DRAWING LIST
GENERAL CONSTRUCTION NOTES
SYMBOLS HOURS OF WORK AND PROCEDURES
PHASING
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-001
COVER
1
A-101
1
A-101
1
A-101
KEYNOTE01
W-01
D-01 DOOR MARKER
WINDOW MARKER
WORK, CONTROL, OR DATUM POINT
SECTION MARKER
DIMENSION TO FACE OF STUD OR MASONRY UNLESS NOTED OTHERWISE
DETAIL MARKER
1000WALL/PARTITION, FLOOR OR ROOF TYPEW1
TYP. INDICATES ALL AREAS ON SHEET MARKED WITH "CLOUD" ARE SAME REVISION NUMBER
REVISION1
TYP.
ELEVATION MARKERP-1 PLUMBING MARKER
1. THESE DRAWINGS AND THE SPECIFICATIONS FORM THE CONTRACT DOCUMENTS. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE THE ADDENDA AND MODIFICATIONS ISSUED BY THE ARCHITECT. ALL WORK, TO BE ACCEPTABLE, MUST BE IN COMPLIANCE WITH THESE DOCUMENTS, AND MUST BE OF A QUALITY EQUAL OR BETTER THAN THE STANDARD OF THE TRADE. ANY CONFLICTS OR DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE REFERRED TO THE ARCHITECT IN WRITING PRIOR TO PROCEEDING.
2. ALL CODES HAVING JURISDICTION ARE HEREBY MADE A PART OF THIS DOCUMENT AND ARE TO BE STRICTLY OBSERVED BY THE CONTRACTOR IN THE CONSTRUCTION OF THE PROJECT. THIS INCLUDES THE CURRENT EDITION OF THE ONTARIO BUILDING CODE INCLUDING AMENDMENTS. IN CASE OF CONFLICT BETWEEN THESE DOCUMENTS AND THE CODE, THE CODE SHALL PREVAIL. IN CASE OF CONFLICT OR DISCREPANCY IMMEDIATELY NOTIFY THE OWNER AND ARCHITECT.
3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURE AND FOR ALL SAFETY PROGRAMS AND PRECAUTIONS IN CONNECTION WITH THE PROJECT. NEITHER THE OWNER NOR THE ARCHITECT IS RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO FOLLOW PROPER SAFETY PROCEDURES.
4. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN WITH THE BEST PRESENT KNOWLEDGE. ANY DISCREPANCIES BETWEEN THE DOCUMENTS AND THE EXISTING CONDITIONS SHALL BE REFERRED TO THE ARCHITECT IN WRITING PRIOR TO PROCEEDING.
5. PRIOR TO BEGINNING WORK, CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ENSURE THAT ALL WORK IS BUILDABLE AS SHOWN. CONDITIONS THAT ARE NOT REFLECTIVE OF THAT WHICH IS SHOWN SHALL BE REFERRED TO THE ARCHITECT IN WRITING PRIOR TO COMMENCING CONSTRUCTION.
6. CONTRACTOR SHALL AT ALL TIMES PROVIDE PROTECTION TO MAINTAIN ALL WORK, MATERIALS, AND EQUIPMENT FREE FROM DAMAGE. SUPPLY HOARDING WALLS WITH LOCKING DOORS C/W CLOSERS, TO ISOLATE WORK AREA AS REQUIRED; SUPPLY THREE KEYS TO OWNERS' REPRESENTATIVE; SUPPLY DUST PROTECTION & COMPLY WITH OHSA & REGULATIONS CONCERNING DESIGNATED SUBSTANCES.
7. CONTRACTOR SHALL DEMOLISH/REMOVE FROM SITE ALL EXISTING CONSTRUCTION AND IMPROVEMENTS AS NECESSARY FOR COMPLETION OF WORK; CONTRACTOR SHALL SUPPLY SHORING C/W ENGINEERING WHERE NECESSARY AND AS REQUIRED.
8. PROVIDE CONSTRUCTION WASTE BIN AND RECYCLING BINS. RECYCLE ALL MATERIALS WHERE FACILITIES EXIST. A SMALL WASTE BIN CAN BE ACCOMMODATED ON SITE IN COOPERATION WITH THE OWNER. THE WASTE BIN SHALL NOT INTERRUPT THE DRIVE LANES, WILL BE MAINTAINED & PROTECTED AT THE SOLE EXPENSE OF THE CONTRACTOR. THE WASTE BIN WILL BE PROMPTLY DEMOBILIZED AT THE REQUEST OF THE OWNER. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR THE COST OF WASTE DISPOSAL.
9. MATERIALS, PRODUCTS AND EQUIPMENT SHALL ALL BE NEW, EXCEPT AS SPECIFICALLY NOTED OTHERWISE. SUPPLY SHOP DRAWINGS FOR REVIEW; PROVIDE A LETTER OF CONFIRMATION THAT SUPPLIES ARE IN INVENTORY IN ADVANCE OF MOBILIZATION.
10. CONTRACTOR TO PRECISELY LOCATE ALL UTILITIES PRIOR TO ANY CONSTRUCTION AND/OR EXCAVATION.
11. PATCH/REPAIR AND MAKE GOOD ALL SURFACES AFFECTED BY CONSTRUCTION. PROVIDE ADEQUATE BLOCKING AND/OR BRACING AT WALL HUNG OR WALL BRACED ITEMS. CUT AND PATCH FLOORS AS REQUIRED; SUPPLY AND INSTALL HIGH EARLY STRENGTH CONCRETE (24 HOURS MAX TO MEET REQUIRED STRENGTH) FOR ALL PATCHES/REPAIRS.
12. ALL WORK NOTED "BY OTHERS" OR "N.I.C." SHALL BE PROVIDED BY THE OWNER UNDER SEPARATE CONTRACT. COORDINATE AS REQUIRED TO ASSURE ORDERLY SEQUENCE OF INSTALLATION.
13. DO NOT SCALE DRAWINGS. ALL DIMENSIONS MARKED "CLEAR" SHALL BE MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL FINISHES.
14. "TYPICAL" OR "TYP." SHALL MEAN THAT THE CONDITION IS REPRESENTATIVE FOR SIMILAR CONDITIONS THROUGHOUT, UNLESS OTHERWISE NOTED (U.O.N.). "ALIGN" SHALL MEAN TO ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE. "SIMILAR OR "SIM." MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS.
15. SUBMIT SHOP DRAWINGS AND PRODUCT INFORMATION FOR REVIEW. PROVIDE WRITTEN CONFIRMATION THAT PRODUCT AND MATERIALS REQUIRED TO COMPLETE THE WORK ARE AVAILABLE PRIOR TO COMMENCING WORK.
ARCHITECTURALA-001 COVERA-002 SCHEDULESA-101 FEMALE WASHROOM FLOOR PLAN (FIRST FLOOR)A-102 FEMALE WASHROOM REFLECTED CEILING PLAN (FIRST FLOOR)A-103 FEMALE WASHROOM FLOOR PLAN & INTERIOR ELEVATIONS
(BASEMENT)A-201 INTERIOR ELEVATIONSA-202 INTERIOR ELEVATIONS & DETAILSA-501 DETAILS
MECHANICAL, ELECTRICAL, PLUMBINGM-01 COVER PAGEM-02 MECHANICAL SPECIFICATIONSM-03 MECHANICAL SPECIFICATIONS CONT'DM-04 WASTE AND VENT PIPING - DEMOLITION/NEW WORKM-05 DOMESTIC WATER SUPPLY - DEMOLITION/NEW WORKM-06 DRAINAGE/DOMESTIC WATER SUPPLY - DEMOLITION/NEW WORK
- GROUND FLOORE-01 ELECTRICAL PLAN & LEGENDE-01 ELECTRICAL SPECIFICATIONS
1. WORK CAN PROCEED 8AM TO 4PM MONDAY TO FRIDAY.
2. WORK FROM 8AM TO 4PM SATURDAY CAN BE ARRANGED IN COOPERATION WITH THE OWNER & WITH 48 HOURS WRITTEN NOTICE.
3. ANY PERSON ATTENDING THE SITE IS REQUIRED TOO SIGN-IN & SIGN-OUT AT THE OFFICE RECEPTION.
1. PHASE 1: SHOWERS & RELATED WORK - FEMALE WASHROOM, FIRST FLOOR
2. PHASE 2: ACCESSIBLE TOILET - FEMALE WSHROOM, BASEMENT
3. CONTRACTOR TO REVIEW WITH OWNER FOR WHICH PHASE STARTS FIRST. ALL WORK MUST BE COMPLETE AND READY FOR OCCUPANCY PRIOR TO STARTING SECOND PHASE.
F
DN 11R
UP 19R
HOARDING
FEMALEWASHROOM
LAUNDRYCORRIDOR
CORRIDOR
HOARDING1. SUPPLY HOARDING WALLS AND LOCKING DOORS AS REQUIRED; REFER TO GENERAL CONSTRUCTION NOTES.
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-002
SCHEDULES
ACCESSORIES SCHEDULEMARK ITEM MFR. MODEL NUMBER MATERIAL / FINISH COMMENTSCH COAT/CLOTHES HOOK BOBRICK CLOTHES HOOK B-233 STAINLESS STEEL, SATIN FINISHCR CURTAIN/SHOWER ROD BOBRICK HEAVY-DUTY SHOWER
CURTAIN RODB-207 STAINLESS STEEL, SATIN FINISH SIZE TO SUIT, INCLUDE STAINLESS STEEL HOOKS AND CURTAIN
GB GRAB BAR BOBRICK - B-5806.99 STAINLESS STEEL, SATIN FINISH PEENED SURFACE; SIZES AS NOTEDHD HAND DRYER EXCEL XLERATOR XL-W WHITE EPOXY PAINTEDSD1 SOAP DISPENSER BOBRICK SURFACE-MOUNTED SOAP
DISPENSERB-2111 STAINLESS STEEL, SATIN FINISH
SD2 SOAP DISPENSER BRADLEY RECESSED SOAP DISH 9403-96 STAINLESS STEEL, SATIN FINISH W/WALL CLAMP, LESS DRIP EDGESS SHOWER SEAT BRADLEY PHENOLIC SHOWER SEAT 9569 WHITE, STAINLESS STEELTPD TOILET PAPER DISPENSER TBD - - -NOTES:
1. REINSTALL EXISTING ACCESSORIES AS INDICATED2. INCLUDE MATERIALS REQUIRED FOR INSTALLATION3. APPROVED EQUALS ARE ACCEPTABLE
PLUMBING SCHEDULEFIXTURE TRIM
MARK LOCATION ITEM MFR. MODEL NUMBER FINISHCOLOUR/
MFR. MODEL NUMBER FINISHCOLOUR/
COMMENTSP- 01 FEMALE WASHROOM SHOWER BRADLEY WALL SHOWER WS-1X CHROME,
STAINLESS STEEL
- - - - SURFACE-MOUNTED W/VALVE, STANDARD INSTITUTIONAL SHOWERHEAD, 5.7 LPM FLOW CONTROL, VANDAL RESISTANT SCREWS
P- 02 FEMALE WASHROOM ACCESSIBLE SHOWER
BRADLEY WALL SHOWER WS-1X-HN CHROME, STAINLESS STEEL
- - - - SURFACE-MOUNTED W/VALVE, STANDARD INSTITUTIONAL SHOWERHEAD, 5.7 LPM FLOW CONTROL, VANDAL RESISTANT SCREWS
P- 03 FEMALE WASHROOM VANITY/SINK CUSTOM VANITY
- - STAINLESS STEEL
MOEN - 8417F15 CHROME CUSTOM STAINLESS STEEL THREE SINK VANITY; KINDRED OV1420U/5 UNDERMOUNT SINKS W/OVERFLOW AND DRAIN GRID/OPEN STRAINER; SINGLE HOLE FAUCET; 5.7 LPM FLOW
NOTES:1. INCLUDE ACCESSORIES REQUIRED TO INSTALL FIXTURES.2. REFER TO MEP SPECIFICATIONS FOR COMPLETE FIXTURE INFORMATION.
DOOR SCHEDULENOMINAL DOOR SIZE DOOR STYLE FRAME
MARK LOCATION WID
TH
HEI
GH
T
THIC
KNES
S
OPERATIONDOOR
MATERIAL GLAZING TYPEFRAME
F.R.R. GROUPHARDWARE
COMMENTSD-01 FEMALE
WASHROOM3'0" 6'8" 1 3/4" SWING 16 GAUGE
HOLLOW METAL, HONEYCOMB CORE
- PRESSED STEEL
T.B.D. I VERIFY SIZE OF EXISTING ROUGH OPENING TO CONFIRM NEW DOOR SIZE WORKS; 16 GAUGE MEDIUM DUTY DOOR AND FRAME PER CSDMA STANDARDS; INCLUDE NEW SIGN.
INSTALL NEW POWER DOOR OPERATOR WITH ACTUATORS FOR BARRIER-FREE ACCESS; LOCATION OF ACTUATORS TO BE DETERMINED IN FIELD IN COOPERATION WITH CONSULTANT; PROVIDE ELECTRICAL CONNECTION ON NEW CIRCUIT TO CLOSEST AVAILABLE ELECTRICAL PANEL.
NOTES:1. ALL DIMENSIONS ARE FINISH DIMENSIONS, ALL ROUGH OPENINGS SHALL BE VERIFIED.2. INCLUDE DOOR HARDWARE FOR ALL DOORS.3. PROVIDE FLOOR MTD. DOOR STOPS (ANSI STANDARD A156.16) WHERE DOOR SWING MAY DAMAGE WALLS; HALF DOME STYLE, SOLID BRASS W/NON-MARRING RESILIENT BUMPER, SATIN CHROME FINISH4. LOCKS TO BE MASTER KEYED; LOCK CYLINDER TO CITY SPECIFICATIONS.
HARDWARE GROUPSI 1. STAINLESS STEEL FLAT PULL, 9" CENTRE TO CENTRE; STAINLESS STEEL PUSH PLATE, 5" X 20", SCREW MOUNTED
2. SCHLAGE L463L DEADBOLT W/THUMBTURN; CYLINDER TO CITY SPECIFICATIONS3. 10" STAINLESS STEEL KICKPLATE EACH SIDE4. POWER DOOR OPERATOR, HUNTER HA-8 OR APPROVED EQUAL, C/W ACTUATORS
KEYNOTES 1.2.3.4.
5.6.7.8.
9.10.11.12.
13.14.15.
16.
17.
18.
19.
20.
21.
22.23.
REMOVE EXISTING HAND DRYERREMOVE EXISTING VANITY AND WALLREMOVE EXISTING SHOWERS AND SHOWER ENCLOSURESREMOVE EXISTING WALL (CONCRETE MASONRY UNIT CONSTRUCTION)INSTALL NEW BATHROOM ACCESSORIES, TYPICALINSTALL NEW WALL MOUNTED VANITYINSTALL NEW MIRRORINSTALL NEW HAND DRYER, LOCATION TO BE CONFIRMED WITH OWNERMODIFY PARTITION AS REQUIRED FOR NEW SHOWERINSTALL NEW STAINLESS STEEL GRAB BARS, TYPICALINSTALL NEW PARTITION WALLS, TYPICALINSTALL NEW SHOWER SEAT, MINIMUM 450mm WIDE AND 400mm DEEP, C/W BACKINGINSTALL NEW STAINLESS STEEL SHOWER CURTAIN ROD, TYPICALINSTALL NEW THRESHOLDREMOVE RESILIENT FLOORING, PATCH AND REPAIR FLOOR, INSTALL NEW EPOXY FLOOR FINISH, TYPICALREMOVE RESILIENT FLOORING AND TERRAZO, PATCH AND REPAIR FLOOR, INSTALL NEW EPOXY FLOOR FINISH, TYPICAL AT SHOWER AREASINSTALL NEW EPOXY WALL FINISH, TYPICAL AT SHOWER AREAS, PATCH AND REPAIR EXISTING WALLSINSTALL NEW SURFACE MOUNTED ACCESSIBLE SHOWER UNIT W/HAND-HELD SHOWER HEAD AND CONTROLS (STAINLESS STEEL ENCLOSURE W/WATER SUPPLY CONNECTIONS AT TOP OF UNIT)INSTALL NEW FLOOR DRAIN, TYPICAL, LOCATION TO BE VERIFIED IN FIELD, REFER TO MECHANICAL DRAWINGINSTALL FURRING (15.9mm FIBREGLASS WRAPPED GYPSUM BOARD OR CEMENT BOARD OVER 22mm STEEL FURRING), TYPICALINSTALL NEW SURFACE MOUNTED SHOWER UNIT W/HEAD AND CONTROLS (STAINLESS STEEL ENCLOSURE W/WATER SUPPLY CONNECTIONS AT TOP OF UNIT)INSTALL NEW WASHROOM SIGNREMOVE EXISTING DOOR AND FRAME, INSTALL NEW DOOR
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-101
FEMALE WASHROOM FLOORPLAN (FIRST FLOOR)
D-01
SD2
CH CH
GB
SS
CH
CH
SD1
SD1
CR
CR
CR
CR
HD
SD1
FEMALE WASHROOM PLAN (FIRST FLOOR/LEVEL 2)Scale: 1:50
1A-101
0 1 2 3 M
UNIT
FEMALEWASHROOM
LAUNDRYCORRIDOR
19
15
18
05
P-1
P-2
20 1,80
0 C
LR.C
A
2
A-201BD
C
A
1
A-201BD
A1
A-202B
1500
CLR
. MIN
.
22
2A-501
1A-
501
3A-202
23
0607
OFFICE
CORRIDOR
14
10
13
1211
09
P-3
460
CLR
.65
065
0
03
04
02
13
19
21
01
08
14
17
17
05
2A-501
3A-
501
1,500 CLR.2,
100
16
15
4A-501
762
V.I.F
.
V.I.F.
LEGENDDEMOLITION
NEW OR MODIFIED WALLEXISTING WALL
SHEET NOTES 1. REFER TO COVER SHEET FOR GENERAL PROJECT NOTES, AND SYMBOL DEFINITIONS.2. REFER TO DOCUMENTS PREPARED BY THE CONSULTING ENGINEER FOR ADDITIONAL INFORMATION.3. VERIFY WITH OWNER AND ARCHITECT WHICH ITEMS ARE TO BE SAVED OR REUSED.4. PATCH/REPAIR AND MAKE GOOD ALL SURFACES AFFECTED BY CONSTRUCTION.5. ALL SIGNS, FIXTURES AND EQUIPMENT ON WALLS THAT WERE REMOVED TO PERFORM THE WORK ARE TO BE REINSTALLED AT SAME LOCATION. CONFIRM W/OWNER IF ANY SIGNS, FIXTURES OR EQUIPMENT ARE TO BE REPLACED OR NOT REINSTALLED.6. PROVIDE ALL REQUIRED CONNECTIONS TO ALL NEW FIXTURES, TRIM, DEVICES AND EQUIPMENT SHOWN ON DRAWINGS, REGARDLESS OF WHETHER CONNECTION IS SPECIFICALLY CALLED OUT OR NOT.7. ALL DEVICES/FIXTURES SHOWN ARE NEW UNLESS OTHERWISE NOTED (U.O.N.) AS EXISTING. RELOCATE EXISTING DEVICES/FIXTURES AS REQUIRED FOR NEW CONSTRUCTION.
CH COAT/CLOTHES HOOK
GB GRAB BARHD HAND DRYER
SD SOAP DISPENSER
TPD TOILET PAPER DISPENSERNOTES:1. INCLUDE MATERIALS REQUIRED FOR INSTALLATION.2. PROVIDE WALL BACKING/BRACING AS REQUIRED.
ACCESSORIES LEGEND
SS SHOWER SEAT
CR CURTAIN ROD/SHOWER ROD
PTD PAPER TOWEL DISPENSER
KEYNOTES 1.2.3.
4.5.
REMOVE EXISTING BULKHEAD AND GRILLESREMOVE EXISTING GYPSUM BOARD CEILINGREMOVE EXISTING SUSPENDED ACOUSTIC TILE CEILING (TILES AND SUSPENSION SYSTEM) AND INSTALL NEW SUSPENDED ACOUSTIC TILE CEILING (TILES AND SUSPENSION SYSTEM, TILE SUITABLE FOR SHOWER AREAS / WET LOCATIONS), TYPICALREMOVE EXISTING LIGHT FIXTURES, TYPICALINSTALL NEW LIGHT FIXTURES, TYPICAL
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-102
FEMALE WASHROOMREFLECTED CEILING PLAN
(FIRST FLOOR)
R
R
R
FEMALE WASHROOM REFLECTED CEILING PLAN (FIRST FLOOR/LEVEL 2)Scale: 1:50
1A-102
0 1 2 3 M
UNIT FEMALEWASHROOM
LAUNDRYCORRIDOR
C
A
2
A-201BD
C
A
1
A-201BD
A1
A-202B
04
05
OFFICE
CORRIDOR02
01
05
03
LEGENDDEMOLITION
NEW OR MODIFIED WALLEXISTING WALL
SHEET NOTES 1. REFER TO COVER SHEET FOR GENERAL PROJECT NOTES, AND SYMBOL DEFINITIONS.2. REFER TO DOCUMENTS PREPARED BY THE CONSULTING ENGINEER FOR ADDITIONAL INFORMATION.3. VERIFY WITH OWNER AND ARCHITECT WHICH ITEMS ARE TO BE SAVED OR REUSED.4. PATCH/REPAIR AND MAKE GOOD ALL SURFACES AFFECTED BY CONSTRUCTION.5. ALL SIGNS, FIXTURES AND EQUIPMENT ON WALLS THAT WERE REMOVED TO PERFORM THE WORK ARE TO BE REINSTALLED AT SAME LOCATION. CONFIRM W/OWNER IF ANY SIGNS, FIXTURES OR EQUIPMENT ARE TO BE REPLACED OR NOT REINSTALLED.6. PROVIDE ALL REQUIRED CONNECTIONS TO ALL NEW FIXTURES, TRIM, DEVICES AND EQUIPMENT SHOWN ON DRAWINGS, REGARDLESS OF WHETHER CONNECTION IS SPECIFICALLY CALLED OUT OR NOT.7. ALL DEVICES/FIXTURES SHOWN ARE NEW UNLESS OTHERWISE NOTED (U.O.N.) AS EXISTING. RELOCATE EXISTING DEVICES/FIXTURES AS REQUIRED FOR NEW CONSTRUCTION.
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-103
FEMALE WASHROOM FLOORPLAN & INTERIOR ELEVATIONS
(BASEMENT)
KEYNOTES 1.2.
3.4.
5.
6.
7.
INSTALL NEW BATHROOM ACCESSORIES, TYPICALREMOVE EXISTING TOILET, INSTALL NEW ACCESSIBLE TOILET, PROVIDE BACK SUPPORT IF FLUSH VALVE TOILET SELECTEDINSTALL NEW STAINLESS STEEL GRAB BARS, TYPICALMODIFY EXISTING TOILET PARTITION AND INSTALL NEW DOOR (940mm WIDE) TO MATCH EXISTINGPATCH AND REPAIR FLOOR, INSTALL NEW EPOXY FLOOR FINISH, TYPICAL AT AREAS AFFECTED BY WORKPATCH AND REPAIR WALLS, PAINT, TYPICAL AT AREAS AFFECTED BY WORKREMOVE TOILET, CAP PIPING, REPAIR CONCRETE FLOOR FOR FINISHING
TPD
CH
GB
GB
FEMALE WASHROOM PLAN (BASEMENT/LEVEL 1)Scale: 1:50
1A-103
0 1 2 3 M
MALEWASHROOM
FEMALEWASHROOM
LAUNDRY CORRIDOR
06
3
A-10305
04
03012
A-103
4
A-103
07
02
SHEET NOTES 1. REFER TO COVER SHEET FOR GENERAL PROJECT NOTES, AND SYMBOL DEFINITIONS.2. REFER TO DOCUMENTS PREPARED BY THE CONSULTING ENGINEER FOR ADDITIONAL INFORMATION.3. VERIFY WITH OWNER AND ARCHITECT WHICH ITEMS ARE TO BE SAVED OR REUSED.4. PATCH/REPAIR AND MAKE GOOD ALL SURFACES AFFECTED BY CONSTRUCTION.5. ALL SIGNS, FIXTURES AND EQUIPMENT ON WALLS THAT WERE REMOVED TO PERFORM THE WORK ARE TO BE REINSTALLED AT SAME LOCATION. CONFIRM W/OWNER IF ANY SIGNS, FIXTURES OR EQUIPMENT ARE TO BE REPLACED OR NOT REINSTALLED.6. PROVIDE ALL REQUIRED CONNECTIONS TO ALL NEW FIXTURES, TRIM, DEVICES AND EQUIPMENT SHOWN ON DRAWINGS, REGARDLESS OF WHETHER CONNECTION IS SPECIFICALLY CALLED OUT OR NOT.7. ALL DEVICES/FIXTURES SHOWN ARE NEW UNLESS OTHERWISE NOTED (U.O.N.) AS EXISTING. RELOCATE EXISTING DEVICES/FIXTURES AS REQUIRED FOR NEW CONSTRUCTION.
LEGENDDEMOLITION
NEW OR MODIFIED WALLEXISTING WALL
INTERIOR ELEVATIONScale: 1:50
3A-103
0 1 2 M
06
150
ABO
VE T
ANK
600 MIN.03
01
INTERIOR ELEVATIONScale: 1:50
4A-103
0 1 2 M
04
PTD
INTERIOR ELEVATIONScale: 1:50
2A-103
0 1 2 M
01
06
150
760
MIN
.
760 MIN.
300 MAX.750
TO 9
00
03
CH COAT/CLOTHES HOOK
GB GRAB BARHD HAND DRYER
SD SOAP DISPENSER
TPD TOILET PAPER DISPENSERNOTES:1. INCLUDE MATERIALS REQUIRED FOR INSTALLATION.2. PROVIDE WALL BACKING/BRACING AS REQUIRED.
ACCESSORIES LEGEND
SS SHOWER SEAT
CR CURTAIN ROD/SHOWER ROD
PTD PAPER TOWEL DISPENSER
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-201
WG WGSD1
CH CH
NEW SHOWER ELEVATIONSScale: 1:50
1A-201
0 1 2 3 M
08
01
03
0907
06
1,75
0 VE
RIFY
HEI
GH
T W
/OW
NER
05
06
1,20
0 VE
RIFY
HEI
GH
TW
/OW
NER
HEI
GH
T TO
SU
ITSH
OW
ER C
URT
AIN
A B C D
02
04
04
KEYNOTES 1.
2.
3.
4.
5.6.7.8.9.
10.
11.
REMOVE RESILIENT FLOORING AND TERRAZO, PATCH AND REPAIR FLOOR, INSTALL NEW EPOXY FLOOR FINISH, TYPICAL AT SHOWER AREASINSTALL EPOXY COVE/BASEBOARD TO MATCH NEW EPOXY FLOOR FINISH, TYPICAL AT NEW WALLSINSTALL NEW EPOXY WALL FINISH, TYPICAL AT SHOWER AREAS, PATCH AND REPAIR EXISTING WALLSINSTALL NEW STAINLESS STEEL WALL GUARDS (TYPE 304 S.S., 16 GAUGE, SATIN FINISH) CORNER GUARD (CG) : 2" LEGS x 48" HIGH END WALL GUARD (WG): 2" RETURNS x 48" HIGH, WIDTH TO SUITPATCH AND REPAIR WALLS, PAINT, TYPICALINSTALL NEW BATHROOM ACCESSORIES, TYPICALINSTALL NEW STAINLESS STEEL SHOWER CURTAIN ROD, TYPICALINSTALL NEW THRESHOLDINSTALL NEW SURFACE MOUNTED SHOWER HEAD AND CONTROLS (STAINLESS STEEL ENCLOSURE W/WATER SUPPLY CONNECTIONS AT TOP OF UNIT)INSTALL NEW SURFACE MOUNTED ACCESSIBLE SHOWER UNIT, W/HAND-HELD SHOWER HEAD AND CONTROLS (STAINLESS STEEL ENCLOSURE W/WATER SUPPLY CONNECTIONS AT TOP OF UNIT)INSTALL NEW SHOWER SEAT, MINIMUM 450mm WIDE AND 400mm DEEP
SHEET NOTES 1. REFER TO COVER SHEET FOR GENERAL PROJECT NOTES, AND SYMBOL DEFINITIONS.2. REFER TO DOCUMENTS PREPARED BY THE CONSULTING ENGINEER FOR ADDITIONAL INFORMATION.3. VERIFY WITH OWNER AND ARCHITECT WHICH ITEMS ARE TO BE SAVED OR REUSED.4. PATCH/REPAIR AND MAKE GOOD ALL SURFACES AFFECTED BY CONSTRUCTION.5. ALL SIGNS, FIXTURES AND EQUIPMENT ON WALLS THAT WERE REMOVED TO PERFORM THE WORK ARE TO BE REINSTALLED AT SAME LOCATION. CONFIRM W/OWNER IF ANY SIGNS, FIXTURES OR EQUIPMENT ARE TO BE REPLACED OR NOT REINSTALLED.6. PROVIDE ALL REQUIRED CONNECTIONS TO ALL NEW FIXTURES, TRIM, DEVICES AND EQUIPMENT SHOWN ON DRAWINGS, REGARDLESS OF WHETHER CONNECTION IS SPECIFICALLY CALLED OUT OR NOT.7. ALL DEVICES/FIXTURES SHOWN ARE NEW UNLESS OTHERWISE NOTED (U.O.N.) AS EXISTING. RELOCATE EXISTING DEVICES/FIXTURES AS REQUIRED FOR NEW CONSTRUCTION.
WG
WG
CH
CH
SD2
NEW ACCESSIBLE SHOWER ELEVATIONSScale: 1:50
2A-201
0 1 2 3 M
1,00
0
1,20
0
450 85
0
1,20
0 M
AX.
10
11
900 MIN.
08
01
03
07
06
05
2,13
4
MAT
CH
EXI
ST. H
EIG
HT
02
A B
C D
2,03
2
04
04
FEMALE WASHROOM INTERIORELEVATIONS (FIRST FLOOR)
CH COAT/CLOTHES HOOK
GB GRAB BARHD HAND DRYER
SD SOAP DISPENSER
TPD TOILET PAPER DISPENSERNOTES:1. INCLUDE MATERIALS REQUIRED FOR INSTALLATION.2. PROVIDE WALL BACKING/BRACING AS REQUIRED.
ACCESSORIES LEGEND
SS SHOWER SEAT
CR CURTAIN ROD/SHOWER ROD
PTD PAPER TOWEL DISPENSER
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-202
INTERIOR ELEVATIONSDETAILS
HD
WG WG WG CG
SD1
HDSD
1
SD1 SD1
FEMALE WASHROOM ELEVATIONSScale: 1:50
1A-202
0 1 2 3 M
01
03
07
06
08
A
B
04
02
09
10
11
05
05
01
1,00
0
1,800
KEYNOTES 1.
2.
3.
4.
5.6.7.8.9.10.11.
REMOVE RESILIENT FLOORING, PATCH AND REPAIR FLOOR, INSTALL NEW EPOXY FLOOR FINISH, TYPICALINSTALL EPOXY COVE/BASEBOARD TO MATCH NEW EPOXY FLOOR FINISH, TYPICAL AT NEW WALLSINSTALL NEW EPOXY WALL FINISH, TYPICAL AT SHOWER AREAS, PATCH AND REPAIR EXISTING WALLSINSTALL NEW STAINLESS STEEL WALL GUARDS (TYPE 304 S.S., 16 GAUGE, SATIN FINISH) CORNER GUARD (CG) : 2" LEGS x 48" HIGH END WALL GUARD (WG): 2" RETURNS x 48" HIGH, WIDTH TO SUITPATCH AND REPAIR WALLS, PAINT, TYPICALINSTALL NEW BATHROOM ACCESSORIES, TYPICALINSTALL NEW STAINLESS STEEL SHOWER CURTAIN ROD, TYPICALMODIFY PARTITION AS REQUIRED FOR NEW SHOWERINSTALL NEW WALL MOUNTED VANITYINSTALL NEW MIRRORINSTALL NEW HAND DRYER, LOCATION TO BE CONFIRMED WITH OWNER
SHEET NOTES 1. REFER TO COVER SHEET FOR GENERAL PROJECT NOTES, AND SYMBOL DEFINITIONS.2. REFER TO DOCUMENTS PREPARED BY THE CONSULTING ENGINEER FOR ADDITIONAL INFORMATION.3. VERIFY WITH OWNER AND ARCHITECT WHICH ITEMS ARE TO BE SAVED OR REUSED.4. PATCH/REPAIR AND MAKE GOOD ALL SURFACES AFFECTED BY CONSTRUCTION.5. ALL SIGNS, FIXTURES AND EQUIPMENT ON WALLS THAT WERE REMOVED TO PERFORM THE WORK ARE TO BE REINSTALLED AT SAME LOCATION. CONFIRM W/OWNER IF ANY SIGNS, FIXTURES OR EQUIPMENT ARE TO BE REPLACED OR NOT REINSTALLED.6. PROVIDE ALL REQUIRED CONNECTIONS TO ALL NEW FIXTURES, TRIM, DEVICES AND EQUIPMENT SHOWN ON DRAWINGS, REGARDLESS OF WHETHER CONNECTION IS SPECIFICALLY CALLED OUT OR NOT.7. ALL DEVICES/FIXTURES SHOWN ARE NEW UNLESS OTHERWISE NOTED (U.O.N.) AS EXISTING. RELOCATE EXISTING DEVICES/FIXTURES AS REQUIRED FOR NEW CONSTRUCTION.
UN
LESS
INC
LIN
ED1,
000m
m M
AX.
MIRROR
STAINLESS STEEL GRAB BAR, TYPICAL
PIPE INSULATION / WRAP AT EXPOSED PIPES AS REQUIRED BY CODE, TYPICAL
460mm MIN.
1,20
0 M
AX.
DISP
ENSI
NG
HEI
GH
T
1,20
0 M
AX.
DISP
ENSI
NG
HEI
GH
T
SOAPDISPENSER
PAPERTOWEL
DISPENSER
1,20
0 M
AX.
DISP
ENSI
NG
HEI
GH
T
HANDDRYER
TYPICAL ACCESSIBLE WASHROOM LAYOUTScale: 1:50
2A-202
0 1 2 3 M84
0 M
AX.
500
100
100
100
100
740
735
MIN
.
685
MIN
.
230
MIN
.
430 MIN.
205 MIN.280 MIN.NEW ACCESSIBLE LAVATORY
Scale: 1:153
A-2020 500 mm
PROVIDE REQUIRED CLEARANCETO MEET ACCESSIBILITY
REQUIREMENTS (INDICATED BYDASHED LINES)
PIPE INSULATION AT EXPOSEDPIPES AS REQUIRED BY CODE,
TYPICAL FINISH FLOOR
CH COAT/CLOTHES HOOK
GB GRAB BARHD HAND DRYER
SD SOAP DISPENSER
TPD TOILET PAPER DISPENSERNOTES:1. INCLUDE MATERIALS REQUIRED FOR INSTALLATION.2. PROVIDE WALL BACKING/BRACING AS REQUIRED.
ACCESSORIES LEGEND
SS SHOWER SEAT
CR CURTAIN ROD/SHOWER ROD
PTD PAPER TOWEL DISPENSER
FORWARD SHELTERWASHROOM UPGRADES
159 FORWARD AVENUEOTTAWA, ON
SEAL
KEY PLAN
PROJECT NAME
SHEET TITLE
SHEET NO
ISSUE / REVISION DATE
160 Clemow Avenue, Ottawa, ON K1S 2B4t: 613.686.5910 f: 613.686.6216
STEWART + TSAI ARCHITECTS INC.STA
PROJECT NO:
DRAWN BY
CHECKED BY
GS
GS
14009
© 2014 ALL RIGHTS RESERVED. Any unauthorized use of these drawings may violate copyright and other applicable laws and could result in criminal or civil penalties.
FOR /POUR
PLANNING AND INFRASTRUCTURE PORTFOLIOINFRASTRUCTURE SERVICES DEPARTMENT
DESIGN AND CONSTRUCTION - BUILDINGS & PARKS, UNIT 2________________________________________________________________
PORTEFEUILLE DE L'URBANISME ET DE L'INFRASTRUCTUREDÉPARTEMENT DES SERVICES D'INFRASTRUCTURE
DIRECTION DE CONCEPTION ET DE CONSTRUCTION - IMMEUBLES ET DES PARCS
INFRASTRUCTURE SERVICES DEPARTMENTDESIGN & CONSTRUCTION - BUILDINGS & PARKS
MORRISON HERSHFIELD LIMITED2440 Don Reid Drive, Suite 200Ottawa, ON K1H 1E1t: 613.739.291 f: 613.739.4926
PRIME CONSULTANT - ARCHITECTURE
STRUCTURAL ENGINEERING
MECHANICAL & ELECTRICAL ENGINEERING
CIVIL ENGINEERING
AREA OFWORK
(LEVEL 1 & 2)
Sep 5, 201414009Drawings.vwx
JUL 14, 2014CLIENT REVIEW01
AUG 6, 2014CLIENT REVIEW02
SEP 5, 2014BUILDING PERMIT SUBMITTAL/TENDER REVIEW03
A-501
DETAILS
THRESHOLD FINISH, SLOPE TO SHOWER SIDE, REFER TO THRESHOLD DETAIL
EPOXY WALL FINISH SYSTEM WITH EPOXY BASECOAT AND URETHANE TOPCOAT; COLOUR FROM STANDARD SELECTIONS; STONGLAZE VSR BY STONHARD OR APPROVED EQUAL
EPOXY FLOOR AND COVE BASE TROWELED EPOXY MORTAR-BASED SYSTEM WITH TEXTURED, SLIP RESISTANT FINISH; SLOPE FINISH TO DRAIN; COLOUR FROM STANDARD SELECTIONS; STONSHIELD HRI BY STONHARD OR APPROVED EQUAL
REPAIR WALL SURFACES, ONE PRIME COAT, TWO FINISH COATS, 100% ACRYLIC, LOW-VOC PRODUCTS
REPAIR WALL SURFACE FOR INSTALLATION OF WALL FINISHES, TYPICAL
CO
VE B
ASE
MAT
CH
EXIS
TIN
G H
EIG
HT
WATERPROOF MEMBRANE AT COVE BASE, EXTEND 50mm MINIMUM BEYOND TOP OF BASE AND ONTO FLOOR
EXISTING CONCRETESLAB
REMOVE EXISTINGTERAZZO FLOOR AND
RESLOPE W/MORTAR BEDTO DRAIN, TYPICAL AT
SHOWER AREAS
NEW DRAIN, REFER TO MECHANICAL DRAWINGS, GROUT IN PLACE
POLYURETHANE SEALANT, COLOUR FROM STANDARD SELECTIONS
35
STANDARD CHASE DETAIL PER MANUFACTURER'S RECOMMENDATIONS
NEW SHOWER DETAIL (FEMALE WASHROOM)Scale: 1:5
1A-501
0 500 mm
EPOXY WALL FINISH SYSTEM WITH EPOXY BASECOAT AND URETHANE TOPCOAT; COLOUR FROM STANDARD SELECTIONS; STONGLAZE VSR BY STONHARD OR APPROVED EQUAL
EPOXY FLOOR AND COVE BASETROWELED EPOXY
MORTAR-BASED SYSTEM WITHTEXTURED, SLIP RESISTANT
FINISH; SLOPE FINISH TO DRAIN;COLOUR FROM STANDARD
SELECTIONS; STONSHIELD HRIBY STONHARD OR APPROVED
EQUAL
CO
VE B
ASE
MAT
CH
EXIS
TIN
G H
EIG
HT
WATERPROOF MEMBRANE ATCOVE BASE, EXTEND 50mmMINIMUM BEYOND TOP OF
BASE AND ONTO FLOOR
35
STANDARD CHASE DETAIL PER MANUFACTURER'S RECOMMENDATIONS
15.9mm FIBREGLASS WRAPPED GYPSUM BOARD OR CEMENT BOARD, TYPICALLIGHT STEEL FRAMING (33 MILS / 20 GAUGE), CONFIRM FRAMING DEPTH ON SITE TO SUIT CONDITIONSBLOCKING AS REQUIRED
EXISTING CONCRETE SLAB
REMOVE EXISTING TERAZZOFLOOR AND RESLOPE
W/MORTAR BED TO DRAIN,TYPICAL AT SHOWER AREAS
NEW ACCESSIBLE SHOWER DETAIL (FEMALE WASHROOM)Scale: 1:5
3A-501
0 500 mm
THRESHOLD, SLOPE TO SHOWER SIDE,BEVEL EDGE (MAXIMUM 1:2)
EPOXY FLOOR AND COVE BASETROWELED EPOXY MORTAR-BASED
SYSTEM WITH TEXTURED, SLIP RESISTANTFINISH; SLOPE FINISH TO DRAIN; COLOUR
FROM STANDARD SELECTIONS;STONSHIELD HRI BY STONHARD OR
APPROVED EQUAL; EPOXY FLOOROVERLAY AT SHOWER AREAS ONLY
13 M
AX.35
STANDARD CHASE DETAIL PER MANUFACTURER'S RECOMMENDATIONS
100 OR
TO SUIT
POLYMER-MODIFIED MORTAR
EXISTING CONCRETE SLAB
REMOVE EXISTING TERAZZO FLOOR ANDRESLOPE W/MORTAR BED TO DRAIN,
TYPICAL AT SHOWER AREAS
TYPICAL THRESHOLDScale: 1:5
2A-501
0 250 mm
EPOXY FLOOR AND COVE BASE TROWELED EPOXY MORTAR-BASED SYSTEM
WATERPROOF MEMBRANE AT COVE BASE, EXTEND 50mm MINIMUM BEYOND TOP OF BASE AND ONTO FLOOR
EXISTING CONCRETE SLAB
CO
VE B
ASE
MAT
CH
EXIS
TIN
G H
EIG
HT
EPOXY WALL FINISH SYSTEM15.9mm GYPSUM BOARD,PAINTED, TYPICAL
92mm LIGHT STEEL FRAMING (33MILS / 20 GAUGE) @ 400mm O.C.
15.9mm FIBREGLASS WRAPPED GYPSUM BOARD OR CEMENT BOARD, TYPICAL
76mm ROXUL ACOUSTIC FIREBATT (AFB) INSULATION OR
APPROVED EQUAL
INSTALL NEW COVE BASE TOMATCH EXISTING, TYPICAL
REMOVE EXISTING TERAZZOFLOOR AND RESLOPE
W/MORTAR BED TO DRAIN,TYPICAL AT SHOWER AREAS
NEW WALL @ SHOWER/CORRIDOR (FEMALE WASHROOM)Scale: 1:5
4A-501
0 500 mm