Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center Improvement Monroe County, New York Prepared for: New York State Department of Transportation Prepared by: Parsons Brinckerhoff, Inc. One Penn Plaza New York, New York February 28, 2014 (Addendum 7)

Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Embed Size (px)

Citation preview

Page 1: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Phase II – Geotechnical &Environmental Data ReportCONTRACT D030864 PIN 4936.04

Rochester Intermodal TransportationCenter Improvement

Monroe County, New York

Prepared for:New York State Department ofTransportation

Prepared by:Parsons Brinckerhoff, Inc.One Penn PlazaNew York, New York

February 28, 2014 (Addendum 7)

Page 2: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

1

TABLE OF CONTENTS

1.0 INTRODUCTION .................................................................................................. 2LIMITATIONS .................................................................................................................. 2

1.0 PHASE II SUBSURFACE INVESTIGATION PROGRAM .................................... 21.1 TEST BORINGS .................................................................................................... 21.2 ENVIRONMENTAL LABORATORY TESTING ............................................................... 31.3 GEOTECHNICAL LABORATORY TESTING ................................................................. 4

LIST OF TABLES

Table 1 - Summary of Borings ......................................................................................... 3

LIST OF FIGURES

Figure 1 – Boring Location Plan

LIST OF APPENDICES

Appendix A Boring LogsAppendix B Environmental Test ResultsAppendix C Geotechnical Laboratory Test ResultsAppendix D Soil Samples, Boulders, and Rock Core Photos

Page 3: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

2

1.0 INTRODUCTION

Phase I of this geotechnical subsurface investigation was performed from April 22nd through29th, 2013. The investigation program was developed based on the proposed layout of the newstation infrastructure provided by the Architect – Sowinski and Sullivan. Phase 1 data report wasprovided to all bidders on July 2013.

This addendum report covers Phase II environmental and geotechnical investigation. Phase IIcommenced on February 18, 2014 and still ongoing at the time of this report preparation.

This data report does not present geotechnical or environmental interpretation of the datacollected and does not provide geotechnical recommendations for design and construction.

Limitations

The information presented herein is based on limited geotechnical information and structureconfiguration from the preliminary architectural plans. Therefore, the data may not be enoughfor final design or construction. Additional geotechnical investigations including soil borings, in-situ testing, and associated laboratory testing and geotechnical analyses are expected to beperformed by the winning Design-Build Contractor when data relative to construction staging,structural loading, station infrastructure layouts are finalized.

The boring logs and geotechnical investigation records depict subsurface conditions only at thespecific soil sampling location. Subsurface conditions at other locations may differ fromconditions observed at specific soil sample and investigation locations. Also, the passage oftime may result in a change in the subsurface condition at an investigation location. There is nowarranty or guarantee, either expressed or implied, that the conditions indicated by suchinvestigations or records thereof are representative of those existing throughout such areas, orany part thereof, or that unexpected developments may not occur, or that materials other than,or in proportions different from those indicated, may not be encountered.

This report does not address environmental issues or issues related to groundwater and soilcontamination.

1.0 PHASE II SUBSURFACE INVESTIGATION PROGRAM

1.1 Test Borings

Four (4) 4-inch diameter (I.D.) boreholes are planned to be advanced by Hollow Stem Auger(HSA) drilling and rock coring techniques. Boring location plan is shown in Figure 1. Depths ofthe planned boreholes are estimated to be 40 feet below ground surface, as shown in Table 1.

Page 4: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

3

Table 1 - Summary of Borings

BoringDesignation

PlannedBoreholedepth (ft)

Boreholedrilled depthsas of 02-27-14

Top of rockdepth

(ft)

RTC-5 45 23 In progressRTC-6 45 In progress N/ARTC-7 45 In progress N/ARTC-8 45 44 29.3

Boring logs for RTC-8 and RTC-5 (partial) following NYSDOT standards are included inAppendix A.

Soil samples, boulders, and rock cores photos for RTC-8 and RTC-5 (partial) are includedAppendix D.

1.2 Environmental Laboratory Testing

Applus RTD/Quality Inspection Services, Inc. was retained to obtain representative soil samplesfor analytical testing in accordance with project specifications and the following parameters:(Please refer to Tables 1 and 2 in Appendix B for an analytical summary of detectedcompounds)

Sample # RITC-5 and RITC-7:

8260 VOC Total/TCLP 8270 SVOC Total/TCLP Pest/Herb Total/TCLP PCB Metals (13 PP) Totals/TCLP Cyanide Hexachrome Ignitability Corrosivity

Based on the analytical results, the following parameters were NOT detected in the two fillsamples:

Chlorinated herbicides Organochlorine pesticides TCLP Herbicides TCLP Pesticides TCLP Volatiles TCLP Semivolatiles TCLP Metals (above regulatory limits) PCBs Ignitability Volatiles (above regulatory limits)

Page 5: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

4

The following parameters were detected above the parameter Method Detection Limits (MDL):

RITC-5: Semivolatiles above MDL but below NYSDEC regulatory levels RITC-5: Metals above MDL (no regulatory levels have been established) RITC-7: Semivolatiles above MDL; some parameters are above the NYSDEC regulatory

levels. However, based on the characteristics of the fill materials (cinders, slag, sand,etc.) such are not uncommon exceedences for these.

RITC-7: Metals above MDL (no regulatory levels have been established)

No hazardous waste materials were detected in the two fill samples that have been collected till02-27-2014.

1.3 Geotechnical Laboratory Testing

GeoTesting Express, Inc. was retained to perform laboratory soil and rock testing. Results oflaboratory testing performed on samples collected from RTC-5 and RTC-8 are presented inAppendix C. All laboratory testing was performed in accordance with the applicable ASTMstandards.

Page 6: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center
Page 7: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

APPENDIX ABORING LOGS (PARTIAL)

Page 8: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

SM 282e (00) STATE OF NEW YORKDEPARTMENT OF TRANSPORTATION

REGION 4 GEOTECHNICAL ENGINEERING BUREAU HOLECOUNTY Monroe SUBSURFACE EXPLORATION LOG LINEPIN 4936.04 STA.PROJECT Rochester Intermodal Transit Center OFFSETACTUAL COORDINATES SURF. ELEV.DATUM DEPTH TO WATER

DATE START 2/18/2014 1:00pm DATE FINISH CASING O.D. HSA: 8” I.D. HSA: 4” WEIGHT OF HAMMER-CASING 140 lb HAMMER FALL-CASING 30” SAMPLER O.D. SPT: 2” I.D. SPT: 1.375” WEIGHT OF HAMMER-SAMPLER 140 lb HAMMER FALL-SAMPLER 30”DEPTHBELOWSURF.

(ft)

CASINGBLOWS/ 1.0 ft

SAMPLENO.

BLOWS ONSAMPLER (in) DESCRIPTION OF SOIL AND ROCK

MOIST.CONT.

(%)

0 / 6” 6” / 12” 12” / 18” 18” / 24” REC0.0 -- -- -- -- -- -- 0”-8” Concrete slab

-- -- -- 8”-5’ Black silty SAND, little gravel, moist (FILL) 17-- -- Hand excavated ---- -- to 5ft depth --

5.0 -- -- ---- J1 8 8 20 5’-6’Black silty SAND, trace gravel, moist (FILL)-- 6 4 6’-7’ Brown silty SAND, moist-- J2 2 3 12 Brown silty SAND, little gravel, moist-- 4 4

10.0 -- J3 2 2 20” Brown silty SAND, moist 5.7-- 3 3-- J4 3 2 17 Brown silty SAND, moist-- 2 3-- J5 2 2 22 Brown silty SAND, moist

15.0 -- 2 2-- J6 1 2 17.5”Brown silty SAND, moist-- 2 2-- J7 2 2 15 Brown silty SAND, moist-- 2 2

20.0 -- J8 3 9 18 19’-19’8” Black silty SAND, little gravel, moist-- 12 15 19’8”-21’ Brown sandy SILT, some gravel, moist-- J9 25 17 13.5 Brown sandy SILT, moist 11.7-- 10 15-- C-1 50/1” Boulders (2ft ),

25.0 -- (Current depth 25ft, to be continued)

30.0

35.0

40.0

45.0Survey data of boring coordinates and elevation are not availableat this time.

50.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR R.Brown estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. X.Guo same information available to the State. It is presented in good faith. By REG. GEOTECH. the nature of the exploration process, the information represents only a small CHIEF INSPECTOR X.Guo fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. 4936.04

SHEET 1 OF 1CONTRACT D030864 CONTRACTOR QISI HOLE

RTC-5

RTC-8

Page 9: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

SM 282e (00) STATE OF NEW YORKDEPARTMENT OF TRANSPORTATION

REGION 4 GEOTECHNICAL ENGINEERING BUREAU HOLECOUNTY Monroe SUBSURFACE EXPLORATION LOG LINEPIN 4936.04 STA.PROJECT Rochester Intermodal Transit Center OFFSETACTUAL COORDINATES SURF. ELEV.DATUM DEPTH TO WATER ~27.8 ft (during drilling)

DATE START 2/20/2014 2:00pm DATE FINISH 2/25/2014 11:45am CASING O.D. HSA: 8” I.D. HSA: 4” WEIGHT OF HAMMER-CASING 140 lb HAMMER FALL-CASING 30” SAMPLER O.D. SPT: 2” I.D. SPT: 1.375” WEIGHT OF HAMMER-SAMPLER 140 lb HAMMER FALL-SAMPLER 30”DEPTHBELOWSURF.

(ft)

CASINGBLOWS/ 1.0 ft

SAMPLENO.

BLOWS ONSAMPLER (in) DESCRIPTION OF SOIL AND ROCK

MOIST.CONT.

(%)

0 / 6” 6” / 12” 12” / 18” 18” / 24” REC0.0 -- -- -- -- -- -- 0”-10” Concrete slab

-- -- -- 10”-5’ Black silty SAND, little gravel, moist (FILL) 17-- -- Hand excavated -- (J- sample was retrieved from hand excacated)-- J1 to 5ft depth --

5.0 -- ---- J2 2 3 15 5’-6’Black silty SAND, trace gravel, moist (FILL)-- 7 5 6’-7’ Brown silty SAND, moist-- J3 3 5 15 Brown silty SAND, little gravel, moist-- 7 7

10.0 -- J4 3 3 12” Brown silty SAND, moist-- 4 4-- J5 2 3 22 Brown silty SAND, moist-- 2 3-- J6 3 1 16 Brown silty SAND, moist

15.0 -- 2 2-- J7 3 2 18” 15’-16’Brown silty SAND, moist-- 2 4 16’-17’ Brown silty clayey SAND, moist-- J8 8 6 0-- 6 8

20.0 -- J9 3 6 16 Brown silty SAND, little gravel, moist-- 5 7-- J10 10 18 21 Brown sandy SILT, moist-- 20 17-- J11 6 12 17” Brown sandy SILT, moist

25.0 -- 15 22-- T1/J12 NA Brown sandy SILT, moist-- -- ---- J13 50/3” 3” Gravel and boulder fragments, little limestone fragments

30.0 J14 50/4” 4” Limestone fragments 29.3 ftLength REC REC RQD RQD Gray LIMESTONE fresh, strong to very strong, medium

Avg R1 (in.) (in.) (%) (in.) (%) to thick bedding, close to moderate fracture spacing, argillaceousadv rate 56 56 100 55 98.2 Run Drilled from 29.3 ft to 34.0 ft

35.0 min/ft

R2 60 58 96.7 58 96.7 Run Drilled from 34.0 ft to 39.0ft

40.0

R3 60 60 100 60 100 Run Drilled from 39.0 ft to 44.0 ft

45.0End of boring at 44.0 ft at 11:45am on 2/25/2014.

Survey data of boring coordinates and elevation are not available50.0 at this time.

The subsurface information shown here was obtained for design and DRILL RIG OPERATOR R.Brown estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. X.Guo same information available to the State. It is presented in good faith. By REG. GEOTECH. the nature of the exploration process, the information represents only a small CHIEF INSPECTOR X.Guo fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. 4936.04

SHEET 1 OF 1CONTRACT D030864 CONTRACTOR QISI HOLE

RTC-8

RTC-8

Page 10: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

APPENDIX BENVIRONMENTAL TEST RESULTS

Page 11: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Amtrak

RochesterInterm

odalTran

sportation

Center

NYSDOTCo

ntractD0308

64,320

CentralA

venu

e,Ro

chester,NY

Tabl

e1

-RIT

C-5

Sam

ple

Res

ults

LOCA

TION

RITC

5RITC

5SA

MPLINGDATE

2/18/2014

2/18/201

4LA

BSA

MPLEID

L1403644

01L1403644

01R1

LABSA

MPLEID

L1403644

01L1403644

01R1

SAMPLEDEP

TH(ft.)

0'5'

0'5'

Cas

Num

NY

-CP5

1U

nits

Qua

lQ

ual

Chl

orin

ated

Her

bici

des

byG

C-W

estb

orou

ghLa

bN

DG

ener

alC

hem

istry

-Wes

tbor

ough

Lab

Sol

ids,

Tota

lN

ON

E%

89.5

--

pH(H

)12

408

025

SU

72

pH(H

)12

408-

02-5

SU

7.2

--

Igni

tabi

lity

ofS

olid

s-W

estb

orou

ghLa

bIg

nita

bilit

yN

ON

E-

NI

NI

Org

anoc

hlor

ine

Pes

ticid

esby

GC

-Wes

tbor

ough

Lab

ND

ND

Pol

ychl

orin

ated

Bip

heny

lsby

GC

-Wes

tbor

ough

Lab

ND

Sem

ivol

atile

Org

anic

sby

GC

/MS

-Wes

tbor

ough

Lab

Fluo

rant

hene

206-

44-0

1000

00ug

/kg

460

--

Nap

htha

lene

91-2

0-3

1200

0ug

/kg

160

J-

-B

enzo

(a)a

nthr

acen

e56

-55-

310

00ug

/kg

220

--

Ben

zo(a

)pyr

ene

50-3

2-8

1000

ug/k

g17

0-

-B

enzo

(b)fl

uora

nthe

ne20

5-99

-210

00ug

/kg

260

--

Ben

zo(k

)fluo

rant

hene

207-

08-9

800

ug/k

g11

0-

-(

)g

gC

hrys

ene

218-

01-9

1000

ug/k

g38

0-

-A

nthr

acen

e12

0-12

-710

0000

ug/k

g66

J-

-B

enzo

(ghi

)per

ylen

e19

1-24

-210

0000

ug/k

g12

0J

--

Phe

nant

hren

e85

-01-

810

0000

ug/k

g50

0-

-In

deno

(1,2

,3-c

d)py

rene

193-

39-5

500

ug/k

g12

0J

--

Pyr

ene

129-

00-0

1000

00ug

/kg

380

--

Pyr

ene

129-

00-0

1000

00ug

/kg

380

--

Dib

enzo

fura

n13

2-64

-9ug

/kg

95J

--

2-M

ethy

lnap

htha

lene

91-5

7-6

ug/k

g26

0-

-TC

LPH

erbi

cide

sby

EP

A13

11-W

estb

orou

ghLa

bN

DTC

LPM

etal

sby

EP

A13

11-W

estb

orou

ghLa

bC

oppe

r,TC

LP74

40-5

0-8

mg/

l0.

04J

--

Ld

TCLP

7439

921

5/l

003

JLe

ad,T

CLP

7439

-92-

15

mg/

l0.

03J

--

Silv

er,T

CLP

7440

-22-

45

mg/

l0.

05J

--

Zinc

,TC

LP74

40-6

6-6

mg/

l0.

11J

--

Page 12: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Amtrak

RochesterInterm

odalTran

sportation

Center

NYSDOTCo

ntractD0308

64,320

CentralA

venu

e,Ro

chester,NY

Tabl

e1

-RIT

C-5

Sam

ple

Res

ults

(con

tinue

d)LO

CATION

RITC

5RITC

5SA

MPLINGDATE

2/18/2014

2/18/201

4LA

BSA

MPLEID

L1403644

01L1403644

01R1

LABSA

MPLEID

L1403644

01L1403644

01R1

SAMPLEDEP

TH(ft.)

0'5'

0'5'

Cas

Num

NY

-CP5

1U

nits

Qua

lQ

ual

TCLP

Pes

ticid

esby

EP

A13

11-W

estb

orou

ghLa

bN

DN

DTC

LPS

emiv

olat

iles

byE

PA

1311

-Wes

tbor

ough

Lab

ND

TCLP

Vol

atile

sby

EP

A13

11-W

estb

orou

ghLa

bN

Dy

gTo

talM

etal

s-W

estb

orou

ghLa

bA

ntim

ony,

Tota

l74

40-3

6-0

mg/

l3.

5-

-A

rsen

ic,T

otal

7440

-38-

2m

g/l

11-

-B

eryl

lium

,Tot

al74

40-4

1-7

mg/

l0.

41-

-C

hrom

ium

,Tot

al74

40-4

7-3

mg/

l3.

7-

-C

oppe

r,To

tal

7440

-50-

8m

g/l

38-

-C

oppe

r,To

tal

7440

-50-

8m

g/l

38-

-Le

ad,T

otal

7439

-92-

1m

g/l

92-

-M

ercu

ry,T

otal

7439

-97-

6m

g/l

0.1

--

Nic

kel,

Tota

l74

40-0

2-0

mg/

l5.

8-

-S

elen

ium

,Tot

al77

82-4

9-2

mg/

l1

--

Silv

er,T

otal

7440

-22-

4m

g/l

0.09

J-

-Th

alliu

mTo

tal

7440

280

mg/

l0

27J

Thal

lium

,Tot

al74

40-2

8-0

mg/

l0.

27J

--

Zinc

,Tot

al74

40-6

6-6

mg/

l20

--

Vol

atile

Org

anic

sby

GC

/MS

-Wes

tbor

ough

Lab

ND

Page 13: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Amtrak

RochesterInterm

odalTran

sportation

Center

NYSDOTCo

ntractD0308

64,320

CentralA

venu

e,Ro

chester,NY

Tabl

e2

-RIT

C-7

Sam

ple

Res

ults

(CO

NTI

NU

ED

)LO

CATION

RIT

C-7

SAMPLINGDATE

2/20

/201

4LA

BSA

MPLEID

L14

0392

1-01

SAMPLEDEP

TH(ft.)

TCLP

VOC1.52.5';1.5'5

.0'

Cas

Num

NY

-CP5

1U

nits

Qua

lTC

LPM

etal

sby

EP

A13

11-W

estb

orou

ghLa

bC

oppe

r,TC

LP74

40-5

0-8

mg/

l0.

04J

Lead

,TC

LP74

39-9

2-1

5m

g/l

0.02

JZi

nc,T

CLP

7440

-66-

6m

g/l

0.14

JTC

LPP

estic

ides

byE

PA

1311

-Wes

tbor

ough

Lab

ND

TCLP

Sem

ivol

atile

sby

EP

A13

11-W

estb

orou

ghLa

bN

DTC

LPV

olat

iles

byE

PA

1311

-Wes

tbor

ough

Lab

ND

Tota

lMet

als

-Wes

tbor

ough

Lab

Ant

imon

y,To

tal

7440

-36-

0m

g/l

2.6

Ars

enic

,Tot

al74

40-3

8-2

mg/

l22

Ber

ylliu

m,T

otal

7440

-41-

7m

g/l

0.48

Cad

miu

m,T

otal

7440

-43-

9m

g/l

0.21

JC

hrom

ium

,Tot

al74

40-4

7-3

mg/

l7

Cop

per,

Tota

l74

40-5

0-8

mg/

l55

Lead

,Tot

al74

39-9

2-1

mg/

l84

Mer

cury

,Tot

al74

39-9

7-6

mg/

l0.

06J

Nic

kel,

Tota

l74

40-0

2-0

mg/

l15

Sel

eniu

m,T

otal

7782

-49-

2m

g/l

0.33

JS

ilver

,Tot

al74

40-2

2-4

mg/

l0.

27J

Zinc

,Tot

al74

40-6

6-6

mg/

l73

Vol

atile

Org

anic

sby

GC

/MS

-Wes

tbor

ough

Lab

Tric

hlor

oeth

ene

79-0

1-6

500

ug/k

g6.

8Ig

nita

bilit

yof

Sol

ids

-Wes

tbor

ough

Lab

Igni

tabi

lity

NO

NE

NI

NI

Not

es:Y

ello

wsh

aded

cells

indi

cate

exce

eden

ces

ofcu

rren

treg

ulat

ory

stan

dard

s/gu

idel

ines

Page 14: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Amtrak

RochesterInterm

odalTran

sportation

Center

NYSDOTCo

ntractD0308

64,320

CentralA

venu

e,Ro

chester,NY

Tabl

e2

-RIT

C-7

Sam

ple

Res

ults

LOCA

TION

RIT

C-7

SAMPLINGDATE

2/20

/201

4LA

BSA

MPLEID

L14

0392

1-01

SAMPLEDEP

TH(ft.)

TCLP

VOC1.52.5';1.5'5

.0'

Cas

Num

NY

-CP5

1U

nits

Qua

lC

hlor

inat

edH

erbi

cide

sby

GC

-Wes

tbor

ough

Lab

ND

Gen

eral

Che

mis

try-W

estb

orou

ghLa

bS

olid

s,To

tal

NO

NE

%82

.1C

yani

de,T

otal

57-1

2-5

mg/

l0.

73J

pH(H

)12

408-

02-5

SU

7.3

Org

anoc

hlor

ine

Pes

ticid

esby

GC

-Wes

tbor

ough

Lab

ND

Pol

ychl

orin

ated

Bip

heny

lsby

GC

-Wes

tbor

ough

Lab

ND

Sem

ivol

atile

Org

anic

sby

GC

/MS

-Wes

tbor

ough

Lab

Ace

naph

then

e83

-32-

920

000

ug/k

g54

0Fl

uora

nthe

ne20

6-44

-010

0000

ug/k

g12

000

Nap

htha

lene

91-2

0-3

1200

0ug

/kg

460

Ben

zo(a

)ant

hrac

ene

56-5

5-3

1000

ug/k

g63

00B

enzo

(a)p

yren

e50

-32-

810

00ug

/kg

3700

Ben

zo(b

)fluo

rant

hene

205-

99-2

1000

ug/k

g66

00B

enzo

(k)fl

uora

nthe

ne20

7-08

-980

0ug

/kg

2200

Chr

ysen

e21

8-01

-910

00ug

/kg

7000

Ace

naph

thyl

ene

208-

96-8

1000

00ug

/kg

130

JA

nthr

acen

e12

0-12

-710

0000

ug/k

g17

00B

enzo

(ghi

)per

ylen

e19

1-24

-210

0000

ug/k

g23

00Fl

uore

ne86

-73-

730

000

ug/k

g83

0P

hena

nthr

ene

85-0

1-8

1000

00ug

/kg

8300

Dib

enzo

(a,h

)ant

hrac

ene

53-7

0-3

330

ug/k

g11

00In

deno

(1,2

,3-c

d)py

rene

193-

39-5

500

ug/k

g25

00P

yren

e12

9-00

-010

0000

ug/k

g79

00D

iben

zofu

ran

132-

64-9

ug/k

g51

02-

Met

hyln

apht

hale

ne91

-57-

6ug

/kg

560

Car

bazo

le86

-74-

8ug

/kg

630

Ben

zald

ehyd

e10

0-52

-7ug

/kg

230

JTC

LPH

erbi

cide

sby

EP

A13

11-W

estb

orou

ghLa

b

Page 15: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

APPENDIX CGEOTECHNICAL LABORATORY TEST RESULTS

Page 16: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: ---Sample ID: ---Depth : ---

Sample Type: ---Test Date: 02/24/14Test Id: 289449

Tested By: jbrChecked By: jdt

Moisture Content of Soil and Rock - ASTM D2216

Boring ID Sample ID Depth Description MoistureContent,%

RTC-5

RTC-5

RTC-8

J-3

J-9

J-1

9-11 ft.

21-23 ft.

3-5 ft.

Moist, brown silty sand

Moist, brown sandy silt

Moist, black silty sand with gravel

5.7

11.7

17.0

Notes: Temperature of Drying : 110º Celsius

Page 17: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: ---Sample ID: ---Depth : ---

Sample Type: ---Test Date: 02/24/14Test Id: 289452

Tested By: jbrChecked By: jdt

Specific Gravity of Soils by ASTM D 854-10 Boring ID Sample ID Depth Visual Description Specific

Gravity

RTC-5

RTC-5

RTC-8

J-3

J-9

J-1

9-11 ft.

21-23 ft.

3-5 ft.

Moist, brown silty sand

Moist, brown sandy silt

Moist, black silty sand with gravel

2.70

2.74

2.72

Notes: Specific Gravity performed by using method A (oven dried specimens) of ASTM D 854

Moisture Content determined by ASTM D 2216.

Page 18: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-5Sample ID: J-3Depth : 9-11 ft.

Sample Type: jarTest Date: 02/24/14Test Id: 289444

Tested By: jbrChecked By: jdt

Test Comment: ---Sample Description: Moist, brown silty sandSample Comment: ---

Particle Size Analysis - ASTM D422

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000Grain Size (mm)

% Cobble

---

% Gravel

0.0

% Sand

82.0

% Silt & Clay Size

18.0

Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies

#4

#10

#20

#40

#60

#100

#200

---

---

---

---

---

---

---

---

---

4.75

2.00

0.85

0.42

0.25

0.15

0.075

Particle Size (mm)

0.0332

0.0228

0.0128

0.0093

0.0065

0.0047

0.0033

0.0014

100

100

100

100

96

66

18

Percent Finer

12

9

7

6

5

4

3

1

Spec. Percent Complies

CoefficientsD =0.2085 mm85

D =0.1379 mm60

D =0.1193 mm50

D =0.0892 mm30

D =0.0513 mm15

D =0.0251 mm10

C =5.494u C =2.299c

ClassificationASTM Silty sand (SM)

AASHTO Silty Gravel and Sand (A-2-4 (0))

Sample/Test DescriptionSand/Gravel Particle Shape : ---

Sand/Gravel Hardness : ---

Dispersion Device : Apparatus A - Mech Mixer

Dispersion Period : 1 minute

Specific Gravity : 2.65

Separation of Sample: #200 Sieve

Page 19: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-5Sample ID: J-9Depth : 21-23 ft.

Sample Type: jarTest Date: 02/24/14Test Id: 289445

Tested By: jbrChecked By: jdt

Test Comment: ---Sample Description: Moist, brown sandy siltSample Comment: ---

Particle Size Analysis - ASTM D422

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000Grain Size (mm)

% Cobble

---

% Gravel

1.8

% Sand

39.1

% Silt & Clay Size

59.1

Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies

0.375 in

#4

#10

#20

#40

#60

#100

#200

---

---

---

---

---

---

---

---

---

9.50

4.75

2.00

0.85

0.42

0.25

0.15

0.075

Particle Size (mm)

0.0327

0.0215

0.0124

0.0091

0.0064

0.0046

0.0033

0.0014

100

98

94

90

86

82

75

59

Percent Finer

38

27

18

14

11

8

7

4

Spec. Percent Complies

CoefficientsD =0.3608 mm85

D =0.0779 mm60

D =0.0526 mm50

D =0.0243 mm30

D =0.0101 mm15

D =0.0057 mm10

C =13.667u C =1.330c

ClassificationASTM Sandy silt (ML)

AASHTO Silty Soils (A-4 (0))

Sample/Test DescriptionSand/Gravel Particle Shape : ROUNDED

Sand/Gravel Hardness : HARD

Dispersion Device : Apparatus A - Mech Mixer

Dispersion Period : 1 minute

Specific Gravity : 2.65

Separation of Sample: #200 Sieve

Page 20: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-1Depth : 3-5 ft.

Sample Type: jarTest Date: 02/24/14Test Id: 289446

Tested By: jbrChecked By: jdt

Test Comment: ---Sample Description: Moist, black silty sand with gravelSample Comment: ---

Particle Size Analysis - ASTM D422

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000Grain Size (mm)

% Cobble

---

% Gravel

21.3

% Sand

56.8

% Silt & Clay Size

21.9

Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies

0.75 in

0.5 in

#4

#10

#20

#40

#60

#100

#200

---

---

---

---

---

---

---

---

---

19.00

12.50

4.75

2.00

0.85

0.42

0.25

0.15

0.075

Particle Size (mm)

0.0342

0.0228

0.0125

0.0093

0.0065

0.0047

0.0033

0.0014

100

96

79

67

57

47

39

31

22

Percent Finer

15

11

8

6

5

4

3

1

Spec. Percent Complies

CoefficientsD =6.8137 mm85

D =1.0796 mm60

D =0.5150 mm50

D =0.1415 mm30

D =0.0327 mm15

D =0.0176 mm10

C =61.341u C =1.054c

ClassificationASTM Silty sand with gravel (SM)

AASHTO Stone Fragments, Gravel and Sand(A-1-b (0))

Sample/Test DescriptionSand/Gravel Particle Shape : ROUNDED

Sand/Gravel Hardness : HARD

Dispersion Device : Apparatus A - Mech Mixer

Dispersion Period : 1 minute

Specific Gravity : 2.65

Separation of Sample: #200 Sieve

Page 21: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-5Sample ID: J-3Depth : 9-11 ft.

Sample Type: jarTest Date: 02/21/14Test Id: 289441

Tested By: camChecked By: jdt

Test Comment: ---Sample Description: Moist, brown silty sandSample Comment: ---

Atterberg Limits - ASTM D4318

Symbol Sample ID Boring Depth NaturalMoisture

Content,%

LiquidLimit

PlasticLimit

PlasticityIndex

LiquidityIndex

Soil Classification

J-3 RTC-5 9-11 ft. 6 n/a n/a n/a n/a Silty sand (SM)

Sample Determined to be non-plastic

0% Retained on #40 Sieve

Dry Strength: LOW

Dilatancy: RAPID

Toughness: n/a

The sample was determined to be Non-Plastic

Page 22: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-5Sample ID: J-9Depth : 21-23 ft.

Sample Type: jarTest Date: 02/21/14Test Id: 289442

Tested By: camChecked By: jdt

Test Comment: ---Sample Description: Moist, brown sandy siltSample Comment: ---

Atterberg Limits - ASTM D4318

Symbol Sample ID Boring Depth NaturalMoisture

Content,%

LiquidLimit

PlasticLimit

PlasticityIndex

LiquidityIndex

Soil Classification

J-9 RTC-5 21-23 ft. 12 n/a n/a n/a n/a Sandy silt (ML)

Sample Determined to be non-plastic

14% Retained on #40 Sieve

Dry Strength: HIGH

Dilatancy: RAPID

Toughness: n/a

The sample was determined to be Non-Plastic

Page 23: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-1Depth : 3-5 ft.

Sample Type: jarTest Date: 02/21/14Test Id: 289443

Tested By: camChecked By: jdt

Test Comment: ---Sample Description: Moist, black silty sand with gravelSample Comment: ---

Atterberg Limits - ASTM D4318

Symbol Sample ID Boring Depth NaturalMoisture

Content,%

LiquidLimit

PlasticLimit

PlasticityIndex

LiquidityIndex

Soil Classification

J-1 RTC-8 3-5 ft. 17 n/a n/a n/a n/a Silty sand with gravel (SM)

Sample Determined to be non-plastic

53% Retained on #40 Sieve

Dry Strength: LOW

Dilatancy: RAPID

Toughness: n/a

The sample was determined to be Non-Plastic

Page 24: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: ---Sample ID: ---Depth : ---

Sample Type: ---Test Date: 02/26/14Test Id: 289685

Tested By: jbrChecked By: jdt

Moisture Content of Soil and Rock - ASTM D2216

Boring ID Sample ID Depth Description MoistureContent,%

RTC-8

RTC-8

RTC-8

J-7

J-10

J-11

15-17 ft

21-23 ft

23-25 ft

Moist, dark brown silty sand

Moist, brown silty sand

Moist, brown sandy silt

13.6

13.4

10.6

Notes: Temperature of Drying : 110º Celsius

Page 25: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: ---Sample ID: ---Depth : ---

Sample Type: ---Test Date: 02/27/14Test Id: 289688

Tested By: jbrChecked By: jdt

Specific Gravity of Soils by ASTM D 854-10 Boring ID Sample ID Depth Visual Description Specific

Gravity

RTC-8

RTC-8

RTC-8

J-7

J-10

J-11

15-17 ft

21-23 ft

23-25 ft

Moist, dark brown silty sand

Moist, brown silty sand

Moist, brown sandy silt

2.70

2.71

2.73

Notes: Specific Gravity performed by using method A (oven dried specimens) of ASTM D 854

Moisture Content determined by ASTM D 2216.

Page 26: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-7Depth : 15-17 ft

Sample Type: jarTest Date: 02/26/14Test Id: 289677

Tested By: jbrChecked By: jdt

Test Comment: ---Sample Description: Moist, dark brown silty sandSample Comment: ---

Particle Size Analysis - ASTM D422

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000Grain Size (mm)

% Cobble

---

% Gravel

0.9

% Sand

67.1

% Silt & Clay Size

32.0

Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies

0.375 in

#4

#10

#20

#40

#60

#100

#200

---

---

---

---

---

---

---

---

---

9.50

4.75

2.00

0.85

0.42

0.25

0.15

0.075

Particle Size (mm)

0.0338

0.0210

0.0132

0.0090

0.0066

0.0047

0.0034

0.0016

100

99

97

94

86

72

54

32

Percent Finer

16

12

8

7

6

4

2

1

Spec. Percent Complies

CoefficientsD =0.4064 mm85

D =0.1779 mm60

D =0.1322 mm50

D =0.0679 mm30

D =0.0292 mm15

D =0.0168 mm10

C =10.589u C =1.543c

ClassificationASTM Silty sand (SM)

AASHTO Silty Gravel and Sand (A-2-4 (0))

Sample/Test DescriptionSand/Gravel Particle Shape : ---

Sand/Gravel Hardness : ---

Dispersion Device : Apparatus A - Mech Mixer

Dispersion Period : 1 minute

Specific Gravity : 2.65

Separation of Sample: #200 Sieve

Page 27: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-10Depth : 21-23 ft

Sample Type: jarTest Date: 02/26/14Test Id: 289678

Tested By: jbrChecked By: jdt

Test Comment: ---Sample Description: Moist, brown silty sandSample Comment: ---

Particle Size Analysis - ASTM D422

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000Grain Size (mm)

% Cobble

---

% Gravel

11.8

% Sand

43.5

% Silt & Clay Size

44.7

Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies

0.75 in

0.5 in

0.375 in

#4

#10

#20

#40

#60

#100

#200

---

---

---

---

---

---

---

---

---

19.00

12.50

9.50

4.75

2.00

0.85

0.42

0.25

0.15

0.075

Particle Size (mm)

0.0340

0.0222

0.0132

0.0089

0.0065

0.0047

0.0033

0.0016

100

93

90

88

85

82

78

73

64

45

Percent Finer

25

16

11

8

6

4

3

3

Spec. Percent Complies

CoefficientsD =1.9991 mm85

D =0.1290 mm60

D =0.0906 mm50

D =0.0414 mm30

D =0.0210 mm15

D =0.0118 mm10

C =10.932u C =1.126c

ClassificationASTM Silty sand (SM)

AASHTO Silty Soils (A-4 (0))

Sample/Test DescriptionSand/Gravel Particle Shape : ROUNDED

Sand/Gravel Hardness : HARD

Dispersion Device : Apparatus A - Mech Mixer

Dispersion Period : 1 minute

Specific Gravity : 2.65

Separation of Sample: #200 Sieve

Page 28: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-11Depth : 23-25 ft

Sample Type: jarTest Date: 02/26/14Test Id: 289679

Tested By: jbrChecked By: jdt

Test Comment: ---Sample Description: Moist, brown sandy siltSample Comment: ---

Particle Size Analysis - ASTM D422

0

10

20

30

40

50

60

70

80

90

100

0.0010.010.11101001000Grain Size (mm)

% Cobble

---

% Gravel

11.2

% Sand

37.7

% Silt & Clay Size

51.1

Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies

0.75 in

0.5 in

0.375 in

#4

#10

#20

#40

#60

#100

#200

---

---

---

---

---

---

---

---

---

19.00

12.50

9.50

4.75

2.00

0.85

0.42

0.25

0.15

0.075

Particle Size (mm)

0.0291

0.0214

0.0127

0.0087

0.0064

0.0046

0.0032

0.0016

100

95

93

89

84

79

75

70

64

51

Percent Finer

29

25

18

14

10

7

5

3

Spec. Percent Complies

CoefficientsD =2.5077 mm85

D =0.1224 mm60

D =0.0714 mm50

D =0.0305 mm30

D =0.0095 mm15

D =0.0062 mm10

C =19.742u C =1.226c

ClassificationASTM Sandy silt (ML)

AASHTO Silty Soils (A-4 (0))

Sample/Test DescriptionSand/Gravel Particle Shape : ROUNDED

Sand/Gravel Hardness : HARD

Dispersion Device : Apparatus A - Mech Mixer

Dispersion Period : 1 minute

Specific Gravity : 2.65

Separation of Sample: #200 Sieve

Page 29: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-7Depth : 15-17 ft

Sample Type: jarTest Date: 02/26/14Test Id: 289680

Tested By: camChecked By: jdt

Test Comment: ---Sample Description: Moist, dark brown silty sandSample Comment: ---

Atterberg Limits - ASTM D4318

Symbol Sample ID Boring Depth NaturalMoisture

Content,%

LiquidLimit

PlasticLimit

PlasticityIndex

LiquidityIndex

Soil Classification

J-7 RTC-8 15-17 ft 14 n/a n/a n/a n/a Silty sand (SM)

Sample Determined to be non-plastic

14% Retained on #40 Sieve

Dry Strength: HIGH

Dilatancy: RAPID

Toughness: n/a

The sample was determined to be Non-Plastic

Page 30: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-10Depth : 21-23 ft

Sample Type: jarTest Date: 02/26/14Test Id: 289681

Tested By: camChecked By: jdt

Test Comment: ---Sample Description: Moist, brown silty sandSample Comment: ---

Atterberg Limits - ASTM D4318

Symbol Sample ID Boring Depth NaturalMoisture

Content,%

LiquidLimit

PlasticLimit

PlasticityIndex

LiquidityIndex

Soil Classification

J-10 RTC-8 21-23 ft 13 n/a n/a n/a n/a Silty sand (SM)

Sample Determined to be non-plastic

22% Retained on #40 Sieve

Dry Strength: HIGH

Dilatancy: RAPID

Toughness: n/a

The sample was determined to be Non-Plastic

Page 31: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject: Rochester Intermodal Transportation Center Imp.Location: Rochester, NY Project No: GTX-300571Boring ID: RTC-8Sample ID: J-11Depth : 23-25 ft

Sample Type: jarTest Date: 02/26/14Test Id: 289682

Tested By: camChecked By: jdt

Test Comment: ---Sample Description: Moist, brown sandy siltSample Comment: ---

Atterberg Limits - ASTM D4318

Symbol Sample ID Boring Depth NaturalMoisture

Content,%

LiquidLimit

PlasticLimit

PlasticityIndex

LiquidityIndex

Soil Classification

J-11 RTC-8 23-25 ft 11 n/a n/a n/a n/a Sandy silt (ML)

Sample Determined to be non-plastic

25% Retained on #40 Sieve

Dry Strength: HIGH

Dilatancy: RAPID

Toughness: n/a

The sample was determined to be Non-Plastic

Page 32: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons Brinckerhoff

Project Name:

Project Location: Rochester, NYGTX #: 300571Test Date: 2/26/2014Tested By: daa/mthChecked By: mpdBoring ID: RTC-8Sample ID: Run No. 1Depth, ft: 30.20-30.55Sample Type: rock coreSample Description:

Peak Compressive Stress: 32,356 psi

Notes: Young's Modulus and Poisson's Ratio calculated using the tangent to the line in the stress range listed.Calculations assume samples are isotropic, which is not necessarily the case.

See photographsIntact material failure

0.24

11800-20400 7,560,000 0.33

20400-27000 7,740,000

3200-11800 6,630,000

0.49

Rochester Intermodal Transportation CenterImp.

Compressive Strength and Elastic Moduli of Rockby ASTM D 7012 - Method D

Stress Range, psi Young's Modulus, psi Poisson's Ratio

0

10000

20000

30000

40000

-4000 -2000 0 2000 4000 6000

Vert

ical

Stre

ss(p

si)

MicroStrain

Stress vs. Strain

Lateral Strain Axial Strain

Page 33: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Clie

nt:

Pars

ons

Brin

cker

hoff

Test

Dat

e:2/

25/2

014

Proj

ect

Nam

e:Roc

hest

erIn

term

odal

Tran

spor

tation

Cen

ter

Imp.

Test

edBy:

daa/

mth

Proj

ect

Loca

tion

:Roc

hest

er,N

YChe

cked

By:

mpd

GTX

#:

3005

71Bor

ing

ID:

RTC

-8Sam

ple

ID:

Run

No.

1D

epth

:30

.20-

30.5

5ft

Vis

ualD

escr

iption

:See

phot

ogra

phs

BU

LKD

EN

SIT

YD

EVIA

TIO

NFR

OM

ST

RA

IGH

TNE

SS

(Pro

ced

ure

S1

)

Spe

cim

enLe

ngth

,in

:M

axim

umga

pbe

twee

nsi

deof

core

and

refe

renc

esu

rfac

epl

ate:

Spe

cim

enD

iam

eter

,in

:Is

the

max

imum

gap

<0.

02in

.?YE

SSpe

cim

enM

ass,

g:Bul

kD

ensi

ty,

lb/f

t3M

inim

um

Dia

met

er

Tole

ren

ceM

et?

YES

Max

imum

differ

ence

mus

tbe

<0.

020

in.

Leng

thto

Dia

met

erRat

io:

Len

gth

toD

iam

ete

rR

atio

Tole

ran

ceM

et?

YES

Str

aig

htn

ess

Tol

era

nce

Me

t?Y

ES

EN

DFL

ATN

ES

SA

ND

PA

RA

LLEL

ISM

(Pro

ced

ure

FP1

)EN

D1

-0.8

75-0

.750

-0.6

25-0

.500

-0.3

75-0

.250

-0.1

250.

000

0.12

50.

250

0.37

50.

500

0.62

50.

750

0.87

5D

iam

eter

1,in

-0.0

0020

-0.0

0020

-0.0

0010

-0.0

0010

-0.0

0010

-0.0

0010

0.00

000

0.00

000

0.00

000

0.00

000

0.00

000

0.00

000

0.00

010

0.00

010

0.00

020

Dia

met

er2,

in(r

otat

ed90

o )0.

0004

00.

0004

00.

0003

00.

0003

00.

0002

00.

0002

00.

0001

00.

0000

00.

0000

00.

0000

0-0

.000

10-0

.000

10-0

.000

20-0

.000

30-0

.000

30D

iffe

renc

ebe

twee

nm

axan

dm

inre

adin

gs,

in:

0°=

0.00

040

90°

=0.

0007

0

END

2-0

.875

-0.7

50-0

.625

-0.5

00-0

.375

-0.2

50-0

.125

0.00

00.

125

0.25

00.

375

0.50

00.

625

0.75

00.

875

Dia

met

er1,

in-0

.000

20-0

.000

20-0

.000

20-0

.000

20-0

.000

10-0

.000

10-0

.000

100.

0000

00.

0000

00.

0000

00.

0000

00.

0000

00.

0000

00.

0001

00.

0001

0D

iam

eter

2,in

(rot

ated

90o )

0.00

050

0.00

050

0.00

040

0.00

030

0.00

030

0.00

020

0.00

010

0.00

000

0.00

000

0.00

000

-0.0

0010

-0.0

0010

-0.0

0020

-0.0

0020

-0.0

0030

Diffe

renc

ebe

twee

nm

axan

dm

inre

adin

gs,

in:

0°=

0.00

0390

°=

0.00

08M

axim

umdi

ffer

ence

mus

tbe

<0.

0020

in.

Diffe

renc

e=

+0.

0004

0Fl

atn

ess

Tol

era

nce

Me

t?Y

ES

DIA

MET

ER1

End

1:Slo

peof

Bes

tFi

tLi

ne0.

0001

9Ang

leof

Best

Fit

Line

:0.

0108

9

End

2:Slo

peof

Bes

tFi

tLi

ne0.

0001

8Ang

leof

Best

Fit

Line

:0.

0103

1

Max

imum

Angu

lar

Diff

eren

ce:

0.00

057

Pa

rall

eli

smTo

lera

nce

Met

?Y

ES

Sph

eric

ally

Seat

ed

DIA

MET

ER2

End

1:Slo

peof

Bes

tFi

tLi

ne-0

.000

42Ang

leof

Best

Fit

Line

:-0

.024

06

End

2:Slo

peof

Bes

tFi

tLi

ne-0

.000

46Ang

leof

Best

Fit

Line

:-0

.026

36

Max

imum

Angu

lar

Diff

eren

ce:

0.00

229

Pa

rall

eli

smTo

lera

nce

Met

?Y

ES

Sph

eric

ally

Seat

ed

PER

PE

ND

ICU

LAR

ITY

(Pro

ced

ure

P1

)(C

alcu

late

dfr

omEn

dFl

atne

ssan

dPa

ralle

lism

mea

sure

men

tsab

ove)

END

1D

iam

eter

(in.

)Slo

peAng

le°

Perp

endi

cula

rity

Tole

ranc

eM

et?

Max

imum

angl

eof

depa

rtur

em

ust

be<

0.25

°D

iam

eter

1,in

0.00

040

1.98

00.

0002

00.

012

Dia

met

er2,

in(r

otat

ed90

o )0.

0007

01.

980

0.00

035

0.02

0P

erp

en

dic

ula

rity

Tole

ran

ceM

et?

YE

S

END

2D

iam

eter

1,in

0.00

030

1.98

00.

0001

50.

009

Dia

met

er2,

in(r

otat

ed90

o )0.

0008

01.

980

0.00

040

0.02

3YE

SYE

S

1.98

1.98

1.98

545.

3516

52.

1

YES

Diff

eren

ce,

Max

imum

and

Min

imum

(in.

)

YES

4.07

4.07

4.07

UN

ITW

EIG

HT

DET

ERM

INATI

ON

AN

DD

IMEN

SIO

NAL

AN

DSH

APE

TOLE

RAN

CES

OF

RO

CK

CO

RE

SPE

CIM

ENS

BY

ASTM

D45

43

12

Ave

rage

y=

0.00

019x

-0.0

0003

-0.0

0200

-0.0

0100

0.00

000

0.00

100

0.00

200 -1

.00

-0.7

5-0

.50

-0.2

50.

000.

250.

500.

751.

00

DialGageReading,in

Dia

met

er,i

n

End

1D

iam

eter

1y

=-0

.000

42x

+0.

0000

6

-0.0

0200

-0.0

0100

0.00

000

0.00

100

0.00

200 -1

.00

-0.7

5-0

.50

-0.2

50.

000.

250.

500.

751.

00

DialGageReading,in

Dia

met

er,i

n

End

1D

iam

eter

2

y=

0.00

018x

-0.0

0006

-0.0

0200

-0.0

0100

0.00

000

0.00

100

0.00

200 -1

.00

-0.7

5-0

.50

-0.2

50.

000.

250.

500.

751.

00

DialGageReading,in

Dia

met

er,i

n

End

2D

iam

eter

1y

=-0

.000

46x

+0.

0000

9

-0.0

0200

-0.0

0100

0.00

000

0.00

100

0.00

200 -1

.00

-0.7

5-0

.50

-0.2

50.

000.

250.

500.

751.

00

DialGageReading,in

Dia

met

er,i

n

End

2D

iam

eter

2

Page 34: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Client: Parsons BrinckerhoffProject Name: Rochester Intermodal Transportation Center Imp.Project Location: Rochester, NYGTX #: 300571Test Date: 2/26/2014Tested By: daa/mthChecked By: mpdBoring ID: RTC-8Sample ID: Run No. 1Depth, ft: 30.20-30.55

After cutting and grinding

After break

Page 35: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rochester Intermodal Transportation Center Improvement GEOTECHNICAL & ENVIRONMENTAL DATA REPORT (GDR)

APPENDIX DSOIL SAMPLES, BOULDERS,AND ROCK CORE PHOTOS

Page 36: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-1 Depth: 5’-7’ Rec: 20” N=7

Page 37: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-2 Depth: 7’-9’ Rec: 12” N=3.5

Page 38: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-3 Depth: 9’-11’ Rec: 20” N=2.5

Page 39: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-4 Depth: 11’-13’ Rec: 17” N=2

Page 40: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-5 Depth: 13’-15’ Rec: 22” N=2

Page 41: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-6 Depth: 15’-17’ Rec: 17.5” N=2

Page 42: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-7 Depth: 17’-19’ Rec: 15” N=2

Page 43: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: J-8 Depth: 19’-21’ Rec: 18” N=10.5

Boring No: RTC-5 Sample Number: J-9 Depth: 21’-23’ Rec: 17” N=13.5

Page 44: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-5 Sample Number: C-1 (Boulder) Depth: 23’-25’ Rec: 24”

Page 45: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-1 Depth: 3’-5’(Sample was retrieved by hand excavation)

Boring No: RTC-8 Sample Number: J-2 Depth: 5’-7’ Rec: 15” N=5.5

Page 46: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-3 Depth: 7’-9’ Rec: 15” N=6

Page 47: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-4 Depth: 9’-11’ Rec: 12” N=3.5

Page 48: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-5 Depth: 11’-13’ Rec: 22” N=2.5

Boring No: RTC-8 Sample Number: J-6 Depth: 13’-15’ Rec: 16” N=1.5

Boring No: RTC-8 Sample Number: J-7 Depth: 15’-17’ Rec: 18” N=2

Page 49: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-9 Depth: 19’-21’ Rec: 16” N=5.5

Boring No: RTC-8 Sample Number: J-10 Depth: 21’-23’ Rec: 21” N=19Boring No: RTC-8 Sample Number: J-11 Depth: 23’-25’ Rec: 17” N=13.5

Page 50: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-12/T1 Depth: 25’-27’(Sample retrieved by Thin Wall Shelby Tube failed, transfer to Jar sample as J12)

Boring No: RTC-8 Sample Number: J-13 Depth: 27’-29’ Rec: 4” N=50/3”

Page 51: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Boring No: RTC-8 Sample Number: J-14 Depth: 29’-29.3’ Rec: 4” N=50/4”

Page 52: Phase II – Geotechnical & Environmental Data Report · Phase II – Geotechnical & Environmental Data Report CONTRACT D030864 PIN 4936.04 Rochester Intermodal Transportation Center

Rock Sample Number: R-1 Depth: 29.3’-34.0’ Rec 56” (100%) RQD 55” (98.2%)(R-1 from 30’1” to 31’ was shipped to the laboratory before boring complete)

Rock Sample Number: R-2 Depth: 34.0’-39.0’ Rec 58” (96.7%) RQD 58” (96.7%)Rock Sample Number: R-3 Depth: 39.0’-44.0’ Rec 60” (100%) RQD 60” (100%)