Information on City of Ottawa Area-Specific Development Charges AREA W-2 SHIRLEY’S BROOK STORMWATER FACILITIES Effective May 22, 2019 BY-LAW 2019-163 For information on the main By-Law 2019-163 or other area-specific stormwater by-laws, please consult individual pamphlets. PURPOSE Development charges fund a portion of the growth-related capital costs required to meet the increased need for services resulting from residential and non-residential development. The funds may only be used for the purpose for which they are collected. CALCULATION Location, type of dwelling, number of bedrooms and gross floor area are the major factors impacting the amount of development charges owing at building permit issuance. INDEXING OF RATES The various rates will be indexed annually beginning on April 1, 2020. The indexing is based on annual changes to the Statistics Canada Infrastructure Construction Price Index. Please refer to the reverse side for specific rates. NON-STATUTORY EXEMPTIONS The following are the major types of development that are either wholly or partially exempt from the payment of development charges payable: - Every place of worship and the land used in connection therewith, other than the charge for public transit. The exemption from develop- ment charges other than public transit is limited to a place of worship to a maximum of 5,000 square feet or in respect of that portion of the gross floor area of a place of worship which is used as an area for worship, whichever is greater; - Non-residential use buildings used for bona fide agricultural purpos- es, including buildings on a fairgrounds of an agricultural society; - A residential use building erected and owned by non-profit housing, provided that satisfactory evidence is provided to the Treasurer that the residential use building is intended for persons of low or modest incomes and that the dwelling units are being made available at values that are initially and will continue to be below current market levels in the City; - A non-profit health care facility only with respect to the capital cost that is not reimbursed or subsidized by either the Provincial or Federal Governments; - Where specifically authorized by a resolution of Council; de- velopment on land owned by a non-profit corporation provider of child care and long- term care facilities and development on land where a public facility is being provided. - The creation of a coach house. Note: There are additional statutory and non-statutory exemptions listed within the DC By-law. REDEVELOPMENT A credit will be provided against development charges owing where buildings or structures have been demolished, other than a derelict building, to allow for the redevelopment of the site. The eligibility for credits is restricted to demolitions that occur within five years of the redevelopment of the property. The credits provided are not transferable to another parcel of land. COLLECTION Development charges are generally payable and collected in full on the date that a building permit is issued. COMPLAINT A complaint may not be made later than 90 days after the day the development charge, or any part of it, is payable. The complaint must be in writing, must state the complainant’s name, the address where notice can be given to the complainant and the reasons for the complaint.

PURPOSE CALCULATION Area-Specific ... - documents.ottawa.ca

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Information on City of Ottawa

Area-Specific Development Charges

AREA W-2 SHIRLEY’S BROOK

STORMWATER FACILITIES

Effective May 22, 2019

BY-LAW 2019-163

For information on the main By-Law 2019-163 or other area-specific stormwater by-laws,

please consult individual pamphlets.

PURPOSEDevelopment charges fund a portion of the growth-related capital costs required to meet the increased need for services resulting from residential and non-residential development. The funds may only be used for the purpose for which they are collected.

CALCULATIONLocation, type of dwelling, number of bedrooms and gross floor area are the major factors impacting the amount of development charges owing at building permit issuance.

INDEXING OF RATESThe various rates will be indexed annually beginning on April 1, 2020. The indexing is based on annual changes to the Statistics Canada Infrastructure Construction Price Index. Please refer to the reverse side for specific rates.

NON-STATUTORY EXEMPTIONSThe following are the major types of development that are either wholly or partially exempt from the payment of development charges payable:

- Every place of worship and the land used in connection therewith, other than the charge for public transit. The exemption from develop-ment charges other than public transit is limited to a place of worship to a maximum of 5,000 square feet or in respect of that portion of the gross floor area of a place of worship which is used as an area for worship, whichever is greater;

- Non-residential use buildings used for bona fide agricultural purpos-es, including buildings on a fairgrounds of an agricultural society;

- A residential use building erected and owned by non-profit housing, provided that satisfactory evidence is provided to the Treasurer that the residential use building is intended for persons of low or modest incomes and that the dwelling units are being made available at values that are initially and will continue to be below current market levels in the City;

- A non-profit health care facility only with respect to the capital cost that is not reimbursed or subsidized by either the Provincial or Federal Governments;

- Where specifically authorized by a resolution of Council; de-velopment on land owned by a non-profit corporation provider of child care and long- term care facilities and development on land where a public facility is being provided.

- The creation of a coach house.

Note: There are additional statutory and non-statutory

exemptions listed within the DC By-law.

REDEVELOPMENTA credit will be provided against development charges owing where buildings or structures have been demolished, other than a derelict building, to allow for the redevelopment of the site. The eligibility for credits is restricted to demolitions that occur within five years of the redevelopment of the property. The credits provided are not transferable to another parcel of land.

COLLECTIONDevelopment charges are generally payable and collected in full on the date that a building permit is issued.

COMPLAINTA complaint may not be made later than 90 days after the day the development charge, or any part of it, is payable. The complaint must be in writing, must state the complainant’s name, the address where notice can be given to the complainant and the reasons for the complaint.

REVISION / RÉVISION - 2019 / 03 / 06

I:\CO\2019\Location\StormwaterAreaMaps\ShirleysBrookW2

19-0241-D

J

©Parcel data is owned by Teranet Enterprises Inc. and its suppliersAll rights reserved. May not be produced without permission

THIS IS NOT A PLAN OF SURVEY

©Les données de parcelles appartient à Teranet Entreprises Inc. et à ses fournisseurs. Tous droits réservés. Ne peut être reproduit

sans autorisation. CECI N'EST PAS UN PLAN D'ARPENTAGE

Area W-2 /Secteur W-2

LOCATION MAP / PLAN DE LOCALISATIONZONING KEY PLAN / SCHÉMA DE ZONAGE

STATEMENT OF THE TREASURERThe annual statement documents the various transactions relating to the reserve funds such as opening and closing balances, interest earnings, funds allocated and borrowed. The annual statement is available by contacting Gary Baker, in the Planning Department, at (613) 580-2424 ext. 27406 or at [email protected]

MORE INFORMATIONFor more information concerning a building permit application, including the calculation and payment of development charges, please contact the Building Code Services Branch or the Client Service Line at 3-1-1.

This pamphlet and the information contained herein are intend-ed only to be used as a guide. Applicants should consult Build-ing Code Services staff to determine the applicable charges for specific development projects. Any discrepancy between this pamphlet and the By-law, the By-law shall prevail.

By-law 2019-163 Shirley’s Brook Stormwater Management FacilitiesSchedule B - Residential Development Charges

Development Charge per Dwelling Unit Type of Residential Use

SHIRLEY’S BROOK

Single-Detached Dwelling and

Semi-Detached Dwelling

Multiple Dwelling, Mobile Home & Row Dwelling

Apartment Dwelling

Stormwater Management Facility and Accessory Sewers

$ 2,734 $ 2,550 $ 1,636

Schedule C - Non-Residential Development ChargesDevelopment Charge per square foot of non-residential gross or total floor area

Shirley’s Brook Non-Residential

Stormwater Management Facility and Accessory Sewers $2.75

prom. Helmsdale Dr.

voie Flamborough Way

ch. March Valley Rd.

ch. K

londike Rd.

prom. Shirle y's Brook

Dr.

ch. Sandhill Rd.

ch. Maxwell B

ridge R

d.

av. Marconi Ave.

tsse. H

alto

n Te

rr.

ch. March Rd. Area W-2 /

Secteur W-2

THE LANDS TO WHICH THE BY-LAW APPLIES ARE AS SHOWN ON THE ATTACHED MAP AND ARE AS DESCRIBED IN SCHEDULE “A” OF THE BY-LAW.