Nuclear Services
Dr. Boris Gehring
March 2017
OE
Supply-Chain in
Nuclear
2015-02-12
It should not finally look like this!
Owners Engineers and Supply-Chain services
TÜV SÜD Nuclear Services 06/04/2017
In NPP New build, OE and SCS will help to keep:
-Time-line
-Costs
-Quality
-Safety
in all areas of nuclear plants and facilities focusing on
Safety, Reliability and Availability.
Slide 3
Owners Engineers and Supply-Chain services
TÜV SÜD Nuclear Services 06/04/2017
By
• Independent testing
• Inspection
• Certification
• Engineering consulting
• Training and Assessment Services
Examples:
Slide 3
Owners Engineer
TÜV SÜD Slide 6 Nuclear Services
Services as Owner's Engineer starts with Concept phase , Planning and Design, Component
Manufacturing, Construction phase to the Commissioning phase
Technical support and expertise:
• Licensing and environmental support
• Design reviews
• Support at the implementation of technical specifications and regulatory requirements,
• Alignment of modifications
• Monitoring of the construction and installation process
• Supporting and monitoring the commissioning and testing
• International experience in reviews for owners / licensees as well as for manufacturers and
design companies
• Training: suppliers, construction companies and operators Knowledge transfer and
exchange of experience by staff training
06/04/2017
Design review of Systems, Structures and Components
TÜV SÜD Slide 7 Nuclear Services
Scope of our work:
Evaluation of necessary safety
functions
Assessment of system design to
ensure these safety functions
Redundancy (n + 2), diverse
components, separation of trains
Emergency power supply, I&C
Review of QM specifications
Assessment of
Design of safety systems based on plant design
Plant-specific safety features
Classification of systems, structures and
components
Quality management based on classification
Federal State Authorities in Germany
06/04/2017
Assessment of Plant Concept of German NPP
TÜV SÜD Slide 8 Nuclear Services
Scope of our work:
Concept and design assessment,
based on German regulations
Deterministic approach (n + 2)
Accident analyses with validated
codes and models
Calculation of radiological impact with
atmospheric dispersion model
Measures for airplane crash or severe
accidents (accident management)
Assessment of plant concept:
Design of safety system: redundancy, emergency
power supply, separation of trains, …
Provisions for impact of internal and external
events (transients, loss of coolant, earthquake)
Thermo-hydraulic analysis of postulated events
Radiological impact on environment
Federal State (Länder) Authorities in
Germany
06/04/2017
Evaluation of Plant Concept and Systems of German BWR
TÜV SÜD Slide 9 Nuclear Services 06/04/2017
Scope of our work:
Design assessment, based on
German requirements
Deterministic approach (n + 2)
Accident analyses using evaluated
codes and models
Calculation of radiological impact with
atmospheric dispersion model
Evaluation of necessary safety
functions and systems design
Assessment of plant concept:
Design of safety system: redundancy, power
supply, separation of trains, …
Provisions for impact of internal and external
events (transients, loss of coolant, earthquake)
Thermo-hydraulic analysis of all postulated events
Radiological impact on environment
Federal State (Länder) Authorities in
Germany
Owners Engineer Part I
TÜV SÜD Slide 10 Nuclear Services 06/04/2017
Management and process focused support services:
• Assessment of project scope, execution and management procedures, overall technical project
control, responsibilities and levels of authorisation
• Time schedule analysis and optimisation
• Support in the establishment of a change management process
• Preparing HS&E procedures covering all aspects and stages of the project
• Reviewing the EPC contractors procurement procedures
• Qualification of Suppliers
• Supporting preparation of manuals
• Training
Engineering Support Turbine Island Oskarshamn
Scope of our work:
Develop a concept for a risk analysis with
respect to:
Personnel protection
Operability
Standards covered:
IAEA-TECDOC-1209
ISO 31000, ISO 31010
Swedish NPP Oskarshamn 2 (OKG 2)
to be uprated to 135% output
TÜV SÜD is contracted to provide
Engineering Support Activities: Risk
and Event Analysis Turbine Island
Siemens Industrial Turbomachinery AB
TÜV SÜD Slide 11 Nuclear Services 06/04/2017
Comparison of Gen III+ Reactor Designs against the
HSE, UK, NRC, IAEA and STUK Safety Requirements
Siemens
Description of requested reactor designs
(EPR, AP-1000, WWER 1000, WWER
1200, SWR-1000)
Evaluation of a catalogue for safety
assessment of reactor designs
Safety assessment of the 5 designs
Scope of our work:
HSE, NRC, IAEA - STUK Safety
Requirement
Data base on reactor designs
Data base on safety criteria
Plant data and safety features of
different reactor types
The concept of barriers
Safety criteria for design of NPP
Plant answers to authorities‘ safety
criterias
Experiences and comparison of plant
concepts
TÜV SÜD Slide 12 Nuclear Services 06/04/2017
Owners Engineer: Part II
TÜV SÜD AG Slide 13 Nuclear Services 06/04/2017
• Vendor Qualification
• Application and implementation of required codes, standards and regulations – request for
compliance with country specific, licensee specific and project specific requirements
• Equipment Qualification
• Supply Chain Qualification
• Third Party Services (DIN IEC / ISO 17020, Notified Body)
• CE-Marking and European conventional Directives as PED for further Export also to
OTHER countries with NPP projects
TÜV SÜD Slide 14 Nuclear Services
Equipment Qualification – Methodology
Technical Input
Conventional Regulations
and Requirements Nuclear Regulations and
Requirements
Technical Verification of relevant
nuclear requirements
Technical Verification of relevant
conventional requirements
System and Component
Classification
Confirmation by Independant
Inspection Body IEC 17020
Confirmation by Notified Body;
PED, LVD, …
Nuclear or/and
conventional
requirements ?
Conventional requirements
covered by nuclear!
TÜV SÜD Services
Check of Design Requirements
Scope of
Equipment
Qualification
06/04/2017
TÜV SÜD Slide 15
Equipment Qualification Steps 1 and 2
Input from Designer/Owner
• Safety Class Assignment
• Technical and System Specification
• Qualification Requirements
• Applicable/Required Standards, Guidelines Rules, Directives, …..
Compliance Check according to applicable regulations
• Nuclear and non Nuclear Requirements
• Local regulation
Step 1
Step 2
List of Relevant
Requirements
Technical
Details
Nuclear Services
TÜV SÜD Services:
Support the Preparation of Specifications, Check of Completeness and Quality
TÜV SÜD Services:
Compliance Check and Code Comparison (Japan - UK) - Assessment of Technical
Specifications with Respect to Applicable Standards and Requirements,
Definition of Required Qualification Activities
06/04/2017
Project YUMOD in NPP Leibstadt (Switzerland)
TÜV SÜD Slide 16 Nuclear Services 06/04/2017
Scope of our work :
Verifying of project specification
created by the manufacturer
Review of design documents
Review of written procedures
for examination and testing during
the manufacturing process
Modernisation of primary cooling system
Standard: ASME B&PV Code, Section III
AXPO (Owner)
Further projects based on ASME B&PV Code, Sections III and XI
TÜV SÜD Slide 17 Nuclear Services 06/04/2017
Project AUTANOVE in NPP Beznau (Switzerland)
Review of design documents and procedures for
examination and testing
International Special Review of Korean NPP
Review of maintenance and in-service
inspections of eight units at four sites
Review of the compliance of procedures with
ASME III and XI requirements
SIEMENS / NPP Oskarshamn 2 (Sweden)
Exchange of turbine and power amplification
documentation for the systems
Requalification of components
TÜV SÜD Slide 18
Equipment Qualification Steps 3 and 4
Technical Documents
• Detailed layout of equipment / component
• Drawings, calculations, material, description of manufacturing,
welding consumables, coating, inspection plan, …
Conformity Assessment by AIA/NoBo
• Quality and Acceptance Tests
• Independent check by Inspection Agency (IEC 17020)
• Independent check by Notified Body (where necessary)
EQUIPMENT QUALIFICATION
Calculations/Simulations
Theoretical Examination
Practical Testing
Assessment of QA in Manufacturing Process
Step 3
Step 4
Declaration of
Conformity
Pre-Qualification and
Manufacturing
Documents
Test Report
Nuclear Services
TÜV SÜD Services:
Assessment of Pre-Qualification and Manufacturing Documents with respect to
applicable Standards and Requirements, Confirmation of Qualification Activities
06/04/2017
Qualification of Nuclear Components
TÜV SÜD Slide 19 Nuclear Services
Scope of our work:
Design review (e.g. seismic
calculations, FEM analysis, GIPs and
FIPs)
Construction inspection at the
manufacturer (e.g. functional test,
compliance with construction plan)
Qualification for SC3, SC4 and EYT
components
Commissioning inspection from
2015 ongoing
NPP Olkiluoto 3, Finland (EPR)
Construction of EPR at Olkiluoto: Design
Review
06/04/2017
DIN EN ISO/IEC 17020.
- Failure analysis, condition assessment and/or inspection of components
- Inspection of documents.
- Design review, on-site inspections during construction and commissioning of
nuclear facilities and safety assessments of systems, structures and components;
confirmation of compliance with given requirements and with general requirements
- Inspection of maintenance procedures. Preventive, risk-based well and failure-based
maintenance.
DIN EN 17020 Services as Inspection Body Type A
TÜV SÜD Slide 20 Nuclear Services 06/04/2017
TÜV SÜD – Accreditations
Accreditations DIN EN ISO/IEC 17020: 2012 (DAkkS)
DIN EN ISO/IEC 17025: 2005 (DAkkS)
ISO 9001: 2008
ISO 14001: 2004
KOLAS
Our expertise standards Nuclear Codes and Standards:
IAEA
KTA (Germany)
RCC (France)
NUREG
PNAEG / FNP (Russia)
SAPs (UK)
YVL (Finland)
Design Codes:
ASME
DIN EN ISO/IEC
GOST (Russia)
KEPIC (Korea)
TÜV SÜD Slide 21 06/04/2017 Nuclear Services
Supporting Services During Transportation and Shipment
• Preparation and review of shipment and transport documentation
• TÜV SÜD services comprise support of transportation, packaging and storage of
radioactive as well as other hazardous materials.
• Provision of clearance measurements for radioactive materials
• Inspections of hazardous materials during transport and shipment
• Supervision of transportation and shipment of hazardous material
• Design review of transport packages, containers and storage casks
• Testing and inspections of transport packages, containers and storage casks
Transport supervision: dont forget! Citical transports has to be inspected and
supervised all the way through
TÜV SÜD Slide 22 Nuclear Services 06/04/2017