9
KYIV AREA 2016 PROJECT OF CONSTRUCTION OF THE AUTOMOTIVE ROAD KALYNIVKA-BYSHIV-YABLUNIVKA-PEREVIZ-KALYNIVKA

KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016

PROJECT OF CONSTRUCTION OF THE AUTOMOTIVE ROAD

KALYNIVKA-BYSHIV-YABLUNIVKA-PEREVIZ-KALYNIVKA

Page 2: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016

The main objectives of the project "Construction of the Kalynivka-Byshiv-Yablunivka-Pereviz-Kalynivka motorway project, which will connect two motorroads M-06 Kiev-Chop and M-05 Kiev-Odessa." The implementation of thisproject is of great social significance and will allow to fully realize the economicpotential of the region, namely:

- reduction of the distance of transit transport from west to south to Odesa by 50 km; -reduction of transit traffic along the Great Ring Road of Kyivan alternative route with possible free travel, in the event of payment of fares for the new; -Increasing the flow of taxes from taxes to the budget by creating new infrastructure objects; -Provide proper transport links to residents of. Plesetskaya and Pereviz were taken (about 5 thousand) with the district center, as well as free traffic for the needs of both Vasylkivsky and Makarovsky districts; - the construction of a bridge in Kalynivka village of Vasylkivskyi district through the railway will reduce the emergency situation, which at the moment exists on the railway crossing,

Page 3: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016

The length of the road on the existing road, km 51

Road category 3

Actual traffic intensity >1000-3000

The greatest intensity of movement >2000-6000

Estimated speed, km/h 100

Number of bands (in both directions) 2

Bandwidth, m 3,75

Width of the separate strip, m 1

Width of the boundary strengthening band on a

separate lane, m

0,5

Width of the boundary strengthening band on the

side, m

0,5

Width of the earthenware, m 12

Radius curve at the turn, m 600

The largest longitudinal slope, permille 50

The main indicators of the highway Kalynivka-Kalynivka

Page 4: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016Investment projects for the construction of road service complexes for

infrastructure development along the Kalynivka-Kalynivka road

1.

Contemporarygas station

2. Stations of

maintenance

of motor

transport.

The gas station will comply all

requirements: the second category of capacity (capacity of tanks and refills

per hour) and type "B" on technological solutions (underground closed tanks).

Approximate capacity of gas stations sales is approximately 4600 tons / year.

The total area of the maintenance

station will be up to 2000 square m2 (including all buildings and a

platform for trucks and cars).

Page 5: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016

3. Family

recreation

areas.

The parkland will include:

car parking, a pedestrian

zone with wooden benches

and alcoves, cycle tracks

and Wi-Fi zones.

4. Hotels,

motels,

public

catering

establishme

nts and

shopping

centers.

The complex will consist of

shopping and entertainment

areas: clothing area, grocery

supermarket and a number of

public catering establishments, a

concert hall, a children's

entertainment center with a

piano playpen and a children's

room, a laser shooting gallery, a

4D cinema, a billiard club, a

bowling alley, a skeleton and a

hotel for 100 rooms

Page 6: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016

5. Modern

logistics

center

Logistics Center, which will be a

logistics complex of class A in

Vasilkovsky district. The center will

include warehouse and office premises

with a total area of 20,000 sq. M, open

storage areas for goods with a total

area of 7.8 hectares with the possibility

of providing a complex of logistic

services.

6. Modern

auto centerThe modern auto centre will be located on

the territory of approximately 0.95 hectares,

with a total area of 3000 m2. It will include a

modern showroom of 440 m2, which can

accommodate up to 12 exhibition cars. The

inventory of spare parts is more than 350

m2, which will contain about 6000 items.

The total area of the service station is 1000

m2, the rest of the area will occupy a cozy

cafe with Wi-Fi zone, offices and office

space.

Page 7: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016Approximate placement of investment projects and road service

complexes along the Kalynivka-Kalynivka road

Exploration of road

service objects and

investment projects

Page 8: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016The total length of the Kalynivka-Byschiv-Yablunivka-Pereviz-Kalynivka road

51 кm

Estimated cost of design works stage П= 300 000 UAH.РП= 3 000 000 UAH.

Estimated cost of construction work 1 500 000 000 UAH

Estimated project implementation time 12 months

DEPARTMENT OF

CAPITAL REPAIR

Page 9: KYIV AREA 2016 - mofcom.gov.cnimages.mofcom.gov.cn/ua/201907/20190729222313497.pdf · 2019-07-29 · KYIV AREA 2016 3. Family recreation areas. The parkland will include: car parking,

KYIV AREA 2016

www.mtu.gov.ua

Address and contact details of the presentation