Multiple Choice Single AnswerQuestion What do you mean by the project duration for which the total cost is minimum?Correct Answer Optimum durationYour Answer Optimum duration
Multiple Choice Multiple AnswerQuestion Lack of material planning results in the followingCorrect Answer Over ordering , under ordering , stockoutsYour Answer under ordering , stockouts , Over ordering
Multiple Choice Single AnswerQuestion Which kind of defect can be called as minor defect?Correct Answer Which does not reduce the usability of the product for its intended useYour Answer Which does not reduce the usability of the product for its intended use
Multiple Choice Single AnswerQuestion What does CPA stand for?Correct Answer Critical Path AnalysisYour Answer Critical Project Analysis
True/FalseQuestion Grouping of machines gives a lot of flexibility in loading and schedulingCorrect Answer True
Your Answer True
True/FalseQuestion Fixed cost is lower in case of continuous production than intermittent production.Correct Answer FalseYour Answer False
Select The BlankQuestion Function concerned with fixation of time allowed to qualified worker for a job is
called ________.Correct Answer Work MeasurementYour Answer Time Measurement
Select The BlankQuestion The design of any layout is governed by large number of factors and the bestlayout is expected to ________ all these factors.
8/8/2019 p and o mng
2/182
Correct Answer OptimiseYour Answer Consider
Multiple Choice Multiple Answer
Question Which of the following is not the characteristic of Project Production?Correct Answer Continuous flow of material , Highly mechanised material handling , Virtuallyzero manufacturing cycle timeYour Answer Continuous flow of material , Highly mechanised material handling , Virtuallyzero manufacturing cycle time
Multiple Choice Single AnswerQuestion The process of changing inputs into outputs thereby adding some value to entitycan be defined asCorrect Answer Operation
Your Answer Operation
Multiple Choice Multiple AnswerQuestion Which of the following cases can be treated as delay during recording of methodstudy?Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turnat tools stores , Jobs awaiting at the machines for their turnYour Answer Operators awaiting instructions from supervisor , Worker waiting for his turn attools stores , Jobs awaiting at the machines for their turn
True/FalseQuestion Root cause of most of the breakdowns is failure of the lubrication system.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Which of the following are steps to identify the critical path in a small network?Correct Answer Compare the durations of all paths to identify the longest path. , Sum upthe durations of activities along each path. , Enumerate all paths in the network and list
down activities on each path.Your Answer Compare the durations of all paths to identify the longest path. , Sum up thedurations of activities along each path. , Enumerate all paths in the network and list downactivities on each path.
Match The FollowingQuestion Correct Answer Your Answer
8/8/2019 p and o mng
3/182
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple AnswerQuestion What are the benefits of overhauling?Correct Answer It increases useful life of an equipment and it's parts , Advance planningallows to attend equipment without disturbing the production programme , Advanceplanning allows to prepare and keep ready the list of replacement spares
Your Answer It increases useful life of an equipment and it's parts , Advance planning allowsto attend equipment without disturbing the production programme , Advance planningallows to prepare and keep ready the list of replacement spares
True/FalseQuestion The event numbers as far as possible reflect the logical relationships of theactivities.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Technique of Value Engineering can be effectively employed in design of a producttoCorrect Answer To meet the intended function at lowest costYour Answer To meet the intended function at lowest cost
True/FalseQuestion Proper care and storage is not an essential part of a well planned lubricationsystem.
Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion A good plant layout helps inCorrect Answer Reducing handling costsYour Answer Reducing handling costs
8/8/2019 p and o mng
4/182
Multiple Choice Multiple AnswerQuestion Scale model used for layout analysis have following advantagesCorrect Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be
shown , Models can be shifted easilyYour Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can beshown , Models can be shifted easily
Multiple Choice Single AnswerQuestion The ratio of output to input of a production system is commonly known asCorrect Answer ProductivityYour Answer Productivity
Multiple Choice Multiple AnswerQuestion Which of the following products should be produced by using mass production?Correct Answer Refrigerator , Tyre for automobile , Television SetYour Answer Refrigerator , Tyre for automobile , Television Set
True/FalseQuestion Theoretical capacity equals number of normal working hours of that machine.Correct Answer TrueYour Answer True
True/FalseQuestion It is not necessary to know spare time available on the non-critical path to allow alittle delay for noncritical activity.Correct Answer FalseYour Answer False
Select The BlankQuestion Production Planning is a centralised activity which includes functions such as
________
Correct Answer SchedulingYour Answer Scheduling
True/FalseQuestion In case of X bar-R charts,it is ensured that the assignable causes are detectedbefore the tolerances are violated, upper and lower statistical limits are worked out andinserted into a chart.
8/8/2019 p and o mng
5/182
Correct Answer TrueYour Answer True
Select The Blank
Question The ________ is the process of assigning calender dates to the various operationsof a job.Correct Answer SchedulingYour Answer Scheduling
Select The BlankQuestion An Ideal OC curve is ________ shaped curve that accpets all the lots with qualityequal to or better than AQL .Correct Answer RectangularYour Answer Rectangular
Multiple Choice Single AnswerQuestion Any premise in which persons are employed for purpose of making any product/sis calledCorrect Answer FactoryYour Answer Factory
Multiple Choice Multiple AnswerQuestion Which of the following cases indicates change in physical characteristic?
Correct Answer Turning , Grinding , DrillingYour Answer Turning , Grinding , Drilling
Match The FollowingQuestion Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The BlankQuestion Two welknown timing methods are cumulative method and ________.
8/8/2019 p and o mng
6/182
Correct Answer Fly back methodYour Answer Continuous method
Multiple Choice Single Answer
Question How many types of charts are used for the purpose of method study?Correct Answer FourYour Answer Eight
True/FalseQuestion Sampling inspection suffice to check the work of line inspectors and stageinspectors.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Where the ignorance towards the degradation of machine leads to?Correct Answer Eventual breakdownYour Answer Eventual breakdown
Multiple Choice Single AnswerQuestion One of the sophisticated operations research techniques used in material planningisCorrect Answer Dynamic programming
Your Answer Dynamic programming
Multiple Choice Single AnswerQuestion Which of the following policies is advisable in case of low product variety and largevolumes?Correct Answer Low Skilled Labour & Special Purpose MachinesYour Answer Low Skilled Labour & Special Purpose Machines
True/False
Question It pays in the long run to inform the customer regarding expected delays in thedeliveries.Correct Answer TrueYour Answer True
Select The BlankQuestion The ________ is a set of tools and techniques by which products are made to
8/8/2019 p and o mng
7/182
comply with the specifications at minimum cost to the firm.Correct Answer Quality control systemYour Answer Quality control system
Select The BlankQuestion A ________ is another typical chart which is used to record frequency of movements between work centers.Correct Answer Travel chartYour Answer Frequency chart
True/FalseQuestion Cent percent inspection does not mean inspection of component for 100% qualitycharacteristics.Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Route Sheet generally contains following informationCorrect Answer Material Specification , Sequence of operation , Skill of LabourYour Answer Material Specification , Sequence of operation , Skill of Labour
Select The BlankQuestion Any incentive scheme must achieve the ________ of the organisation.
Correct Answer ObjectivesYour Answer Tax goals
Multiple Choice Single AnswerQuestion Document raised by Sales department for goods manufactured to stock is calledCor