestrian Bridge

Figure A-3

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_W

ELL_

%F

 

 

 

Page 42: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

15

9

16

26

16

Added drilling mud to borehole

1MC

2

3%F

4

5MC

6

7

8MC

GP

SP-SM

SM

SM

SP-SM

SM

Gray fine gravel with sand (medium dense, moist) (fill)Gray fine to medium sand with silt and gravel (loose,

moist) (fill)

Grayish brown silty fine to medium sand with gravel(medium dense, moist) (fill)

Reddish brown silty fine to medium sand withoccasional gravel (very loose to loose, moist) (fill)

Grades to orange-brown

Brown fine to medium sand with silt (loose to mediumdense, wet)

Brown silty fine to medium sand with gravel (mediumdense to dense, wet)

4

10

12

10

12

13

10

8

8

11

3

2

5

10

12

24

Notes:

1/30/2017 1/30/2017 61.5EF

HRP Geologic Drill Exploration, Inc. Hollow-stem Auger

D-50 Track RigDrillingEquipment

Automatic140 (lbs) / 30 (in) Drop

WA State Plane NorthNAD83 (feet)

1309919261714.2

140.99NAVD88

Easting (X)Northing (Y)

Surface Elevation (ft)Vertical Datum

DrilledStart End Total

Depth (ft)Logged ByChecked By

HammerData

SystemDatum

Driller DrillingMethod

Groundwater observed at 17½ feet at time ofexploration

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Sheet 1 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-3Totem Lake Pedestrian Bridge

Figure A-4

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKS

Elev

atio

n (f

eet)

140

135

130

125

120

115

110

Dep

th (f

eet)

0

5

10

15

20

25

30

35

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 43: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

18

18

9

10MC

11MC

12

13

14

ML

CL

SC

GM

Brown and gray sandy silt with gravel (hard, wet)

Brownish gray sandy clay with gravel (stiff to very stiff,wet)

Orange-brown clayey fine to coarse sand with gravel(medium dense, wet)

Orange-brown silty fine to coarse gravel with sand andcobbles (medium dense to dense, wet)

18

10

10

10

12

10

41

16

22

25

28

47

Sheet 2 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-3 (continued)Totem Lake Pedestrian Bridge

Figure A-4

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKSEl

evat

ion

(fee

t)

105

100

95

90

85

80

Dep

th (f

eet)

35

40

45

50

55

60

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 44: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

14

12

12

10

8

5

18

10

10

6

5

12

14

40

13

32

1MC

2

3%F

4

5MC

6

7AL

8

TS

SM

SM

GC

ML

GM

CL

6 inches topsoilBrown silty fine to medium sand with gravel and

cobbles (loose to medium dense, moist) (fill)

Reddish brown silty fine to medium sand (loose tomedium dense, moist)

Brown clayey fine to coarse gravel with sand andcobbles (medium dense to dense, wet)

(Added drilling mud to borehole)

Brown silt with sand and occasional gravel (stiff,wet)

(AL [LL = 47; PI = 16])

Brown silty fine to coarse gravel with sand andcobbles (dense, wet)

(Driller noted cobbles at 32 feet)

Gray clay with sand (stiff, wet)

15

15

11

30

16

2.0

13.0

15.0

25.025.326.0

Concrete surfaceseal

3/8-inch bentoniteseal

2-inch Schedule 40PVC well casing

Colorado silica sandbackfill

2-inch Schedule 40PVC screen,0.020-inch slotwidth

2-inch Schedule 40PVC end cap

StartDrilled 2/1/2017

HammerData

Date MeasuredHorizontalDatum

Vertical Datum

DOE Well I.D.: BIK 734A 2 (in) well was installed on 2/1/2017 to a depth of 25(ft).

2/16/2017Easting (X)Northing (Y)

DrillingEquipment

Top of CasingElevation (ft) 144.61

Groundwater seepage encountered at 18 feet during drilling.

D-50 Track Rig

Elevation (ft)

Groundwater Depth toWater (ft)

Notes:

Surface Elevation (ft)

Automatic140 (lbs) / 30 (in) Drop

130.51

144.48NAVD88

1309737261545.1

WA State Plane NorthNAD83 (feet) 13.97

Logged ByHRP

DrillingMethod2/1/2017

EndChecked By Driller

EFTotalDepth (ft) Hollow-stem Auger

Geologic Drill Exploration,Inc.66.5

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Steel surfacemonument

Elev

atio

n (f

eet)

140

135

130

125

120

115

110

Dep

th (f

eet)

0

5

10

15

20

25

30

35

Inte

rval

Wat

er L

evel

Gra

phic

Log

FIELD DATA

Rec

over

ed (

in)

Blo

ws/

foot

Col

lect

ed S

ampl

e

Sam

ple

Nam

eT

estin

g

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Moi

stur

eC

onte

nt (%

)

Fine

sC

onte

nt (%

)

WELL LOG

Sheet 1 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring with Monitoring Well B-4Totem Lake Pedestrian Bridge

Figure A-5

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_W

ELL_

%F

 

 

 

Page 45: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

18

10

18

6

10

18

10

11

35

19

27

50/6"

95

85/11"

9MC

10MC

11

12

13MC

14

15

GC

ML

GC

SM

Brown clayey fine to coarse gravel with sand andcobbles (dense, wet)

Gray silt with sand (very stiff, wet)

Brown clayey fine to coarse gravel with sand andcobbles (very dense, wet)

Gray silty fine sand with gravel (very dense, wet)

Monitoring well installed in separate boring drilled5 feet to the south.

26

19

9

66.5

3/8-inch bentoniteseal

Elev

atio

n (f

eet)

105

100

95

90

85

80

Dep

th (f

eet)

35

40

45

50

55

60

65

Inte

rval

Wat

er L

evel

Gra

phic

Log

FIELD DATA

Rec

over

ed (

in)

Blo

ws/

foot

Col

lect

ed S

ampl

e

Sam

ple

Nam

eT

estin

g

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Moi

stur

eC

onte

nt (%

)

Fine

sC

onte

nt (%

)

WELL LOG

Sheet 2 of 2Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring with Monitoring Well B-4 (continued)Totem Lake Pedestrian Bridge

Figure A-5

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_W

ELL_

%F

 

 

 

Page 46: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

15

25

26

16

19

AL (LL = 45; PI = 14)

Driller noted gravel at 27 feet

1MC

2

3MC

4AL

5MC

6

7

8MC

GP

SM

CL

ML

SC

ML

CL

CL

Gray fine gravel with sand (medium dense, moist) (fill)Brown silty fine to medium sand (medium dense,

moist)

Light gray lean clay with sand (stiff, moist)

Light brown silt with sand and occasional gravel (verystiff, wet)

Brown clayey fine to coarse sand with gravel (dense,wet)

Gray sandy silt (very stiff, wet)

Gray clay with sand and occasional gravel (stiff, wet)

Gray sandy clay with gravel (hard, wet)

18

12

18

6

7

14

12

12

12

26

14

20

34

23

9

62

Notes:

2/2/2017 2/2/2017 31.5EF

HRP Geologic Drill Exploration, Inc. Hollow-stem Auger

D-50 Track RigDrillingEquipment

Automatic140 (lbs) / 30 (in) Drop

WA State Plane NorthNAD83 (feet)

1309591261338.5

146.73NAVD88

Easting (X)Northing (Y)

Surface Elevation (ft)Vertical Datum

DrilledStart End Total

Depth (ft)Logged ByChecked By

HammerData

SystemDatum

Driller DrillingMethod

Groundwater observed at 12½ feet at time ofexploration

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Sheet 1 of 1Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-5Totem Lake Pedestrian Bridge

Figure A-6

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKS

Elev

atio

n (f

eet)

145

140

135

130

125

120

Dep

th (f

eet)

0

5

10

15

20

25

30

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 47: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

38

23

1

2MC

3

4

5MC

6

GP

ML

ML

ML

SM

ML

Fine gravel with sand (medium dense, moist) (fill)Gray silt with sand (very stiff, moist)

Gray silt with lenses of peat (hard, moist)

Gray sandy silt (very stiff to hard, moist to wet)

Gray silty fine sand (dense, wet)

Gray sandy silt (hard, wet)

18

18

18

18

18

18

29

48

32

35

41

55

Notes:

2/2/2017 2/2/2017 21.5EF

HRP Geologic Drill Exploration, Inc. Hollow-stem Auger

D-50 Track RigDrillingEquipment

Automatic140 (lbs) / 30 (in) Drop

WA State Plane NorthNAD83 (feet)

1309518261256.2

147.61NAVD88

Easting (X)Northing (Y)

Surface Elevation (ft)Vertical Datum

DrilledStart End Total

Depth (ft)Logged ByChecked By

HammerData

SystemDatum

Driller DrillingMethod

Groundwater observed at 11½ feet at time ofexploration

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Sheet 1 of 1Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-6Totem Lake Pedestrian Bridge

Figure A-7

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKS

Elev

atio

n (f

eet)

145

140

135

130

Dep

th (f

eet)

0

5

10

15

20

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 48: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

8

31

61

1MC

2

3MC

4MC

5

6

GP

GM

SM

ML/PT

ML

Gray fine gravel with sand (medium dense, moist) (fill)Brown silty fine to coarse gravel with sand (medium

dense, moist) (fill)Gray silty fine to coarse sand with gravel (dense, moist)

(fill)

Gray sandy silt with gravel and lenses of peat (stiff tohard, moist)

Becomes wet

Gray sandy silt (hard, wet)

16

10

18

18

18

18

36

16

21

39

50

48

Notes:

2/2/2017 2/2/2017 21.5EF

HRP Geologic Drill Exploration, Inc. Hollow-stem Auger

D-50 Track RigDrillingEquipment

Automatic140 (lbs) / 30 (in) Drop

WA State Plane NorthNAD83 (feet)

1309310261022.9

150.47NAVD88

Easting (X)Northing (Y)

Surface Elevation (ft)Vertical Datum

DrilledStart End Total

Depth (ft)Logged ByChecked By

HammerData

SystemDatum

Driller DrillingMethod

Groundwater observed at 12½ feet at time ofexploration

Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Aerial Imagery, Vertical approximated based on DEM

Sheet 1 of 1Project Number:

Project Location:

Project:

Kirkland, Washington

0231-090-00

Log of Boring B-7Totem Lake Pedestrian Bridge

Figure A-8

Red

mon

d: D

ate:

5/2

2/1

7 P

ath:

P:\

0\0

23

10

90

\GIN

T\0

23

10

90

00

.GP

J D

BTe

mpl

ate/

LibT

empl

ate:

GEO

ENG

INEE

RS

_DF_

STD

_US

_20

17

.GD

T/G

EI8

_GEO

TEC

H_S

TAN

DAR

D_%

F_N

O_G

W

Fine

sC

onte

nt (%

)

Moi

stur

eC

onte

nt (%

) REMARKS

Elev

atio

n (f

eet)

150

145

140

135

130

Dep

th (f

eet)

0

5

10

15

20

Inte

rval

Gra

phic

Log

FIELD DATA

Sam

ple

Nam

eTe

stin

g

Col

lect

ed S

ampl

e

Gro

upC

lass

ifica

tion

MATERIALDESCRIPTION

Rec

over

ed (

in)

Blo

ws/

foot

 

 

 

Page 49: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

APPENDIX B Laboratory Testing

 

 

 

Page 50: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page B-1 File No. 0231-090-00

APPENDIX B LABORATORY TESTING

Soil samples obtained from the explorations were transported to our Redmond geotechnical laboratory and evaluated to confirm or modify field classifications, as well as to evaluate engineering properties of the soils. Representative samples were selected for laboratory testing that included moisture content, percent fines, grain size distribution (sieve analyses), and plasticity (Atterberg limits) tests. The tests were conducted using test methods of the American Society for Testing and Materials (ASTM) or other applicable procedures.

Soil Classifications

All soil samples obtained from the explorations were visually classified in the field and/or in our laboratory using a system based on the Unified Soil Classification System (USCS) and ASTM classification methods. ASTM Test Method D 2488 was used to visually classify the soil samples, while ASTM D 2487 was used to classify the soils based on laboratory test results. These classification procedures are incorporated in the exploration logs presented as Figures A-2 through A-8 in Appendix A.

Moisture Content Tests

Moisture contents were measured using the ASTM D 2216 test method for several samples obtained from the explorations. The results of these tests are presented on the exploration logs (Appendix A) at the respective sample depths.

Percent Fines Tests

Tests to evaluate the percent fines (particles passing the No. 200 sieve) were completed on several soil samples using ASTM D 1140. The wet sieve method was used to determine the percentage of soil particles by weight larger than the U.S. No. 200 sieve opening. The results of the percent fines tests are presented on the exploration logs (Figures A-2 through A-8) at the depths at which the samples were obtained.

Sieve Analysis

Sieve analyses were performed on two samples obtained from the borings. The analyses were conducted using the ASTM D 6913 test method. The wet sieve analysis method was used to determine the percentage of soil particles by weight larger than the U.S. No. 200 mesh sieve. The results of the sieve analyses were plotted, classified using the USCS, and presented on Figure B-1.

Plasticity Characteristics

Plasticity characteristics of four soil samples were evaluated by conducting Atterberg limits tests using the ASTM D 4318 test method. This test method evaluates the liquid limit, plastic limit and plasticity index of the portion of the sample finer than the No. 40 sieve. The results of the Atterberg limits tests are presented in Figure B-2.

 

 

 

Page 51: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000

PE

RC

EN

T P

AS

SIN

G B

Y W

EIG

HT

GRAIN SIZE IN MILLIMETERS

U.S. STANDARD SIEVE SIZE

SANDSILT OR CLAYCOBBLES

GRAVEL

COARSE MEDIUM FINECOARSE FINE

Boring Number

Depth

(feet) Soil Description

B-1

B-1

10

55

Fine to medium sand with silt (SP-SM)

Fine to coarse sand with gravel (SP)

Symbol

Moisture

(%)

25

15

3/8”3” 1.5” #4 #10 #20 #40 #60 #1003/4”

Fig

ure

B-1

Sie

ve A

na

lysis

Re

su

lts

Tote

m L

ake

Pe

de

stria

n B

ridge

Kirk

lan

d, W

ash

ingto

n

0231-090-00 Date Exported: 02/08/17

Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable only to the specific sample on which they were

performed, and should not be interpreted as representative of any other samples obtained at other times, depths or locations, or generated by separate operations or processes.

The grain size analysis results were obtained in general accordance with ASTM D 6913.

#200

 

 

 

Page 52: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable

only to the specific sample on which they were performed, and should not be interpreted as representative of any other

samples obtained at other times, depths or locations, or generated by separate operations or processes.

The liquid limit and plasticity index were obtained in general accordance with ASTM D 4318.

Figure B-2

Atterberg Limits Test Results

Totem Lake Pedestrian Bridge

Kirkland, Washington

02

31

-09

0-0

0

Da

te E

xpo

rte

d: 0

2/0

9/1

7

SymbolBoring

Number

Depth

(feet)

Moisture

Content

(%)

Liquid

Limit

(%)

Plasticity

Index

(%) Soil Description

B-1

B-2

B-4

B-5

35

35

25

10

24

22

30

26

33

30

47

45

10

7

16

14

Lean clay with sand and gravel (CL)

Silt with sand (ML)

Silt with sand (ML)

Silt with sand and occasional gravel (ML)

0

10

20

30

40

50

60

0 10 20 30 40 50 60 70 80 90 100

PLA

STIC

ITY

IN

DE

X

LIQUID LIMIT

PLASTICITY CHART

CL-ML ML or OL

CL or OL

OH or MH

CH or OH

 

 

 

Page 53: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

APPENDIX C Previous Explorations

 

 

 

Page 54: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page C-1 File No. 0231-090-00

APPENDIX C PREVIOUS EXPLORATIONS

Appendix C presents the logs of previous explorations by others along or near the project alignment, including three borings (B-87, B-89, and B-93) completed by Converse Consultants NW in 1987 for the Redmond Connection sewer force main project.

 

 

 

Page 55: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

DA TE DRILLED: 11/23/87

o· • ... 1'°

,,..~ "'"' ,.,"' ,.,,.. .,.<, rJ ,..~ ~q ,I 0 ... 0 ,$' <,.,. <,.,. q,"

SUMMARY: BORING Nd B-87 St&' ELEVATION· Approx. 130' ' ~ . ·,_ TtUS SUMMARY &PPl.ll!I ONLY AT TH• LOCATION o, TNII .o.,;a. .110 AT .,.Ml'. TIIIII o, oaU.LING

sua,uaPACI CONDITIONI lll&Y o.,, ... AT OTMIII LOCATIONI AND •• , CHANQfl AT'"'' LOCATION

•1TM TNI lllAIIAQI OP TIMI. TNI DATA lllRIIINTID 11 & IJIIPLI" CATION 01 ACTUAL CONDITIONS

l:NCOUNTIJI.D.

DESCRIPTION SYMBOL MOISTURE CONSISTENCY

o-.-~~~~-.-~,--~....-~-.-~~~~~~~~~~~~~~~~~-r-~-.-~-.~~~·--,-~~~~~

SILTY SAND W/GRAVEL (Fill); brown 'SM- sl1ghtl medium mottled rust, fine to medium sand, > moist~ dense

lA

5

2A

! 1 I

\;j

fine to coarse gravel, low ~; plasticity J

____ ,._. , ~

~-':~:ountered obstructi~_.-,at 3' -......_..~-..,,~, r "----•··--,,~,·-'--' - .. --~••··--------~-''__.,,-

- increasing gravel moist loose

10

3A 2 2 3

PEAT; brown, abundant wood fibers Pt wet. and fine roots, interbedded with silty sand, occasional laminations fr~ of organic silt

15

48 pus

5A 2 1 1 I

5 6C 1

2

SAND· descri tion on followin rn.dense 20-'---l~~-'-~L-~L-~'--=.:...;.;..;;~....;;...=~'---'-"...c...;..~...:;..;.;'--'-~....;..;_..;...;..;...,"'---'C...c;..L.-'-~-'-~~---..i.....;_..;._;...___._

(Continued)

• A. 2• spllt-spoon sampler . 8. 3• o.o. lhln-walf Hmplar C. 3-114• O.D. x 2-112• 1111er ••A -Atterberg, C - coHolldatlon, DS - direct ahear, D. 3-112• O.D. spilt barrel umpler X. umple not recovered G - grain alze, T - triaxlal, P - permeablllty

REDMOND CONNECTION PROJECT for HNTB

@ Converse Consultants Geotechnlc•I Englnurtng •nd Applled Science•

r water level

Impervious seal

. : plezometer tip

Project No.

86-35289-04

Drawing No.

A-40

 

 

 

Page 56: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

DA TE DRILLED:

I ~( - 7A 13 23 - ,..l8 - l 'qi

\ -- I

I ---

25 - 7 I// - 8A 8 !

/7 - 9 , --

-----

30 - 9 - 9A 10 19 -- Jl - / ;;,-\ )

- ~/ ----

35 - 17 -lOA 17 - l§ - /' .. ,-·

- / J3 - ,J~/ ----

40

• A. 2• apllt-apoon aempler

SUMMARY: BORING NO( B-87 sr£ ELEVATION:

'{-Conw/ TNIS su••.t.•1' .t.P•\.11!9 ONLY AT TNI I.OC.ITIOM OP TNII •o•••o ••a AT TMI TIMI 01' GRILLING

tu•aua,1.c1 CONDITIONS ... , OtPPUI AT OTNUI LOC.&TIONI ••o ... , CNANGll AT TNlf LOCATION

WITN TNt: PAll.t.Ga 01' TIMt:. TNI DATA PtllllNTID II A IIIIPLlftCATION 01 ACTUAL CONDITIONS

INCOUNTIJIIO.

DESCRIPTION SYMBOL MOISTURE CONSISTENCY

SAND; light gray-brown, fine to SP- wet medium medium, few silt, occasional lami- SM dense nations of brown fine sandy silt ll'IJ - 6" to 811 log at depth 23 1

- occasionally stained rust-brown 10

Vo

• / C '·''\ .

- grades to trace silt // SP L/ i

I L)/ \__

(Continued)

a. 3• O.D. thin-well HfflPler c. 3-114• O.D. x 2-112• liner ••A -Atterber9, C • conaolldetlon, OS - direct aheer,

water level

lmpervioua aeel

o. 3-112• O.D. apllt berrel aempler X. ••mple not recovered G - greln alze, T • lrle:llel, P • permeeblllty plezometer tip

Project No.

...

...

...

....

....

...

...

...

...

...

...

....

....

...

... -... ... .. ... ... ... ... ...

--... .... ... ... --... ... ... ... ... ...

REDMOND CONNECTION PROJECT for HNTB

86-35289-04

@ Converse Consultants Geotechnlcal Engineering and Applied Sciences

Drawing No.

A-41

 

 

 

Page 57: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

DA TE DRILLED:

40 5 <~'" \ -llA 8 '.__\j_V ,'-- 7-- ' -

/ ,~ ( I

- I) [

I I

' - I

- ~-,,..-/'·""'

---- 40 45 -12C 52 9 134 - 67 -------

50 - 18 -_13A 24

- ~

- ~~) -----

- 27 55 -_14A 36 - /~' - ~ --- 10 -_15A 11 14

60 ,.-n·· [',. I

SUMMARY: BORING No:/ B-87 Sc~;.,. ELEVATION:

'-f-eont;} TNI& ,u ......... APPL118 o .. L'f AT THI LOCATIOtl o, TNII .~ ••• o .&NO AT THC TIIH OP' DtllU.lttC

suaau•PACI CONOITIOII& IIA'f DIIPUI AT OTNIII LOCATION• ANO Ill.AT CN,UCQI AT THlf LOCATION

WITH TMI ,aaaAOI Of TIMI. TMI DATA PIIIIINTID II A ltMPLJ,.C.&TIOM Of ACTUAL CONOITIONS

INCOUN'UIIID.

DESCRIPTION SYMBOL MOISTURE CONSISTENCY ~

SAND (Continued) (j/ wet medium dense

- large log at depth 42.5'

SANDY GRAVEL; brown mottled orange- G~.J- very brown, fine to coarse, medium to GM dense coarse sand, few si 1t, little silt 3 in indistinct beds

- grades to gray-brown mottled orange-brown, 1 i tt 1 e silt, GM medium plasticity :3

/3

moiill I

SILT; gray, little fine sand, ML very occasional indistinct beds of 1 ·. dense is--- .. gravelly silt with sand

----·- -~ //fotal depth approximately

3/4" diameter PVC p1ezom~le.d to 58.5' backfilled with pea gravel; bentonite seal placed

60~-~\ with ~-streen interval at bottom; at surface.

• A. 2• apllt-apoon aampler B. 3" O.D. thin-wall Hmpler C. 3-114" O.D. x 2-112• liner ••A -Atterberg, C - coneolldatlon, OS - direct ah,ear, D. 3· 112• O.D. apllt b8rrel Hmpler X. Hmple not recovered G - s,raln elze, T - trtulal, P • permHblllty

Project No.

---

---------... .... ... --.... ... ... ... -----------... ... ... ... ... -

REDMOND CONNECTION PROJECT for HNTB

86-35289-04

@ Converse Consultants Geotechnlcal Engineering and Applled Sciences

Drawing No.

A-42

 

 

 

Page 58: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

DA TE DRILLED: 11/23/87

----

5

- wr 4

I - lA 6 e D1a - 6 - I -

1 - i - I

--

- 10 - 2C 12 9 96 . 14 I .

/

-- 6 - ,/';:\ - 3A ~ ) ~ 17

10

.

. -. -. --

11 15

-. 4C 15 31 1p4

10 . ------

20

• A. 2 • split-spoon a ampler

SUMMARY: BORING Nc(!::89 SoC/ tLEv1.noN, Approx. 1331

TMla IUIIIHIIY Altlt\.118 ONLY AT TMI LOCATION OP,. .... aoln.-a--•• o-i"T-TNI Tllfl o• D•II.LING

su••u•••c.1 CONOITIONI ... , D.,, •• AT o, .... LOCATIONS ANO ... , CJUNGI AT '"'' LOCATION WITM TNI ,, •••• a, OP TIIII. TNI DATA ,. ••• ,.,10 •• A IUIP\.IPICATIOII a, ACTUAL CONDITIONS INCOUNTIIIID.

DESCRIPTION SYMBOL MOISTURE CONSISTENCY

SAND (Fill); rust-brown, fine to SP- very: loose ....

medium, few to little silt SM moist .. .. ..

SAND; 1 i ght brown, fine to medium, SP medium .. trace silt dense ....

1 '-

... ..

...

... --...

... __ ,

t'~~. ,.;,./- .- 1-,

q_ 7 ... i 12-(t4e,7_ ~ ...

- increasing silt SP-\ wet ... SM - --.,----~ ...

i" 13~) ... ...

I'------ ... ... ... ... .... ... ... ...

SILT; light brown, occasional rust ML stiff .... stained, little fine sand, few ... coarse sand and fine gravel, low '70 ....

plasticity ---... ._

(Continued)

a. 3" O.D. thin-wall sampler C. 3-114• O.D. x 2-112• llner ••A •Atterber11, C • conaolldatlon, DS • direct lhHr, r water level

lmpervloua seal

D. 3• 112• O.D. spllt barrel sampler X. sample not recovered Q • grain 1lze, T • trlaxlal, P - permeability

REDMOND CONNECTION PROJECT for HNTB

@ Converse Consultants Geotechnlal EnglnHrtng and Applied Science,

: plezometer Up

Project No.

86-35289-04

Drawing No.

A-43

 

 

 

Page 59: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

DATE DRILLED:

b - SA 5 1111 .. \1 J 1( - 6 ___ /

-

-----

25 - 11 - 6A 15 29 - .17 -\3')' \ -

- \ ) , _ _./

----- ' 22 i

- I 7C 41 i

- I 40 J

30

------

----------

• A. 2• apllt•apoon ••mpler

suMMARY: soR1NG Not'~-sg $"or ELEVAT:, 0"{Cont*J

TNII auMIU.tlT Al'~UII ONI.Y AT TNI LOCATION o, TNfl 10•••0 ANO AT TNI TUii 01' OIU&..LING

1ua1u•••c1 CONOITIONI IIIAT Dtf'PI• AT OTNla 1.ocar10•• AND ... , CNANQI ., '"'' LOCATION

WtTN TNI PAISA.01. o, TUH. TNI DATA tt•IIINTID 11 A IIMl'I.IPIC.t.TION OJ &CTUA\. CONOITIONS

I.NC OUNTIRID.

DESCRIPTION SYMBOL MOISTURE CONSISTENCY

SILT (Cont.); occasional indistinct ML wet fi nn beds of silty gravel with sand ,?

. I

SILT; dark gray-brown, little finE( ML very sand, occasional medium beds of / stiff silty fine sand, occasional thin i

. laminations of peat and decaying \' :!:~J wood

- occasional gravel 1 ayers ....,._

SANDY GRAVEL; orange-brown, fine GW- dense to coarse, medium to coarse sand, GM few silt, occasional beds with '----

little silt

Total depth approximate]~ 3/4" diameter PVC piezome r installed to 30 1 with 21 screen interval at bottom; backf i 11 ed with pea gravel; bentoni te sea 1 placed at surface.

B. 3" O.D. tllln•w•II Hmpler C. 3-114• O.D. x 2-112• liner ••A ·Atterberg, C - con1olld•tlon, OS - direct alle•r, r w•ter level

Impervious seal ·

o. 3-112• 0.0. apllt b•rrel Hmpler X. Hmple not recovered G • 11f'•ln 1lze, T • triaxl•I, P - permeability .: plezometer tip

Project No.

... ---... --... ------... I-

...

...

...

...

...

...

-----------... ... -... .._

REDMOND CONNECTION PROJECT for HNTB

86-35289-04

@) Converse Consultants Geotechnlcal Engineering and Applied Science,

..... _

Drawing No.

A-44

 

 

 

Page 60: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

DATE DRILLED: 12/1/87 SUMMARY: BORING NC('B:.93 ~-,i~)ELEVAT10N: Approx. 242' --. ,-----~

-

\ --

!

- 3 - lA 3 . ',-- .. 23 h{( - 4 ( ~r-- \ / I----

5 ---- \_ j - ,._ \

- ~

7 - 6 ivf 2A 9 7'1 -10

\ ! ) -

-~~-__...,-- \ - 13 I

' - lQO 3C 20 28 10

- 24 :

-------

- 7 15 - 4A 13 -- 1,9

- . '}JJ ) '- _./ ---

--

7 - SA 11 27 -20

LS_

, .... 1u•1u11, APl'LIII 0•1., AT TNI LOCATION o• TNtl ao•••• ANO ., THI TIIU o, 01111.LING

IUISUIIPACI CONDITIONS IIIAY Otl,111 AT OTNIII LOCATIONI AND IIAY CJU.NGI AT THlf LOCATION

WITN TNI l'AIIAQI OP TIIII. TNI: DATA l'RIIINTID ti A lllll'Uf"ICATION oi, ACTUAi. CONDITIONS

INCOUNTIIIIID.

DESCRIPTION SYMBOL MOISTURE CONSISTENCY

SAND (Fil 1); brown, fine to medium, SP- veryf · loose few si 1 t, probably utility backfill 1 moist

/-------

/w,J•i ...2... SILT; light brown with dark rust- ML yery brown clasts, little fine sand, -a }tiff

go low plasticity, occasional beds of __.,

sandy gravel

- with occasional fine to coarse gravel

SILTY SAND W/GRAVEL; light brown, SM dense occasional rust staining, fine sand, fine to coarse gravel, low 30 plasticity, occasional beds of sandy gravel

---. 3o ..

..

.. ---~--Total __ depthd_~P.PEt:>_~~_m

5~r~ely 20_,;2' ~

3/4" diameter PVC pi ezometer-TrisCaTTe to 19. ·wrn,-·-'- --sc,..een interval at bottom; backfilled with pea gravel; bentonite seal placed at surface. • A. 2" •pllt-•poon •empler

a. 3• O.D. thln-w•II Hmpler C. 3-1/4" O.D. x 2-112" llner ••A •Atterberg, C - con•olldetlon, DS - direct 8he•r, D. 3-1 /2" O.D. •Pill berrel ••mpler X. ••mple not recovered G - greln •l~e, T - lrl•xl•I, P - perm••blUty

Project No.

---'" ....

-

---------------------------,_

....

....

._

REDMOND CONNECTION PROJECT for HNTB

86-35289-04

@ Converse Consultants Geotechnlcal Engineering and Applied Sciences

Drawing No.

A-45

 

 

 

Page 61: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

APPENDIX D Report Limitations and Guidelines for Use

 

 

 

Page 62: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page D-1 File No. 0231-090-00

APPENDIX D REPORT LIMITATIONS AND GUIDELINES FOR USE1

This appendix provides information to help you manage your risks with respect to the use of this report.

Read These Provisions Closely

It is important to recognize that the geoscience practices (geotechnical engineering, geology and environmental science) rely on professional judgment and opinion to a greater extent than other engineering and natural science disciplines, where more precise and/or readily observable data may exist. To help clients better understand how this difference pertains to our services, GeoEngineers includes the following explanatory “limitations” provisions in its reports. Please confer with GeoEngineers if you need to know more how these “Report Limitations and Guidelines for Use” apply to your project or site.

Geotechnical Services are Performed for Specific Purposes, Persons and Projects

This report has been prepared for the City of Kirkland, COWI North America, Inc., and other members of the design team for the project specifically identified in the report. The information contained herein is not applicable to other sites or projects.

GeoEngineers structures its services to meet the specific needs of its clients. No party other than the party to whom this report is addressed may rely on the product of our services unless we agree to such reliance in advance and in writing. Within the limitations of the agreed scope of services for the Project, and its schedule and budget, our services have been executed in accordance with our Agreement with the Client and generally accepted geotechnical practices in this area at the time this report was prepared. We do not authorize, and will not be responsible for, the use of this report for any purposes or projects other than those identified in the report.

A Geotechnical Engineering or Geologic Report is Based on A Unique Set of Project-Specific Factors

This report has been prepared for the Totem Lake Connector project in Kirkland, Washington. GeoEngineers considered several unique, project-specific factors when establishing the scope of services for this project and report. Unless GeoEngineers specifically indicates otherwise, do not rely on this report if it was:

■ not prepared for you,

■ not prepared for your project,

■ not prepared for the specific site explored, or

■ completed before important project changes were made.

1 Developed based on material provided by GBA, GeoProfessional Business Association; www.geoprofessional.org.

 

 

 

Page 63: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page D-2 File No. 0231-090-00

For example, changes that can affect the applicability of this report include those that affect:

■ the function of the proposed structures;

■ elevation, configuration, location, orientation or weight of the proposed structures;

■ composition of the design team; or

■ project ownership.

If changes occur after the date of this report, GeoEngineers cannot be responsible for any consequences of such changes in relation to this report unless we have been given the opportunity to review our interpretations and recommendations. Based on that review, we can provide written modifications or confirmation, as appropriate.

Environmental Concerns Are Not Covered

Unless environmental services were specifically included in our scope of services, this report does not provide any environmental findings, conclusions, or recommendations, including but not limited to, the likelihood of encountering underground storage tanks or regulated contaminants.

Subsurface Conditions Can Change

This geotechnical or geologic report is based on conditions that existed at the time the study was performed. The findings and conclusions of this report may be affected by the passage of time, by man-made events such as construction on or adjacent to the site, new information or technology that becomes available after the report date, or by natural events such as floods, earthquakes, slope instability or groundwater fluctuations. If more than a few months have passed since issuance of our report or work product, or if any of the described events may have occurred, please contact GeoEngineers before applying this report for its intended purpose so that we may evaluate whether changed conditions affect the continued reliability or applicability of our conclusions and recommendations.

Geotechnical and Geologic Findings Are Professional Opinions

Our interpretations of subsurface conditions are based on field observations from widely spaced sampling locations at the site. Site exploration identifies the specific subsurface conditions only at those points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory data and then applied its professional judgment to render an informed opinion about subsurface conditions at other locations. Actual subsurface conditions may differ, sometimes significantly, from the opinions presented in this report. Our report, conclusions and interpretations are not a warranty of the actual subsurface conditions.

Geotechnical Engineering Report Recommendations Are Not Final

We have developed the recommendations in this report based on data gathered from subsurface exploration(s). These explorations sample just a small percentage of a site to create a snapshot of the subsurface conditions elsewhere on the site. Such sampling on its own cannot provide a complete and accurate view of subsurface conditions for the entire site. Therefore, the recommendations included in this report are preliminary and should not be considered final. GeoEngineers’ recommendations can be finalized only by observing actual subsurface conditions revealed during construction. GeoEngineers

 

 

 

Page 64: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page D-3 File No. 0231-090-00

cannot assume responsibility or liability for the recommendations in this report if we do not perform construction observation.

We recommend that you allow sufficient monitoring, testing and consultation during construction by GeoEngineers to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes if the conditions revealed during the work differ from those anticipated, and to evaluate whether earthwork activities are completed in accordance with our recommendations. Retaining GeoEngineers for construction observation for this project is the most effective means of managing the risks associated with unanticipated conditions. If another party performs field observation and confirms our expectations, the other party must take full responsibility for both the observations and recommendations. Please note, however, that another party would lack our project-specific knowledge and resources.

A Geotechnical Engineering or Geologic Report Could Be Subject to Misinterpretation

Misinterpretation of this report by members of the design team or by contractors can result in costly problems. GeoEngineers can help reduce the risks of misinterpretation by conferring with appropriate members of the design team after submitting the report, reviewing pertinent elements of the design team’s plans and specifications, participating in pre-bid and preconstruction conferences, and providing construction observation.

Do Not Redraw the Exploration Logs

Geotechnical engineers and geologists prepare final exploration logs based upon their interpretation of field logs and laboratory data. The logs included in a geotechnical engineering or geologic report should never be redrawn for inclusion in architectural or other design drawings. Photographic or electronic reproduction is acceptable, but separating logs from the report can create a risk of misinterpretation.

Give Contractors a Complete Report and Guidance

To help reduce the risk of problems associated with unanticipated subsurface conditions, GeoEngineers recommends giving contractors the complete geotechnical engineering or geologic report, including these “Report Limitations and Guidelines for Use.” When providing the report, you should preface it with a clearly written letter of transmittal that:

■ advises contractors that the report was not prepared for purposes of bid development and that its accuracy is limited; and

■ encourages contractors to confer with GeoEngineers and/or to conduct additional study to obtain the specific types of information they need or prefer.

Contractors Are Responsible for Site Safety on Their Own Construction Projects

Our geotechnical recommendations are not intended to direct the contractor’s procedures, methods, schedule or management of the work site. The contractor is solely responsible for job site safety and for managing construction operations to minimize risks to on-site personnel and to adjacent properties.

 

 

 

Page 65: Phase 1 Geotechnical Engineering Servicesyour.kingcounty.gov/dnrp/library/parks-and-recreation/documents/... · Phase 1 Geotechnical Engineering Services ... INTRODUCTION AND PROJECT

July 14, 2017 | Page D-4 File No. 0231-090-00

Biological Pollutants

GeoEngineers’ Scope of Work specifically excludes the investigation, detection, prevention or assessment of the presence of Biological Pollutants. Accordingly, this report does not include any interpretations, recommendations, findings, or conclusions regarding the detecting, assessing, preventing or abating of Biological Pollutants and no conclusions or inferences should be drawn regarding Biological Pollutants, as they may relate to this project. The term “Biological Pollutants” includes, but is not limited to, molds, fungi, spores, bacteria, and viruses, and/or any of their byproducts.

If Client desires these specialized services, they should be obtained from a consultant who offers such services.