26
ODT and NGC 2008 Photograph courtesy General NGC AO wavefront sensor systems Scientific detector systems delivered to LSP Scientific detector systems in Europe Social Activities

ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ODT and NGC 2008 Photograph courtesy

GeneralNGCAO wavefront sensor systems Scientific detector systems delivered to LSPScientific detector systems in EuropeSocial Activities

Page 2: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

• Cabling

• Support of La Silla Paranal

• Planning

• Ultra-cleaning

• Web pages

• Safety

• Debugging

• Meetings

• …

Photograph courtesy

• Reporting

• Presentations

• Training

• Documentation

• Facilities management

• Hyper-sensitization

• Trouble shooting

• Travel & logistics

• ERP (re-)mastering

• Assembling

• Soldering

• Testing

• Market monitoring

• Procurement

• Order tracking

• Obsolescence hunting

• Stock keeping

• Incoming quality control

• Repairs

• Preventive maintenance

‘The three great essentials to achieve anything worth while are: Hard work, Stick-to-itiveness, and Common sense.’

Thomas A. Edison

The daily essence of successful projects

Page 3: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Stefan Hötzl left on September 30

Mirko Todorovic joined on December 15 as Electronics Technician

Page 4: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ODT and NGC 2008

GeneralNGCAO wavefront sensor systemsScientific detector systems delivered to LSPScientific detector systems in EuropeSocial Activities

Page 5: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

• ESO-wide presentation

ü Internal Lessons-Learned meeting

• Improved user documentation

† Maintaining OPT/IR commonalities becoming increasingly difficult

• More effective test procedures

• Clean-up of layouts by contractor

• NGC-owned TWiki with

- production manual

- version tracking

- bug lists

- history files for each board

- test reports

New General detector Controller (NGC)

COM

IF

RxRx

NEXT LINK

IF

STATUS

REG

Tx

Tx

Rx SE

QUENCER

AQ MANAGER

AQ FIFO 1

AQ FIFO

CLOCK and

BIAS

TX COM

DOWNSTREAM

RX LINK

On Board

ADCs

DOWNSTREAM

TX LINK

CONFIG

REGISTER

SYSTEM RESET

MONITOR

TELEMETRY

LINK CONFIG

UPSTREAM

RX LINK

UPSTREAM

TX LINK

COM

IF

Rx

xRxx

NEXT LINK

IFNEXT LINK

IF

STATUS

REG

STATUS

REG

Tx Tx

Tx

Tx

Rx SE

QUENCER

AQ MANAGER

AQ MANAGER

AQ FIFO 1

AQ FIFO

AQ FIFO

CLOCK and

BIAS

TX COM

DOWNSTREAM

RX LINK

On Board

ADCs

DOWNSTREAM

TX LINK

CONFIG

REGISTER

CONFIG

REGISTER

SYSTEM RESET

MONITOR

MONITOR

TELEMETRY

TELEMETRY

LINK CONFIG

UPSTREAM

RX LINK

UPSTREAM

TX LINK

COM

IF

RxRxRxRx

NEXT LINK

IFNEXT LINK

IF

STATUS

REG

STATUS

REG

Tx Tx

Tx

Tx

Rx SE

QUENCER

AQ MANAGER

AQ MANAGER

AQ FIFO 1

AQ FIFO 1

AQ FIFO

AQ FIFO

CLOCK and

BIAS

TX COM

DOWNSTREAM

RX LINK

On Board

ADCs

DOWNSTREAM

TX LINK

CONFIG

REGISTER

CONFIG

REGISTER

SYSTEM RESET

MONITOR

MONITOR

TELEMETRY

TELEMETRY

LINK CONFIG

UPSTREAM

RX LINK

UPSTREAM

TX LINK

Rx

xx

Rx AQ

MANAGER

AQ MANAGER

DOWNSTREAM

RX LINK

On Board

ADCs

MONITOR

MONITOR

TELEMETRY

CLOCK 3, 4

CLOCK 5, 6

CLOCK 7, 8

CLOCK 9, 10CLOCK 13,14

CLOCK 11,12CLOCK 15, 16

CLOCK 1, 2

CLOCK 17,18

BIAS 1..4

BIAS 5..8

BIAS 9..12

BIAS 13..16

BIAS 17..20

PowerMinusVariable

PowerPlusVariable

PowerMinusVariable

PowerPlusVariable

PowerPlusVariable

PowerMinusVariable

PowerPlusHigh PowerPlusHigh

PowerPlusHigh

PowerMinusVariable

PowerPlusVariable PowerPlusHigh

1

2

3

SJ_VAR/GND

PowerMinusHigh Bottom Layer of Board

Top Layer of Board

PowerPlusVariable

PowerMinusVariable

PowerPlusVariable_BP

PowerMinusVariable_BP

1

2

3

SJ2

1

2

3

SJ3

Power RegulatorPositiv

+13V

+8V

Power RegulatorNegativ

-13V

-8V

PowerPlusHigh

PowerMinusHigh

PowerPlusHigh_BP

PowerMinusHigh_BP

Power RegulatorPositiv 28V

Power RegulatorNegativ

-12V

-5V

1

2

3

SJ4

1

2

3

SJ1

PowerPlusVariable

1

2

3

SJ5

Obj100

Page 6: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

NGC performance

PMC Interface

PCI BUS Interface

Link Processing

and Video Data

Extraction

VIDEO FIFO

DMA

Header #01

PCI REGISTERS

MASTER IF

Rx

Tx

Rx

Tx

Downstream Link

Upstream Link

One Header

Stripped in each

Direction

• RON < 3 e- @ 50 kpix/s demonstrated with e2v CCD types 44-82 and 231

ü MUSE requirements are met

ü Ditto for KMOS, SPHERE IR T/T WFS, and ZIMPOL

ü NGC much more immune to pick-up noise than FIERA is

ü Successfully installed at ODT test benches

• Start-up time of software < 2.5 s

• Standard ADCs run at 1 MHz; on-going developments:

- 3 MHz version of 32AQ board

- 40 MHz high-speed board

• Improved over-voltage protection

• New PMC I/F board for VLTI applications not using SPARTA

† With1310-nm fiber link, could place LLCUs in central computer room.

General change request not supported by LSP Re-consider for every new instrument

Page 7: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

NGC deliveries and production in 2008/2009

Systems are due for:○ MUSE (prototype +)○ KMOS○ SPHERE○ ZIMPOL○ Lab usage

• Two successful revisions of Basic and Transition Board

• 32AQ Board unaltered

• Produced 7 power supply units

• Developed new 2-board housing

with fan (for laboratory use only)

Stock ~sufficient for deliveries in 2009 to:• KMOS• MUSE• SPHERE• ZIMPOL

All accomplished

Page 8: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

NGC-AOPlan: • Develop standard WFS module for all forthcoming VLT AO systems

• Test controller from Marseille / OHP / Grenoble: OCam

• Combine NGC digital and OCam analog electronics

• General sFPDP I/F to SPARTA at LLCU level

Status:

• Bias and clock-driver boards received from OCam

• NGC sequencer board derived from NGC basic board

(Xilinx Virtex-5 instead of II-Pro)

• Firmware prototyped

ü First ‘laboratory light’ achieved in November

† Waiting for ESO-Ocam

• sFPDP development starting

Page 9: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ODT and NGC 2008

GeneralNGCAO Wavefront sensor systemsScientific detector systems delivered to LSPScientific detector systems in EuropeSocial Activities

Page 10: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

(EM-)CCD220 for wavefront sensing @ VLT(or: management at a distance)

StoreArea

Image Area

240x12024□µm

StoreArea

Image Area

240x12024□µm

OP 1

OP 2 GainRegisters

OP 3

OP 4 GainRegisters

OP 8GainRegisters

OP 7

OP 6GainRegisters

OP 5

StoreAreaStoreArea

Image Area

240x12024□µm

StoreArea

Image Area

240x12024□µm

OP 1OP 1

OP 2 GainRegisters

OP 2 GainRegisters

OP 3OP 3

OP 4 GainRegisters

OP 4 GainRegisters

OP 8GainRegisters

OP 8GainRegisters

OP 7OP 7

OP 6GainRegisters

OP 6GainRegisters

OP 5OP 5

• Standard WFS chip for GALACSI/GRAAL/SPHERE

• OCam test controller needed for CCD220 testing by e2v

• Delivery by Marseille delayed

† Two deliveries to e2v failed; 3rd attempt in 2009 January

Page 11: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Nov 2007 ELT AO WFS Possible Developments

Joint tests of pnCCDs with MPE-HLL

• 264x264 51-μm pixels• 450 μm thick • Split frame-transfer device• 528 amplifiers + CAMEX (ASIC)• 1000 fps• RON < 3e

1111

300 400 500 600 700 800 900 1000 110020

30

40

50

60

70

80

90

100

QE pnCCD First Test Run

Wavelength [nm]

QE %

• Plausible back-up for CCD220• Device too small for LGS and SH@E-ELT• But OK for XAO with pyramid WFS?• XAO needs 3 kfps – AApnCCDs?

Slide repeated from last year

• Joint usage of ODT test bench continued• Could help MPE-HLL to make good progress

Page 12: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Standard VLT AO WFS system

(GALACSI, GRAAL, SPHERE)

ü Prepared very comprehensive FDR documentation† Waiting for ESO-OCam, NGC-AO, and more detectors• Baseline detector is CCD 220 from e2v • Need to build 15 systems in 2009-2011 (AOD want them earlier)

1 2 3 4 5 6 7 8

A

B

C

D

87654321

D

C

B

A

Title

Number RevisionSize

A2

Date: 18-Oct-2008 Sheet of File: H:\Projects\AO Facility\Documents\Designs\PDR\Protel\WFSCameraSystem.ddbDrawn By:

AC IN

Thermal Controller

3U 19" Rack

AC IN

Instrument

Pow

er In

& P

eltier

Driv

e

Ther

mal M

onito

ring

Sync

h. IN

Sync

h. O

UT

Fibr

e LLC

UFi

bre R

TC

Digital Control

Pow

er In

& P

eltier

Driv

e

Ther

mal M

onito

ring

Sync

h. IN

Sync

h. O

UT

Fibr

e LLC

UFi

bre R

TC

Head Power

AC IN

Over Temperature

WFS Camera HeadPower Supply

Head Power

AC IN

Over Temperature

Head Power

Coolant From SCPWater

InWaterOut

AC Mains

AC In

Gbit Eth.

(19" 5U Rack)LLCU

AC In

Gbit Eth.

Fiber InFiber Out

NGC PCI I/FFiber InFiber Out AC Mains

LAN to Instrument

JUMO-LLCU Serial Fiber

Camera Head

Serial Link

Serial Comm.Serial Link

WorkstationOUT

RxTx

FibreConverter

OUTRxTx

Thermal Cabinet

Head Electronics IN3

COM 2 RS422

Alarm Relay OUT 5

CCD220 IN1Logic IN 1

Peltier Backside IN2

Peltier Control OUT1

JUMO

Head Electronics IN3

COM 2 RS422

Alarm Relay OUT 5

CCD220 IN1Logic IN 1

Peltier Backside IN2

Peltier Control OUT1

TxINRx

RS232-422/Fibre ConverterTxINRx

To Alarm Handling Unit

Thermal Alarm

Over Temperature Alarm

AC Mains

Camera Head - LLCU

Alarm

Serial

WFS Camera Head

To Other Camera HeadsSynchronization

To RTC SPARTACamera Head -RTC

Fiber Link

Fibre Link

3U 19" Rack

Control IN

Peltier Drive

Kniel CUI 15.3

Power Supply

Control IN

Peltier Drive

Thermal Monitoring

W1

W2

W3

W4 W5

W11

W6

W8

W9

W10

Peltier Drive

AC MainsAC Mains

W12

15V 3A

Peltier Control

To Alarm Handling Unit

Thermal Cabinet

Thermal Cabinet

Back Connector Panel

1 - cooling fluid in2 - cooling fluid return3 - fiber feedthrough4 - electrical connector 15 - electrical connector 26 - flushing valves

Page 13: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Nov 2007 ELT AO WFS Possible Developments 1313

Detectors for E-ELT AO WFS

• Feasibility-study phase with 4 contractors successfully completed

• Issued new CfT for Technology (Pixel) Demonstrator

• Awarded 3 fixed-price contracts (all CMOS-based)

• Last one is supposed to enter Design Review in January, 2009

• First one has already reached shuttle-run phase

† Contractors are struggling with combination of speed and read noise

(some find it difficult to just read the requirements)

• Continually refined requirements (models, contractors’ responses, etc.)

• About mid-2009 issue CfT for Scaled-down Demonstrator

Page 14: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ODT and NGC 2008

GeneralNGCAO wavefront sensor systemsScientific detector systems delivered to LSPScientific detector systems in EuropeSocial Activities

Page 15: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

X-shooter

• FIERA software defines 2 nearly fully independent virtual cameras on one common front-end electronics

• VIS system (with MIT/LL CCID-20)• UVB system (with e2v CCD44-82)ü Requirements-compliant systems delivered to Paranal

Page 16: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Giraffe upgrade

• First deep-depletion device with dual-layer coating (e2v)• Successfully commissioned in 2008 May• Prototype for VIMOS red upgradeüThicker silicon offers decisive advantages - but also suffers more particle hits

Major improvement in red sensitivityMuch reduced fringing

10,000 s

Page 17: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

2005 Assembly Hall

Garching

OmegaCAM: from Lagerhalle to Bodega

2006 Storage Hall

Garching

2008 Bodega Paranal

Page 18: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

OmegaCAM: between the bodegas

• Shipped to Paranal• Re-assembledü Fully successfully testedü I/F instrument / detector system verifiedü Packed and safely stored• Awaiting VST

† Filters from Barr Ass. broken (again …)

Page 19: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

OmegaCAM: one CCD failed

Typically asked questions:

How bad is it?

It’s very bad

Is damage due to transport?

No, it isn’t

When will CCD be un-kaputted?

CCD can’t be repaired

Can it be replaced?

Yes. At cost and risk

Will it be replaced?

It depends

31 CCDs functioning as before!

Here it is

(Identical CCD died years ago under similar circumstances)

Page 20: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ODT and NGC 2008

GeneralNGCAO wavefront sensor systemsScientific detector systems delivered to LSPScientific detector systems in EuropeSocial Activities

Page 21: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Multi-unit Spectroscopic Explorer (MUSE)

(Multi = 24 = MANY)

Tee Pee

• 4k x 4k engineering-grade CCD 231 from e2v extensively tested• Helped to debug 2nd ODT test bench and NGCü Requirements are met• Final detector head just manufactured – will install science-grade CCDü Prototype system to be delivered in March• Agreement reached with AI Potsdam for support of serial production† ESO has become part of MUSE Consortium: extra bureaucracy• TeePee serial production initiated

Page 22: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ZIMPOL (SPHERE)

Originally, ZIMPOL was supposed to provide a VLT-compliant detector system

Now, the ODT may more nearly be supplying a ZIMPOL-compliant detector system

• Comprehensive FDR documentation submitted• NGC system produced

Page 23: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

UVES red upgrade• EMMI red released for cannibalism• Installation in 2009 July

VIMOS red upgrade• Contract with e2v signed in 2008 (?)• 5 deep-depletion CCDs due before 2009 August • Installation in P84

FIERA• 2009 releases of VLTSW (incl. enhancements)

Pulpo1• Multiple clean-ups after upgrade attempts on LSP

MIT/LL Phase 4• Have given up on receiving any devices

Miscellaneous

ESPRESSO Phase A• Broad survey of detector options

Ultra-stable Cryostat• Procurement of parts

Page 24: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

ODT and NGC 2008

GeneralNGCAO wavefront sensor systemsScientific detector systems delivered to LSPScientific detector systems in EuropeSocial Activities

Page 25: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Team building efforts

INS SADness

ODT Isar Party

Thank you, Sebastian!

Page 26: ODT and NGC - ESO · Pulpo1 • Multiple clean-ups after upgrade attempts on LSP MIT/LL Phase 4 • Have given up on receiving any devices Miscellaneous ESPRESSO Phase A • Broad

Happy holidays!

NGC 2264 (WFI@ESO/MPG 2.2-m)[WFI celebrating 10th anniversary!]