Upload
lorena-williamson
View
218
Download
4
Tags:
Embed Size (px)
Citation preview
Optimize plant efficiency and availability with an integrated solutionBratin Roy Vice President - Industry Service TÜV SÜD South Asia
TÜV SÜD Slide 1 Optimizing plant efficiency with an integrated solution05/10/15
Overview
1 Background
2 Steps to provide integrated solution
3 Benefit
Bild durch Klicken auf Symbol hinzufügen
TÜV SÜD Group – Conventional Power Plant Solution 4
TÜV SÜD Slide 2Optimizing plant efficiency with an integrated solution05/10/15
Background
In today’s changing environment, fossil-fuel plant owners face significant lifecycle management challenges
Along with existing issues like fuel availability, price pressures due to market liberalization, new concerns of climate change and other environmental issues have further impacted the industry
Operation and maintenance cost reductions are needed along with performance improvements along the entire lifecycle
As a result, fossil fuel power plants need to be more flexible, reliable and efficient, while cutting emissions. In some countries, government has initiated fuel-saving or energy efficiency program, which constitutes further Market Based Instruments(MBI) for plant operators to improve efficiency and reduce their fuel consumption
Coal, Gas and oil power plant upgrades and retrofits are focused on improved efficiency, greater power generation capacity and better emission control systems
TÜV SÜD Slide 3Optimizing plant efficiency with an integrated solution05/10/15
Overview
1 Background
2 Steps to provide Integrated solution
3 Benefit
Bild durch Klicken auf Symbol hinzufügen
TÜV SÜD Group – Conventional Power Plant Solution 4
TÜV SÜD Slide 4Optimizing plant efficiency with an integrated solution05/10/15
Steps to provide integrated solution
Taking an integrated approach from beginning delivers greater benefits than the traditional project stage specific approach
Integrated solutions focus on operational and implementation synergies with due consideration of plant and market needs and demand, which often get missed in traditional component/ equipment specific approach
Condition Assessment Operation & Maintenance – status
assessments Performance Measurement Energy Assessment/Audit Integrated plant retrofits along with
comprehensive Renovation & Modernisation Program
TÜV SÜD Slide 5Optimizing plant efficiency with an integrated solution05/10/15
Condition Assessment
Condition Assessment These evaluations focus on establishing the current condition of assets for more precise planning of refurbishment or optimisation.
Condition assessments provide a comprehensive review of the status of all plant equipment
Risk assessments review factors influencing the operational reliability of plant components and assist in planning of refurbishment activities
Damage assessments are used after an incident to identify affected equipment and guide repair efforts
Component assessments provide an up-to-date condition status of all components and systems
TÜV SÜD Slide 6Optimizing plant efficiency with an integrated solution05/10/15
Modern maintenanceand retrofit techniques
Preventive and Predictive maintenance Condition-oriented maintenance
– Inspection planning– NDT program– Monitoring methods– Calculation methods (e.g. fracture
mechanics calc.)– Remaining life assessment– Repair/replacement of damaged
components
Full up time of the plant ensuring 100% productivity, avoiding unnecessary force shut
down
Operation & Maintenance – status assessment
13-01-31
Benefits
Plant status assessment
TÜV SÜD Slide 7Optimizing plant efficiency with an integrated solution05/10/15
CPP solutions: Performance test for power plants and energy systems
Performance test for power plants and energy systemsAchieve guaranteed performance and maximise efficiency
Independent assessment of technical condition of plant, e.g. at the end of O & M Contract; during operation before taking decision of retrofitting or renovation
Identification of shortfall/deficiencies in the efficiency and capacity of plant
Follow international practice and test procedure like ASME, VDI
Assess results and prepared detail plan of implementation for technical mediation and moderation to attain maximum efficiency and reduce operation costs
TÜV SÜD Slide 8Optimizing plant efficiency with an integrated solution05/10/15
Performance Testing – Background
Power Output at dedicated loads Heat Rate (GJ/GWh) Indication of ⇨
power plant efficiency Electrical Characteristics, e.g.
• Auxiliary power,• Operation test within voltage and
frequency limits, • Power factor range prescribed
Water / Steam Parameters Emissions (Air, Sound Pressure) Vibrations Consumption of Water and Chemicals Treatment of water and waste water
Technical contents of Contract / Guarantees
• Desired Conditio
n
• Heat Rate
• Air and Noise
Emissions
• Fuel• deman
d
• Consumption
• (Auxil. Water,
Chemicals) • Vibrations
• Power Output
05/10/15TÜV SÜD Slide 9Optimizing plant efficiency with an integrated solution
Performance Testing – Key Parameters
Equipment : Measurement system
• Accuracy Class of Instruments
- RTD (PT100) up to 150 °C < 0.1 K- Differential pressure sensors < 1 mbar- Gauge and absolute pressure sensors < 0.1 %- Powermeter < 0.1 %
• Accredited Calibration / QA
05/10/15TÜV SÜD Slide 10Optimizing plant efficiency with an integrated solution
Fact
Around 70% of the world’s power plants use coal, natural gas, oil, biomass or solid waste to generate electrical energy.
7 -15 % of the power generated at fossil-fuel plants is consumed by the plant’s auxiliary systems.
Auxiliary systems are a major part of a power generation facility. They include all the drive power applications (pumps, fans, motors, drives), electrical balance of plant and instrumentation, control and optimization systems.
Much of this energy could be saved or sold to generate higher plant revenues. By improving the efficiency of each auxiliary, energy consumption of an existing facility can be reduced by 10-30%
Energy Efficiency assessment/Audit
Success Factor
Energy efficiency, productivity, reliability and stability – are intimately connected.
TÜV SÜD Slide 11Optimizing plant efficiency with an integrated solution
A successful energy efficiency program would require a detail technical and independent evaluation of power plant and related system evaluation, and a cost vs. benefit analysis to obtain reliable cost estimates for the options under consideration, taking into account site-specific conditions
05/10/15
Fuel Handling Plant Boiler Thermal Insulation Ash Handling Water Pumping Fans Steam Turbine Condenser Cooling Compressor Air System Motors Air Conditioning Lighting ESP
Process optimization
Operational improvements
Advance maintenance to reduce wastage
Capital investment ( up-gradation; retrofitting ; renovation & modernization)
To conduct energy analysis of the overall plant and determine the efficiencies and energy losses of all the major components on the power plant.
Select and develop the areas where energy losses are being experienced.
Determine the costs and payback periods for the new technologies suggested for efficiency improvement.
Energy Audit/Assessment – steps
Scope
Energy assessment is key to decide a successful solution
Objective Expected Goal
TÜV SÜD Slide 12Optimizing plant efficiency with an integrated solution05/10/15
Integrated Retrofitting
Integrated retrofitting Optimise availability and reliability over the long term.
Component/part retrofitting is not sufficient specially when ultimate goal is total asset optimisation and highest possible generation
By organising, an integrated program that incorporates various upgrades across the plant, matching the capabilities of any combination of main components and associate parts it delivers maximum efficiency in most
cost effective life extension solution With limited budget and timeline integrated retrofit solutions are a great way to explore hidden potential without
the involvement of huge capital
13-01-31TÜV SÜD Slide 13Optimizing plant efficiency with an integrated solution05/10/15
Achieve rated output/higher than rated Output
Better availability of generating equipment
Improved performance / efficiency and life extension of unit
Facilitate adoption of improved operations and maintenance practices.
Improvement in emission levels from thermal power plants
Life Extension for another 15 to 20 years is possible
Increase of rated capacity 4% - 8%
Increase of efficiency 8%-10%
Review /Study of Design basics, Erection, first commissioning and O & M record/reports
Energy Audit Performance testing Hot and cold walk-down survey
of the plant Interaction with O & M staff Non-destructive tests
(Mechanical tests and Electrical tests on critical components, Dynamic behavior tests)
Evaluation and analysis of test results
Preparation of R & M proposal & Cost benefit analysis
Rehabilitation & Modernization
Objective
Every R & M project is unique, requiring adaptation and system expertise that depends on extensive experience.
Methods Expected Goal
TÜV SÜD Slide 14Optimizing plant efficiency with an integrated solution05/10/15
Background
Steps to provide Integrated solution
Benefit
Bild durch Klicken auf Symbol hinzufügen
TÜV SÜD Group – Conventional Power Plant Solution
TÜV SÜD Slide 15Optimizing plant efficiency with an integrated solution
1
2
3
4
05/10/15
Tangible benefits from integrated life cycle management
TÜV SÜD Slide 16Optimizing plant efficiency with an integrated solution05/10/15
Key
Su
cces
s F
acto
rs
Maximum yield over the entire life cycle Designed performance
Controlled risks
Return of investment
Lower costs, lesser risks
Stable cash flow Pea
ce o
f M
ind
Overview
Background
Steps to provide Integrated solution
Benefit
Bild durch Klicken auf Symbol hinzufügen
TÜV SÜD Group – Conventional Power Plant Solution
TÜV SÜD Slide 17Optimizing plant efficiency with an integrated solution
1
2
3
4
05/10/15
Our heritage: 149 years of business success
Establishment of a Mannheim-based steam boiler inspection association by 21 operators and owners of steam boilers, with the objective of protecting man, the environment and property against the risk emanating from a new and largely unknown form of technology
1866
First vehicle periodic technical inspection (PTI)1910
1958 Development of a Bavaria-wide network of vehicle inspection centres in the late 1950s
1926 Introduction of the “TÜV mark / stamp” in Germany
1990s Conglomeration of TÜVs from the southern part of Germany to form TÜV SÜD and the expansion of business operations into Asia
TÜV SÜD continues to pursue a strategy of internationalisation and growth
Today
2006 Expansion of services in ASEAN by acquiring Singapore-based PSB Group
2009 Launch of Turkey-wide vehicle inspection by TÜVTURK
TÜV SÜD Slide 18Optimizing plant efficiency with an integrated solution05/10/15
TÜV SÜD in numbers: Growing from strength to strength
1 One-stop Technical Solution Provider
800 Locations Worldwide
Employees Worldwide 20,200
Million Euro in Sales Revenue 20131,900
150 Years of Experience
Note: Figures have been rounded off.
TÜV SÜD Slide 19Optimizing plant efficiency with an integrated solution05/10/15
Global expertise. Local experience.
TÜV SÜD Slide 20Optimizing plant efficiency with an integrated solution05/10/15
Global Headquarters: Munich, Germany
INTERNATIONAL
750 € mio9,800 staff
GERMANY
1,190 € mio10,400 staff
Countries with TÜV SÜD offices
Regional headquarters
Holistic solutions across the value chain
TÜV SÜD Slide 21Optimizing plant efficiency with an integrated solution05/10/15
From feasibility and planning through to procurement, construction, commissioning, operation, maintenance, and decommissioning, TÜV SÜD conventional power services ensure improved operational safety, reliability and overall performance of power plants for investors, engineering, procurement and construction contractors and operators.
Advisory services along the capital value chain
TÜV SÜD Slide 22Optimizing plant efficiency with an integrated solution
Feasibility & Planning
Refurbishment & Decommission
Procurement Construction Commission In-service
INVESTMENT OPERATION
Componentcertification
Componentcertification
ISO 9001ISO 14001
Feasibilitystudy
Riskanalysis
EIA
CalculationSimulation
Constructionsupervision
Weldingsurveillance
HSEinspections
Expediting
NDT
Codecompliance
Supplierevaluation
Vendor qualityassurance
Final acceptancetest
NDT
LTA
F4S
Repairsupervision
O & Mmanagement
AIM / RBI
Regulated
Non-regulated
ISO 50001
IEE plant certification
Rehabilitation/modernizationmanagement
QA/QC
Claim management
Compliance certification
Design reviewDesign approval
Licensing & consenting
Staff training / qualification
Technical due diligence
Performance tests
Owner’s engineer
Tender & contractmanagement
Technical advisor
Plantoptimization
Plant status assessment
Pre-qualification
Failure analysis(RCFA)
In-serviceinspection
Efficiencyconsultancy
Noise / vibration / emissions testing
Due diligence(TDD - technical, EDD - environmental)Site assessment
05/10/15
Increase availability, optimize performanceTÜV SÜD’s experts help you obtain professional advice in performance optimization to reduce outage time
and increase your return on investment.
Promote efficiency, reduce emissions
Our experts’ impartial perspective fosters cost
efficiency in your organisation, while their comprehensive
knowledge contributes to your emissions goals.
Minimise risk, improve reliability
We help you to reduce the risk of conventional power plant incidents, enhance safety for people and the
environment, increase process transparency and eliminate
interface problems.
Strengthenyour competitive
edgeLeverage on our expertise in safety and statutory compliance for legal
certainty. Third-party certification by TÜV SÜD demonstrates your
commitment to quality.
Your Business Benefits: Maximise Profits
13-01-31TÜV SÜD Slide 23Optimizing plant efficiency with an integrated solution05/10/15
Contact us today.
TÜV SÜD Slide 24Optimizing plant efficiency with an integrated solution05/10/15