AECOM Phase 1 Geotechnical and Geo-environmental Desk Study Report 29 Capabilities on project: Environment Geotechnical Hazard Category (excluding contamination issues) Engineering Implications Underground mining Low. Refer to Section 4.7.2 Existing sub-structures (e.g. foundations, basements, and adjacent sub-structures) Foundations and basements from demolished buildings, underground utilities across the site Adverse ground chemistry (including expansive slags and weathering of sulphides to sulphates) None identified from the desk study 6.3 Foundations and Ground Engineering 6.3.1 Pavement Design For preliminary design purposes a California Bearing Ratio (CBR) of 2.5-3.0 is likely for the Glacial Clay but will need to be confirmed by geotechnical testing. Whereas in the Glacial Sand deposits a CBR of 40 maybe able to be achieved. 6.3.2 Foundation design WCCE Route: Although no structures are currently proposed for light to moderate loads, the ground conditions are expected to be suitable for the use of traditional spread foundations founded within the formation. Piled foundations may be considered for structures located in close proximity to existing trees or for more heavily loaded structures. The glacial till typically has a low shrinkage potential and therefore a minimum founding depth of 0.75m should be considered for preliminary design purposes. Footings should be taken deeper than 2m in the presence of Made Ground to at least 0.1m into the underlying glacial till. Similarly, footings should be taken deeper than the minimum depth specified, where structures are located within influencing distance of any existing or future trees. In these circumstances reference should be made to Chapter 4.2 of NHBC’s Standards (2011). A maximum net allowable bearing pressures of 75-150kN/m 2 may be anticipated for strip / spread foundations, if founded on glacial till (clay), and a bearing pressure of 200 to 600 kN/m 2 may be applied if founding on medium dense sand. These values are subject to confirmatory testing during the ground investigation stage. The construction of both bored and driven piles would be technically feasible at this site. However, due to the close proximity to other buildings, it is considered that driven piles are unlikely to be acceptable from an environmental/nuisance point of view. No groundwater was found in the historic boreholes and no obstructions were recorded. WCCE Substation: The ground conditions are expected to be suitable for the use of traditional spread foundations founded within the formation. Piled foundations may be considered for structures located in close proximity to existing trees or for more heavily loaded structures. The glacial till typically has a low shrinkage potential and therefore a minimum founding depth of 0.75m should be considered for preliminary design purposes. Footings should be taken deeper than 5m in the presence of Made Ground to at least 0.1m into the underlying glacial till. Similarly, footings should be taken deeper than the minimum depth specified, where structures are located within influencing distance of any existing or future trees. In these circumstances reference should be made to Chapter 4.2 of NHBC’s Standards (2011).

AECOM Phase 1 Geotechnical and Geo-environmental Desk ... · AECOM Phase 1 Geotechnical and Geo-environmental Desk Study Report 32 7.1 Summary The WCCE will be street running and

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

AECOM Phase 1 Geotechnical and Geo-environmental Desk Study Report 29

Capabilities on project:

Environment

Geotechnical Hazard Category

(excluding contamination issues)

Engineering Implications

Underground mining Low. Refer to Section 4.7.2

Existing sub-structures (e.g. foundations, basements, and adjacent sub-structures)

Foundations and basements from demolished buildings, underground utilities across the site

Adverse ground chemistry (including expansive slags and weathering of sulphides to sulphates)

None identified from the desk study

6.3 Foundations and Ground Engineering

6.3.1 Pavement Design

For preliminary design purposes a California Bearing Ratio (CBR) of 2.5-3.0 is likely for the Glacial Clay but will need to be

confirmed by geotechnical testing. Whereas in the Glacial Sand deposits a CBR of 40 maybe able to be achieved.

6.3.2 Foundation design

WCCE Route:

Although no structures are currently proposed for light to moderate loads, the ground conditions are expected to be suitable for the

use of traditional spread foundations founded within the formation. Piled foundations may be considered for structures located in

close proximity to existing trees or for more heavily loaded structures.

The glacial till typically has a low shrinkage potential and therefore a minimum founding depth of 0.75m should be considered for

preliminary design purposes.

Footings should be taken deeper than 2m in the presence of Made Ground to at least 0.1m into the underlying glacial till.

Similarly, footings should be taken deeper than the minimum depth specified, where structures are located within influencing

distance of any existing or future trees. In these circumstances reference should be made to Chapter 4.2 of NHBC’s Standards

(2011).

A maximum net allowable bearing pressures of 75-150kN/m2 may be anticipated for strip / spread foundations, if founded on glacial

till (clay), and a bearing pressure of 200 to 600 kN/m2 may be applied if founding on medium dense sand. These values are

subject to confirmatory testing during the ground investigation stage.

The construction of both bored and driven piles would be technically feasible at this site. However, due to the close proximity to

other buildings, it is considered that driven piles are unlikely to be acceptable from an environmental/nuisance point of view.

No groundwater was found in the historic boreholes and no obstructions were recorded.

WCCE Substation:

The ground conditions are expected to be suitable for the use of traditional spread foundations founded within the formation. Piled

foundations may be considered for structures located in close proximity to existing trees or for more heavily loaded structures.

The glacial till typically has a low shrinkage potential and therefore a minimum founding depth of 0.75m should be considered for

preliminary design purposes.

Footings should be taken deeper than 5m in the presence of Made Ground to at least 0.1m into the underlying glacial till.

Similarly, footings should be taken deeper than the minimum depth specified, where structures are located within influencing

distance of any existing or future trees. In these circumstances reference should be made to Chapter 4.2 of NHBC’s Standards

(2011).

AECOM Phase 1 Geotechnical and Geo-environmental Desk Study Report 30

Capabilities on project:

Environment

A maximum net allowable bearing pressures of 75kN/m2 may be anticipated for strip / spread foundations, if founded on glacial till

(clay), and a bearing pressure of 200 to 600 kN/m2 may be applied if founding on medium dense sand. These values are subject to

confirmatory testing during the ground investigation stage.

The construction of both bored and driven piles would be technically feasible at this site. However, due to the close proximity to the

Birmingham canal, it is considered that driven piles are unlikely to be acceptable from an environmental point of view.

No groundwater was found in the historic boreholes and no obstructions were recorded.

6.3.3 Ground Floor Slabs

Ground bearing floor slabs are thought to be suitable but are dependent on the thickness and consistency of the Made Ground

and the floor loading. The potential use of ground bearing floor slabs will be determined following the ground investigation.

6.3.4 Excavations

Shallow excavations for foundations and drainage are anticipated to be stable in the short term. Close or continuous support will

be required for any manned entry to excavations.

Shallow groundwater maybe encountered as a perched water table within the Made Ground. Detailed information regarding the

groundwater regime will be available following the ground investigation and subsequent monitoring.

Excavations should be relatively easy in the Glacial Till and Glacial Sand.

6.3.5 Soakaways

The ground conditions are unlikely to be suitable for the use of pit soakaways unless glacial sand is encountered. Therefore,

surface water run-off should be directed to main drainage subject to appropriate consent to discharge. The decision will depend

on the ground conditions identified from the ground investigation.

7 Recommendations for Further

Work

AECOM Phase 1 Geotechnical and Geo-environmental Desk Study Report 32

7.1 Summary

The WCCE will be street running and will extend 700 m from Bilston Street opposite the Crown and County Court along the

length of Piper’s Row to Railway Drive where it will head towards the existing railway station and terminate.

The WCCE may require additional traction power. If additional traction power is required an existing substation (known as

substation 2) situated on the Corner of Bilston Street and Chillington Street will be extended.

Based on a review of historical and current mapping the area within the vicinity of the WCCE experienced varied historical and

recent potentially contaminating industrial and commercial land uses and activities, including but not limited to railway land, sites

of activity foundries, engineering works, vehicle depots and garages, timber yards and dry cleaners. As such, there is a risk of

encountering ground contamination.

Ground gas including methane and carbon dioxide may be present associated with the Warwickshire Group, along with the

possible presence of Made Ground. The presence of ground gas should be investigated as part of a ground investigation during

detailed design. However, the risk posed by ground gas is routinely mitigated on development sites with the inclusion of ground

gas protection measures incorporated into the development. Therefore, ground gas is not considered to pose a significant risk to

the WCCE.

The Envirocheck Report states that basic radon protection measures are not required as the WCCE is not within an area that

experiences high levels of Radon. As such, radon is not considered to pose a significant risk.

The main geotechnical risk for the WCCE route is the possibility of encountering buried basements and buried foundations along

the alignment from current or historical foundations. For both sites the thicknesses of Made Ground encountered could lead to

poor founding conditions and excessive settlement. Any loose or deleterious material should be removed and replaced with

engineered fill. A CBR value for preliminary design purposes of 2.5-3.0 is likely for the Glacial Clay but will need to be confirmed

by geotechnical testing. Whereas in the Glacial Sand deposits a CBR of 40 maybe able to be achieved

The potential risks that have been identified have been assessed by the preliminary risk assessment as being very low to

medium with the majority being moderate/low risk. The risks identified are not uncommon for urban area, and the soils and

geology expected at the site. The risks may be mitigated by further assessment through intrusive ground investigation and risk

assessment at the detailed design stage, and if necessary the inclusion of routine construction measures for example, usage of

correct PPE for construction workers and ground gas protection measures. Therefore, the potential risks identified are not

considered to pose a significant risk to the WCCE.

7.2 Recommendations

Once the layout and nature of the WCCE are finalised a ground investigation will be required in order to inform the detailed

design of the site.

7 Summary and

Recommendations

8 References

AECOM Phase 1 Geotechnical and Geo-environmental Desk Study Report 34

British Geological Survey (2014) BGS GeoIndex [Internet], London, British Geological Survey. Available from: <

http://www.bgs.ac.uk/geoindex/> [Accessed 12th December 2013].

British Standards Institution (1999) BS 5930:1999 Code of practice for site investigations (+A2:2010). London, BSI.

British Standards Institution (2004) BS EN 1997-1:2004 Eurocode 7: Geotechnical design. General rules (incorporating

corrigendum February 2009). London, BSI.

British Standards Institution (2007) BS EN 1997-2:2007 Eurocode 7: Geotechnical design. Ground investigation and testing

(incorporating corrigendum June 2010). London, BSI.

British Standards Institution (2011) BS 10175:2011 Investigation of potentially contaminated sites – Code of practice. London,

BSI.

Building Research Establishment (2007) Soakaway design. Bracknell, BRE. (Digest 365).

Department for Communities and Local Government (2012) National Planning Policy Framework. London, HMSO.

Department for Environment, Food and Rural Affairs (2012) Environmental Protection Act 1990: Part 2A Contaminated Land

Statutory Guidance. London, HMSO.

Department for Environment, Food and Rural Affairs and Environment Agency (2004) Model Procedures for the Management of

Land Contamination. Bristol, Environment Agency. (Contaminated Land Report 11).

Environment Agency (2008) Groundwater protection: Policy and practice (GP3), Part 4 – Legislation and Policies. Bristol,

Environment Agency.

Environment Agency (2009) River Basin Management Plan Humber River Basin District, Annex B: water body status objectives.

[Internet], Bristol, Environment Agency. Available from: < http://publications.environment-agency.gov.uk/pdf/GENE0910BSQT-E-

E.pdf> [Accessed 20th

December 2013]

Environment Agency (2014) What’s in your backyard? [Internet], Bristol, Environment Agency. Available from:

<http://www.environment-agency.gov.uk/homeandleisure/37793.aspx> [Accessed 12th December 2013].

Environmental Protection Act 1990 (c. 43) London, HMSO

Miles, J. and others (2007) Indicative Atlas of Radon in England and Wales. Nottingham, British Geological Survey and Didcot,

Health Protection Agency. (HPA-RPD-033).

National House Building Council (2011) NHBC Standards 2011. Part 4 – Foundations. Milton Keynes, NHBC.

National House Building Council and Environment Agency (2008) Guidance for the Safe Development of Housing on Land

Affected by Contamination. NHBC, Environment Agency and Chartered Institute of Environmental Health. (R&D Publication 66).

Scivyer, C. (2007) Radon: Guidance on protective measures for new buildings. Bracknell, IHS BRE Press. (BR 211).

Simpson, B. and others (1989) The engineering implications of rising groundwater levels in the deep aquifer beneath London.

London, CIRIA. (Special Publication SP 69).

Stone, K. and others (2009) Unexploded ordnance (UXO): a guide for the construction industry. London, CIRIA. (Publication

C681).

8 References

Figures

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

AECOM

AECOM House

179 Moss Lane

Altrincham

WA15 8FH

Tel: +44 (0)161 927 8200

Fax: +44 (0)161 927 8299

www.aecom.com

Copywright: OpenStreet Map (And Contributers)

Wolverhampton City Centre Metro

Extension

Centro

Date: 20/03/2014

Figure 1

Scheme Location

SCHEME LOCATION

PROPOSED

SUBSTATION

LOCATION

Appendices

Appendix A: Scheme Route Plan (WCCE-PDP-100)

PLA

NS

CA

LE1:500

©C

rown

copyright.A

llrightsreserved.

2009Licence

Num

ber100019543

101

102

123

PRO

JECT

NU

MB

ER

60274057

SHEET

TITLE

PLA

N

SHEET

NU

MB

ER

WC

CE

-PD

P-100

Project Management Initials: Designer: Checked: Approved:RPG MC REM ISO A1 594mm x 841mm

KEY

PLAN

CLIEN

T

Filename: F:\TP\PROJECT\TRAFFIC - WOLVERHAMPTON CITY CENTRE METRO EXTENSION\5 - DESIGN\5.1 - DRAWINGS\INTERNAL\WCCE-PDP-100_PLAN_2014.DWG Last saved by: CHILDA Last Plotted: 2014-01-21

CO

NSU

LTAN

T

AEC

OM

Colm

oreP

lazaC

olmore

Circus

Queensw

ay,B

IRM

ING

HA

MB4

6AT0121

2621900

tel0121

2621999

faxw

ww

.aecom.com

Printed

on___%

Post-Consum

erR

ecycledC

ontentPaper

PRO

JECT

WO

LVER

HAM

PTON

CITY

CEN

TRE

EXTEN

SION

I/RD

ATED

ESC

RIP

TION

ISSUE/R

EVISION

C01

MA

RC

H2013

FIRS

TISSU

E

C02

04/11/2013S

CH

EME

RE

VISED

C03

JAN

2014S

CH

EM

ER

EVISED

KEY

PR

OPO

SED

TRAM

ALIG

NM

EN

T

PR

OPO

SED

TRAM

STOP

PR

OP

OS

ED

REALIG

NED

KER

B

Appendix B: Site Walkover Photographs