National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org MEMORANDUM To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject: NFPA 418 First Draft TC FINAL Ballot Results (F2015 Cycle) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 14 Members Eligible to Vote 6 Not Returned (Aaron, Gammon, Kaisler, Buehler, Kays, Smith) 8 Affirmative on All Revisions (Syms, with comment on one or more Revisions) 0 Negatives 0 Abstentions The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each first revision, if applicable. There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2 /3 vote. The mock examples below show how the calculations are determined. (1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes are required to pass ballot. (Sample calculation: 20 members eligible to vote ÷ 2 = 10 + 1 = 11) (2) Example for Affirmative 2 /3: Assuming there are 20 vote eligible committee members and 1 member did not return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample calculation: 20 members eligble to vote 1 not returned 2 abstentions = 17 x 0.66 = 11.22 = 12 ) As always please feel free to contact me if you have any questions.

M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

National Fire Protection Association

1 Batterymarch Park, Quincy, MA 02169-7471

Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org

M E M O R A N D U M

To: NFPA Technical Committee on Helicopter Facilities

From: Elena Carroll, Administrator, Technical Projects

Date: July 1, 2014

Subject: NFPA 418 First Draft TC FINAL Ballot Results (F2015 Cycle)

According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

14 Members Eligible to Vote

6 Not Returned (Aaron, Gammon, Kaisler, Buehler, Kays, Smith)

8 Affirmative on All Revisions (Syms, with comment on one or more Revisions)

0 Negatives

0 Abstentions

The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of

the vote for each first revision, if applicable.

There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2/3

vote. The mock examples below show how the calculations are determined.

(1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes

are required to pass ballot. (Sample calculation: 20 members eligible to vote ÷ 2 = 10 + 1 = 11)

(2) Example for Affirmative 2/3: Assuming there are 20 vote eligible committee members and 1 member did not

return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample

calculation: 20 members eligble to vote – 1 not returned – 2 abstentions = 17 x 0.66 = 11.22 = 12 )

As always please feel free to contact me if you have any questions.

Page 2: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 28-NFPA 418-2014 [ Global Input ]

Add new 2.3.1 as follows:2.3.1 ASTM Publications.ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959.ASTM E108, Standard Test Methods for Fire Tests of Roof Coverings, 2011.ASTM E136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C, 2012.ASTM E2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 Degrees C, 2012.

Submitter Information Verification

Submitter Full Name: Michael BeadyOrganization: [ Not Specified ]Street Address:City: State: Zip:Submittal Date: Mon Jun 02 14:33:13 EDT 2014

Committee Statement

Committee Statement: Added references per new text in FR 19Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.

Page 1 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 3: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 2 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 4: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 30-NFPA 418-2014 [ Global Input ]

Add new section as follows:2.3.X FM Publications.FM Global, 1301 Atwood Avenue, P.O. Box 7500, Johnston, RI 02919, www.fmglobal.comFM 4470, Approval for Class 1 Roof Covers, 2012.

Submitter Information Verification

Submitter Full Name: Michael BeadyOrganization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon Jun 02 14:49:29 EDT 2014

Committee Statement

Committee Statement: Adding new reference per text in FR 13Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative All

Page 3 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 5: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Behnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 4 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 6: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 24-NFPA 418-2014 [ New Section after 1.3.2 ]

1.4 Retroactivity.The provisions of this standard reflect a consensus of what is necessary to providean acceptable degree of protection from the hazards addressed in this standard at the time the standard was issued.1.4.1Unless otherwise specified, the provisions of this standard shall not apply to facilities, equipment, structures, or installations that existed or were approved for construction or installation prior to the effective date of the standard. Where specified, the provisions of this standard shall be retroactive.1.4.2In those cases where the authority having jurisdiction determines that the existing situation presents an unacceptable degree of risk, the authority having jurisdiction shall be permitted to apply retroactively any portions of this standard deemedappropriate.1.4.3The retroactive requirements of this standard shall be permitted to be modified if their application clearly would be impractical in the judgment of the authority having jurisdiction, and only where it is clearly evident that a reasonable degree of safety is provided.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Wed May 14 16:40:55 EDT 2014

Committee Statement

Committee Statement:

A retroactivity clause has been added to prevent hardship of existing heliports being required to comply with new requirements.

Response Message:

Ballot Results

This item has passed ballot

Page 5 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 7: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 6 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 8: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 1-NFPA 418-2014 [ Section No. 2.2 ]

2.2 NFPA Publications.National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471.

NFPA 10, Standard for Portable Fire Extinguishers, 2010 2013 edition.

NFPA 11, Standard for Low-, Medium-, and High-Expansion Foam, 2015 edition.

NFPA 13, Standard for the Installation of Sprinkler Systems, 2010 2016 edition.

NFPA 14, Standard for the Installation of Standpipe and Hose Systems, 2010 2016edition.

NFPA 16, Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray Systems, 2015 edition.

NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection, 2010 2016 edition.

NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2011 2014 edition.

NFPA 30, Flammable and Combustible Liquids Code, 2008 2015 edition.

NFPA 70®, National Electrical Code®, 2011 2014 edition.

NFPA 72®, National Fire Alarm and Signaling Code, 2010 2016 edition.

NFPA 99, Standard for Health Care Facilities Health Care Facilities Code , 2005 2015 edition.

NFPA 101®, Life Safety Code®, 2009 2015 edition. NFPA 220, Standard on Types of Building Construction, 2009 2015 edition.

NFPA 407, Standard for Aircraft Fuel Servicing, 2007 2012 edition.

NFPA 409, Standard on Aircraft Hangars, 2011 2016 edition.

NFPA 780, Standard for the Installation of Lightning Protection Systems,2011 2014 edition.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:11:30 EDT 2014

Committee Statement

Page 7 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 9: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Committee Statement: Update references.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 8 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 10: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 2-NFPA 418-2014 [ Section No. 2.3.1 ]

2.3.2 FAA Publications.Federal Aviation Administration, Department of Transportation, Distribution Unit, M-494.3, Washington, DC 20590.

FAA AC 150/5390-2B 2C , Heliport Design Advisory Circular, September 30 April 24 , 2004 2012 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:19:28 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., Anthony

Page 9 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 11: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Dryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 10 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 12: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 29-NFPA 418-2014 [ Section No. 2.3.2 ]

2.3.4 UL Publications.Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096.

UL 162, Standard for Foam Equipment and Liquid Concentrates, 1994 with revisions through September 1999.

ANSI/UL 790, Standard Test Methods for Fire Tests of Roof Covering , 2004.

Submitter Information Verification

Submitter Full Name: Michael BeadyOrganization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon Jun 02 14:46:17 EDT 2014

Committee Statement

Committee Statement: Adding new reference per text in FR 13Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., Anthony

Page 11 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 13: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Dryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 12 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 14: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 26-NFPA 418-2014 [ Section No. 2.4 ]

2.4 References for Extracts in Mandatory Sections. (Reserved)NFPA 101 ® , Life Safety Code ® , 2015 edition.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Fri May 16 17:51:15 EDT 2014

Committee Statement

Committee Statement: New extracts added.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.

Page 13 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 15: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 14 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 16: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 3-NFPA 418-2014 [ Section No. 4.2.2 ]

4.2.2The design of the heliport, including all the aeronautical components, shall be in accordance with FAA AC 150/5390-2B 2C , Heliport Design Advisory Circular.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:25:03 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.

Page 15 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 17: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 16 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 18: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 4-NFPA 418-2014 [ Section No. 4.3.2 ]

4.3.2Oxygen and other medical gases shall be stored and used in accordance with Section 9.4 of NFPA 99. , Standard for Health Care Facilities .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:30:21 EDT 2014

Committee Statement

Committee Statement:

Updated reference title. Removed incorrect reference to specific section.

Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, Edward

Page 17 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 19: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Rosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 18 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 20: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 5-NFPA 418-2014 [ Section No. 4.3.3 ]

4.3.3Aboveground flammable liquid storage tanks, compressed gas storage tanks, fuel storage tanks, and liquefied gas storage tanks shall be laterally located at least 50 ft (15.2 m) from the edge of the FATO area as defined in FAA AC 150/5390-2B 2C , Heliport Design Advisory Circular.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:31:45 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.

Page 19 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 21: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 20 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 22: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 12-NFPA 418-2014 [ Section No. 4.7.2 ]

4.7.2Fueling equipment shall be located a minimum of 25 ft (7.6 m) from hangars and fixed fire protection equipment.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Wed May 14 10:12:26 EDT 2014

Committee Statement

Committee Statement:

The requirement is intended to specify a minimum distance. Equipment located distances greater than 25 feet from hangars and fixed fire protection equipment should also be considered as meeting the requirement.

Response Message:Public Input No. 9-NFPA 418-2013 [Section No. 4.7.2]

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative All

Page 21 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 23: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Behnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 22 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 24: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 6-NFPA 418-2014 [ Section No. 4.7.3 ]

4.7.3Fuel servicing equipment shall be designed to not penetrate the FATO and safety area obstruction clearance requirements in FAA AC 150/5390-2B 2C , Heliport Design Advisory Circular.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:32:14 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, Edward

Page 23 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 25: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Rosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 24 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 26: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 19-NFPA 418-2014 [ New Section after 5.4.1 ]

5.4.1.1*A material that complies with any of the following shall be considered a noncombustible material:

(1)

(2) A material that is reported as passing ASTM E136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C

(3) A material that is reported as complying with the pass/fail criteria of ASTM E136 when tested in accordance with the test method and procedure in ASTM E2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 Degrees C

[ 101, 2015]

Supplemental Information

File Name Description418_FR19_Annex_edited.docx

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Wed May 14 15:46:46 EDT 2014

Committee Statement

Committee Statement:

The extracted text provides a definition of "noncombustible" material, which can be applied to rooftop landing pad materials and coatings.

Response Message:

Ballot Results

This item has passed ballot

* A material that, in the form in which it is used and under the conditions anticipated, will not ignite, burn, support combustion, or release flammable vapors when subjected to fire or heat

Page 25 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 27: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 26 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 28: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

A.5.4.1.1 The provisions of 5.4.1.1 do not require inherently noncombustible materials to be tested in order to be classified as noncombustible materials. [101, 2012] A.5.4.1.1(1) Examples of such materials include steel, concrete, masonry, and glass. [101, 2012]

Page 29: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 13-NFPA 418-2014 [ Section No. 5.4.2 ]

5.4.2The contiguous building roof covering within 50 ft (15.2 m) of the landing pad edge shall have a Class A fire resistance rating for exterior fire exposure, and shall be tested according to FM 4470, Approval for Class 1 Roof Covers; ANSI/UL 790, Standard Test Methods for Fire Tests of Roof Covering ; or ASTM E108, Standard Test Methods for Fire Tests of Roof Coverings .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Wed May 14 10:39:59 EDT 2014

Committee Statement

Committee Statement:

Section 5.4.2 contains a requirement that is vague and not specific. The revised wording comes from NFPA 5000 38.2.1.1.

ResponseMessage:Public Input No. 8-NFPA 418-2013 [Section No. 5.4.2]

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Page 27 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 30: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 28 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 31: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 25-NFPA 418-2014 [ Sections 5.7, 5.8, 5.9, 5.10 ]

5.7 Fire Protection.A foam fire-extinguishing system with either a fixed discharge outlet(s) in accordance with 5.7.3 or a hose line(s) in accordance with 5.7.4 shall be designed and installed to protect the rooftop landing pad, unless otherwise permitted by the following:

A foam fire-extinguishing system shall not be required for heliports located on open parking structures or buildings that are not normally occupied.

For H-1 heliports, two portable foam extinguishers, each having a rating of 20-A:160-B, shall be permitted to be used to satisfy the requirement of Section 5.7 .

5.7.1 General.A foam fire-extinguishing system with either a fixed discharge outlet(s) in accordance with 5.7.2 5.7.25.7.3 or a hose line(s) in accordance with 5.7.3 5.7.35.7.4 shall be designed and installed to protect the rooftop landing pad, unless otherwise permitted by the following:

(1) A foam fire-extinguishing system shall not be required for heliports located on open parking structures or buildings that are not normally occupied.

(2) For H-1 heliports, two portable foam extinguishers, each having a rating of 20-A:160-B, shall be permitted to be used to satisfy the requirement of Section 5.7.1 5.7.15.7 .

5.7.1.1Where trained personnel are not available, fixed fire protection outlet(s) shall beprovided.5.7.1.2*The foam discharge rate for the fire-extinguishing system shall be 0.10 gpm/ft2 (4.1 L/min·m2) for aqueous film forming foam (AFFF). 5.7.1.3Where freezing is possible, freeze protection shall be provided.5.7.1.4The foam components shall be installed in an area of the heliport and shall not penetrate the approach takeoff surface, transitional surfaces, and safety area as defined in FAA AC 150/5390-2B 150/5390-2C , Heliport Design Advisory Circular.5.7.2Where freezing is possible, freeze protection shall be provided.5.7.3The foam components shall be installed in an area of the heliport and shall not penetrate the approach takeoff surface, transitional surfaces, and safety area as defined in FAA AC 150/5390-2B , Heliport Design Advisory Circular .5.7.2Where trained personnel are not available, fixed fire protection outlet(s) shall beprovided.5.7.3*The foam discharge rate for the fire-extinguishing system shall be 0.10 gpm/ft 2

(4.1 L/min·m 2 ) for aqueous film forming foam (AFFF).5.7.2 Fixed Foam Fire-Extinguishing Systems.

Page 29 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 32: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

5.7.2.1Fixed foam fire-extinguishing systems shall be designed and installed in accordance with NFPA 11 , NFPA 16 , or an equivalent standard, as appropriate,except as modified by this chapter.5.7.2.2*The area of application of foam discharge for fixed discharge outlet systems shall be the entire rooftop landing pad. 5.7.2.3The duration of foam discharge for the fixed discharge outlet system shall be 5 10minutes.5.7.3.2.1The supply calculation method shall be performed in accordance with Chapter 6 of NFPA 409 , Standard on Aircraft Hangars . 5.7.2.4A fixed nozzle discharge outlet system shall be one of the following: fixed stationarynozzles around the perimeter, two or more oscillating monitors/nozzles, or in-deck nozzles within the perimeter of the deck.5.7.2.5Where fixed foam systems utilizing fixed deck nozzles or oscillating foam turrets, or both, are installed, system components shall be listed or approved.5.7.2.6 Activation of Systems.5.7.2.6.1*The fixed discharge outlet system shall be activated manually.5.7.2.6.2*The activation shall be by manual pull stations located at each egress point from the rooftop landing pad. An additional manual pull station Manual actuation stations shall be located at each egress point from the rooftop landing pad and atan approved location inside the building from which the rooftop landing pad can be viewed. 5.7.2.6.3Manual foam activation stations shall be clearly labeled or identified as to the purpose and hazard protected.5.7.2.6.4Where buildings are provided with a fire alarm system, the activation of the foam system shall be monitored by the building fire alarm system in accordance with NFPA 72. , National Fire Alarm and Signaling Code .5.7.2.6.5An approved manual control for foam system shutdown shall be accessible at all times, including the time of fire and system operation.5.7.3 Manual Fire-Fighting Equipment.5.7.3.1*The area of application of foam discharge for hose line systems shall be the practical critical fire area for the category of the helicopter landing facility inaccordance with Table 5.7.3.1 Table 5.7.3.1Table 5.7.4.1 .Table 5.7.3.1 Practical Critical Fire Areas for Hose Line Systems Only

Heliport Category

Helicopter Overall Length*

Practical Critical Fire Area

ft2 m2

H-1 Less than 50 ft (15.2 m) 375 34.8H-2 50 ft (15.2 m) up to but not including 80 ft (24.4 m) 840 78.0H-3 80 ft (24.4 m) up to but not including 120 ft (36.6 m) 1440 133.8

*Helicopter length, including the tail boom and the rotors.

Page 30 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 33: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

5.7.3.2The duration of foam discharge for the hose line systems shall be 2 minutes.5.7.4.3The supply calculation method shall be performed in accordance with Chapter 6 of NFPA 409 , Standard on Aircraft Hangars .5.7.3.3A fixed nozzle discharge outlet system shall be one of the following: fixed stationary nozzles around the perimeter, two or more oscillating monitors/nozzles, or in-deck nozzles within the perimeter of the deck.5.7.4 Supplementary Protection.Standpipes and hose stations, if used, shall be installed in accordance with NFPA 14.5.7.5 Water Supply.The water supply for the foam system shall be from a source approved by the AHJ.5.7.5.1The water supply for the foam system shall be from a source approved by the AHJ.5.7.5.2Fire pumps, if used, shall be installed in accordance with NFPA 20. , Standard for the Installation of Stationary Pumps for Fire Protection .5.7.4.2Standpipes and hose stations, if used, shall be installed in accordance with NFPA 14 , Standard for the Installation of Standpipe and Hose Systems .5.7.6.3Where freezing is possible, freeze protection shall be provided.5.7.7The foam components shall be installed in an area of the heliport and shall not penetrate the approach takeoff surface, transitional surfaces, and safety area as defined in FAA AC 150/5390-2B , Heliport Design Advisory Circular .5.7.6 Foam Concentrate Supply.At facilities where there is more than one rooftop landing pad, the supply of foam available shall be sufficient to cover an incident on at least one of the pads.5.7.6.1At facilities where there is more than one rooftop landing pad, the The supply of foam available concentrate shall be sufficient to cover an incident on at least one of the pads supply the largest system .5.7.6.2The foam concentrate for the fixed system or manual fire-fighting equipment shall be listed in accordance with UL 162, Standard for Foam Equipment and LiquidConcentrates, and shall be on the qualified products list for MIL-F-24385, or equivalent.5.7.7 Fire Alarm.A means of communication shall be provided from the roof area to notify the fire department of emergencies.5.7.7.1A means of communication shall be provided from the roof area to notify the fire department of emergencies.5.7.7.2Where buildings are provided with a fire alarm system, a manual pull station shall be provided for each designated means of egress from the roof. (See 5.5.1.)5.7.8 Acceptance Testing. 5.7.8.1 Acceptance Testing. Fixed Foam Fire-Extinguishing Systems.The fixed foam discharge outlet system shall be tested with foam to determine the coverage of the rooftop landing pad.

Page 31 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 34: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

5.7.8.1.1The fixed foam discharge outlet system shall be tested with foam to determine the coverage of the rooftop landing pad.5.7.8.1.1The system shall cover 95 percent of the rooftop landing pad during the test.5.7.8.1.2The access points for firefighting and for egress shall be covered.5.7.8.2 Manual Fire-Fighting Equipment.The hose hand-lines shall be flow tested to demonstrate that the design objectives are met.5.7.9 Inspection, Testing, and Maintenance.Fire protection systems installed in accordance with NFPA 14 or NFPA 16 shall be inspected, tested, and maintained in accordance with NFPA 25 .5.7.9.1Fire protection systems installed in accordance with NFPA 14 or NFPA 16 shall be inspected, tested, and maintained in accordance with NFPA 25 .5.7.9.2Foam systems installed in accordance with NFPA 11 shall be maintained in accordance with NFPA 11 .5.7.6Where fixed foam systems utilizing fixed deck nozzles or oscillating foam turrets, or both, are installed, system components shall be listed or approved.5.7.7The foam concentrate for the fixed system or manual fire-fighting equipment shall be listed in accordance with UL 162, Standard for Foam Equipment and LiquidConcentrates , and shall be on the qualified products list for MIL-F-24385, orequivalent.5.7.2.6 Activation of Systems. 5.7.2.6.1*The fixed discharge outlet system shall be activated manually. 5.7.2.6.2*The activation shall be by manual pull stations located at each egress point from the rooftop landing pad. An additional manual pull station Manual actuation stations shall be located at each egress point from the rooftop landing pad and at an approved location inside the building from which the rooftop landing pad can be viewed. 5.7.2.6.3Manual foam activation stations shall be clearly labeled or identified as to the purpose and hazard protected.5.7.2.6.4Where buildings are provided with a fire alarm system, the activation of the foam system shall be monitored by the building fire alarm system in accordance withNFPA 72. , National Fire Alarm and Signaling Code .5.7.2.6.5An approved manual control for foam system shutdown shall be accessible at all times, including the time of fire and system operation.5.7.7 Fire Alarm.A means of communication shall be provided from the roof area to notify the fire department of emergencies.5.7.7.1A means of communication shall be provided from the roof area to notify the fire department of emergencies.5.7.7.2

Page 32 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 35: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Where buildings are provided with a fire alarm system, a manual pull station shall be provided for each designated means of egress from the roof. (See 5.5.1.)5.7.8 Acceptance Testing. 5.7.8.1 Acceptance Testing. Fixed Foam Fire-Extinguishing Systems.The fixed foam discharge outlet system shall be tested with foam to determine the coverage of the rooftop landing pad.5.7.8.1.1The fixed foam discharge outlet system shall be tested with foam to determine the coverage of the rooftop landing pad.5.7.8.1.1The system shall cover 95 percent of the rooftop landing pad during the test.5.7.8.1.2The access points for firefighting and for egress shall be covered.5.7.8.2 Manual Fire-Fighting Equipment.The hose hand-lines shall be flow tested to demonstrate that the design objectives are met.

Supplemental Information

File Name Description418_FR25_Reorganized_5.7_edited.docx

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Fri May 16 17:30:48 EDT 2014

Committee Statement

Page 33 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 36: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Committee Statement:

Sections 5.7, 5.8, 5.9, and 5.10 were reorganized and combined into a single 5.7 to provide clarity.

5.7.1.4 (previous 5.7.6): Update reference.

5.7.2.1 (new): The standard should identify an appropriate installation standard for fixed foam systems.

5.7.2.3 (previous 5.7.3.2): The foam discharge duration was revised to be consistent with NFPA 16 and NFPA 409. There are operational and first-responder issues that would benefit from the increased duration. Rooftop heliports are not easily accessible to first-responders within a five-minute time frame.

previous 5.7.3.2.1 (deleted): Chapter 6 of NFPA 409 no longer provides guidance on the supply calculation method.

5.7.2.6.2 (previous 5.8.2): Combined into a single sentence to meet the Manual of Style.

5.7.2.6.3 (new): It is important that personnel on the rooftop are able to locate and identify the correct activation station during an emergency.

5.7.2.6.4 (new): The new text provides additional guidance on the location of the foam system shutoff.

previous 5.7.4.3 (deleted): Chapter 6 of NFPA 409 no longer provides guidance on the supply calculation method.

5.7.6.1 (previous 5.7.7: The intent is to provide sufficient foam concentrate for the largest system, based on the supply calculation method. Multiple pads may be covered by a single system or individual systems. The previous terminology, which tied the requirement to "pads", did not accomplish this intent.

5.7.9 (new): Foam systems installed in accordance with NFPA 11 are not covered by NFPA 25.

ResponseMessage:Public Input No. 11-NFPA 418-2013 [Section No. 5.7.7]

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned7 Affirmative All1 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, James

Page 34 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 37: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Kaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Younis, Steven E.

Affirmative with CommentSyms, Raymond A. 5.7.2.6.5 An approved manual control for foam system shutdown shall be accessible at all times, including the time of fire and system operation. COMMENTS: This needs to beexpanded with requirements for the shutoff being co-located with activation controls. A quick shutoff is needed in the event of an inadvertent discharge, need for rescue persons to reach the helicopter, fire under control to preserve foam or at end of foam duration to shut off foam to prevent the foam blanket from being washed away by the water only discharge. This currently allows for the shutoff to be isolated from the heliport attendant as long as it is accessible which needs to be spelled out.

Page 35 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 38: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

SL Note: Substantiations are provided in red text for ease of reference. These should not be included in the First Draft.

************

5.7 Fire Protection. 5.7.1 General. A foam fire-extinguishing system with either a fixed discharge outlet(s) in accordance with 5.7.3 5.7.2 or a hose line(s) in accordance with 5.7.4 5.7.3 shall be designed and installed to protect the rooftop landing pad, unless otherwise permitted by the following:

(1) A foam fire-extinguishing system shall not be required for heliports located on open parking structures or buildings that are not normally occupied.

(2) For H-1 heliports, two portable foam extinguishers, each having a rating of 20-A:160-B, shall be permitted to be used to satisfy the requirement of Section 5.7 5.7.1.

5.7.1 5.7.1.1 Where trained personnel are not available, fixed fire protection outlet(s) shall be provided. 5.7.2 5.7.1.2* The foam discharge rate for the fire-extinguishing system shall be 0.10 gpm/ft2 (4.1 L/min·m2) for aqueous film forming foam (AFFF).

A.5.7.2 A.5.7.1.2 Currently, the qualified products listed for MIL-F-24385 do not contain any fluoroprotein or protein foam products.

5.7.5.3 5.7.1.3 Where freezing is possible, freeze protection shall be provided. 5.7.6 5.7.1.4 The foam components shall be installed in an area of the heliport and shall not penetrate the approach takeoff surface, transitional surfaces, and safety area as defined in FAAAC 150/5390-2B 150/5390-2C, Heliport Design Advisory Circular.

SUBSTANTIATION for 5.7.1.4: Update reference. 5.7.3 5.7.2 Fixed Foam Fire-Extinguishing Systems. 5.7.2.1 Fixed foam fire-extinguishing systems shall be designed and installed in accordance with NFPA 11, NFPA 16, or an equivalent standard, as appropriate, except as modified by this chapter.

SUBSTANTIATION for 5.7.2.1: The standard should identify an appropriate installation standard for fixed foam systems.

5.7.3.1 5.7.2.2* The area of application of foam discharge for fixed discharge outlet systems shall be the entire rooftop landing pad.

A.5.7.3.1 A.5.7.2.2 Consideration should be given to the environmental conditions of the rooftop landing pad in the design of the system, including wind, exhaust fans, and other factors that affect the distribution of the foam on the rooftop landing pad.

Page 39: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

5.7.3.2 5.7.2.3 The duration of foam discharge for the fixed discharge outlet system shall be 5 10 minutes.

SUBSTANTIATION for 5.7.2.3: The foam discharge duration was revised to be consistent with NFPA 16 and NFPA 409. There are operational and first-responder issues that would benefit from the increased duration. Rooftop heliports are not easily accessible to first-responders within a five-minute time frame.

5.7.3.2.1 The supply calculation method shall be performed in accordance with Chapter 6 of NFPA 409, Standard on Aircraft Hangars.

SUBSTANTIATION for old 5.7.3.2.1: Chapter 6 of NFPA 409 no longer provides guidance on the supply calculation method.

5.7.4.4 5.7.2.4 A fixed nozzle discharge outlet system shall be one of the following: fixed stationary nozzles around the perimeter, two or more oscillating monitors/nozzles, or in-deck nozzles within the perimeter of the deck. 5.7.8 5.7.2.5 Where fixed foam systems utilizing fixed deck nozzles or oscillating foam turrets, or both, are installed, system components shall be listed or approved. 5.8 5.7.2.6 Activation of Systems. 5.8.1 5.7.2.6.1* The fixed discharge outlet system shall be activated manually.

A.5.8.1 A.5.7.2.6.1 Training on the operation of the fire protection system should be in accordance with Annex B.

5.8.2 5.7.2.6.2* The activation shall be by manual pull stations located at each egress point from the rooftop landing pad. An additional manual pull station Manual actuation stations shall be located at each egress point from the rooftop landing pad and at an approved location inside the building from which the rooftop landing pad can be viewed.

SUBSTANTIATION for 5.7.2.6.2: Combined into a single sentence to meet the Manual of Style.

A.5.8.2 A.5.7.2.6.2 It is acceptable for the rooftop landing pad to be viewed using video or other acceptable means.

5.7.2.6.3 Manual foam activation stations shall be clearly labeled or identified as to the purpose and hazard protected.

SUBSTANTIATION for 5.7.2.6.3: It is important that personnel on the rooftop are able to locate and identify the correct activation station during an emergency.

5.8.3 5.7.2.6.3 Where buildings are provided with a fire alarm system, the activation of the foam system shall be monitored by the building fire alarm system in accordance with NFPA 72, National Fire Alarm and Signaling Code. 5.7.2.6.4 An approved manual control for foam system shutdown shall be accessible at all times, including the time of fire and system operation.

Page 40: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

SUBSTANTIATION for 5.7.2.6.4: The new text provides additional guidance on the location of the foam system shutoff.

5.7.4 5.7.3 Manual Fire-Fighting Equipment. 5.7.4.1 5.7.3.1* The area of application of foam discharge for hose line systems shall be the practical critical fire area for the category of the helicopter landing facility in accordance with Table 5.7.4.1 5.7.3.1. Table 5.7.4.1 5.7.3.1 Practical Critical Fire Areas for Hose Line Systems Only

Heliport Category Helicopter Overall Length*

Practical Critical Fire Area

ft2 m2

H-1 Less than 50 ft (15.2 m) 375 34.8

H-2 50 ft (15.2 m) up to but not including 80 ft (24.4 m)

840 78.0

H-3 80 ft (24.4 m) up to but not including 120 ft (36.6 m)

1440 133.8

*Helicopter length, including the tail boom and the rotors.

A.5.7.4.1 A.5.7.3.1 The area of application and the duration where using a hose line system is reduced because foam is applied efficiently and directly on the fire by trained personnel.

5.7.4.2 5.7.3.2 The duration of foam discharge for the hose line systems shall be 2 minutes. 5.7.4.3 The supply calculation method shall be performed in accordance with Chapter 6 of NFPA 409, Standard on Aircraft Hangars.

SUBSTANTIATION for old 5.7.4.3: Chapter 6 of NFPA 409 no longer provides guidance on the supply calculation method.

5.7.5.2 5.7.4 Supplementary Protection. Standpipes and hose stations, if used, shall be installed in accordance with NFPA 14, Standard for the Installation of Standpipe and Hose Systems. 5.7.5 Water Supply. 5.7.5.1 The water supply for the foam system shall be from a source approved by the AHJ. 5.7.5.1 5.7.5.2 Fire pumps, if used, shall be installed in accordance with NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection. 5.7.6 Foam Concentrate Supply.

Page 41: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

5.7.7 5.7.6.1 At facilities where there is more than one rooftop landing pad, the The supply of foam available concentrate shall be sufficient to cover an incident on at least one of the pads supply the largest system.

SUBSTANTIATION for 5.7.6.1: The intent is to provide sufficient foam concentrate for the largest system, based on the supply calculation method. Multiple pads may be covered by a single system or individual systems. The previous terminology, which tied the requirement to "pads", did not accomplish this intent.

5.7.9 5.7.6.2 The foam concentrate for the fixed system or manual firefighting equipment shall be listed in accordance with UL 162, Standard for Foam Equipment and Liquid Concentrates, and shall be on the qualified products list for MIL-F-24385, or equivalent. 5.9 5.7.7 Fire Alarm. 5.7.7.1 A means of communication shall be provided from the roof area to notify the fire department of emergencies. 5.9.1 5.7.7.2 Where buildings are provided with a fire alarm system, a manual pull station shall be provided for each designated means of egress from the roof. (See 5.5.1.) 5.10 Testing. 5.10.1 5.7.8 Acceptance Testing. 5.10.1.1 5.7.8.1 Fixed Foam Fire-Extinguishing Systems. The fixed foam discharge outlet system shall be tested with foam to determine the coverage of the rooftop landing pad. 5.10.1.1.1 5.7.8.1.1 The system shall cover 95 percent of the rooftop landing pad during the test. 5.10.1.1.2 5.7.8.1.2 The access points for firefighting and for egress shall be covered. 5.10.1.2 5.7.8.2 Manual Fire-Fighting Equipment. The hose hand-lines shall be flow tested to demonstrate that the design objectives are met. 5.10.2 5.7.9 Inspection, Testing, and Maintenance. 5.7.9.1 All water-based fire Fire protection systems installed in accordance with NFPA 14 or NFPA 16 shall be inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. 5.7.9.2 Foam systems installed in accordance with NFPA 11 shall be maintained in accordance with NFPA 11.

SUBSTANTIATION for 5.7.9: Foam systems installed in accordance with NFPA 11 are not covered by NFPA 25.

Page 42: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 15-NFPA 418-2014 [ Section No. 10.1 ]

10.1 Emergency Response Plan.An approved emergency response plan shall be developed for each heliport.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Wed May 14 13:54:34 EDT 2014

Committee Statement

Committee Statement:

The emergency response plan for a heliport should be reviewed and approved by the AHJ.

ResponseMessage:Public Input No. 7-NFPA 418-2013 [Section No. 10.1]

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.

Page 36 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 43: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 37 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 44: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 8-NFPA 418-2014 [ Section No. A.4.2 ]

A.4.2FAA AC 150/5390-2B 2C , Heliport Design Advisory Circular, contains design and construction information on heliports. This advisory circular provides for adequate clearance between operating aircraft and buildings or structures located at the heliport. The FAA advisory circular should be consulted to ensure that adequate safe practice and facilities are maintained.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 17:54:00 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., Anthony

Page 38 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 45: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Dryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 39 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 46: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 11-NFPA 418-2014 [ Section No. C.2.1 ]

C.2.1The calculation method is supported by research and experimental work done mainly at the United States Federal Aviation Administration (FAA) Technical Center. It was developed by the Rescue and Firefighting Panel II (RFFP II), a group of international experts in the field, convened by the International Civil Aviation Organization, in Montreal, Canada, circa 1970 in 1972 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 18:11:17 EDT 2014

Committee Statement

Committee Statement: Corrected date of RFFP II.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., Anthony

Page 40 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 47: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Dryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 41 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 48: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 9-NFPA 418-2014 [ Section No. D.1.2.1 ]

D.1.2.1 FAA Publications.Federal Aviation Administration, Department of Transportation, Distribution Unit, M-494.3, Washington, DC 20590.

FAA AC 150/5390-2B 2C , Heliport Design Advisory Circular, January 20 , 1994 April 24, 2012 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 18:02:04 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., Anthony

Page 42 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 49: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Dryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 43 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 50: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 10-NFPA 418-2014 [ Section No. D.1.2.2 ]

D.1.2.2 ICAO Publications.International Civil Aviation Organization, Montreal, Canada.

“ Rescue and Firefighting Panel, II ( Report of the Second Meeting," Document 9036 RFFP II, Montreal, June 5–16, 1972. ), Research and experimental work, circa 1970 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Mon May 12 18:06:04 EDT 2014

Committee Statement

Committee Statement: Update reference.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., Anthony

Page 44 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 51: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Dryden, Steve C.Orazine, EdwardRosenberger, Mark S.Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 45 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 52: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

First Revision No. 27-NFPA 418-2014 [ Section No. D.3 ]

D.3 References for Extracts in Informational Sections. (Reserved)NFPA 101 ® , Life Safety Code ® , 2015 edition.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]Organization: [ Not Specified ]Street Address: City:State: Zip: Submittal Date: Fri May 16 17:56:29 EDT 2014

Committee Statement

Committee Statement: New extracts added.Response Message:

Ballot Results

This item has passed ballot

14 Eligible Voters6 Not Returned8 Affirmative All0 Affirmative with Comments0 Negative with Comments 0 Abstention

Not ReturnedAaron, Michael E.Buehler, Lawrence J.Gammon, JamesKaisler, Michael H.Kays, MarkSmith, Dudley G.

Affirmative AllBehnke, Joseph A.Colletto, Jr., AnthonyDryden, Steve C.Orazine, EdwardRosenberger, Mark S.

Page 46 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...

Page 53: M E M O R A N D U M - NFPA · M E M O R A N D U M To: NFPA Technical Committee on Helicopter Facilities From: Elena Carroll, Administrator, Technical Projects Date: July 1, 2014 Subject:

Slater, Jr., Donald J.Syms, Raymond A.Younis, Steven E.

Page 47 of 47National Fire Protection Association Report

7/1/2014http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=%28%28Com...