JB LS1 LS3 LS6 LS5 LS4 2 2 2 1 1 3 #8AWG + GRD -53mmC 3 #8AWG + GRD -53mmC APPROXIMATE LOCATION OF ELECTRICAL ROOM JB 3 #8AWG + GRD -53mmC 3 #8AWG + GRD -53mmC APPROXIMATE LOCATION OF EXISTING JUNCTION BOX 2x (3 8AWG) + GRD 2 #8AWG + GRD OVERBROOK PARK - SITE LAYOUT 1:200 1 E1 NEW LED LIGHT STANDARD AND POLE NEW LIGHT STANDARD AND CIRCUIT NUMBER IDENTIFICATION NEW UNDERGROUND CONDUIT LS# 1 (TYPICAL) ELECTRICAL NOTES: PROVIDE AND INSTALL NEW 240V LED TYPE 'A' LIGHT STANDARD c/w CONCRETE POLE ASSEMBLY. PROVIDE AND INSTALL A NEW 'ON' PUSHBUTTON ON LS2 POLE. NEW PUSHBUTTON TO BE ENCLOSED IN WEATHERPROOF/WATERTIGHT ENCLOSURE.COORDINATE PUSHBUTTON ENCLOSURE MOUNTING WITH POLE MANUFACTURER. APPROXIMATE LOCATION OF ELECTRICAL ROOM. CONTRACTOR TO PROVIDE NEW CONTACTOR AND CONNECT TO EXISTING TIMECLOCK/NEW PUSHBUTTON FOR LIGHTING CONTROL. CONNECT NEW RINK LIGHTING TO x2 NEW 20A-2P BREAKERS. ALSO PROVIDE NEW BREAKER/WIRING FOR PUSHBUTTON CONTROL. PROVIDE NEW 53mmC FROM NEW JUNCTION BOX (LOCATED NEAR EXISTING JUNCTION BOX) TO BE RUN DOWN OUTSIDE WALL TO EXTERIOR. PROVIDE TRENCHING/SAWCUT TO ALLOW FOR NEW CONDUIT RUN. CONTRACTOR TO COORDINATE USE OF LIFT DEVICE WITH CLIENT. EXISTING GYMNASIUM FLOOR SHALL BE PROTECTED AND MAINTAINED TO EXISTING CONDITION. TYPE OF LIFT USED SHALL BE DESIGNED FOR SUCH USE AND PRIOR APPROVED BY CLIENT. 1 2 3 4 2 5 3 cct# 5 4 6 6

OVERBROOK PARK - SITE LAYOUT - Ottawadocuments.ottawa.ca/sites/documents.ottawa.ca/files/documents/...drawings and specifications for examination and approval prior to commencement

Embed Size (px)

Citation preview

JB

LS1

LS3

LS6

LS5

LS4

2

2

2

1

1

3 #8AWG + GRD

-53mmC

3 #8AWG + GRD

-53mmC

APPROXIMATE LOCATION

OF ELECTRICAL ROOM

JB

3 #8AWG + GRD

-53mmC

3 #8AWG + GRD

-53mmC

APPROXIMATE LOCATION

OF EXISTING JUNCTION BOX

2x (3 8AWG) + GRD

2 #8AWG + GRD

OVERBROOK PARK - SITE LAYOUT

1:200

1

E1

NEW LED LIGHT STANDARD AND POLE

NEW LIGHT STANDARD AND CIRCUIT

NUMBER IDENTIFICATION

NEW UNDERGROUND CONDUIT

LS#

1

(TYPICAL)

ELECTRICAL NOTES:

PROVIDE AND INSTALL NEW 240V LED TYPE 'A' LIGHT STANDARD c/w CONCRETE

POLE ASSEMBLY.

PROVIDE AND INSTALL A NEW 'ON' PUSHBUTTON ON LS2 POLE. NEW PUSHBUTTON

TO BE ENCLOSED IN WEATHERPROOF/WATERTIGHT ENCLOSURE.COORDINATE

PUSHBUTTON ENCLOSURE MOUNTING WITH POLE MANUFACTURER.

APPROXIMATE LOCATION OF ELECTRICAL ROOM. CONTRACTOR TO PROVIDE NEW

CONTACTOR AND CONNECT TO EXISTING TIMECLOCK/NEW PUSHBUTTON FOR

LIGHTING CONTROL. CONNECT NEW RINK LIGHTING TO x2 NEW 20A-2P BREAKERS.

ALSO PROVIDE NEW BREAKER/WIRING FOR PUSHBUTTON CONTROL.

PROVIDE NEW 53mmC FROM NEW JUNCTION BOX (LOCATED NEAR EXISTING

JUNCTION BOX) TO BE RUN DOWN OUTSIDE WALL TO EXTERIOR.

PROVIDE TRENCHING/SAWCUT TO ALLOW FOR NEW CONDUIT RUN.

CONTRACTOR TO COORDINATE USE OF LIFT DEVICE WITH CLIENT. EXISTING

GYMNASIUM FLOOR SHALL BE PROTECTED AND MAINTAINED TO EXISTING

CONDITION. TYPE OF LIFT USED SHALL BE DESIGNED FOR SUCH USE AND PRIOR

APPROVED BY CLIENT.

1

2

3

4

2

5

3

cct#

5

4

6

6

LIGHTING CONTROL DESCRIPTION:

1. THE NEW RINK LIGHTING IS TO BE CONTROLLED BY A DIGITAL TIME

CLOCK, PUSH-BUTTON AND CONTACTORS AS INDICATED TO PRESET A

SHUTDOWN TIME (11:00P.M.)

2. THE RINK LIGHTING WILL BE ENERGIZED BY A PUSH-BUTTON

MOUNTED ON THE EXTERIOR OF THE BUILDING. THE DIGITAL

TIMECLOCK WILL NOT ALLOW LIGHTS TO BE ENERGIZED BY

PUSHBUTTON UNLESS THE PRESET TIME IS REACHED. THE LIGHTING

WILL TURN OFF BY TIMECLOCK WHEN THE PRESET OFF TIME IS

REACHED.

3. THE RINK LIGHTING CONTACTOR - H.O.A. SWITCH LOCATED IN THE

ELECTRICAL ROOM WILL ALLOW THE USER TO BYPASS THE

PUSH-BUTTON AND DIGITAL TIMECLOCK, THEREFORE ALLOWING THE

RINK LIGHTING TO TURN ON WHEN REQUIRED.

4. CONTACT TR1A N.O. PREVENTS THE START BUTTON FROM

ENERGIZING THE RINK LIGHTING CONTACTOR.

5. START PUSH-BUTTON ENERGIZES CONTACTOR C1 IF TR1 PERMITS

AND CONTACT C1 N.O. CLOSES AND MAINTAINS THE CONTACTOR.

DIGITAL TIMECLOCK CONTACT DESCRIPTION

LED

SOD

LED LIGHT STANDARD. (TYP. OF 6)

NEW RINK LIGHTING TO MEET CITY OF OTTAWA RINK LIGHTING CRITERIA FOR

AVERAGE AND UNIFORMITY ILLUMINATION LEVELS. CONTRACTOR TO SUBMIT A

HARD COPY COMPUTER SIMULATION DEPICTING PROPOSED LIGHTING LEVELS FOR

APPROVAL.

CABLE/DUCT TRENCH DETAIL (TYP.)

NTS

A

E2

LIGHTING CONTROL SCHEMATIC

NTS

B

E2

DIRECT BURIED POLE DETAIL

NTS

C

E2

1. INSTALLATION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES AND BY-LAWS AND BE INSTALLED BY

WORKMEN SKILLED IN THAT PARTICULAR PORTION OF THE CONTRACT. DO COMPLETE INSTALLATION IN

ACCORDANCE WITH CSA C22.1-2012.

2. EXAMINE SITE AND LOCAL CONDITIONS AFFECTING WORK UNDER THIS DIVISION TO ENSURE THAT ALL WORK

CAN BE SATISFACTORILY CARRIED OUT WITHOUT CHANGES TO DRAWINGS. NO ALLOWANCES WILL BE MADE

LATER FOR ANY EXPENSE INCURRED THROUGH FAILURE TO MAKE THIS EXAMINATION. START OF WORK WILL BE

DEEMED EVIDENCE OF ACCEPTANCE OF, AND SATISFACTION WITH, EXISTING CONDITIONS.

3. PERMITS, FEES AND INSPECTION:

SUBMIT TO ELECTRICAL INSPECTION DEPARTMENT AND SUPPLY AUTHORITY NECESSARY NUMBER OF

DRAWINGS AND SPECIFICATIONS FOR EXAMINATION AND APPROVAL PRIOR TO COMMENCEMENT OF WORK. PAY

ASSOCIATED FEES. NOTIFY ENGINEER OF CHANGES REQUIRED BY ELECTRICAL INSPECTION DEPARTMENT

PRIOR TO MAKING CHANGES. FURNISH TO ENGINEER CERTIFICATES OF ACCEPTANCE FROM ELECTRICAL

INSPECTION DEPARTMENT ON COMPLETION OF WORK.

4. GUARANTEE ALL WORK FOR 12 MONTHS FROM DATE OF ACCEPTANCE.

5. COORDINATE ALL WORK WITH OTHER CONTRACTORS WORKING ON THIS PROJECT.

6. PERSONNEL PROTECTION / EQUIPMENT PROTECTION:

ENSURE THAT ALL PRECAUTIONS ARE TAKEN TO PROTECT ALL PERSONNEL FROM HAZARDS DURING THE

WORK. PROTECT ALL EQUIPMENT FROM DAMAGE FROM ANY CAUSE.

7. SCOPE OF WORK:

PERFORM ALL WORK SHOWN ON CONTRACT DRAWINGS AND AS COVERED IN THESE SPECIFICATIONS.

8. CLEAN UP:

DURING THE COURSE OF CONSTRUCTION AND UPON COMPLETION, REMOVE ALL RUBBISH AND WASTE

RESULTING FROM THIS WORK. CHECK, CLEAN AND REPAINT WHERE NECESSARY ALL ELECTRICAL EQUIPMENT

AND LEAVE IN A FIRST-CLASS CONDITION. PROVIDE FOR THE DAILY REMOVAL OF ELECTRICAL WASTE AND

DEBRIS FROM THE SITE.

9. MAINTAINING SERVICES:

REINSTATE, AS SOON AS POSSIBLE, ANY EXISTING CIRCUITS DISRUPTED DURING DEMOLITION OR

CONSTRUCTION NOT INTENDED TO BE REMOVED AS PART OF THIS CONTRACT. ANY EXISTING SERVICE THAT IS

TO REMAIN AND IS UNAVOIDABLY DISRUPTED DURING RENOVATION SHALL BE RESTORED TO ITS ORIGINALLY

FUNCTIONING STATE.

10. RESTORATION OF MATERIAL DAMAGE, CUTTING PATCHING AND MAKING GOOD:

COORDINATE, WITH OWNER, THE RESTORATION OF ANY BUILDING SURFACE OR INFRASTRUCTURE COMPONENT

THAT IS TO REMAIN AND IS DAMAGED AS A RESULT OF DEMOLITION (OR INSTALLATION) UNDER THIS DIVISION, IN

THIS PROJECT. THESE ITEMS SHALL BE RESTORED TO PRE-EXISTING CONDITION, THIS WORK INCLUDES

SURFACE FINISHES.

11. CLIENT COORDINATION:

COORDINATE JOB START-DATE AND WORKING HOURS WITH CLIENT OR CLIENTS REPRESENTATIVE. CO-

ORDINATE ANY ANTICIPATED ELECTRICAL SERVICE(S) DOWNTIME IN ADVANCE, WITH CLIENT, OR CLIENTS

REPRESENTATIVE.

12. MATERIALS AND EQUIPMENT:

NEW EQUIPMENT AND MATERIALS TO BE CSA CERTIFIED. WHERE THERE IS NO ALTERNATIVE TO SUPPLYING

EQUIPMENT WHICH IS NOT CSA CERTIFIED, OBTAIN SPECIAL APPROVAL FROM ELECTRICAL INSPECTION

DEPARTMENT.

13. EQUIPMENT SUBSTITUTION:

ALL EQUIPMENT SUPPLIED SHALL BE EXACTLY AS SPECIFIED HEREIN. SUBSTITUTIONS OR ALTERNATIVES TO

WHAT IS SPECIFIED WILL NOT BE ACCEPTED AFTER THE CLOSING OF TENDERS. SUBSTITUTION OR

ALTERNATIVES MUST BE SUBMITTED PRIOR TO TENDER CLOSING AND MUST BE APPROVED BY ENGINEER AND

OWNER. SUBSTITUTE OR EQUIVALENT EQUIPMENT MAY BE SUBMITTED FOR APPROVAL BUT ONLY DURING THE

TENDER PERIOD. AFTER TENDER CLOSES, NO SUBSTITUTE OR EQUIVALENT EQUIPMENT WILL BE APPROVED.

ALL EQUIVALENCY DECISIONS MADE BY THE ENGINEER WILL BE FINAL. THE BURDEN OF PROOF OF

EQUIVALENT PRODUCTS BOTH IN TERMS OF PERFORMANCE AND QUALITY SHALL BE ON THE CONTRACTOR.

14. EQUIPMENT IDENTIFICATION - LAMICOID NAMEPLATES:

ALL PULL-BOXES, PANELBOARDS, CONTACTORS OR OTHER SIMILAR EQUIPMENT FURNISHED IN THIS

SPECIFICATION, SHALL BE PROVIDED WITH ENGRAVED LAMICOID NAMEPLATES IDENTIFYING THE FUNCTION OF

EACH DEVICE. ALL LABELS LAMICOID 3mm THICK PLASTIC ENGRAVING SHEET WHITE FACE WITH BLACK CORE,

MECHANICALLY ATTACHED WITH SELF-TAPPING SCREWS: NAMEPLATES TO MATCH CITY OF OTTAWA

STANDARDS. NAMEPLATES FOR JUNCTION BOXES SHALL INDICATE SYSTEM AND VOLTAGE CHARACTERISTICS

TIMERS, CONTACTORS: INDICATE DEVICE NAME, EQUIPMENT BEING CONTROLLED AND VOLTAGE PULL BOXES:

INDICATE TYPE OF SYSTEM AND VOLTAGE

15. CSA AND MANUFACTURERS LABELS:

TO BE VISIBLE, ACCESSIBLE AND LEGIBLE AFTER EQUIPMENT IS INSTALLED.

16. CONDUITS, CONDUIT FITTINGS:

DRAWINGS DO NOT INDICATE ALL CONDUIT RUNS. THOSE INDICATED ARE IN DIAGRAMMATIC FORM ONLY.

EXTERIOR CONDUITS: RIGID PVC CONDUIT: SIZE AS INDICATED. INTERIOR CONDUITS: ELECTRICAL METALLIC

TUBING (EMT): WITH COUPLINGS, SIZE AS INDICATED. CONDUIT FASTENINGS: ONE HOLE STEEL STRAPS TO

SECURE SURFACE CONDUITS 50 MM AND SMALLER. TWO HOLE STEEL STRAPS FOR CONDUITS LARGER THAN

50mm. CONDUIT FITTINGS: FITTINGS: MANUFACTURED FOR USE WITH CONDUIT SPECIFIED. COATING: SAME AS

CONDUIT. FACTORY "ELLS" WHERE 90 DEGREE BENDS ARE REQUIRED FOR 25mm AND LARGER CONDUITS.

WATERTIGHT CONNECTORS AND COUPLINGS FOR EMT. SET-SCREWS ARE NOT ACCEPTABLE. EXPANSION

FITTINGS FOR RIGID CONDUIT: WEATHERPROOF EXPANSION FITTINGS WITH INTERNAL BONDING ASSEMBLY

SUITABLE FOR 200mm LINEAR EXPANSION. WATERTIGHT EXPANSION FITTINGS WITH INTEGRAL BONDING

JUMPER SUITABLE FOR LINEAR EXPANSION AND 19mm DEFLECTION IN ALL DIRECTIONS. WEATHERPROOF

EXPANSION FITTINGS FOR LINEAR EXPANSION AT ENTRY TO PANEL.

CONDUIT INSTALLATION:

INSTALL CONDUITS TO CONSERVE HEADROOM IN EXPOSED LOCATIONS AND CAUSE MINIMUM INTERFERENCE IN

SPACES THROUGH WHICH THEY PASS. USE ELECTRICAL METALLIC TUBING (EMT) FOR GENERAL USE, EXCEPT IN

CAST CONCRETE. BEND CONDUIT COLD. REPLACE CONDUIT IF KINKED OR FLATTENED MORE THAN 1/10TH OF

ITS ORIGINAL DIAMETER. MECHANICALLY BEND STEEL CONDUIT OVER 19mm DIA. FIELD THREADS ON RIGID

CONDUIT MUST BE OF SUFFICIENT LENGTH TO DRAW CONDUITS UP TIGHT. INSTALL FISH CORD IN EMPTY

CONDUITS. WHERE CONDUITS BECOME BLOCKED, REMOVE AND REPLACE BLOCKED SECTION. DO NOT USE

LIQUIDS TO CLEAN OUT CONDUITS. DRY CONDUITS OUT BEFORE INSTALLING WIRE. PROVIDE PULL (FISH) CORD:

IN EMPTY CONDUITS.

17. WIRE AND CABLES:

LL WIRING SHALL BE COPPER. MINIMUM SIZE OF 12 AWG. COPPER CONDUCTORS STRANDED FOR 10 AWG AND

LARGER. CONDUCTORS SIZED AS INDICATED ON PROJECT DRAWINGS WITH 600V INSULATION OF CHEMICALLY

CROSS-LINKED THERMOSETTING POLYETHYLENE MATERIAL RATED. INTERIOR CONDUCTORS TO BE RW90.

EXTERIOR CONDUCTORS TO BE RWU90. WIRING IDENTIFICATION: IDENTIFY WIRING WITH PERMANENT INDELIBLE

IDENTIFYING MARKINGS, EITHER NUMBERED OR COLOURED PLASTIC TAPES, ON BOTH ENDS OF PHASE

CONDUCTORS OF FEEDERS AND BRANCH CIRCUIT WIRING. MAINTAIN PHASE SEQUENCE AND COLOUR CODING

THROUGHOUT. USE COLOUR CODED WIRES IN COMMUNICATIONS SYSTEMS CABLES, MATCHED THROUGHOUT

THE SYSTEM. COLOUR CODE TO CSA C22.1

18. JUNCTION BOXES:

ALL JUNCTION BOXES SHALL BE COMPLETE WITH BLANK COVER PLATES. EXTERIOR PULL BOXES: SHALL BE PVC

CONSTRUCTED AND WEATHERPROOF/WATERTIGHT.

19. FOLLOW MANUFACTURERS' INSTRUCTIONS REGARDING THE HANDLING, INSTALLING AND TESTING OF THEIR

EQUIPMENT.

20. GROUNDING AND BONDING:

PROVIDE GROUNDING & BONDING TO CSA C22.2 No. 0.4-[M1982 (R1993)], BONDING AND GROUNDING OF

ELECTRICAL EQUIPMENT INSTALL COMPLETE PERMANENT, CONTINUOUS, SYSTEM AND CIRCUIT, EQUIPMENT,

GROUNDING SYSTEMS INCLUDING CONDUCTORS, CONNECTORS, ACCESSORIES, AS REQUIRED TO CONFORM TO

REQUIREMENTS OF LOCAL AUTHORITY HAVING JURISDICTION OVER INSTALLATION. WHERE EMT IS USED, RUN

GROUND WIRE IN CONDUIT.

21. TESTING AND INSPECTION:

TEST ALL WIRING AND EQUIPMENT AND CORRECT ANY FAILURE TO PERFORM. MAKE GOOD ANY DEFICIENCIES

NECESSARY TO OBTAIN THE ELECTRICAL INSPECTION CERTIFICATE AT NO COST TO THE OWNER.

22. LIGHTING FIXTURES (LUMINAIRES), COMPLETE WITH LAMPS AS FOLLOWS :

TYPE LAMP VOLTAGE DESCRIPTION

A LED 240V GLEON-AA-07-LED-E1-SL4 OR EQUIVALENT

(CONCRETE POLE USI HA-250-C-2PG-USI-20)

FIXTURE WIRING: MAKE CONNECTIONS OF WIRES TO TERMINALS OF LAMPHOLDER AND OTHER ACCESSORIES IN

A NEAT AND WORKMANLIKE MANNER AND WHICH ARE ELECTRICAL AND MECHANICALLY SECURE AND SAFE,

WITH NO LOOSE STRANDS PROTRUDING. PROVIDE WIRING CHANNELS AND WIREWAYS FREE FROM

PROJECTIONS AND ROUGH OR SHARP EDGES THROUGHOUT. AT POINT OR EDGES OVER WHICH THE

CONDUCTORS SHALL PASS AND MAY BE SUBJECT TO INJURY OR WEAR, ROUND EDGE TO MAKE A SMOOTH

CONTACT SURFACE WITH THE CONDUCTORS. INSTALL INSULATED BUSHINGS AT POINTS OF ENTRANCES AND

EXITS OF FLEXIBLE WIRING. PROTECT WIRING WITH GROMMET OR TUBING AT POINTS WHERE ABRASION MAY

OCCUR. CONCEAL WIRING WITHIN FIXTURE CONSTRUCTION EXCEPT WHERE THE FIXTURE DESIGN OR

MOUNTING DICTATES OTHERWISE.

23. CONCRETE POLE:

CONCRETE POLES TO NEMA SH5-1969 (R1974), DESIGNED FOR UNDERGROUND WIRING AND DIRECT BURIED

MOUNTING. STYLE: ROUND TAPERED (12" - 6" DIAMETER) ROUND FOR NUMBER OF LUMINAIRE MOUNTING

BRACKETS, AS INDICATED. THE POLES SHALL HAVE SUFFICIENT STRENGTH TO WITHSTAND STEADY WIND

SPEEDS OF 135 KM/H WITH A 1.3 GUST FACTOR. POLE TO BE C/W REQUIRED SUPPORTS AND ASSOCIATED

ACCESSORIES. CONCRETE POLE (MATERIAL) INFORMATION SHOWN FOR REFERENCE ONLY.

24. POLE EXECUTION:

POLES SHALL BE HANDLED USING SUITABLE NON-ABRASIVE SLINGS AT THE POLE PICK-UP POINTS SPECIFIED BY

THE POLE MANUFACTURER. MOUNT POLES AS INDICATED AND IN ACCORDANCE WITH THE MANUFACTURER'S

INSTRUCTIONS.

25. LIGHTING CONTACTOR(S):

TO CSA C22.2 NO.14

INSTALLED IN A CSA TYPE 2, EEMAC GREY

COIL VOLTAGE: 120VAC/60HZ

CONTACT RATINGS: 240VAC, 2P, 30A INDUCTIVE

AUXILIARY CONTACTS: NORMALLY OPEN AND CLOSED RATED FOR 120VAC.

PILOT LIGHTS: 120VAC LED PUSH-TO-TEST

APPROVED MANUFACTURERS: EATON CUTLER-HAMMER, SCHNEIDER, SIEMENS

26. DIGITAL TIMECLOCKS:

INSTALLED IN A METAL INDOOR/OUTDOOR ENCLOSURE NEMA 3R

STANDARD: cUL LISTED

INPUT VOLTAGE: 120VAC/60HZ

TIMING ACCURACY: LINE FREQUENCY

DISPLAY: LCD

TYPE: 24HR PERMANENT SCHEDULE RETENTION

MANUAL OVERRIDE ON/OFF

CLOCK FORMAT: 12HR, AUTOMATIC DAYLIGHT SAVINGS TIME AND LEAP YEAR COMPENSATION

BACKUP POWER: CAPACITOR, 100HRS, W/ POWER FAILURE INDICATION

CONTACT RATINGS: 120VAC, SPDT, 30A INDUCTIVE

APPROVED MANUFACTURERS: TORK MODEL E103B

27. LUMINAIRE INSTALLATION:

LUMINAIRES SHALL BE KEPT FREE OF CONDITIONS WHERE MOISTURE OR DIRT COULD DAMAGE THE BALLASTS

OR REFLECTING SURFACES OF THE OPTICAL SYSTEM. LUMINAIRES SHALL BE CHECKED FOR THE CORRECT

OPTICAL SYSTEM SETTINGS TO GIVE THE DESIGNATED TYPE OF LIGHT DISTRIBUTION. IF REQUIRED, THE

CONTRACTOR SHALL RESET THE LAMPHOLDER IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS

TO GIVE THE PROPER TYPE OF DISTRIBUTION INDICATED IN THE CONTRACT DOCUMENTS. LUMINAIRES SHALL

BE MOUNTED ON POLES AND SHALL BE INSTALLED LEVEL ALONG BOTH THE LONGITUDINAL AND TRANSVERSE

AXIS. LUMINAIRE CLAMPING ASSEMBLIES SHALL BE SECURELY TIGHTENED, UPON COMPLETION OF LEVELING,

TO PREVENT SHIFTING BY WIND.

RISER WIRES IN POLES SHALL BE TERMINATED AT TOP OF POLE. CONNECTIONS SHALL BE MADE WITH

COMPRESSION CONNECTORS INSULATED WITH INSULATING COVERS.

28. SHOP DRAWINGS:

PROVIDE SIX (6) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT: CONTACTOR, DIGITAL

TIMECLOCK, BREAKERS, LUMINAIRE, LAMP, BALLAST, CONCRETE POLE AND ACCESSORIES ANY ADDITIONAL

EQUIPMENT AS REQUIRED BY THE ENGINEER.

29. RECORD DRAWING:

SHOW ON THE RECORD DRAWINGS THE APPROXIMATE PATH OF RACEWAYS LINKING ALL OUTLETS, JUNCTION

AND PULL BOXES: THE LOCATION OF JUNCTION AND PULL BOXES, THE NUMBER AND SIZE OF CONDUCTORS IN

ALL RACEWAYS. SHOW ON THE RISER DIAGRAMS ALL JUNCTION BOXES AND PULL BOXES AND IDENTIFY THEM

WITH RESPECT TO LOCATION IN THE BUILDING. CROSS-REFERENCE THESE BOXES BETWEEN RISERS AND

FLOOR PLANS. TURN OVER TO THE ENGINEER TWO COMPLETE SETS OF `AS-BUILT' DRAWINGS UPON

COMPLETION OF THE PROJECT AND PRIOR TO FINAL PAYMENT.

30. LOAD BALANCE:

MEASURE PHASE CURRENT TO PANELBOARDS WITH NORMAL LOADS (LIGHTING) OPERATING AT TIME OF

ACCEPTANCE. ADJUST BRANCH CIRCUIT CONNECTIONS AS REQUIRED TO OBTAIN BEST BALANCE OF CURRENT

BETWEEN PHASES AND RECORD CHANGES. SUBMIT, AT COMPLETION OF WORK, REPORT LISTING PHASE AND

NEUTRAL CURRENTS ON PANELBOARDS, OPERATING UNDER NORMAL LOAD. STATE HOUR AND DATE ON WHICH

EACH LOAD WAS MEASURED, AND VOLTAGE AT TIME OF TEST.

31. FIELD QUALITY CONTROL:

INSULATION RESISTANCE TESTING: MEGGER CIRCUITS, FEEDERS AND EQUIPMENT UP TO 250 V WITH A 500V

INSTRUMENT. CHECK RESISTANCE TO GROUND BEFORE ENERGIZING. CARRY OUT TESTS IN PRESENCE OF

ENGINEER. PROVIDE INSTRUMENTS, METERS, EQUIPMENT AND PERSONNEL REQUIRED TO CONDUCT TESTS

DURING AND AT CONCLUSION OF PROJECT. SUBMIT TEST RESULTS FOR ENGINEER'S REVIEW.

32. COORDINATION OF PROTECTIVE DEVICES:

ENSURE CIRCUIT PROTECTIVE DEVICES SUCH AS OVERCURRENT TRIPS, RELAYS AND FUSES ARE INSTALLED TO

REQUIRED VALUES AND SETTINGS.

33. OPERATION AND MAINTENANCE MANUAL:

AT CLOSE OF CONTRACT, PRIOR TO COMMISSIONING, PROVIDE A THREE-RING BINDER CONTAINING A LISTING

OF ALL MAJOR ITEMS OF EQUIPMENT IN PROJECT (AND RELEVANT CATALOGUE NUMBERS). LIST ADDRESSES

AND TELEPHONE NUMBERS OF SUPPLIERS. WHERE APPLICABLE, INCLUDE MANUFACTURER DRAWINGS,

SPECIFICATIONS, MAINTENANCE AND OPERATING INSTRUCTIONS AND RECOMMENDATIONS. IDENTIFY NAME OF

PROJECT AND CITY OF OTTAWA PROJECT NUMBER, IN BOLD LETTERS, ON FRONT AND SPINE OF BINDER.

34. INSTRUCT, OR PROVIDE FOR INSTRUCTION OF CLIENT OR CLIENT DESIGNATED STAFF IN THE OPERATION OF

ANY SYSTEMS NEWLY INSTALLED IN THIS PROJECT.

35. DUCTBANK INSTALLATION:

TO REMOVE SAND, EARTH AND OTHER FOREIGN MATTER: PULL A STEEL MANDREL NOT LESS THAN 300mm LONG

AND 6mm LESS THAN THE INTERNAL DIAMETER OF DUCT THROUGH EACH INDIVIDUAL DUCT, FOLLOW THIS BY A

STIFF BRISTLE BRUSH. PULL A STIFF BRISTLE BRUSH THROUGH EACH DUCT IMMEDIATELY BEFORE PULLING IN

CABLES. IN EACH EMPTY DUCT INSTALL A POLYPROPYLENE PULL ROPE CONTINUOUS THROUGHOUT, WITH 3M

OF SPARE ROPE AT EACH END. INSTALL CABLE DUCT MARKERS AS REQUIRED ABOVE FINISHED DUCTS. END OF

SPECIFICATION